26Q0028_RFQ document.pdf
PDF 2 MB Posted
- Attached to
- Lima - Chancery Generators Maintenance Federal contract opportunity
- Solicitation number
- 19PE5026Q0028
- Issued by
- Department of State US Embassy Lima
About this file
This is a Request for Quotations (RFQ) issued by the U.S. Embassy in Lima, Peru for preventive maintenance services on five diesel standby generators. The RFQ number is 19PE5026Q0028, with quotations due by June 10, 2026 at 4:00 PM. A mandatory site visit is scheduled for June 2, 2026 at 10:00 AM. The Embassy plans to award a firm fixed-price purchase order to the responsible company submitting the lowest acceptable quotation. Quotations must remain valid for 30 days from the closing date and be submitted in English via email to Christian R Rivas at RivasCR@state.gov in a single Word or PDF file.
The scope includes annual and semi-annual preventive maintenance services for three Cummins 1250 DFLC generators, one Cummins 350 DFLC generator, and one Cummins 250DQDAA generator, with tentative performance periods in November 2026 and May 2027. The contractor must supply all labor, materials, tools, and equipment to perform planned maintenance and inspections in accordance with the Statement of Work, including oil and filter changes, battery service, cooling system maintenance, control panel cleaning, engine control module diagnostics, load bank testing at 80% capacity for two hours, and chemical analysis of oil and coolant samples. The contractor must provide qualified technicians with appropriate certifications, maintain spare parts inventory, obtain and submit equipment history logs, furnish a set of belts per unit, and provide emergency support within 24 hours at an hourly rate. Pricing must include all direct and indirect costs, overhead, insurance, customs duties, and taxes. The contractor must obtain Defense Base Act (DBA) workers' compensation insurance for all employees and provide proof of insurance within 10 days of contract award. Additional requirements include obtaining commercial licenses and permits, providing Original Equipment Manufacturer certifications, and delivering a strategic plan detailing work procedures, equipment and materials, spare parts availability, and quality assurance measures.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 26Q0028_Questions and Answers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 27, 2026
To: Prospective Offerors
Subject: Request for Quotations 19PE5026Q0028 – Chancery Generators
Maintenance
The US Embassy, Lima, Peru, would like to invite your company to submit a proposal for the maintenance service to the Embassy generators. The Request for
Quotations (RFQ) consists of the following sections:
1. Standard Form SF-1449
2. Section 2: Statement of Work (SOW)
3. Section 3: Instructions to Offerors
4. Section 4: FAR clauses and provisions & DOSAR clauses
5. Section 5: Guide to obtain the DBA insurance policy
A site visit will be held on June 2, 2026 at 10:00 a.m. Please submit the full name and DNI of people attending the visit to Mr. Christian Rivas at rivascr@state.gov on May 29 to get the authorization to enter the building.
Questions regarding this RFQ must be sent in English to the same email address no later than June 3; the answers to these questions will be advertised within the same
RFQ notice in the System for Award Management (SAM) on June 5, 2026.
The Embassy plans to award a purchase order to the responsible company submitting an acceptable quotation at the lowest price. You are encouraged to make your quotation competitive. You are also cautioned against any collusion with other potential offerors regarding price quotations to be submitted. The RFQ does not commit the American Embassy to make any award and it may cancel this
RFQ or any part of it.
Embassy of the United States of America
Lima, Peru mailto:rivascr@state.gov
Quotations are due by June 10, 2026 at 1600 hrs. No quotations will be accepted after this time. Quotations must be in English and incomplete quotations will not be accepted. Your quotation must be submitted by email in a single file using
Word or PDF format to Mr. Christian Rivas at RivasCR@state.gov
Sincerely, Patrick McElroy
Contracting Officer
Enclosure: As stated
05/26/2026 20:49 GMT
McElroy, Patrick (McElroyPH@state.gov) mailto:RivasCR@state.gov
AUTORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 02/2012)
PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
PR15996066
PAGE 1 OF 52 PAGES
2. CONTRACT NO. 3. AWARD/ EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER
19PE5026Q0028
6. SOLICITATION ISSUE
DATE 05/27/2026
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME Christian R Rivas
b. TELEPHONE NUMBER(No collect calls) (51 ) 618-2192
8. OFFER DUE DATE/
LOCAL TIME
06/10/2026 / 16:00
CODE PE500 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
HUBZONE SMALL
BUSINESS
(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM NAICS: 811310
EDWOSB EMERGING SMALL BUSINESS
9. ISSUED BY
AMERICAN EMBASSY LIMA
Av. Lima Polo cdra 2 s/n, Monterrico, Surco ATTN: GSO/Procurement Lima
PERU
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS 8 (A) SIZE STANDARD:
13b. RATING11. DELIVERY FOR FOB DESTINAT-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
14. METHOD OF SOLICITATION
X RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
AMERICAN EMBASSY LIMA
Av. Lima Polo cdra 2 s/n, Monterrico, Surco, ATTN: GSO/Procurement Lima
PERU
AMERICAN EMBASSY LIMA
Av. Lima Polo cdra 2 s/n, Monterrico, Surco ATTN: GSO/Procurement Lima
PERU
CODE FACILITY
CODE
17a. CONTRACTOR/
OFFERER
TELEPHONE NO.
18a. PAYMENT WILL BE MADE BY
AMERICAN EMBASSY LIMA
AV. Lima Polo cdra 1 s/n Monterrico-Surco
ATTN: FMO / DBO
Lima
PERU
CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only) x 27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1 AND 52.212-4. ADDENDA ARE ARE NOT ATTACHED
27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _ __ COPIES
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. _ _______________ OFFER DATED
_ __________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY
ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS
TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
X
ITEM NO. 20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT 37. CHECK NUMBER
PARTIAL FINAL COMPLETE PARTIAL FINAL
38. S/R ACCOUNT NO. 39. S/R VOUCHER NO. 40. PAID BY
41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41C. DATE
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Solicitation to contract the Preventive Maintenance Services of five (5) generators in accordance with the attached Statement of Work (SOW) and related documentation.
Annual Preventive Maintenance Services:
Tentative Period of Performance: November 2026 Gen Set Cummins 1250 DFLC (03ea) Gen Set Cummins 350 DFCC (01ea) Gen Set Cummins 250DQDAA (01ea)
Semi-Annual Preventive Maintenance Services:
Tentative Period of Performance: May 2027 Gen Set Cummins 1250 DFLC (03ea) Gen Set Cummins 350 DFCC (01ea) Gen Set Cummins 250DQDAA (01ea)
Supply a set of belts as it is indicated in the Statement of Work (SOW)
1 1 SV
2 1 SV
3 1 SET
DBA Insurance policy4 1 YEAR
RFQ 19PE5026Q0028
Page | 2
(Continuation of SF-1449)
To assure timely and fair consideration of your proposal, you must follow the instructions contained herein. Proposals must be complete, self-sufficient, and respond directly to the requirement of this RFQ. Failure to provide requested information in the format specified in this section may result in an unfavorable evaluation or non-consideration of your proposal.
The Offeror/Quoter must identify and explain/justify any deviations, exceptions, or conditional assumptions taken with respect to any of the instructions or requirements of this request for quotation.
The Government intends to award a Firm Fixed Price (FFP) purchase order payable entirely in US dollars or in the local currency.
Proposal Due Date
Proposals must be received by June 10, 2026 at 1600 hrs.
Pricing
The price shall include all direct and indirect costs, overhead, general and administrative expenses, per diem, travel, profit, shipping/delivery charges, insurance, customs duties and taxes, if applicable.
Validity of quotes
Quotes must be valid for 30 days from the closing date for this solicitation.
Place Of Delivery
US Embassy Lima, Av. La Enclada block 17, Surco, Peru.
Delivery date
Delivery must be made to the specified place of delivery, to be coordinated along with the Embassy representative.
Payment Terms
Net 30 days. Electronic payments to bank accounts will normally be processed within 30 calendar days after receipt of goods and services and original invoice.
RFQ 19PE5026Q0028
Page | 3
Offeror identification
If the Offeror will not have an active Federal Government contracts registration in the System for Award Management (https://www.sam.gov) when submitting its offer, it must complete the requirements of FAR 52.204-90 and provide as a minimum its assigned NCAGE code
Proposal Format and Content
Submit your proposal in one (1) single file, Word or PDF format. To be considered in the evaluation you must complete and submit the following:
• SF-1449 (blanks 17a, 23, 24, 30a, 30b and 30c)
• The Certifications and Representations contained in Section 4, where applicable
• Proof of your company’s registration in the System for Award Management
(SAM) or your assigned NCAGE code.
• The quote for the DBA insurance policy (see the guide on Section 5)
If applicable, provide proof that service will be sourced through authorized distribution channels, (documented business agreement and/or business partnership).
The Government expects that competition will establish fair and reasonable prices.
However, the government reserves the right to require information other than cost and pricing data if it is later determined that said information is needed to evaluate the proposed price. Failure to provide requested information may render the offeror ineligible for award.
https://www.sam.gov/
PowerSupport@State.gov OBO/CFSM/FAC/PS/PEMP/PowerSupport 19-09-24
SECTION 2 - STATEMENT OF WORK
LOW VOLTAGE DIESEL STANDBY GENERATORS
1. GENERAL INFORMATION:
The United States Embassy in Lima requires professional services and contractor cost proposals to perform Planned Maintenance and Inspection services of the facility’s Low Voltage Diesel Standby
Generator systems.
2. PROJECT REQUIREMENTS:
The Contractor shall perform planned maintenance and inspections as described in this Statement of
Work (SOW). The intent of this SOW is to ensure the entire standby generator systems for this facility are maintained according to manufacturer’s recommendations and to ensure the readiness and proper operation of the system.
3. DESCRIPTION OF EQUIPMENT *:
*Please see attachment at the end of this sheet for more details
4. GENERAL REQUIREMENTS:
The contractor shall provide the labor and materials required to carry out regularly planned maintenance and inspections as outlined in this SOW.
A. The Contractor shall inventory, supply and replace maintenance service items (eg. filters, and fluids).
a. Only fluids and parts which meet or exceed manufacturer’s specifications shall be used.
b. All fluids shall be delivered in original sealed containers.
c. Contractor shall supply the parts required in performance of maintenance included in this
SOW. (eg. Rocker cover gaskets when performing valve lash, thermostats when performing coolant change)
B. The Contractor shall maintain a supply of expendable and common parts so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters, generator starting batteries, grease, sealant, thermostats, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment
(hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits.
C. Exclusion. This contract does NOT include repair of equipment and replacement of hardware
(e.g. bearings, pistons, piston rings, crankshaft, and gears) except as indicated in additions and equipment list. Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance. The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize
Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.
a. Replacement/repair of any electronic or electrical parts must be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or mailto:PowerSupport@State.gov electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.
D. Checklist Approval
a. The Contractor shall submit to the COR a schedule and description of planned maintenance tasks which the Contractor plans to provide. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement.
E. It is the responsibility of the Contractor to perform all manufacturers recommended planned maintenance as well as planned maintenance recommended by the manufacture technical manuals for standby operations of the respective equipment.
a. This does not include major maintenance, planned overhauls, injector replacements.
F. PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES
a. The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The Contractor shall provide all of the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.
G. SAFETY & SPECIAL INSTRUCTIONS:
a. Use appropriate personal protective equipment (PPE) when performing work
b. Check all work areas, tools, and equipment to ensure unsafe conditions are eliminated or guarded against.
c. Follow site safety procedures.
d. Schedule maintenance with operating personnel and affected offices (security).
e. Follow approved lockout/tag out procedures.
f. Review and follow the manufacturer’s instructions.
g. Record results in the equipment history log.
h. Remove lockout/tag out in accordance with appropriate procedures.
i. Report all incidents and near miss incidents to COR and assist as requested in the investigation and corrective action.
H. Disposal of used oil, fuel, battery and other toxic substances. The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to
Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.
I. Chemical analysis: The Contractor is responsible for conducting laboratory analysis for coolant and oil samples. All charges for such analysis is payable by the Contractor and a report stating the test results shall be submitted to the COR.
J. Load Bank: The Contractor is responsible for exercising the generator using an appropriately sized load bank. If prior permission is obtained building load may be used. The diesel units shall be run at 80% of the rated capacity for a minimum of 2-hours. All charges for such testing is payable by the Contractor and a report shall be submitted to the COR. Refer to maintenance section on Run Unit – With load.
a. The Government will provide load banks for generator testing.
K. The offeror shall address its plan to obtain all commercial licenses and permits required by local law. If offeror already possesses the locally required licenses and permits, a copy shall be provided.
L. Provide a copy of Original Equipment Manufacturer (OEM) (eg. CAT, MTU, KOHLER, Cummins) authorized certificate or equivalent to carry out the necessary level of requested repair/planned maintenance service on post Generators.
M. The offeror’s strategic plan for generator maintenance services to include but not limited to:
a. A work plan taking into account all work elements in the Performance Work Statement.
b. Identify types and quantities of equipment, supplies and materials required for performance of services under this contract. Identify if the offeror already possesses the listed items and their condition for suitability and if not already possessed or inadequate for use, how and when the items will be obtained.
c. Identify and submit the list of parts and materials required for Quarterly, Semi-Annual and Annual maintenance service for all Generators.
d. Provide a statement that laboratory analysis report will be provided for oil and coolant samples collected.
e. Provide a statement that manifest or proof of disposal will be provided for toxic / hazardous substance wastes collected.
f. Plan of ensuring quality of services including but not limited to contract administration and oversight;
i. If insurance is required by the solicitation, a copy of the Certificate of
Insurance(s), or
ii. a statement that the Contractor will get the required insurance, and the name of the insurance provider to be used.
g. List of spare parts and suppliers of spare parts for generator and proposals shall include a description of the firm’s ability to obtain replacement parts and ability to perform specialized tests/diagnostic/programming equipment for doing the planned maintenance.
N. The contractor shall provide emergency assistance for generator support, priced at an hourly rate, within 24 hours of being contacted by the COR.
O. DELIVERABLES
a. The following items shall be delivered under this contract:
Description QTY Delivery Date Deliver to
Names, biographic data, police clearance on Contractor personnel
1 5 days after contract award COR
Certificate of Insurance 1 10 days after contract award CO
Certification of disposal of toxic chemicals by local authorities
1 After each oil change service COR
LOAD BANKS TYPE MAKE MODEL SIZE VOLTAGE PHASES FREQUENCY
GEN#1 STATIONARY SIMPLEX NEPTUNE 400 KW 480VOLTS 3 60 HZ
GEN#2 STATIONARY SIMPLEX NEPTUNE 400 KW 480VOLTS 3 60 HZ
GEN#3 PORTABLE SIMPLEX ELECTRA 560KW 480VOLTS 3 60 HZ
Checklist signed by Contractor’s employee
1 After completion of each maintenance service
COR &
powersupport@state.gov Laboratory report for chemical analysis
1 30 days after completion of each oil change service
COR &
powersupport@state.gov
PMI/service Report 1 After completion of each service
COR &
powersupport@state.gov
Invoice 1 After completion of each maintenance service
COR
5. Exhibit A: SCOPE OF WORK - - GENERATOR PLANNED MAINTENANCE AND
INSPECTION
The contractor shall provide all materials, supervision, labor, tools, and equipment to perform planned maintenance and inspections. All personnel working in the vicinity shall wear and /or use appropriate safety protection while work is performed. Any questions or injuries shall be brought to the attention of the Post COR and Occupation Safety and Health Officer (POSHO). Material Safety Data Sheets (MSDS) shall be provided by the contractor for all HAZMAT materials. Copies will be provided to the COR for approval.
The systems and components to be maintained include diesel generator prime mover, AC alternator, fuel, cooling, ventilation and lubrication systems, start and transfer systems, as well as control and monitoring systems. The attached equipment list provides details.
1. The contractor shall provide the COR with a list of necessary parts and materials.
a. Only fluids and parts which meet or exceed manufacturer’s specifications for the particular equipment shall be used.
b. All fluids shall be delivered in original sealed containers.
If any discrepancies are found with the generator systems that are not covered under this scope of work, the contractor shall provide the following:
1. Detailed report noting the discrepancy found.
2. Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.
3. Price quote for repair labor.
At a minimum, the following work shall be completed:
Planned Maintenance and Inspection Interval Schedule
A. Semi-annual PMI Schedule
1. Conduct visual inspection around generator.
• Check for evidence of leaks, damage, loose or missing hardware.
• Inspect engine and generator wiring harness for wear and damage.
• Inspect supports and spring isolators for soundness and stability.
• Inspect system for corrosion.
• Hoses and Clamps – Inspect and replace if needed.
• Belts – Inspect and adjust/replace if needed.
• Inspect all fuel, oil, and water piping for secure mounting and leaks.
• Inspect exhaust piping and muffler insulation.
• Check / service air cleaner
2. Batteries.
• Battery charger – Inspect operation and clean.
• Battery electrolyte level and specific gravity – Check and adjust. Add distilled water as needed.
• Perform battery load/condition test.
• Clean battery terminals and lugs (apply grease on terminal connections).
3. Fluids and Filters.
• Cooling System Coolant Level - Check and adjust.
• Coolant conditioner (DCA4) – Check and adjust to specs.
• Jacket Water Heater - Check proper operation.
• Water pump - Check
• Engine Oil Level - Check and add if needed.
• Fuel/water separators – Drain water.
• Engine Air Cleaner Service Indicator – Check, replace filter if needed.
4. Control Panel/generator cabinet.
• Open all cabinets; remove panel covers to clean/inspect.
• Clean dust and vacuum all the controls, meters, switching mechanism components, interior buswork, remote start control panel, annunciator, disconnect breaker and connecting lugs. Inspect/Check buswork and supporting hardware for cracks, corrosion, or any type of deterioration.
• Check all control wiring and power cables (especially wiring between or near hinged door) for sign of wear and deterioration. Secure and/or protect wiring and cables as required.
• Check the cabinet interior for loose hardware – tighten connections.
• Electrical Connections - Check tightness
• Clean and remove dust from panels.
5. Engine Control Module (ECM)
• Plug in OEM computer/diagnostic hardware if applicable.
• Review fault history.
• Download status report or similar depending on manufacturer to be submitted with report.
• [Note: most modern engines utilize electronic controls which require proprietary OEM software to access parameters, replace controls boards and perform diagnostic tests. Ie.
CAT ET, Cummins InPower.]
6. Run unit – No load.
• Run the generator with no load for 10 minutes.
▪ Remote Start Panel-Inspect and test operation.
▪ Check the generator for unusual conditions, such as: excessive vibration, leaks, smoke.
▪ Verify all meters, gauges and indicators are normal and functioning properly.
7. Run Unit – With load. Start unit and run under load for 1 hour.
• Unit should be run under facility load if COR authorizes to test and exercise entire system.
• If facility load is not permissible or is not a minimum of 50% of rated capacity or if wet stacking is prevalent, the unit shall be exercised with a load bank to a minimum 80% capacity for 2 hours.
• Automatic Start/Stop – Inspect.
• Check louvers, shutters and room exhaust fans for proper operation.
• Generator Set Vibration – Inspect.
• Read and record all key performance indicators from gauges/meters/ECM.
• Record load readings – Voltage, amps, % of load, frequency, power factor.
• Record Alternator bearing temperatures.
• Check exhaust for excessive black or white smoke.
• Check turbocharger for vibrations or any abnormal noise during operation.
• Check generator bearing for noise and overheating.
• Check exhaust manifold, flexible exhaust, muffler, and piping for leaks and secure mountings.
• Check Crankcase breather/Blow By
• Check / service air filter
• Check fuel filter restriction if applicable. Replace filters if required.
8. Additional.
• Ensure system is left in proper position for automatic start and transfer.
• Clean generator and generator room. Wash radiator if necessary.
• Annotate date, hours and maintenance in Generator log, complete maintenance checklist and deficiency report and brief COR.
• Perform any additional maintenance tasks as recommended in the manufacture’s operation and maintenance manuals.
• Submit Service Inspection and Test Report to COR and email electronic copies to powersupport@state.gov
B. Annual Schedule
1. Conduct quarterly / semi- annual PMI service
2. Engine Air Cleaner Elements – Replace.
3. Engine Crankcase Breather – Clean.
4. Engine Oil Sample - Obtain and perform analysis. Submit report to COR.
5. Engine Oil and Filter(s) – Replace.
6. Annotate date and hours on all filters when replaced.
7. Fuel Filters and Water Separators – Replace.
a. To include filters to day tanks if applicable.
b. Clean any fuel screens if applicable.
8. Obtain fuel sample at day tank and storage tank for analysis.
9. Radiator – Clean (follow manufacturer’s recommendation).
10. Intake louvers and ducts – Inspect
11. Cooling System Coolant Sample - Test
12. Cooling System Supplemental Coolant Additive (SCA) – Test - Add if applicable.
13. Coolant filter – Change if applicable
14. Crankshaft Vibration Damper - Inspect
15. Engine Protective Devices - Check
16. Turbocharger – Inspect/Check
17. Clean and lubricate fuel pump linkages if applicable.
18. Fan bearing – Inspect/Grease.
19. Engine Control Module (ECM)
a. Download status report or similar depending on manufacturer to be submitted with report.
mailto:powersupport@state.gov
b. Test unit safety shutdowns.
c. Provide post an electronic copy of ECM program file.
20. Check injector pump and injectors for flow rate pressure
21. AC Alternator – Inspect. Check for moisture, dust, oil, grease, and debris on main stator windings, exciter. Check commutator & slip rings, rotor & stator, bearings, bearing lubrication, voltage regulator. Measure & record resistance readings of windings with insulation tester
(Megger). Clean as needed.
22. Check Rotating Rectifier
23. Inspect / Check Varistor
C. Additional maintenance required per manufacturers recommendations and service interval:
1. Generator bearing – Inspect/Grease as recommended by manufacturer’s maintenance schedule.
2. Engine Generator Batteries – Indicate age of current batteries on equipment sheet for planning purposes and proper quotation.
3. Cooling System Coolant – Flush system and replace per manufacturer’s maintenance schedule with coolant per manufacturers specifications.
• Every 3 years since last change.
• Every 6 years for Extended life coolant
▪ When performing coolant change; flush engine and replace engine thermostats.
▪ Replace hoses if necessary.
[NOTE: Indicate age of coolant on equipment sheet for planning purposes and proper quotation. If this hasn’t been done or age is unknown – this needs to be performed at contractor’s first service]
4. Engine Valve Lash/injector height - Inspect/Adjust per manufacturer’s maintenance schedule.
Replace rocker cover gaskets and torque to proper specs.
[NOTE: typically, manufacturers require an initial valve lash to be performed.
• This may occur at 250hrs or up to 1500hrs depending upon manufacturer and model number.
• Many manufacturers and models require this to be done annually or according to a schedule based on run time. This needs to occur at first service if this has not been done and according to manufacturer’s requirements thereafter.
• Indicate date and hrs on equipment list for planning and proper quotation]
D. Additional:
1. The contractor shall supply to post at the start of this contract:
• 1 set of engine belts per unit to be kept onsite.
▪ Provide labor to replace belts as needed during regular scheduled service as needed based on inspection.
Equipment List: (list generators, ATS, day tanks and other related equipment to be serviced or maintained)
END OF STATEMENT OF WORK
Hrs and date of last battery change
Hrs and date of last coolant change
MAKE MODEL SERIAL SPEC MAKE MODEL SERIAL
Gen#1 Cummins 1250 DFLC L930527998 65266J Cummins KTA-50-G3 33126083 January-12 1021.8Hrs/Nov 2022 Gen#2 Cummins 1250 DFLC L930528000 65266J Cummins KTA-50-G3 33126090 January-12 612.4Hrs/Nov 2024 Gen#3 Cummins 1250 DFLC L930527999 65266J Cummins KTA-50-G3 33126097 January-12 190.7Hrs/Nov 2022
Safe Haven Generator Cummins 350 DFLC I930520975 64497H Cummins NTA-855-G3 30342072 January-12 469.5Hrs/Dec 2022 ITC Generator Cummins DQAA-6639652 ----- ----- Cummins ----- ----- September-24 1010Hrs/Sep 2024
Gen Set ENGINE
Page | 12
SECTION 3 - INSTRUCTIONS TO OFFERORS
52.212-1 Instructions to Offerors—Commercial Products and Commercial
Services (Deviation Jan 2026)
(a) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. As a minimum, offers shall include—
(1) The solicitation number;
(2) The name, address, telephone number of the Offeror;
(3) The Offeror’s Unique Entity Identifier (UEI) and, if applicable, Electronic
Funds Transfer (EFT) indicator;
(4) Information necessary to evaluate the factors contained in the provision at
52.212-2 or as described in the solicitation;
(5) Responses to provisions that require Offeror completion of information, representations, and certifications (other than those collected via the System for
Award Management (SAM)); and
(6) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and any solicitation amendments.
(b) Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(c) Late submissions, modifications, revisions, and withdrawals of offers.
(1) Offerors are responsible for submitting offers and any modifications or revisions to the Government office designated in the solicitation by the time specified in the solicitation.
(2) Any offer, modification, or revision received after the time specified for receipt of offers is “late” and will not be considered unless it is received before award is made and the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition. However, a late modification of an
Page | 13 otherwise successful offer that makes its terms more favorable to the Government will be considered at any time it is received and may be accepted.
(3) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent
Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(4) Offerors may withdraw their offers by written notice to the Government received at any time before award.
(d) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with Offerors. Therefore, the Offeror’s initial offer should contain the Offeror’s best terms. However, the
Government reserves the right to conduct discussions, if necessary. The Government may reject any or all offers if such action is in the public interest, accept other than the lowest offer, and waive informalities and minor irregularities in offers received.
(e) Debriefings. If a post award debriefing is given to requesting Offerors, the
Government will disclose the following information, if applicable:
(1) The agency’s evaluation of the significant weak or deficient factors in the debriefed Offeror’s offer.
(2) The overall evaluated cost or price and technical rating of the successful
Offeror and the debriefed Offeror and past performance information on the debriefed Offeror.
(3) The overall ranking of all Offerors when any ranking was developed by the agency during source selection.
(4) A summary of the rationale for award.
(5) For acquisitions of commercial products, the make and model of the product to be delivered by the successful Offeror.
Page | 14
(6) Reasonable responses to relevant questions posed by the debriefed Offeror as to whether the agency followed source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities.
(End of provision)
Page | 15
SECTION 4 - CLAUSES AND PROVISIONS
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This purchase order or BPA incorporates the following clauses by reference, with the same force and effect as if they were given in full text. Upon request, the
Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide ; this address is subject to change.
DOSAR clauses may be accessed at: https://acquisition.gov/dosar
FEDERAL ACQUISITION REGULATION CLAUSES
NUMBER TITLE DATE
52.204-7 SYSTEM FOR AWARD MANAGEMENT-
REGISTRATION
DEV NOV 2025
52.204-7 SYSTEM FOR AWARD MANAGEMENT-
REGISTRATION – ALTERNATE I
52.204-9 PERSONAL IDENTITY VERIFICATION OF
CONTRACTOR PERSONNEL
JAN 2011
52.204-13 SYSTEM FOR AWARD MANAGEMENT -
MAINTENANCE
52.204-91 CONTRACTOR IDENTIFICATION DEV NOV 2025
52.225-19
CONTRACTOR PERSONNEL IN A
DIPLOMATIC OR CONSULAR MISSION
OUTSIDE THE UNITED STATES
MAY 2020
52.232-40 PROVIDING ACCELERATED PAYMENTS
TO SMALL BUSINESS
SUBCONTRACTORS
MAR 2023
52.244-6 SUBCONTRACTS FOR COMMERCIAL
ITEMS
MAR 2023
52.246-26 REPORTING NONCONFORMING ITEMS
AUG 2024
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://acquisition.gov/dosar
Page | 16
52.212-4 TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (DEVIATION JAN 2026)
(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.
(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The
Government must exercise its post acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the
Contractor may not assign its rights to receive payment under this contract.
(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes.
Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR
52.233-1, Disputes, which is incorporated in this contract by reference. The
Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the
Page | 17
Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—
(1) Notify the Contracting Officer in writing as soon as possible;
(2) Remedy the delay as quickly as possible; and
(3) Notify the Contracting Officer when the occurrence is over.
(g) Invoice. The Government will handle invoices according to the Prompt
Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any
United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the
Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim
Page | 18
(C) Affected line item or subline item, if applicable;
(D) Contractor point of contact; and
(ii) Provide a copy of the remittance and supporting documentation to the
Contracting Officer.
(5) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in
(i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by FAR part 33 if–
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the
Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the
Contractor;
Page | 19
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the
Contractor until, and shall pass to the Government upon—
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work.
Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the
Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the
Government shall not be liable to the Contractor for any amount for supplies or
Page | 20 services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the
Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered under this contract are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C. chapter 37, Contract Work
Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation; and 41 U.S.C. chapter 21 relating to procurement integrity.
(r) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services;
(2) The Disputes, Payments, Invoice, Compliance with Laws Unique to
Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) Other contract clauses incorporated in the solicitation or contract;
(4) Addenda to this solicitation or contract;
(5) Solicitation provisions incorporated in the solicitation;
(6) Other paragraphs of this clause;
(7) Other documents, exhibits, and attachments; and
(8) The specification.
(s) Unauthorized obligations.
(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement
(EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any
Page | 21 person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (s)(1) of this clause does not apply to indemnification by the
Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(t) Comptroller General examination of record. This paragraph applies if this contract was awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
Page | 22
(u) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management
(SAM), are incorporated by reference into the contract.
(End of clause)
52.228-3 WORKERS’ COMPENSATION INSURANCE (DEFENSE BASE ACT)
(JUL 2014)
(a) The Contractor shall
(1) Before commencing performance under this contract, establish provisions to provide for the payment of disability compensation and medical benefits to covered employees and death benefits to their eligible survivors, by purchasing workers’ compensation insurance or qualifying as a self-insurer under the Longshore and
Harbor Workers’ Compensation Act (33 U.S.C. 932) as extended by the Defense
Base Act (42 U.S.C.1651, et seq.), and continue to maintain provisions to provide such Defense Base Act benefits until contract performance is completed;
(2) Within ten days of an employee’s injury or death or from the date the Contractor has knowledge of the injury or death, submit Form LS-202 (Employee’s First Report of Injury or Occupational Illness) to the Department of Labor in accordance with the
Longshore and Harbor Workers’ Compensation Act (33 U.S.C. 930(a), 20 CFR
702.201 to 702.203);
(3) Pay all compensation due for disability or death within the time frames required by the Longshore and Harbor Workers’ Compensation Act (33 U.S.C. 914, 20 CFR
702.231 and 703.232);
(4) Provide for medical care as required by the Longshore and Harbor Workers’
Compensation Act (33 U.S.C. 907, 20 CFR 702.402 and 702.419);
(5) If controverting the right to compensation, submit Form LS-207 (Notice of
Controversion of Right to Compensation) to the Department of Labor in accordance with the Longshore and Harbor Workers’ Compensation Act (33 U.S.C. 914(d), 20
CFR 702.251);
(6) Immediately upon making the first payment of compensation in any case, submit
Form LS-206 (Payment Of Compensation Without Award) to the Department of
Labor in accordance with the Longshore and Harbor Workers’ Compensation Act
(33 U.S.C. 914(c), 20 CFR 702.234);
http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section932&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1651&num=0&edition=prelim…