26Z2AQ1 Replace Tunnel Doors SOW.pdf
PDF 155 KB Posted
- Solicitation number
- 15B20126Q00000005
About this file
This is a Statement of Work for replacing tunnel doors at the United States Penitentiary (USP) Allenwood in Pennsylvania. The Federal Bureau of Prisons (FBOP) seeks a single award to a responsible entity to provide all necessary equipment, labor, materials, and incidentals for the project. The scope includes verification of site conditions, demolition and disposal of six doors and three frames (with the FBOP retaining all locks and locking hardware), and purchasing and installation of new galvanized doors and frames with specified dimensions and components. Required materials include three galvanized door frames (116" x 103" x 8.75"), six galvanized doors (four without windows and two with windows featuring specific glazing configurations), 30 Southern Folger #5 weld-on hinges, eight Southern Folger 3862HM Cremone deadbolts keyed both sides with spares, and powder coating to match existing color. All work must comply with seismic zone requirements, environmental compliance, Life Safety codes, NFPA, ADA-ABA, and all Federal, State, and Local codes and regulations.
Contractor work hours are 7:30 AM to 3:30 PM, Monday through Friday, excluding weekends and federal holidays, with alternate hours requiring five working days' advance written notice to the Contracting Officer and Warden approval. Contractors must submit written equipment submittals within 15 days of receiving the Notice to Proceed, provide security clearance documentation 14 working days prior to work start, and submit three copies of Safety Data Sheets for all materials used. All contractor and subcontractor employees must pass security clearance, attend a mandatory four-hour orientation and security procedures training, and wear picture ID badges issued by the institution. Additional requirements include daily tool and material inventories, secure lockable storage in gang boxes with dual-lock protocols, prohibition of cell phones and cameras on site, specified dress code restrictions, and responsibility for all structural repairs, debris removal, and site housekeeping. The FBOP provides water, restroom access, and minimal 120V electricity; the contractor provides all other equipment, supplies, and materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DBA WD PA20260069.pdf | ||
| Questions and Answers - 15B20126Q00000005.pdf | ||
| HANDLE.jpg | JPG image | |
| PRE-BID SITE VISIT MINUTES - Replace USP Tunnel Doors.pdf | ||
| HANDLE 2.jpg | JPG image | |
| DOOR.JPG | JPG image | |
| DOOR Outer.JPG | JPG image | |
| SF1449 - 15B20126Q00000005.pdf | ||
| Door Drawing.pdf | ||
| Tunnel Access Drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
REPLACE TUNNEL DOORS
USP ALLENWOOD- PROJECT #26Z2AQ1
I. SPECIFICATIONS:
A. INTRODUCTION
The Federal Bureau of Prisons (FBOP), Federal Correctional Institution in Allenwood, PA intends to make a single award to a responsible entity to provide all necessary equipment, labor, materials, and incidentals to replace three sets of double doors in the USP tunnel. All manufacturers’ recommendations will be required to be implemented. The project is located at the Unites States Penitentiary (USP), Allenwood, PA Route 15. 2 Miles N. of Allenwood, Allenwood, PA 17810.
All equipment specified in this statement must be brand name or an equal product. Should your firm choose to submit an equal product, you must submit all technical specifications of the equal product to be analyzed, and a technical determination issued with acceptance/non-acceptance. The government retains the right to determine technical acceptance for all submitted equal products.
B. SCOPE OF WORK
• Verification of all site conditions, dimensions, and quantities.
• Demolition and disposal of 6 doors, 3 frames, and all other construction waste (FBOP to retain all locks and locking hardware).
• Purchasing and installation of new doors and frames (all measurements are approximate. Must be field verified by contractor before manufacturing):
o (3) Galvanized Door Frames (116” x 103” x 8.75”).
o (4) Galvanized Doors (53.75” x 95” x 2”) no windows.
o (2) Galvanized Doors (53.75” x 95” x 2”) w/ windows.
Each door to have (2) 18” x 37.5” windows and (1) 14.5” x 24” window.
o (4) 1” Thick Glazing (18” x 37.5”) o (2) 1” Thick Glazing (14.5” x 24”) o (30) Southern Folger #5 Weld-On Hinges o (8) Southern Folger 3862HM Cremone deadbolts, keyed both sides (Includes 2 spares):
To include all necessary mounting hardware, foot bolts, foot bolt receptacles, handles, & escutcheons.
o (1) Powder coating of doors and frames to match existing color (to be determined by FBOP).
C. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS
All seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA-ABA, and Federal, State and Local codes and regulations will be considered during all phases of this project.
D. UTILITIES
The FBOP will provide water, use of restrooms and minimal electricity service (120V) for small hand power tools including battery chargers. The contractor will provide all other equipment, supplies and materials needed to complete this project.
bop74550 Approved
E. HOUSEKEEPING AND MATERIAL DISPOSAL
The contractor awarded the contract will be responsible for ensuring the premises are always kept clean and free from accumulations of waste materials and rubbish. The contractor will remove all debris, scrap, and rubbish from the work area daily. Surplus materials and all equipment shall be promptly removed from the site upon completion of the work.
The Contractor shall be responsible to remove all debris and waste materials from the job site at USP Allenwood upon conclusion and acceptance of the project. These items must be disposed of in accordance with all Federal, State, and local laws. The Contractor is also responsible to conduct all structural repairs, patch walls, paint, repair ceiling etc., associated with this project.
F. SUBMITTALS
1. The contractor shall provide written submittals to the COR describing recommended equipment within (15) days from receiving the Notice to proceed for approval.
2. All security clearance paperwork/documentation shall be submitted to the COR a minimum of (14) working day prior to the start of work (see below).
3. The Contractor shall provide to the COR three (3) copies of the Safety Data Sheets (SDS) on all materials and substances that may be used during the course of the project. In the event the material is not approved by the Safety Manager, it shall be the responsibility of the Contractor to locate and procure an alternative product.
4. Any deviations from this Statement of Work will be considered a Change Order Request and must be authorized through the institution’s Contracting Officer prior to the implementation of the requested change.
5. It is the Contractor’s responsibility to repair and/or replace any Government property damaged by contractors/subcontractors’ employees. Damage will be corrected and restored to previous conditions at no cost to the Government.
6. It shall be the Contractor’s responsibility for obtaining all measurements and data requirements to comply with manufacturer’s installation recommendations. All installations must be in accordance with product manufacture’s recommendations.
II. CONTRACTOR SECURITY/WORKING REGULATIONS
A. Work Hours:
Work Hours for the contractor are 7:30 AM – 3:30 PM, Monday - Friday, excluding weekends and federal holidays. Any work required to be completed at any other time than noted above must be requested in writing to the COR five (5) working days prior to the start of the work and must be approved by the Warden. In the event of any work being completed that would result in downtime of the normal orderly running of the institution, alternate work hours may be authorized in accordance with the time frame stated above.
Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, their employees, and their subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight-hour workday. The Government assumes no responsibility to the Contractor nor to any of his subcontractors for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines.
Contractors should plan for a minimal amount of time accrued for security considerations, i.e., check-in screening, delay due to inmate movements, institution lock-down, institution emergencies, etc. In the event of an institutional emergency, the Contractor will be instructed to secure all work, secure and stow all tools, equipment and materials, and the Contractor will be escorted out of the institution. Work will resume once the institution emergency passes.
B. Delivery of Materials:
All construction materials/equipment required for work on this project is required to be processed by the Contractor and coordinated with the institution COR for temporary storage.
Any construction-related deliveries which are directly shipped to the contractor can be received between the hours of 7:00 a.m. to 2:00 p.m., Monday through Friday, excluding Federal Holidays. At no point will a Bureau of Prisons (BOP) staff member receive or sign for a delivery if the contractor or his representative is not present to verify and accept the delivery.
Under no circumstances will FCC Allenwood or its staff be responsible for the acceptance of any Contractor or company deliveries. The contractor shall be responsible for providing their own means of loading and unloading contractor material or equipment.
The contractor shall not use the institution entry/driveway for the loading, unloading, or storage of any materials and equipment. The contractor will not impede/block the driveway at any time during or after the work shift.
C. Storage of Materials and Equipment:
All construction materials/tools shall be stored in a designated area mutually agreed upon between the COR and the contractor. The storage area will be a secure lockable gang box or similar size to be determined by the contractor and the COR. If required, the contractor shall provide a securable, single point access storage container, such as a Job or Gang Box that will be left in the agreed upon storage area for the duration of the project. Size of the storage container will be determined by the contractor and the COR. The container will be secured using a padlock protocol with two locks to secure it. One shall be a contractor lock and the other lock provided by the institution. If necessary, a heavy-duty chain provided by the contractor may be used to facilitate the locking requirement. All materials and equipment stored within the container will be maintained in safe and orderly fashion
All tools will be inventoried prior to entering the institution and will be inventoried back in to ensure accurate accountability when exiting the institution at the end of each workday.
Materials cannot be stored at a height that would create a fall hazard. All tools will be inventoried prior to entering the Institution. At the start of each workday all tools will be inventoried out on a daily tool inventory sheet and at the end of the workday all tools will be inventoried back in to ensure accurate accountability of all tools at the end of each workday.
All contractor-owned extension cords that will be used during the project, regardless of length, shall be in good condition with no broken outer Insulation. Extension cords are considered a “high risk” tool having a Federal Bureau of Prisons’ tool classification of Double A. All contractors-owned extension cords used for this project will be required to exit the institution at the end of every workday for the duration of the project.
All contractor-owned ladders approved for use within the institution, regardless of the size, shall be stored in a pre-determined area and secured to a stationary fixture with a heavy link chain and lock which would prevent removal.
D. Security Clearance/Contractor Badges:
The contractor shall provide the COR with all the necessary security clearance documents for all contractors and subcontractor employees accessing the institution and be security cleared for badging within 14 days of receiving the Notice to Proceed, as stated above. Security clearance documents will only be accepted from the prime contractor. If submitted by a sub-contractor, they will be rejected. It is the prime contractor’s responsibility to review security clearance submissions to ensure they are complete.
All contractors and their construction staff awarded the project will be required to attend a four (4) hour orientation and security procedures training. The contractors and any subcontract staff are required to attend. This training must be accomplished prior to any contract or subcontract employee being granted access to federal property to start work.
In the event a contractor or subcontractor employee cannot pass the security clearance process, it will be the contractor’s responsibility to provide another candidate. By law the BOP cannot, and will not, release any information to the contractor concerning the nature of why a contractor or subcontractor employee was not able to pass the security clearance process.
All contractors/subcontractors working at FCC Allenwood will be issued and required to wear a picture ID/contractor badge provided by the institution. For security reasons, the badge will be worn in a visible manner as directed by the
COR.
All contractors and subcontractor employees will provide a check list of all employees on site each day to the COR, verifying the number of workers on site each day and that all workers are approved to be on site.
E. Safety and Personal Protective Equipment:
All contractors and employees shall have and wear the required personal protective equipment (PPE) always prescribed by industry standards while on the job site. It is the responsibility of the contractor to provide all PPE equipment. All ladders regardless of the size shall be stored and secured in a stationary fixture with a chain and lock in a predetermined area, in a way that they cannot be removed. If ladders are required, immediately consult with the COR to ensure that he or she can make timely notifications to appropriate institution staff. All extension cords regardless of length shall be in good condition with no broken outer insulation and will be secured in a locked construction gang box. Should a system require Lock-out/Tag-out, the system will be required to have both Contractor and USP Allenwood locks on the isolation point to prevent shock. All Lock-out/Tag-out procedures will be in compliance with the institution Lock-out program.
F. Additional Considerations:
1. Contractors will NOT be allowed to bring cell phones, cameras or two-way pagers into the institution. The Facilities Department maintains a digital camera that will be utilized by BOP staff to document the project work. The Contractor may request copies of these documentation photos for record keeping.
2. Contractor will be permitted to wear jeans in the institution, however, shorts, green or khaki-color clothing will not be allowed. The clothes will be proper and suitable for the services that are being provided.
3. Lunches will be consumed at the work site. Contractors shall ensure they have everything they need for their lunch when they check in first thing in the morning.
4. Federal smoking policy on Federal property states that smoking is only allowed in outdoor designated areas. This policy will be strictly enforced.
File details come from the government source that posted it. Updated .