About this file

This technical guide document, issued by the Connecticut Department of Transportation, provides detailed installation specifications for fiber optic communication conduit systems as part of the Rehabilitation of Bridge No. 00196 (Interstate 95 over U.S. Route 1) in Branford, Connecticut, identified as Project No. 0014-0185. The document includes comprehensive technical drawings and installation details for multiple components of the fiber optic infrastructure, including conduit crossing specifications under roadways and existing utilities, guide rail crossings, pullbox and handhole installations, and conduit treatment at sign supports. The specifications detail minimum installation depths of 40 inches for conduit, minimum bend radius requirements of 22.5 to 48 inches for rigid metal conduit, and restoration requirements for areas disturbed during trenching operations. The contractor is responsible for ensuring that all conduit installations do not conflict with underground utilities and must contact the Call Before You Dig hotline (1-860-594-3447) prior to excavation.

The document establishes detailed specifications for both underground and aerial fiber optic cable installations, including wood pole and utility pole configurations with specific measurements for messenger support, cable lashing clamps, splice cases, and clearance requirements. Aerial installations must maintain minimum clearances of at least 40 inches below the lowest power company attachment and at least 12 inches above the highest test communications utility attachment. The specifications require contractors to store nominal 75 to 100 feet of extra fiber length at splice enclosures and maintain the manufacturer's minimum bend radius for all fiber optic cable bends. Warning tape and identification posts with reflectorized orange signage must be installed in areas where fiber optic conduit is buried below ground to alert excavators and construction personnel to the presence of underground communication infrastructure.

View the file

Other files

File Type Posted
26PSX0014 Attachment 1 Standard Sheets_Special Provisions.pdf PDF
26PSX0014 Equipment List_Attachment A.xlsx XLSX spreadsheet
26PSX0014 Exhibit B Price Schedule.xlsx XLSX spreadsheet
26PSX0014_Aug_17_26_solicitation_doc.pdf PDF
26PSX0014_Aug_21_26_solicitation_doc.pdf PDF
26PSX0014_Sep_10_26_solicitation_doc.pdf PDF
26PSX0014 Contract Document.pdf PDF
26PSX0014_Jun_30_26_solicitation_doc.pdf PDF
26PSX0014_Sep_1_26_solicitation_doc.pdf PDF
26PSX0014_Sep_16_26_solicitation_doc.pdf PDF
26PSX0014_Sep_17_26_solicitation_doc.pdf PDF
26PSX0014_Sep_24_26_solicitation_doc.pdf PDF
26PSX0014_Oct_2_26_solicitation_doc.pdf PDF
26PSX0014_Oct_8_26_solicitation_doc.pdf PDF
26PSX0014_Oct_16_26_solicitation_doc.pdf PDF
26PSX0014_Sep_11_26_solicitation_doc.pdf PDF
26PSX0014_Oct_7_26_solicitation_doc.pdf PDF
26PSX0014_Oct_15_26_solicitation_doc.pdf PDF
Attachments B through E.pdf PDF
26PSX0014 Attachment 1 Standard Sheets_Special Provisions.pdf.crdownload CRDOWNLOAD file
26PSX0014_Aug_10_26_solicitation_doc.pdf PDF
26PSX0014_Aug_19_26_solicitation_doc.pdf PDF
26PSX0014_Aug_27_26_solicitation_doc.pdf PDF
26PSX0014_Aug_28_26_solicitation_doc.pdf PDF
26PSX0014_Sep_4_26_solicitation_doc.pdf PDF
26PSX0014_Oct_13_26_solicitation_doc.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPICAL GUIDE RAIL CROSSING

EXISTING GRADE

10 (MIN.)

CONDUIT

SAND BACKFILL

(MIN.)

1 1

10 (MIN.)

LEVEL

(MIN.)

(MIN.)

EXISTING UTILITY PIPE OR CONDUIT

(TO BE PROTECTED DURING CONSTRUCTION)

CONDUIT CROSSING UNDER EXISTING UTILITY

2" (50)

36" (900)36" (900)

RIGID METAL CONDUIT

METAL BEAM RAIL

POST

RIGID METAL CONDUIT

P.V.C. OR RMC

AS SPECIFIED

NOTES:

2" OR 4" (50 OR 100) DIA.

22.5°- 48" (1200) RADIUS

FOR 4" (100) RIGID METAL CONDUIT

CONTRACTOR SHALL BE RESPONSIBLE FOR ASSURING THAT CONDUIT

CONTRACTOR SHALL INSTALL CONDUIT AT A MINIMUM DEPTH OF 40" (1000).

CONTRACTOR TO RESTORE AREAS DISTURBED BY TRENCH TO ORIGINAL CONDITION.

WILL NOT CONFLICT WITH UNDERGROUND UTILITIES.

C

PCBC

MAX. 22.5° BEND 48" R (12OO R) (TYP.)

CIRCULAR SHAFT SIGN SUPPORT FOUNDATION L SIGN SUPPORT

PROPOSED EOP

48" (1200) TYP.

108"

(2700)

TYP.

60" 60"

(1500) (1500)

CURB OR EDGE OF ROAD

2" (50) RIGID METAL CONDUIT

22.5° - 48" (1200) RADIUS RIGID METAL BEND

CURB OR EDGE OF ROAD

RMC CONDUIT

22.5° - 48" (1200) RADIUS RIGID METAL BEND

COMMUNICATION

NOTE:

THE CONTRACTOR SHALL BE RESPONSIBLE TO TO ENSURE THAT THE RADIUS OF THE

FOR THE FIBER OPTIC CABLE.

D.K. SWINBURNE

R.A. KENNEDY

TYPICAL PULLBOX/HANDHOLE INSTALLATION - CONDUIT UNDER ROADWAY

HANDHOLE

PULL BOX/

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

3/28/2018

BLOCK:

SIGNATURE/

DATE: APPROVED BY:

OFFICE OF ENGINEERING

...\COMM-05-06-07 CTSS FIBER GUIDE SHEETS.dgnPlotted Date:

C

ONNECTICU

T

D E

P A

R T

M E

N T

O F TRAN

S

P O

R T

A T I

O N

RMC

RMC

2" (50) CONDUIT TREATMENT AT SIGN SUPPORT

RMC

RMC

INSTALLED 2" (50) RMC IS NOT GREATER THAN THE MINIMUM ALLOWED

THE 2" (50) RMC ENTERING AND EXITING THE PULL BOX/HANDHOLE MUST BE INSTALLED

PERPINDICULAR TO THE SIDEWALL OF THE PULL BOX/HANDHOLE.

TYPICAL INTERCONNECT CONDUIT

CROSSING DETAILS

0014-0185

COMM-05

BRANFORD

05.35

REHABILITATION OF BRIDGE

NO. 00196 - INTERSTATE 95

OVER U.S. ROUTE 1

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

3/28/2018

BLOCK:

SIGNATURE/

ONNECTICU

T

D E

P A

R T

M E

N T

O F TRAN

S

P O

R T

A T I

O N

IDENTIFICATION POST DETAIL

WARNING TAPE

GROUND LINE

SOUTHERN YELLOW PINE WOOD POST

FIBER OPTIC

COMMUNICATION

CONDUIT

BURIED BELOW

CONTACT : CALL

BEFORE YOU DIG

1-860-594-3447

SIGN FACE ON ALL FOUR SIDESBEVELED END ALL SIDES

4" X 4" (100 x 100) PRESSURE TREATED

2. TO BE USED FOR CONDUIT IN EARTH.

1. SIGNS TO BE ATTACHED TO POST WITH

‚" X 1‚" (6 x 30) STAINLESS STEEL LAG

SCREW WITH NYLON WASHER.

NOTES: 4

.2 m

M I N

.2 m

M I N

CAUTION - FIBER OPTIC CABLE BURIED BELOWD BELOW

SIGN FACE DETAIL

NOTE:

SIGN FACE TO BE

REFLECTORIZED ORANGE

WITH BLACK LETTERS.

FIBER OPTIC

COMMUNICATION

CONDUIT

BURIED BELOW

CONTACT : CALL

BEFORE YOU DIG

1-860-594-3447

3" (75)

…" (9) TYP.

•" (13) TYP.

1•" (38) TYP.

1 •" (38)

1 ‚" (31)

30" (750) MAX.

(TYP.)

D.K. SWINBURNE

R.A. KENNEDY

IDENTIFICATION POST AND

REVISED NUMBER ON CBYD SIGN FACE DETAIL8/5/141

WARNING TAPE DETAILS

0014-0185

CAUTI

COMM-06

BRANFORD

05.36

REHABILITATION OF BRIDGE

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

3/28/2018

BLOCK:

SIGNATURE/

ONNECTICU

T

D E

P A

R T

M E

N T

O F TRAN

S

P O

R T

A T I

O N

R.A. KENNEDY

D.K. SWINBURNE----

NOTES:

OPTIC CABLE SPLICE ENCLOSURE."

1. NEWLY INSTALLED WOOD POLES SHOWN. INSTALLATIONS

TO EXISTING UTILITY POLES SIMILAR.

3. SPLICE CASES SHALL BE PAID UNDER THE ITEM "FIBER

CABLE-DROP INSTALLATION

CABLE LASHING CLAMPS (TYP.)

MESSENGER SUPPORT

WITH "J" HOOK

3 BOLT SUSPENSION CLAMP

DOUBLE LASHED TO MESSENGER (TYP.)

SPLICE CASE (SEE DETAIL)

WOOD POLE

STAND-OFF CONDUIT CLAMP

MESSENGER SUPPORT

12" (300) MIN.

72"

(1800)

MAX.

STAND-OFF ELEVATION STAND-OFF ENTRANCE DETAIL

MESSENGER SUPPORT

WITH "J" HOOK

3 BOLT SUSPENSION CLAMP

DOUBLE LASHED TO MESSENGER

CONDUIT STAND-OFF INSTALLATION

FOR WOOD POLE

TYPICAL WOOD POLE AND GUY INSTALLATION

CONDUIT CLAMP DETAIL

ELEVATION

WOOD POLE

96"

(2400)

MIN.

SPLICE CASE

PLAN

4"

(100)

WOOD POLE

WITH P.U.C.A. STANDARDS

INSTALLED IN ACCORDANCE

STAND-OFFS SHALL BE

CABLE LASHING AT A CORNER POLE DETAIL

72"

(1800)

GROUND SURFACE

STRANDVISE

STRANDVISE

GUY GRIP

STRANDVISE

GUY GUARD

EYE BOLT WITH WASHER AND NUT

1" (25) ANCHOR ROD

CHANCE ANCHOR CATALOG

NO. 1283-1 OR EQUIV.

CABLE GUARD

12" (3

) 12" (300)

10" (2

) 10" (250)

END CAP

MESSENGER SUPPORT

SPLICE TRAYS

RIGID METAL OR PLASTIC

CLAMP BARS

CLAMP ASSEMBLY FOR CABLE

8"

(200)

COVER ASSEMBLY

RE-ENTERABLE WATERTIGHT

34" (850) (TYP)

(TYP)

FIBER OPTICAL CABLE FIBER OPTICAL CABLE

FIBER OPTICAL CABLE

FIBER OPTICAL CABLE

ATTACHMENT, UNLESS OTHERWISE DIRECTED ON PLANS.

AND AT LEAST 12" (300) ABOVE HIGHTEST COMMUNICATIONS

40" (1000) BELOW LOWEST POWER COMPANY ATTACHMENT,

2. ENSURE THE ATTACHMENT POINT HAS CLEARANCES OF AT LEAST

UTILITY AND WOOD POLE

INSTALLATION DETAILS

WEATHERPROOF CLAMP STYLE FITTING

ENTRANCE FITTING TO BE

OPTICAL FIBER CABLE TO

TRAFFIC SIGNAL CONTROLLER

MINIMUM BEND RADIUS SPECIFIED BY THE MANUFACTURER

4. BENDS IN FIBER OPTIC CABLE SHALL NOT EXCEED THE

WEATHERPROOF CLAMP STYLE FITTING

ENTRANCE FITTING TO BE

OPTICAL FIBER CABLE

CONTROLLER

TO TRAFFIC SIGNAL

OPTICAL FIBER CABLE

LASHED TO MESSENGER (TYP.)

OPTICAL FIBER CABLE DOUBLE

0014-0185

COMM-07

AERIALLY ON SNOWSHOE.

OF SPLICE ENCLOSURE AS NOTED ON FIBER LAYOUT PLAN NEATLY

6. COIL AND STORE NOMINAL 75 FEET SPARE FIBER ON ALL SIDES

NOTED ON FIBER LAYOUT PLAN NEATLY AERIALLY ON SNOWSHOE.

5. COIL AND STORE NOMINAL 100 FEET EXTRA LENGTH FIBER WHERE

BRANFORD

05.37

REHABILITATION OF BRIDGE

HW_MSH_0014_0185_SUBSET COVER_TRAFFIC (05-23-18)
TR_MSH_STD_0014_0185_SPM_PLAN-01.DGN (05-23-18)
TR_MSH_STD_0014_0185_SPM_PLAN-02.DGN (05-23-18)
HW_MSH_0014_0185_STG SECTIONS (05-23-18)
HW_MSH_0014_0185_STG-01.DGN (05-23-18)
HW_MSH_0014_0185_STG-02.DGN (05-23-18)
HW_MSH_0014_0185_STG-03 & 04.DGN (05-23-18)
HW_MSH_0014_0185_STG-5A.DGN (05-23-18)
HW_MSH_0014_0185_STG-5B.DGN (05-23-18)
HW_MSH_0014_0185_STG-5C.DGN (05-23-18)
HW_MSH_0014_0185_STG-6.DGN (05-23-18)
HW_MSH_0014_0185_STG-03-1a.DGN (05-23-18)
HW_MSH_0014_0185_STG-03-1.DGN (05-23-18)
HW_MSH_0014_0185_STG-03-2.DGN (05-19-18)
HW_MSH_0014_0185_STG-03-3.DGN (05-19-18)
HW_MSH_0014_0185_STG-03-5.DGN (05-19-18)
HW_MSH_0014_0185_STG-04A.DGN (05-19-18)
HW_MSH_0014_0185_STG-04B.DGN (05-19-18)
HW_MSH_0014_0185_STG-04C.DGN (05-19-18)
HW_MSH_0014_0185_STG-04D.DGN (05-19-18)
HW_MSH_0014_0185_STG-04E.DGN (05-19-18)
HW_MSH_0014_0185_STG-05_I95.DGN (05-19-18)
CTDOT_TRAFFIC_GS (05-23-18)
CTDOT_TRAFFIC_GS 2 (05-23-18)
CTDOT_TRAFFIC_GS 3(05-23-18)

File details come from the government source that posted it. Updated .