27-0706 NH200 REPLACE DOOR AND ADD DUMPSTER PAD - SUBMITTAL REGISTER.pdf
PDF 46 KB Posted
- Attached to
- NH200 Replace Door and Add Dumpster Pad
- Solicitation number
- N4008524R2811
About this file
This document is a Submittal Register for Contract No. 27-0706 "NH200 REPLACE DOOR AND ADD DUMPSTER PAD". The Submittal Register outlines the various submittals required from the contractor for this construction project, including plans, reports, certifications, and closeout documents. Key submittals include a Crane Work Plan, Activity Hazard Analysis, Construction Schedule, Accident Prevention Plan, Equipment Delivery Schedule, Quality Control Plan, Backflow Prevention Certification, and Regulatory Citations. The contract opportunity is for the Department of the Navy Naval Facilities Engineering Command to replace a door and add a dumpster pad at the NH200 facility. Only contractors listed on the General Requirements cover page are eligible to submit a proposal for this project within the ROICC Camp Lejeune area of responsibility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO.
CONTRACTOR
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A
C
T
I
O
N
C
O
D
E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A
C
T
I
O
N
C
O
D
E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 20 00
1.3
01 30 00
1.4.1
01 31 50
1.2
01 32 16
1.2
1.3
01 33 00
1.4.1
1.6.1
01 35 29
1.9
1.10
1.9.1
1.9.1
1.7.1.4
1.14
1.14.1
1.14.3
1.14.4
1.14.5
1.11
Crane Reports
SD-07 CERTIFICATES
Confined Space Entry Permit
Approving Authority Contractor
Schedule Dates
SD-11 CLOSEOUT SUBMITTALS
Interim DD1354, Transfer & Acceptance
SD-11 CLOSEOUT SUBMITTALS
Submittal Register
Complete Submittal Package
TITLE AND LOCATION
Lighting Inverter Replacement G644
Schedule of Prices
List of Contact Personnel
Construction Schedule of Military Real Property (If Applicable)
A
C
T
I
V
I
T
Y
N
O
T
R
A
N
S
M
I
T
T
A
L
N
O
(d)
Contractor
Action
DESCRIPTION
ITEM SUBMITTED
(Enter Contractor Name Here)
Crane Work Plan (If Applicable)
Activity Hazard Analysis (AHA)
SD-06 TEST REPORTS
SD-01 PRECONSTRUCTION SUBMITTALS
23-0401
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP)
SD-01 PRECONSTRUCTION SUBMITTALS
Equipment Delivery Schedule
SD-01 PRECONSTRUCTION SUBMITTALS
SUBMITTAL REGISTER
P
A
R
A
G
R
A
P
H
N
O
S
P
E
C
S
E
C
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
G
O
V
T
O
R
A
E
R
E
V
W
R
Crane Critical Lift Plan (If Applicable)
Crane Operators (If Applicable)
Reports
Accident Reports
Monthly Exposure Reports
Regulatory Citations and Violations
1.14.6
1.14.7
01 45 10
1.6
01 50 00
1.6.2.1
2.1
3.1
1.3
01 57 19
1.6.1
1.6.4
1.7.2
1.7
1.7
PAGE 1 OF _
Third Party Certification of Barge-
Mounted Movile Cranes
SD-11 CLOSEOUT SUBMITTALS
Qaulity Control Plan (QC Plan)
Certificate of Compliance
Backflow Tester Certification (If Applicable)
Backflow Preventer Tests (If Applicable)
SD-01 PRECONSTRUCTION SUBMITTALS
Traffic Control Plan (If Applicable)
SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE
MSDS for Class I ODS Waivered Product
SD-01 PRECONSTRUCTION SUBMITTALS
Permit for Storm Water Discharge (If applicable)
Environmental Protection Plan
Preconstruction Survey
Notice of Intent (If applicable)
SD-03 PRODUCT DATA
Backflow Preventers (If Applicable)
Backflow Preventers Certificate (If Applicable)
SD-06 TEST REPORTS
SD-07 CERTIFICATES
File details come from the government source that posted it. Updated .