26Q0072_Itemized_Pricing_Sheet.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- N5523626Q0072
About this file
This is an itemized pricing sheet for tank and bilge cleaning services aboard the Navy barge YRBM-29, located in Navy Region Southwest. The contract requires the contractor to provide all labor, services, equipment, and materials to empty, clean, and make gas-free a fuel oil storage tank with a 25,000-gallon void capacity containing an estimated 3,500 gallons of liquid. The scope includes initial "safe for workers" certification, new tank and void cover gaskets, offload and disposal of all liquid waste remaining in the tank, hazardous and non-hazardous waste generated during operations, and gas-free certification of the void as "safe for man" by a marine chemist, all in accordance with the Statement of Work. The performance period is 11 May 2026 through 15 May 2026, with specific milestone dates requiring void gas-free certification by 12 May 2026 and tank emptying, cleaning, and final certification by 12-14 May 2026.
The pricing sheet presents six itemized pricing line items with all unit prices currently set at $0.00, indicating this is a template awaiting contractor pricing submission. Item 0001 covers tank emptying, cleaning, and gas-free services; Item 0002 addresses waste offload, transportation, and disposal for 3,500 gallons; Item 0003 provides gas-free void certification; Item 0004 establishes a fixed fully-burdened hourly labor rate for additional work at 40 hours; Item 0005 covers additional materials as Other Direct Costs; and Item 0006 includes a material handling fee percentage to be applied to additional materials. The contractor must provide all management, administrative services, tools, cranes, scaffolding, and utilities, and must return any remaining liquid not disposed of under Item 0002. The contract is issued by the Department of the Navy Naval Sea Systems Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26Q0072_Amend0001.pdf | ||
| 26Q0072_COMSS .pdf | ||
| 26Q0072_RFC.docx | DOCX document | |
| 26Q0072_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
SCOPE SHEET
| CONTRACT: | TANK AND BILGE CLEANING |
| CONTRACT NO.: | |
| D.O. | |
| CONTRACTOR: | |
| SHIP: | YRBM-29 |
| LOCATION: | NAVY REGION SOUTHWEST |
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| WORK REQUEST N43-003 | 3-5-0-V, VOID: 25,000 GALLONS VOID CAPACITY |
ESTIMATED VOLUME OF LIQUID INSIDE THE VOID: 3,500 GALLONS
| SEE NOTES 1 THRU 4 | 1 | ||
| ITEMIZED PRICING: 0001 | |||
| PROVIDE SERVICES AND MATERIAL TO EMPTY, CLEAN AND MAKE GAS FREE THE FUEL OIL STORAGE TANK, TO INCLUDE INITIAL "SAFE FOR WORKERS" CERTIFICATION, NEW TANK AND VOID COVER GASKETS IN ACCORDANCE WITH THE STATEMENT OF WORK | 1 | $0.00 |
| JSN | LOCATION | GAL | UNIT PRICE | EXT PRICE |
| WORK REQUEST N43-003 | 3-5-0-V, VOID: 25,000 GALLONS VOID CAPACITY |
ESTIMATED VOLUME OF LIQUID INSIDE THE VOID: 3,500 GALLONS
| SEE NOTES 1 THRU 4 | 3,500 | ||
| ITEMIZED PRICING: 0002 | |||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE OFFLOAD, TRANSPORTATION AND DISPOSAL OF LIQUID WASTE REMAINING IN THE TANK AT OPENING AND OTHER LIQUID WASTE, SOLIDS WASTE, HAZARDOUS WASTE, NON-HAZARDOUS WASTE, DUST AND DEBRIS GENERATED DURING THE EXECUTION OF THE TANK EMPTYING, GAS FREE, AND DISPOSAL OPERATIONS IN ACCORDANCE WITH THE STATEMENT OF WORK | 3,500 | $0.00 |
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| WORK REQUEST N43-003 | 3-5-0-V, VOID: 25,000 GALLONS VOID CAPACITY |
ESTIMATED VOLUME OF LIQUID INSIDE THE VOID: 3,500 GALLONS
| SEE NOTES 1 THRU 4 | 1 | ||
| ITEMIZED PRICING: 0003 | |||
| PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIAL TO PROVIDE GAS FREE CERTIFICATION OF THE VOID (SAFE FOR MAN) IN ACCORDANCE WITH THE STATEMENT OF WORK. MARINE CHEMIST TO CERTIFY THE VOID AS SAFE FOR MAN ACCORDANCE WITH THE STATEMENT OF WORK | 1 | $0.00 |
TOTAL: $0.00
| OVER AND ABOVE - LABOR AND MATERIALS: | |||||
| It is anticipated that additional work may become necessary during the contract performance. . The estimated quantity and estimated per unit of issue of the additional labor hours, materials cost, and materials handling fee shall be negotiated and authorized by the Contracting Officer prior to the awarding of the Ourchase Order or modification(s) to an awarded Purchase Order. | ESTIMATED AMOUNT | UNIT OF ISSUE | ESTIMATED PRICE PER UNIT OF ISSUE | TOTAL | |
| ITEMIZED PRICING: 0004 | ADDITIONAL WORK - LABOR | ||||
| NOTE: For contract changes involving Prime contractor additional labor hours. The offeror’ s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 40 | HR | $0.00 | ||
| ITEMIZED PRICING: 0005 | ADDITIONAL WORK - MATERIALS | ||||
| Note: For contract changes involving Prime contractor additional materials and subcontractors labor/services/materials. The Prime contractor additional materials and subcontractors labor/services/materials shall be treated as Other Direct Costs (ODCs) and shall be subject to the contract material handling fee rate. Additional materials and subcontractor labor/services/materials must be competitively acquired and submitted with the Prime contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed amount materials and services to be performed by the Prime contractor combined with subcontractor labor/services/materials and not be allowed to cost more than it would have, had the prime contractor directly provided all labor/services/material. | 1,000.00 | DOLLARS, US | - 0 | ||
| ITEMIZED PRICING: 0006 | ADDITIONAL WORK - MATERIALS HANDLING FEE | ||||
| Note: Offeror shall propose a material handling fee rate of ______% to be applied to ITEMIZED PRICING: 0005. | LOT | $1.00 | $0.00 |
| MILESTONE EVENT | DATE |
| 1. Purchase Order Start Date: | 11-May-2026 |
| 2. Void Gas Free Certification "Safe for Man" NLT or sooner : | 12-May-2026 |
| 3. Empty, Cleaning and Gas Free Certification "Safe for Man" NLT or sooner: | 12 - 14 MAY 2026 |
| 4. Purchase Order End Date: | 15-May-2026 |
| NOTES: | |
| 1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the ITEMIZED PRICING listed in the scope of work. | |
| 2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(ai), and the requirements of the ELINS listed in the scope of work. | |
| 3. The Contractor shall return to the Government the remaining amount of the estimated volume of liquid not removed (drained and dispose) under Itemized Pricing 0002 during the performance of this contract. | |
| 4. Fuel Oil Storage Tank access is thru Void 3-5-0-V Void. |