26PSX0014 Exhibit B Price Schedule.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- 26PSX0014
- Issued by
- New Haven County, Bridgeport City, Connecticut
About this file
This is a Price Schedule (Exhibit B) for Connecticut Contract 26PSX0014, establishing pricing for electrical service and sign installation units provided to the State of Connecticut Department of Transportation. The contract encompasses a comprehensive range of services organized into 44 pricing categories, including additional personnel (traffic signal technicians, electricians, apprentices, and laborers), electrical service units, specialized equipment (cranes, digger derricks, trenchers), traffic signal installation and relamping, highway illumination services, pedestrian crossing signals, interconnect and fiber cable services, video detection systems, and traffic control services. Services are priced by district (Districts 1-4) with additional charges for night, Saturday, and Sunday work where applicable. Pricing structures include hourly rates, daily rates, per-unit rates, and per-linear-foot rates depending on the service category.
Contractors may propose prices equal to or less than the stated maximum prices, with specific caps including $125 per hour for traffic signal technicians and journeyperson electricians, $90 per hour for apprentices, and $85 per hour for laborers. For traffic control services, maximum prices range from $200-$300 per hour for uniformed flaggers depending on expressway or two-lane configurations. The price schedule includes provisions for annual price adjustments after the first twelve months, with adjustments limited to the percentage change in the U.S. Producer Price Index for Electrical Contractors (NAICS 238210) and subject to DAS Procurement approval. Contractors must submit adjustment requests during the 30-day window preceding annual anniversary dates, with approved adjustments taking effect no sooner than ten calendar days after approval. All initial prices remain firm for twelve months from the effective date.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| State of Connecticut | |||||||
| CONTRACT: 26PSX0014 | |||||||
| EXHIBIT B, PRICE SCHEDULE | |||||||
| 1 | Additional Personnel (when needed) | Per Hour Rate | |||||
| 1a | Traffic Signal Technician | $125 = Maximum Price. Contractor may enter proposed prices equal to or less than but not greater than $125.00. | |||||
| 1b | Trades Journeyperson Electrician (E-2) | $125 = Maximum Price. Contractor may enter proposed prices equal to or less than but not greater than $125.00. | |||||
| 1c | State of CT Registered Electrical Apprentice | $90 = Maximum Price. Contractor may enter proposed prices equal to or less than but not greater than $90.00. | |||||
| 1d | Laborer | $85 = Maximum Price. Contractor may enter proposed prices equal to or less than but not greater than $85.00. | |||||
| 2 | Electrical Service Unit | Daily Rate | |||||
| 2a | District 1 | ||||||
| 2b | District 2 | ||||||
| 2c | District 3 | ||||||
| 2d | District 4 | ||||||
| 2e | Night – Additional | ||||||
| 2f | Saturday – Additional | ||||||
| 2g | Sunday – Additional | ||||||
| 3 | Telescopic Boom Crane Truck | Daily Rate | |||||
| 3a | District 1 | ||||||
| 3b | District 2 | ||||||
| 3c | District 3 | ||||||
| 3d | District 4 | ||||||
| 4 | Digger Derrick Truck | Daily Rate | |||||
| 4a | District 1 | ||||||
| 4b | District 2 | ||||||
| 4c | District 3 | ||||||
| 4d | District 4 | ||||||
| 5 | Signal Loop Detector Installation Unit | Per Linear Foot of Saw Cut | |||||
| 5a | District 1 | ||||||
| 5b | District 2 | ||||||
| 5c | District 3 | ||||||
| 5d | District 4 | ||||||
| 6 | Piezo Sensor Installation Unit | Installed Per Piezo | |||||
| 6a | District 1 | ||||||
| 6b | District 2 | ||||||
| 6c | District 3 | ||||||
| 6d | District 4 | ||||||
| 6e | Night – Additional | ||||||
| 6f | Saturday – Additional | ||||||
| 6g | Sunday – Additional | ||||||
| 7 | Traffic Signal Installation Unit | Daily Rate | |||||
| 7a | District 1 | ||||||
| 7b | District 2 | ||||||
| 7c | District 3 | ||||||
| 7d | District 4 | ||||||
| 7e | Night – Additional | ||||||
| 7f | Saturday – Additional | ||||||
| 7g | Sunday – Additional | ||||||
| Pole Auger/Derrick Truck with a 50' boom | Additional to the Daily Rate | ||||||
| 7h | District 1 | ||||||
| 7i | District 2 | ||||||
| 7j | District 3 | ||||||
| 7k | District 4 | ||||||
| Loader/Backhoe | Additional to the Daily Rate | ||||||
| 7l | District 1 | ||||||
| 7m | District 2 | ||||||
| 7n | District 3 | ||||||
| 7o | District 4 | ||||||
| Dump Truck | Additional to the Daily Rate | ||||||
| 7p | District 1 | ||||||
| 7q | District 2 | ||||||
| 7r | District 3 | ||||||
| 7s | District 4 | ||||||
| 50' Hydraulic Boom | Additional to the Daily Rate | ||||||
| 7t | District 1 | ||||||
| 7u | District 2 | ||||||
| 7v | District 3 | ||||||
| 7w | District 4 | ||||||
| Loop Truck | Additional to the Daily Rate | ||||||
| 7x | District 1 | ||||||
| 7y | District 2 | ||||||
| 7z | District 3 | ||||||
| 7aa | District 4 | ||||||
| Self-Propelled Trencher with 4” wide cut and 4’ depth | Additional to the Daily Rate | ||||||
| 7bb | District 1 | ||||||
| 7cc | District 2 | ||||||
| 7dd | District 3 | ||||||
| 7ee | District 4 | ||||||
| 8 | Sign Installation Unit | Daily Rate | |||||
| 8a | District 1 | ||||||
| 8b | District 2 | ||||||
| 8c | District 3 | ||||||
| 8d | District 4 | ||||||
| 8e | Night – Additional | ||||||
| 8f | Saturday – Additional | ||||||
| 8g | Sunday – Additional | ||||||
| Auger Truck | Additional to the Daily Rate | ||||||
| 8h | District 1 | ||||||
| 8i | District 2 | ||||||
| 8j | District 3 | ||||||
| 8k | District 4 | ||||||
| Hydraulic Boom | Additional to the Daily Rate | ||||||
| 8l | District 1 | ||||||
| 8m | District 2 | ||||||
| 8n | District 3 | ||||||
| 8o | District 4 | ||||||
| Cement/Concrete Mixer | Additional to the Daily Rate | ||||||
| 8p | District 1 | ||||||
| 8q | District 2 | ||||||
| 8r | District 3 | ||||||
| 8s | District 4 | ||||||
| 9 | Traffic Signal Relamping Unit | Installed Unit Price | |||||
| 9a | District 1 | ||||||
| 9b | District 2 | ||||||
| 9c | District 3 | ||||||
| 9d | District 4 | ||||||
| 10 | Highway Illumination Relamping Unit | Installed Unit Price | |||||
| 10a | District 1 | ||||||
| 10b | District 2 | ||||||
| 10c | District 3 | ||||||
| 10d | District 4 | ||||||
| 11 | Highway Illumination Fixture Replacement Unit | Installed Unit Price | |||||
| 11a | District 1 | ||||||
| 11b | District 2 | ||||||
| 11c | District 3 | ||||||
| 11d | District 4 | ||||||
| 12 | Pedestrian Crossing Signal Relamping Unit | Installed Unit Price | |||||
| 12a | District 1 | ||||||
| 12b | District 2 | ||||||
| 12c | District 3 | ||||||
| 12d | District 4 | ||||||
| 13 | Accessible Pedestrian Push Button Installation Unit | Installed Unit Price | |||||
| 13a | District 1 | ||||||
| 13b | District 2 | ||||||
| 13c | District 3 | ||||||
| 13d | District 4 | ||||||
| 14 | Pedestrian Heads Installation Unit | Installed Unit Price | |||||
| 14a | District 1 | ||||||
| 14b | District 2 | ||||||
| 14c | District 3 | ||||||
| 14d | District 4 | ||||||
| 15 | 8’ Pedestal & Foundation Installation Unit | Installed Unit Price | |||||
| 15a | District 1 | ||||||
| 15b | District 2 | ||||||
| 15c | District 3 | ||||||
| 15d | District 4 | ||||||
| 16 | Relocate Interconnect Cable Unit | Per Hour Price (Including Materials) | |||||
| 16a | District 1 | ||||||
| 16b | District 2 | ||||||
| 16c | District 3 | ||||||
| 16d | District 4 | ||||||
| 17 | Repair Interconnect Cable Unit | Per Hour Price (Including Materials) | |||||
| 17a | District 1 | ||||||
| 17b | District 2 | ||||||
| 17c | District 3 | ||||||
| 17d | District 4 | ||||||
| 18 | Replace Interconnect Cable Unit | Per Linear Foot Price (Including Materials) | |||||
| 18a | District 1 | ||||||
| 18b | District 2 | ||||||
| 18c | District 3 | ||||||
| 18d | District 4 | ||||||
| 19 | Remove Interconnect Cable Unit | Per Hour Price (Including Materials) | |||||
| 19a | District 1 | ||||||
| 19b | District 2 | ||||||
| 19c | District 3 | ||||||
| 19d | District 4 | ||||||
| 20 | Span Wire Installation Unit | Per Linear Foot Price (Including Materials) | |||||
| 20a | District 1 | ||||||
| 20b | District 2 | ||||||
| 20c | District 3 | ||||||
| 20d | District 4 | ||||||
| 21 | Span Wire Relocation Unit | Per Hour Price (Including Materials) | |||||
| 21a | District 1 | ||||||
| 21b | District 2 | ||||||
| 21c | District 3 | ||||||
| 21d | District 4 | ||||||
| 22 | 360 Video Detection Installation Unit | Daily Rate (Including Incidental Materials ) | |||||
| 22a | District 1 | ||||||
| 22b | District 2 | ||||||
| 22c | District 3 | ||||||
| 22d | District 4 | ||||||
| 23 | Thermal Video Detector Assembly Installation Unit | Daily Rate (Including Incidental Materials ) | |||||
| 23a | District 1 | ||||||
| 23b | District 2 | ||||||
| 23c | District 3 | ||||||
| 23d | District 4 | ||||||
| 24 | IP Video Detection Camera Assembly Installation Unit | Daily Rate (Including Incidental Materials ) | |||||
| 24a | District 1 | ||||||
| 24b | District 2 | ||||||
| 24c | District 3 | ||||||
| 24d | District 4 | ||||||
| 25 | MSRP CATALOG LIST PRICING QUANTITY RANGE | 360° Video Detection/Smart Mount Kit Percentage off | Thermal Video Monitor Percentage off | IP Video Detection Camera Percentage off | REPEATERS Percentage off | ||
| 25a | 0 - 10 | ||||||
| 25b | 11 - 25 | ||||||
| 25c | 26 - 75 | ||||||
| 25d | OVER 75 | ||||||
| 26 | Wooden Pole Installation Unit | Installed Per Unit Price (Including Materials) | |||||
| 26a | District 1 | ||||||
| 26b | District 2 | ||||||
| 26c | District 3 | ||||||
| 26d | District 4 | ||||||
| 27 | Traffic Controller and Cabinet Installation Unit | Installed Per Unit Price (Including Materials) | |||||
| 27a | District 1 | ||||||
| 27b | District 2 | ||||||
| 27c | District 3 | ||||||
| 27d | District 4 | ||||||
| 27e | Night – Additional | ||||||
| 27f | Saturday – Additional | ||||||
| 27g | Sunday – Additional | ||||||
| 28 | Control Cable Installation Unit | Installed Per Linear Foot Price (Including Materials) | |||||
| 28a | District 1 | ||||||
| 28b | District 2 | ||||||
| 28c | District 3 | ||||||
| 28d | District 4 | ||||||
| 29 | Two-Lane Traffic Control PER HOUR PRICE FOR EACH | Traffic Control | Uniformed Flagger | TMA -Truck Mounted Attenuator with Operator | |||
| 29a | District 1 | $200 = Max Price | $75 = Max Price | $200 = Max Price | |||
| 29b | District 2 | $200 = Max Price | $75 = Max Price | $200 = Max Price | |||
| 29c | District 3 | $200 = Max Price | $75 = Max Price | $200 = Max Price | |||
| 29d | District 4 | $200 = Max Price | $75 = Max Price | $200 = Max Price | |||
| 30 | Expressway Traffic Control PER HOUR PRICE FOR EACH | Traffic Control | Uniformed Flagger | TMA -Truck Mounted Attenuator with Operator | |||
| 30a | District 1 | $300 = Max Price | $75 = Max Price | $200 = Max Price | |||
| 30b | District 2 | $300 = Max Price | $75 = Max Price | $200 = Max Price | |||
| 30c | District 3 | $300 = Max Price | $75 = Max Price | $200 = Max Price | |||
| 30d | District 4 | $300 = Max Price | $75 = Max Price | $200 = Max Price | |||
| 31 | Relocate Fiber Interconnect Cable Unit | Per Hour Price (Including Materials) | |||||
| 31a | District 1 | ||||||
| 31b | District 2 | ||||||
| 31c | District 3 | ||||||
| 31d | District 4 | ||||||
| 32 | Repair Fiber Interconnect Cable Unit | Per Hour Price (Including Materials) | |||||
| 32a | District 1 | ||||||
| 32b | District 2 | ||||||
| 32c | District 3 | ||||||
| 32d | District 4 | ||||||
| 33 | Install Fiber Interconnect Cable Unit | Per Linear Foot (Including Materials) | |||||
| 33a | District 1 | ||||||
| 33b | District 2 | ||||||
| 33c | District 3 | ||||||
| 33d | District 4 | ||||||
| 34 | Replace Fiber Interconnect Cable Unit | Per Linear Foot (Including Materials) | |||||
| 34a | District 1 | ||||||
| 34b | District 2 | ||||||
| 34c | District 3 | ||||||
| 34D | District 4 | ||||||
| 35 | Radar Vehicle Detector Installation Unit | Daily Rate (Including Incidental Materials ) | |||||
| 35a | District 1 | ||||||
| 35b | District 2 | ||||||
| 35c | District 3 | ||||||
| 35d | District 4 | ||||||
| 36 | Radio Interconnect Assembly Installation Unit | Daily Rate (Including Incidental Materials ) | |||||
| 36a | District 1 | ||||||
| 36b | District 2 | ||||||
| 36c | District 3 | ||||||
| 36d | District 4 | ||||||
| 37 | Camera Assemby Installation Unit | Per Hour Price (Includes Materials) | |||||
| 37a | District 1 | ||||||
| 37b | District 2 | ||||||
| 37c | District 3 | ||||||
| 37d | District 4 | ||||||
| 38 | Camera Assembly Replacement Unit | Per Hour Price (Includes Materials) | |||||
| 38a | District 1 | ||||||
| 38b | District 2 | ||||||
| 38c | District 3 | ||||||
| 38d | District 4 | ||||||
| 39 | Camera Assembly Relocation Unit | Per Hour Price (Includes Materials) | |||||
| 39a | District 1 | ||||||
| 39b | District 2 | ||||||
| 39c | District 3 | ||||||
| 39d | District 4 | ||||||
| 40 | Ethernet Switch Installation Unit | Per Hour Price (Includes Materials) | |||||
| 40a | District 1 | ||||||
| 40b | District 2 | ||||||
| 40c | District 3 | ||||||
| 40d | District 4 | ||||||
| 41 | Ethernet Switch Replacement Unit | Per Hour Price (Includes Materials) | |||||
| 41a | District 1 | ||||||
| 41b | District 2 | ||||||
| 41c | District 3 | ||||||
| 41d | District 4 | ||||||
| 42 | Overhead Sensor Installation Unit | Per Hour Price (Includes Materials) | |||||
| 42a | District 1 | ||||||
| 42b | District 2 | ||||||
| 42c | District 3 | ||||||
| 42d | District 4 | ||||||
| 43 | Overhead Sensor Replacement Unit | Per Hour Price (Includes Materials) | |||||
| 43a | District 1 | ||||||
| 43b | District 2 | ||||||
| 43c | District 3 | ||||||
| 43d | District 4 | ||||||
| 44 | Description | Manufacturer | Mark up Percentage (Not to Exceed 15%) | Manufactuer List Price Date | |||
| 44a | Replacement Parts | ||||||
| 44b | Replacement Parts | ||||||
| 44c | Replacement Parts | ||||||
| 44d | Replacement Parts |
Price Adjustment
| Price Adjustments: |
| 1. Prices listed in Exhibit B- Price Schedule shall remain firm for twelve (12) months following the Effective Date. The Contractor may submit a written request for a price adjustment only during the thirty (30) days immediately preceding the annual anniversary dates of the Effective Date during the Term. |
2. After the first year, the Contractor may request one price adjustment annually. Each price adjustment shall be based on the percentage change that does not exceed, and is consistent with the U.S. Producer Price Index (PPI) for Electrical Contractors and Other Wiring Installation Contractors (NAICS 238210), as published by the U.S. Bureau of Labor Statistics. The change will be measured from the PPI in effect on the Effective Date to the most recently published PPI when the price adjustment request is submitted. Should that PPI cease to be published, the Contractor shall use the most comparable index published by the Federal government. Each request must include, without limitation, such PPI and cost documentation, manufacturer and market data as support for the requested price adjustment showing the applicable percentage change in the PPI.
3. DAS Procurement reserves the sole right to approve, negotiate, or reject any price adjustment request, in whole or in part, at its discretion. Approved adjustments may result in either an increase or decrease to the Contract pricing.
4. All requests for price adjustments must be submitted directly to DAS Procurement and in accordance with the Contract Notice Section. Requests sent to a Client Agency are invalid, and will be treated as if no request was made, and will not extend the 30‑day submission window. If a Contractor does not submit a timely request, the Contractor’s right to request a price adjustment for that year will lapse, and the current pricing will remain in effect for the next twelve (12) months until the next eligible price adjustment period.
5. If DAS approves a price adjustment, it will take effect no sooner than ten (10) calendar days after the approval date. The Contractor shall honor all Purchase Orders issued before the effective date of an approved price adjustment and at the prices in effect when those Purchase Orders were issued.
File details come from the government source that posted it. Updated .