27009-BRADLEY LAKE – 3-PHASE POWER LONG LEAD EQUIPMENT - Drawing.pdf

PDF 17 MB Posted

Attached to
BRADLEY LAKE – 3-PHASE POWER LONG LEAD EQUIPMENT
Solicitation number
27009
Issued by
Kenai Peninsula Borough, Alaska

About this file

This is a technical drawing document for the Alaska Energy Authority (AEA) Bradley Lake Hydroelectric Project, specifically detailing the three-phase powerline infrastructure. The drawing set includes staking sheets, plan views, and elevation profiles for the Bradley Lake 3-Phase Powerline project, with primary design engineers Peter M. Blake and Christopher T. Davis. The drawings depict the complete powerline layout from the hydroelectric facility through various Alaska locations including Juneau, St. Matthew Island, Kodiak, and other communities. The project incorporates overhead conductors, underground primary conductors, padmount transformers, junction boxes, power poles, handholes, reclosers, and communication cables. The drawings were initially issued for construction on May 6, 2026, with a revision issued on July 3, 2026 that modified the service to TR4/5 (transformer sections 4 and 5). The design includes four road crossing points with specified clearances ranging from 26 to 41 feet above road surfaces, along with detailed specifications for underground conduit systems including 24-inch, 48-inch, and 60-inch corrugated metal pipes at various locations.

The document provides comprehensive technical specifications including station-to-station layout details, elevation profiles spanning from approximately 0 to 1,500 feet of elevation change, and precise grading information denoted throughout the drawings. The engineering firm responsible for the design is EPS Inc., located in Anchorage, Alaska. The drawings reference multiple related plan sheets (BLP-P-08 through BLP-P-14) and detail sheets covering overhead and underground installations, guy anchor specifications, and telecommunications infrastructure. The revision history indicates coordination between design and construction phases, with approval and review signatures from Christopher T. Davis (EE-10642ER) and project management oversight documented with engineering stamps and work order number AECC738.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUNEAU

ST. MATTHEW

ISLAND

KODIAK

PRIBILOF

ISLANDS

ISLAND

NUNIVAK

BETHEL

ANCHORAGE

BARROW

NOMEST. LAWRENCE

ISLAND

TANANA

KOTZEBUE

FAIRBANKS

McGRATH

BRADLEY LAKEHOMER

ALASKA

ENERGY AUTHORITY

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

AECC738

05-06-2026

ALASKA

ENERGY AUTHORITY

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

07-03-2026

C

CC

C

C

CC

CC

CC

C C

C

C

C

C

C

C

C C C C C C C C C

CC

C

CCC

T T T

T T

T T

24"CMP

48"CMP

"C

M P

60"CMP

C C

CCCCC

C

C

C C

C C

C

C

C

C C

C

C C

C

C

C C

C C

C

C

C

C C

C

C

C

C

C C

C

C

C C C

C

C

C C

C

C

C

C C C C C

C C C C

JB08

JB09

JB10

C

JB11

JB12

JB13

JB14

C

C C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

ALASKA

ENERGY AUTHORITY

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

AutoCAD SHX Text

WEB: WWW.EPSINC.COM

AutoCAD SHX Text

REF DWG(S):

AutoCAD SHX Text

OF

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DRAWING NO.:

AutoCAD SHX Text

DRAWING NAME:

AutoCAD SHX Text

ENG. STAMP

AutoCAD SHX Text

REVIEWED (MGR/SUPV)/DATE

AutoCAD SHX Text W.O. #:

AutoCAD SHX Text

DWN BY/DATE

AutoCAD SHX Text

APPROVED (DIRECTOR)/DATE

AutoCAD SHX Text

ANCHORAGE, AK 99503

AutoCAD SHX Text

NO.

AutoCAD SHX Text

PROJECT:

AutoCAD SHX Text

DESIGNER/PROJECT ENGINEER:

AutoCAD SHX Text

DESIGN/CONSTRUCTION/ASBUILT REVISION

AutoCAD SHX Text

3305 ARCTIC BLVD, SUITE 201

AutoCAD SHX Text

AECC: 738

AutoCAD SHX Text

TEL: (907) 522-1953

AutoCAD SHX Text

BRADLEY LAKE 3-PHASE POWERLINE

AutoCAD SHX Text

PETER M. BLAKE/CHRISTOPHER T. DAVIS

AutoCAD SHX Text 25-0305

AutoCAD SHX Text

AEA BRADLEY LAKE HYDROELECTRIC PROJECT

AutoCAD SHX Text

BRADLEY LAKE 3-PHASE POWERLINE

AutoCAD SHX Text

STAKING SHEET

AutoCAD SHX Text

BLP-G-06

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

EDS/05-06-2026

AutoCAD SHX Text

CTD/05-06-2026

AutoCAD SHX Text

AutoCAD SHX Text

REVISED TR4/5 SERVICE

AutoCAD SHX Text

EDS/06-22-2026

AutoCAD SHX Text

CTD/07-03-2026

AutoCAD SHX Text

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C C C C C

C C

C C

C C

C C

C C

C C

C C

C C C

C

C

C

C C C C C C

C C

C

C

C

C

C

C C

T T TC

C

C

C C

CC

C

C C

C C

C C

C C

C C

C C

C C

C

CCCCC

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

ALASKA

ENERGY AUTHORITY

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C C

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C

C

C

C

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C C C

C C C

C C

C C

C C C

C

C

C

C

C

C

JB08

C C C C

C C

C C

C C

C C

C

C

C

C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C

C

C

C

C

C

C

C

C C

C C

C

C

C

C

C

C

C

C

C

C

JB09

JB10

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C

C

JB

C

C

C

C

C C

C C

C

C

C

C

C

C

C

C

C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C

C

C

C C

C C C C C C

C

C C

C C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C

JB11

JB12

JB13

JB14

C

C

C

C

C

C

C

C C

C C C C C C

C

C C

C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

12 13

"C

M P

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C

C C

C

C C

C

C

C C

C

C

C

C

C

C C

C

C

C C

C

C

C C C

C

JB14

C

C

C

C

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1710

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

18 19 20 21 22 23 24 25 26 27 28 29 30 31

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

Road Crossing Clearances

Road Crossing STR-STR Min. Clearance Above Road (ft) Cable Type

1 STR12 - STR13 41 Comm cable

2 STR15 - STR16 36 Comm cable

3 STR26 - STR27 37 Comm cable

4 STR63 - STR64 26 Comm cable

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

14 15 16 17 18 19 20 21 22 23 24 25

C C C C C C

C C

C

C C

C C

C

C

C

C C

C

C

C

C

C C C

C C

C C

C

C

C C

C C

C

C C

C

C C C

C C C C C

C

C

C

C

C

C

C C C

C

C C

C C

C

C

C C

C

C

C

C

C

C

C

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

29 30

C

C C

C

C

C

C

CCCC

C

C C

C

C

C

C

C C

C C

C C

C C

C C C

C

C

C

C

C C

C C

C C

C

C

C C

C

C

C

C

C

C C

C

C

C

C

C

C

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

56 57 58 59 60 61 62 63 64 65 66 67 68

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

T T

C C

C

C

C

C

C C

C

C C C

C

C C

C C

C C

C C

C C

C C

C C

C

C

C

C C C

C C

C C C C

C

C

C

C

C C

C C

C C

C C

C

44A

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

88 89 90 91 92 93 94 95 96 97 98 99 10

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

U.G. TRIPLEX

AutoCAD SHX Text

TR5

AutoCAD SHX Text

TR4

AutoCAD SHX Text

60"CMP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WEB: WWW.EPSINC.COM

AutoCAD SHX Text

REF DWG(S):

AutoCAD SHX Text

OF

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DRAWING NO.:

AutoCAD SHX Text

DRAWING NAME:

AutoCAD SHX Text

ENG. STAMP

AutoCAD SHX Text

REVIEWED (MGR/SUPV)/DATE

AutoCAD SHX Text W.O. #:

AutoCAD SHX Text

DWN BY/DATE

AutoCAD SHX Text

APPROVED (DIRECTOR)/DATE

AutoCAD SHX Text

ANCHORAGE, AK 99503

AutoCAD SHX Text

NO.

AutoCAD SHX Text

PROJECT:

AutoCAD SHX Text

DESIGNER/PROJECT ENGINEER:

AutoCAD SHX Text

DESIGN/CONSTRUCTION/ASBUILT REVISION

AutoCAD SHX Text

3305 ARCTIC BLVD, SUITE 201

AutoCAD SHX Text

AECC: 738

AutoCAD SHX Text

TEL: (907) 522-1953

AutoCAD SHX Text

BRADLEY LAKE 3-PHASE POWERLINE

AutoCAD SHX Text

PETER M. BLAKE/CHRISTOPHER T. DAVIS

AutoCAD SHX Text 25-0305

AutoCAD SHX Text

AEA BRADLEY LAKE HYDROELECTRIC PROJECT

AutoCAD SHX Text

BRADLEY LAKE 3-PHASE POWERLINE

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text

BLP-P-09

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

EDS/05-06-2026

AutoCAD SHX Text

CTD/05-06-2026

AutoCAD SHX Text

AutoCAD SHX Text

REVISED SERVICE TO TR4/5.

AutoCAD SHX Text

EDS/06-22-2026

AutoCAD SHX Text

CTD/07-03-2026

AutoCAD SHX Text

SCALE: 1"=100'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FT.

AutoCAD SHX Text

SHEET BLP-P-08

AutoCAD SHX Text

SHEET BLP-P-10

AutoCAD SHX Text Elevation (ft)

AutoCAD SHX Text Elevation (ft)

AutoCAD SHX Text Station

AutoCAD SHX Text Station

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

CONSTRUCTION LEGEND

AutoCAD SHX Text

NEW

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text

CONNECT FUTURE SECONDARY TO ONE SIDE OF EXISTING TRANSFER SWITCH

AutoCAD SHX Text

PROJECT BOUNDARY

AutoCAD SHX Text

PROJECT BOUNDARY

AutoCAD SHX Text

CCCC

C C

C C

C

C

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C C C

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C C

C C

C C

C C

C

CC

C

C

C

C

C

CCCCCCCCCCCCCCC

C C

C

CCC

C C C C C

C C

C C C C C C C C C C C C C C C

C

C

C

C

C C C

C C

C C

C C

C C

C C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C

CCCCC

CCCC

C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C C

C C

C

CC

C C

C C

CCC

C

C C

C C

T T

C C

C C

C C C C

C C

C C C C

C C

C C

C C

C C

C C

C C C C

C C C C C

C

C

C

C

C

C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C C

C C

C C

C C

C

C

C

C

C C

C C

C

C

C C

C C

C C

C C

C

C

C C

C C

C C

C CC C

C C

C C

C C

C C

C C

C

C

C

C

C

CCC

C C

C C

C C

C C

C C

C

C

C

C

C

CCC

C C

C

C

C

C

CCCCCCCCC

CC

C

C

C C

C C

C C

C

C

C

C

CCCCCCC

CC

CC

C

C C

C C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C C C C C C C C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

5'- 0"

"L"

LE

NGTH O

F EXTENSIO

N(S

TA-*E

XT

NOTE 2

8' -0

" M

IN

IM

U

M

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

12"

4" 4"

ALASKA

ENERGY AUTHORITY

12"

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

ENERGY AUTHORITYA

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

ENERGY AUTHORITYA

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

bradleylake_3-ph_general-G-01
bradleylake_3-ph_general-G-01
bradleylake_3-ph_general-G-03
bradleylake_3-ph_general-G-03
bradleylake_3-ph_general-G-04
bradleylake_3-ph_general-G-04
bradleylake_3-ph_general-G-05
bradleylake_3-ph_general-G-05
bradleylake_3-ph_plans-P-01
bradleylake_3-ph_plans-P-01
bradleylake_3-ph_plans-P-02
bradleylake_3-ph_plans-P-02
bradleylake_3-ph_plans-P-03
bradleylake_3-ph_plans-P-03
bradleylake_3-ph_plans-P-04
bradleylake_3-ph_plans-P-04
bradleylake_3-ph_plans-P-05
bradleylake_3-ph_plans-P-05
bradleylake_3-ph_plans-P-06
bradleylake_3-ph_plans-P-06
bradleylake_3-ph_plans-P-07
bradleylake_3-ph_plans-P-07
bradleylake_3-ph_plans-P-08
bradleylake_3-ph_plans-P-08
bradleylake_3-ph_plans-P-10
bradleylake_3-ph_plans-P-10
bradleylake_3-ph_plans-P-11
bradleylake_3-ph_plans-P-11
bradleylake_3-ph_plans-P-12
bradleylake_3-ph_plans-P-12
bradleylake_3-ph_plans-P-13
bradleylake_3-ph_plans-P-13
bradleylake_3-ph_plans-P-14
bradleylake_3-ph_plans-P-14
bradleylake_3-ph_details-S-01_overhead
bradleylake_3-ph_details-S-01_overhead
bradleylake_3-ph_details-S-02_overhead
bradleylake_3-ph_details-S-02_overhead
bradleylake_3-ph_details-S-03_overhead
bradleylake_3-ph_details-S-03_overhead
bradleylake_3-ph_details-S-04_guy_anchor
bradleylake_3-ph_details-S-04_guy_anchor
bradleylake_3-ph_details-S-05_underground
bradleylake_3-ph_details-S-05_underground
bradleylake_3-ph_details-S-06_underground
bradleylake_3-ph_details-S-06_underground
bradleylake_3-ph_details-S-07_telecomm
bradleylake_3-ph_details-S-07_telecomm
bradleylake_3-ph_G-02_2026-07-03.pdf
Sheets and Views
G-02
bradleylake_3-ph_G-06_2026-07-03.pdf
Sheets and Views
G-06
bradleylake_3-ph_P-09_2026-07-06.pdf
Sheets and Views
P-09

File details come from the government source that posted it. Updated .