This document is an ESPC (Energy Savings Performance Contract) Grading Plan prepared by Thomas and Hutton for JDA Stanton Springs and property owner Andrea Gray, covering site clearing and erosion control work for the Moore Tract located at 13924 Highway 278, Social Circle, Georgia 30025. The project encompasses 22.0 acres of land disturbance across four parcel tax identification numbers, with the grading plan prepared on May 12, 2026. The work includes site clearing, silt fence installation, temporary sediment basins, erosion and sediment control best management practices (BMPs), and grading and drainage infrastructure. The plan is organized into construction phases: an initial phase limiting disturbance to 2.2 acres for perimeter erosion control installation, followed by a construction and final phase covering the remaining acreage. Key features include two drainage basins (Basin 1 with 9.1 acres and Basin 2 with 6.0 acres), 16 temporary downdrains using 18-inch HDPE pipe, temporary sediment traps, rock filter dams, and outlet protection structures. The project requires a 7-day inspection following initial phase BMP installation before major grading operations commence. All cleared areas must be stabilized within 14 days of disturbance completion using temporary seeding and mulching, with permanent vegetation establishment required to achieve 70 percent density before BMP removal.
The grading and drainage design includes 60 linear feet of 24-inch reinforced concrete pipe at 1.00 percent slope and 62 linear feet of 18-inch reinforced concrete pipe at 0.57 percent slope, with detailed outlet protection specifications including riprap sizing and check dam installations. Soil conditions across the site include multiple series classifications ranging from Ashlar Sandy Loam to Pacolet Sandy Clay Loam with varying slope percentages. The plan incorporates comprehensive environmental controls including 25-foot state waters buffers, protection of existing wetlands and flood zones, and compliance with Georgia's Manual for Erosion and Sediment Control standards. The site contains existing utilities including overhead power lines, underground communications, gas lines, water mains, sewer lines, and a 12-inch force main, with a 16.5-foot communications easement and 40-foot sewer easement noted. Daily inspection and maintenance of all BMPs is required throughout construction, with dust control by water truck or temporary mulching mandated for all disturbed areas. The construction contractor is responsible for construction exit installation, tree removal, slope roughening, and all erosion control monitoring and repairs prior to final site stabilization and grassing approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26900_0015 _ Moore Tract Specs.pdf | ||
| Invitation to Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARCEL BOUNDARY
HWY 278
LITTLE RIVER
NELSON CREEK
REV. NO. REVISION
REVISION HISTORY
BY DATE
SUBMITTED TO
SUBMITTAL HISTORY
DATEDATE
J-
0.
/1
2/
M
O O
RE
T
RA
C
T
ES
PC
G
RA
D
IN
G
P
LA
N
Know what'sbelow.
before you dig.Call
R
SITE CLEARING PLANS
OF
MOORE TRACT
ESPC GRADING PLAN
13924 HWY 278
SOCIAL CIRCLE, GA 30025
PREPARED FOR:
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
MONROE, GA 30655
ANDREA@ANDREAPGRAY.COM
MAY 12, 2026
TM# 0124000000039000,
0124000000048000, 0134000000005J00, 0134000000005I00, 0134000000005K00
J-26900.0015
VICINITY MAP
SCALE: 1" = 1000'
SITE
PREPARED BY:
3633 Wheeler Road • Suite 385 Augusta, GA 30909 p.762.212.4870 www.thomasandhutton.com
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
C
S-
PL
.D W
G
M ay
6,
- 8
:1
A M
GSWCC ID: 0000064323
EXP: 12/22/2027
Sheet List Table Sheet
Number Sheet Title
C0 COVER SHEET
C1.1 EXISTING CONDITIONS - OVERALL SITE
EC0.1 EROSION CONTROL NOTES
EC0.2 EROSION CONTROL NOTES
EC0.3 EROSION CONTROL NOTES
EC1.1 EROSION CONTROL PLAN - INITIAL PHASE
EC1.2 EROSION CONTROL PLAN - INITIAL PHASE
EC2.1 EROSION CONTROL PLAN - CONSTRUCTION - FINAL PHASE
EC2.2 EROSION CONTROL PLAN - CONSTRUCTION - FINAL PHASE
EC4.1 EROSION CONTROL DETAILS
EC4.2 EROSION CONTROL DETAILS
EC4.3 EROSION CONTROL DETAILS
EC4.4 EROSION CONTROL DETAILS
EC4.5 EROSION CONTROL DETAILS
C3.1 GRADING AND DRAINAGE PLAN AND PROFILE
C3.2 GRADING AND DRAINAGE PLAN
C3.3 GRADING AND DRAINAGE DETAILS
http://www.thomasandhutton.com rutt.z Text Box 05/12/2026 rutt.z Snapshot rutt.z Civil Plans - Final - Review
''F
M
''F
M
''F
M
''F
M
''F M
''F
M
12''FM
12''FM
''F
M
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
X X
X X
XXX
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X X
X
X X
X X
X
X X
X X
X
X
X X X
X X X X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
UTL UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
O
HP
O
HP
OHP OHP OHP OHP OHP OHP OHP
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UGC
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UGG
UGG
UGG
UGG
UGG
UGG
GAS
GAS
GAS
GAS
GAS
PROPERTY BOUNDARY (TYP.)
EXISTING OVERHEAD
POWER (TYP.)
EXISTING WETLANDS (TYP.)
EXISTING TRIBUTARY TO
LITTLE RIVER
EXISTING WATER MAIN
EXISTING UNDERGROUND COMMUNICATIONS
EXISTING GAS LINE
EXISTING WATER MAIN
EXISTING BUILDING
EXISTING FENCE (TYP.)
EXISTING WETLANDS (TYP.)
ABANDONED PROPERTY LINE
ABANDONED PROPERTY LINE
25' SETBACK (TYP.)
55' FRONT SETBACK (TYP.)
25' BUFFER ALONG
STATE WATERS (TYP.)
EXISTING 12" FORCE MAIN
40' SEWER EASEMENT
EXISTING GRAVITY SEWER
FLOOD ZONE A (TYP.)
16.5' UTILITY EA
SEM
EN
T
FLOOD ZONE A (TYP.)
ABANDONED PROPERTY
LINE
ABANDONED PROPERTY LINE
HWY 278
60' R/W
LITTLE RIVER
NELSON CREEK
ADJACENT PROPERTY BOUNDARY (TYP.)
EXISTING BOX CULVERT
EXISTING CONCRETE
DRIVEWAY
10' W A
TER
EA
SEM
EN
T
25' BUFFER ALONG
STATE WATERS (TYP.)
1" = 200'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
O
S-
PL
.D W
G
M ay
6,
- 8
:1
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS -
OVERALL SITE
C1.1 26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
05/12/2026
ZR
ZR
DG
WHE
3633 Wheeler Road • Suite 385 Augusta, GA 30909 • 762.212.4870 www.thomasandhutton.com
GRAPHIC SCALE:
1 INCH =
200 FEET
200 100 200 http://www.thomasandhutton.com rutt.z Snapshot
3633 Wheeler Road • Suite 385 Augusta, GA 30909 • 762.212.4870 www.thomasandhutton.com http://www.thomasandhutton.com rutt.z Snapshot www.thomasandhutton.com http://www.thomasandhutton.com rutt.z Snapshot
3633 Wheeler Road • Suite 385 Augusta, GA 30909 • 762.212.4870 www.thomasandhutton.com http://www.thomasandhutton.com rutt.z Snapshot
CCA
PfD2PfC2
HwC2
Rk
HwB2 HwC2
GwD2
HwC2
PfD2
PaC
PfE2
TCA
HeB GeC
''F
M
''F
M
''F
M
''F M
''F
M
''F M
''F
M
''F M
12''FM
12''FM
12''FM
12''FM
''F
M
''F M
''F
M
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
X X X
X X
X X
X
XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X
X X
X
X X
X X
X X
X X
X
X
X X X X X
X X
X X
X X
X
X
X
X
X
XX
X X X
X X
X X X X X X X
X X X
X X
X
X
X
X
X X
X
X
X
X
X X
X X
X
X
X
XX
X
X X
X X
X
X
X
W W
W
W
W
W
W
W
W W
W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
O
HP
O
HP
O
HP
O
HP
O
HP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
OHP OHP OHP OHP
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UGC
UGC
UGC
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UGC
UGG
UGG
UGG
UGG
UGG
UGG
UGG UGG
UGG
UGG
UGG
UGG
UGG
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
X
X X
X
X
X
X
X
Co
X
LAT: 33.6059
LONG: -83.7159
UPSTREAM SAMPLING LOCATION
LITTLE RIVER
TRIBUTARY TO LITTLE RIVER
(INTERMITTENT STREAM)
25' STATE WATERS
BUFFER (TYP)
EXISTING WETLANDS (TYP.)
FLOOD ZONE A (TYP.)
PROPERTY BOUNDARY (TYP.)
LITTLE RIVER
(PERENNIAL STREAM)
25' STATE WATERS
BUFFER (TYP)
SOIL SERIES
DELINEATION (TYP.)
72472
65665
652654656658
664666668672674
682684
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
DLOD
LO
D
LOD
LOD
LOD
LODLOD
LO
D
Rd
Sd1-S
PROVIDE TWO ROWS OF
Sd1-S ALONG STATE WATERS
AND SENSITIVE AREAS (TYP.)
LEAVE OPENING IN
SILT FENCE AND PROVIDE
ROCK DAM
Rd
LEAVE OPENING IN
SILT FENCE AND PROVIDE
ROCK DAM
LIMITS OF DISTURBANCE (±2.2 AC)
FOR INITIAL PHASE - ONLY WHAT IS
REQUIRED TO INSTALL PERIMETER
SILT FENCE
Ds1 Ds2
DuDs1 Ds2
Du
1" = 100'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-P L0
1.
D
W G
M ay
6,
- 8 :1
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL PLAN -
INITIAL PHASE
EC1.1
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
100 FEET
100 50 100
CONSTRUCTION SEQUENCE - INITIALIZATION
1. THE CONTRACTOR SHALL INSTALL THE CONSTRUCTION EXIT IN ACCORDANCE WITH THE "MANUAL FOR
EROSION AND SEDIMENT CONTROL IN GEORGIA" PRIOR TO COMMENCEMENT OF CLEARING AND
GRUBBING.
2. THE CONTRACTOR SHALL ONLY CLEAR AND GRUB AREAS NECESSARY FOR THE INSTALLATION OF INITIAL ES & PC BMPs SHOWN ON THIS PLAN.
3. THE CONTRACTOR SHALL MAINTAIN OR REPLACE THE SILT FENCE ALONG THE PERIMETER OF THE SITE AS
NEEDED.
4. THE ONLY GRADING THAT SHALL TAKE PLACE DURING THE INITIAL PHASE, AND PRIOR TO 7-DAY LETTER
ISSUANCE IS FOR THE SEDIMENT BASIN.
5. ONCE ALL INITIAL PHASE CONTROLS ARE IN PLACE AND THE 7-DAY LETTER IS ISSUED, THE CONTRACTOR
CAN THEN COMPLETE THE REMAINING CLEARING AND GRUBBING. THE SEDIMENT BASIN MAY BE
INSTALLED AFTER THE 7-DAY INSPECTION BUT MUST BE IN PLACE PRIOR TO INITIATING MAJOR GRADING
OPERATIONS.
6. THE CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES FOR ALL DISTURBED AREAS BY WATER
TRUCK OR TEMPORARY MULCHING.
7. ONCE ALL ES & PC BMPs PER THIS PLAN ARE IN PLACE, THE CONTRACTOR SHALL NOTIFY THE DESIGN
ENGINEER TO PERFORM THE 7-DAY INSPECTION.
8. THE ONLY STORM WATER POLLUTANT ANTICIPATED DURING CONSTRUCTION IS SEDIMENT. THE BMPs INCLUDED ON THIS PLAN ARE DESIGNED TO REDUCE THE SEDIMENT DEPOSITION ONTO DOWNSTREAM
PROPERTIES & RECEIVING WATERS.
9. SEDIMENT STORAGE FOR THE INITIAL PHASE HAS BEEN PROVIDED BY SILT FENCE.
10. NO WORK IS PERMITTED TO BE DONE IN JURISDICTIONAL WETLANDS OR STATE WATERS AS PART OF THIS
PLAN.
EROSION CONTROL
LEGEND
DESCRIPTION PLAN SYMBOL
DISTURBED AREA STABILIZATION
(MULCHING ONLY)
DISTURBED AREA STABILIZATION
(TEMPORARY SEEDING)
DISTURBED AREA STABILIZATION
(PERMANENT VEGETATION)
DUST CONTROL
COMPOST FILTER SOCK
CONSTRUCTION EXIT
DIVERSION
DOWNDRAIN STRUCTURES
(TEMPORARY)
ROCK FILTER DAM
SILT FENCE - TYPE S
TEMPORARY SEDIMENT BASIN
TEMPORARY SEDIMENT TRAP
FLOATING SURFACE SKIMMER
STORM DRAIN OUTLET PROTECTION
Ds1
Ds2
Ds3
Du
Cd-Fs
Co
Di
Dn1
Rd
Sd1-S
Sd3
Sd4
Sk
St
SOIL SERIES LEGEND
SOIL SERIES SOIL DESCRIPTION
ArF ASHLAR SANDY LOAM
CCA CARTECAY AND CHEWACLA
CeC CECIL SANDY LOAM
GeC GWINNETT SANDY LOAM
GwD2 GWINNETT SANDY CLAY LOAM
Heb HIWASSEE SANDY LOAM
HwB2 HIWASSEE SANDY CLAY LOAM 2-6%
SLOPE
HwC2 HIWASSEE SANDY CLAY LOAM 6-10%
SLOPE
PaC PACOLET SANDY LOAM
PfC2 PACOLET SANDY CLAY LOAM 2-10%
SLOPE
PfD2 PACOLET SANDY CLAY LOAM 10-15%
SLOPE
PfE2 PACOLET SANDY CLAY LOAM 15-25%
SLOPE
Rk ROANOKE SILT LOAM
TCA TOCCOA AND CONGAREE
HATCHING LEGEND
WETLANDS:
FLOOD ZONE A:
http://www.thomasandhutton.com rutt.z Snapshot
PaC TCA
PfD2
HeB GeC
ArF
CCA
CeC
CCA
HeB
12''FM
''F
M
''F
M
''F
M
12''FM
''F
M
''F M
''F
M
''F
M
''F M
''F
M
''F
M
''F
M
''F
M
''F
M
''F
M
''F
M
X X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X X
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
XX
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X
X
X X
X
X X
X
X
X
UPSTREAM
SAMPLING LOCATION
NELSON CREEK
DOWNSTREAM SAMPLING LOCATION
NELSON CREEK
DOWNSTREAM SAMPLING LOCATION
LITTLE RIVER
LITTLE RIVER
(PERENNIAL STREAM)
NELSON CREEK
(PERENNIAL STREAM)
WETLAND (TYP)
FLOOD ZONE A (TYP.)
PROPERTY BOUNDARY (TYP.)
25' STATE WATERS
BUFFER (TYP)
25' STATE WATERS
BUFFER (TYP.)
SOIL SERIES
DELINEATION (TYP.)
694696
65665
6 706 706
662 664 666 668
642644646648
65465
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
DLOD
LO
D
LOD
LOD
LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
Rd
Rd
Sd1-S
PROVIDE TWO ROWS OF
Sd1-S ALONG STATE WATERS
AND SENSITIVE AREAS (TYP.)
LEAVE OPENING IN
SILT FENCE AND PROVIDE
ROCK DAM
LEAVE OPENING IN
SILT FENCE AND PROVIDE
ROCK DAM
Sd1-S
PROVIDE J-HOOKS IN AREAS
OF SLOPE ALONG SILT FENCE
FOR EVERY 5 FEET OF
VERTICAL DROP (TYP.)
Du
Du
Ds1 Ds2 Du
Ds1 Ds2
Ds1 Ds2
LIMITS OF DISTURBANCE (±2.2 AC)
FOR INITIAL PHASE - ONLY WHAT IS
REQUIRED TO INSTALL PERIMETER
SILT FENCE
1" = 100'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-P L0
1.
D
W G
M ay
6,
- 8 :1
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL PLAN -
INITIAL PHASE
EC1.2
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
100 FEET
100 50 100
CONSTRUCTION SEQUENCE - INITIALIZATION
1. THE CONTRACTOR SHALL INSTALL THE CONSTRUCTION EXIT IN ACCORDANCE WITH THE "MANUAL FOR
EROSION AND SEDIMENT CONTROL IN GEORGIA" PRIOR TO COMMENCEMENT OF CLEARING AND
GRUBBING.
2. THE CONTRACTOR SHALL ONLY CLEAR AND GRUB AREAS NECESSARY FOR THE INSTALLATION OF INITIAL ES & PC BMPs SHOWN ON THIS PLAN.
3. THE CONTRACTOR SHALL MAINTAIN OR REPLACE THE SILT FENCE ALONG THE PERIMETER OF THE SITE AS
NEEDED.
4. THE ONLY GRADING THAT SHALL TAKE PLACE DURING THE INITIAL PHASE, AND PRIOR TO 7-DAY LETTER
ISSUANCE IS FOR THE SEDIMENT BASIN.
5. ONCE ALL INITIAL PHASE CONTROLS ARE IN PLACE AND THE 7-DAY LETTER IS ISSUED, THE CONTRACTOR
CAN THEN COMPLETE THE REMAINING CLEARING AND GRUBBING. THE SEDIMENT BASIN MAY BE
INSTALLED AFTER THE 7-DAY INSPECTION BUT MUST BE IN PLACE PRIOR TO INITIATING MAJOR GRADING
OPERATIONS.
6. THE CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES FOR ALL DISTURBED AREAS BY WATER
TRUCK OR TEMPORARY MULCHING.
7. ONCE ALL ES & PC BMPs PER THIS PLAN ARE IN PLACE, THE CONTRACTOR SHALL NOTIFY THE DESIGN
ENGINEER TO PERFORM THE 7-DAY INSPECTION.
8. THE ONLY STORM WATER POLLUTANT ANTICIPATED DURING CONSTRUCTION IS SEDIMENT. THE BMPs INCLUDED ON THIS PLAN ARE DESIGNED TO REDUCE THE SEDIMENT DEPOSITION ONTO DOWNSTREAM
PROPERTIES & RECEIVING WATERS.
9. SEDIMENT STORAGE FOR THE INITIAL PHASE HAS BEEN PROVIDED BY SILT FENCE.
10. NO WORK IS PERMITTED TO BE DONE IN JURISDICTIONAL WETLANDS OR STATE WATERS AS PART OF THIS
PLAN.
EROSION CONTROL
LEGEND
DESCRIPTION PLAN SYMBOL
DISTURBED AREA STABILIZATION
(MULCHING ONLY)
DISTURBED AREA STABILIZATION
(TEMPORARY SEEDING)
DISTURBED AREA STABILIZATION
(PERMANENT VEGETATION)
DUST CONTROL
COMPOST FILTER SOCK
CONSTRUCTION EXIT
DIVERSION
DOWNDRAIN STRUCTURES
(TEMPORARY)
ROCK FILTER DAM
SILT FENCE - TYPE S
TEMPORARY SEDIMENT BASIN
TEMPORARY SEDIMENT TRAP
FLOATING SURFACE SKIMMER
STORM DRAIN OUTLET PROTECTION
Ds1
Ds2
Ds3
Du
Cd-Fs
Co
Di
Dn1
Rd
Sd1-S
Sd3
Sd4
Sk
St
SOIL SERIES LEGEND
SOIL SERIES SOIL DESCRIPTION
ArF ASHLAR SANDY LOAM
CCA CARTECAY AND CHEWACLA
CeC CECIL SANDY LOAM
GeC GWINNETT SANDY LOAM
GwD2 GWINNETT SANDY CLAY LOAM
Heb HIWASSEE SANDY LOAM
HwB2 HIWASSEE SANDY CLAY LOAM 2-6%
SLOPE
HwC2 HIWASSEE SANDY CLAY LOAM 6-10%
SLOPE
PaC PACOLET SANDY LOAM
PfC2 PACOLET SANDY CLAY LOAM 2-10%
SLOPE
PfD2 PACOLET SANDY CLAY LOAM 10-15%
SLOPE
PfE2 PACOLET SANDY CLAY LOAM 15-25%
SLOPE
Rk ROANOKE SILT LOAM
TCA TOCCOA AND CONGAREE
HATCHING LEGEND
WETLANDS:
FLOOD ZONE A:
http://www.thomasandhutton.com rutt.z Snapshot
M
''F
M
''F
M
''F M
''F
M
''F M
''F
M
''F M
12''FM
12''FM
12''FM
12''FM
''F
M
''F M
''F
M
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
X X X
X X
X X
X
XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X
X X
X
X X
X X
X X
X X
X
X
X X X X X
X X
X X
X X
X
X
X
X
X
XX
X X X
X X
X X X X X X X
X X X
X X
X
X
X
X
X X
X
X
X
X
X X
X X
X
X
X
XX
X
X X
X X
X
X
X
W W
W
W
W
W
W
W
W W
W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
O
HP
O
HP
O
HP
O
HP
O
HP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
OHP OHP OHP OHP
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UGC
UGC
UGC
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UGC
UGG
UGG
UGG
UGG
UGG
UGG
UGG UGG
UGG
UGG
UGG
UGG
UGG
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
10+68.87
CCA
PfD2PfC2
HwC2
Rk
HwB2 HwC2
GwD2
HwC2
PfD2
PaC
PfE2
TCA
HeB GeC
Sd4
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St
15' 6'
13' 14"
9" 6"
MIN
3.39 8.72
24"
72472
65665
652654656658
664666668672674
682684
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St
11' 3'
10' 14"
9" 6"
MIN
7.12 5.54
12"
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St
13.5' 4.5'
9' 14"
9" 6"
MIN
1.05 1.25
18"
Rd
Rd
PROVIDE CHECK-DAMS
IN DITCH FOR EVERY
2 FEET OF VERTICAL DROP
PROVIDE CHECK-DAMS IN
THE DIVERSIONS FOR EVERY
2 FEET OF VERTICAL DROP
PROVIDE TWO ROWS OF
Sd1-S ALONG STATE WATERS
AND SENSITIVE AREAS (TYP.)
LEAVE OPENING IN
SILT FENCE AND PROVIDE
ROCK DAM
LEAVE OPENING IN
SILT FENCE AND PROVIDE
ROCK DAM
LIMITS OF DISTURBANCE (TYP.)
COMBINATION OUTLET
X
X X
X
X
X
X
X
Co
X LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LAT: 33.6059
LONG: -83.7159
UPSTREAM SAMPLING LOCATION
LITTLE RIVER
TRIBUTARY TO LITTLE RIVER
(INTERMITTENT STREAM)
25' STATE WATERS
BUFFER (TYP)
EXISTING WETLANDS (TYP.)
FLOOD ZONE A (TYP.)
PROPERTY BOUNDARY (TYP.)
LITTLE RIVER
(PERENNIAL STREAM)
25' STATE WATERS
BUFFER (TYP)
SOIL SERIES
DELINEATION (TYP.)
DRAINAGE BASIN (TYP.)
BASIN 3
2.0 ACRE
LIMITS OF CLEARING (TYP.)
Du Ds1 Ds2 Ds3
Sd3
St
SkCd-Fs
Cd-Fs Du Ds1 Ds2 Ds3
St
Sd1-S
St 1" = 100'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-P L0
2.
D
W G
M ay
6,
- 8 :1
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL PLAN -
CONSTRUCTION - FINAL PHASE
EC2.1
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
100 FEET
100 50 100
CONSTRUCTION SEQUENCE - CONSTRUCTION AND STABILIZATION
1. ONCE ALL INITIAL PHASE CONTROLS ARE IN PLACE AND THE 7-DAY LETTER IS ISSUED, THE CONTRACTOR
CAN THEN COMPLETE THE REMAINING CLEARING AND GRUBBING.
2. ALL TREES WITHIN THE LIMITS OF DISTURBANCE WILL BE REMOVED.
3. DISTURBED SLOPES SHALL BE ROUGHENED WITH TRACKED MACHINERY.
4. ALL BMPs SHALL BE INSPECTED DAILY AND REPAIRED AS NECESSARY.
5. THE ONLY STORM WATER POLLUTANT ANTICIPATED DURING CONSTRUCTION IS SEDIMENT. THE BMPs
INCLUDED ON THIS PLAN ARE DESIGNED TO REDUCE THE SEDIMENT DEPOSITION ONTO DOWNSTREAM
PROPERTIES & RECEIVING WATERS.
6. ALL CLEARED AND GRUBBED AREAS SHALL BE STABILIZED USING TEMPORARY SEEDING AND MULCHING
WITHIN 14 DAYS OF THE END OF DISTURBANCE.
7. THE CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES FOR ALL DISTURBED AREAS BY WATER
TRUCK OR TEMPORARY MULCHING.
8. THE CONSTRUCTION EXITS SHALL BE REMOVED PRIOR TO COMPACTION OF SUB-BASE AND INSTALLATION
OF GRADED AGGREGATE BASE FOR ROAD CONSTRUCTION.
9. THE CONTRACTOR SHALL SEED ALL DISTURBED AREAS WITH PERMANENT GRASSES AND TEMPORARY GRASSES IN ACCORDANCE WITH THE "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA."
10. ONCE GRASSING HAS A 70% DENSITY OF THE ENTIRE COVERAGE AREA AND THE FINAL LOT NOTICE OF TERMINATION IS ACCEPTED, THE EROSION CONTROL BMPs CAN BE REMOVED, INCLUDING PERIMETER
SILT FENCE AND TEMPORARY SEDIMENT TRAPS AND BASINS.
11. ANY AREAS OF EROSION THAT OCCUR PRIOR TO FINAL STABILIZATION SHALL BE REPAIRED BY THE
CONTRACTOR.
12. ALL TEMPORARY BMP'S TO BE REMOVED AFTER THE SITE ACHIEVES FINAL STABILIZATION.
EROSION CONTROL
LEGEND
DESCRIPTION PLAN SYMBOL
DISTURBED AREA STABILIZATION
(MULCHING ONLY)
DISTURBED AREA STABILIZATION
(TEMPORARY SEEDING)
DISTURBED AREA STABILIZATION
(PERMANENT VEGETATION)
DUST CONTROL
COMPOST FILTER SOCK
CONSTRUCTION EXIT
DIVERSION
DOWNDRAIN STRUCTURES
(TEMPORARY)
ROCK FILTER DAM
SILT FENCE - TYPE S
TEMPORARY SEDIMENT BASIN
TEMPORARY SEDIMENT TRAP
FLOATING SURFACE SKIMMER
STORM DRAIN OUTLET PROTECTION
Ds1
Ds2
Ds3
Du
Cd-Fs
Co
Di
Dn1
Rd
Sd1-S
Sd3
Sd4
Sk
St
SOIL SERIES LEGEND
SOIL SERIES SOIL DESCRIPTION
ArF ASHLAR SANDY LOAM
CCA CARTECAY AND CHEWACLA
CeC CECIL SANDY LOAM
GeC GWINNETT SANDY LOAM
GwD2 GWINNETT SANDY CLAY LOAM
Heb HIWASSEE SANDY LOAM
HwB2 HIWASSEE SANDY CLAY LOAM 2-6%
SLOPE
HwC2 HIWASSEE SANDY CLAY LOAM 6-10%
SLOPE
PaC PACOLET SANDY LOAM
PfC2 PACOLET SANDY CLAY LOAM 2-10%
SLOPE
PfD2 PACOLET SANDY CLAY LOAM 10-15%
SLOPE
PfE2 PACOLET SANDY CLAY LOAM 15-25%
SLOPE
Rk ROANOKE SILT LOAM
TCA TOCCOA AND CONGAREE
HATCHING LEGEND
WETLANDS:
FLOOD ZONE A:
LIMITS OF MULCH ONLY:
http://www.thomasandhutton.com rutt.z Snapshot
12''FM
''F
M
''F
M
''F
M
12''FM
''F
M
''F M
''F
M
''F
M
''F M
''F
M
''F
M
''F
M
''F
M
''F
M
''F
M
''F
M
X X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X X
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
9+00
10+00
10+68.87
PaC TCA
PfD2
HeB GeC
ArF
CCA
CeC
CCA
HeB
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St
11' 3'
10' 14"
9" 6"
MIN
7.12 5.54
12"
694696
65665
6 706 706
662 664 666 668
642644646648
65465
704 702 700 698 696 694 692
700 698
690 686
686688
692690
704 Dn1
Dn1
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St
13.5' 4.5'
9' 14"
9" 6"
MIN
1.05 1.25
18"
Rd
Rd
PROVIDE CHECK-DAMS IN
THE DIVERSIONS FOR EVERY
2 FEET OF VERTICAL DROP
PROVIDE CHECK-DAMS IN
THE DIVERSIONS FOR EVERY
2 FEET OF VERTICAL DROP
PROVIDE CHECK-DAMS IN
THE DIVERSIONS FOR EVERY
2 FEET OF VERTICAL DROP
PROVIDE CHECK-DAMS IN
THE DIVERSIONS FOR EVERY
2 FEET OF VERTICAL DROP
PROVIDE CHECK-DAMS IN
THE DIVERSIONS FOR EVERY
2 FEET OF VERTICAL DROP
PROVIDE TWO ROWS OF
Sd1-S ALONG STATE WATERS
AND SENSITIVE AREAS (TYP.)
LEAVE OPENING IN
SILT FENCE AND PROVIDE
ROCK DAM
LEAVE OPENING IN
SILT FENCE AND PROVIDE
ROCK DAM
LIMITS OF DISTURBANCE (TYP.)
XX
X X
X X
X
X
X
X X
X X
X
X X
X X
X
X
X
X X
X
X X
X
X
X
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LOD
LO
D
UPSTREAM
SAMPLING LOCATION
NELSON CREEK
DOWNSTREAM SAMPLING LOCATION
NELSON CREEK
DOWNSTREAM SAMPLING LOCATION
LITTLE RIVER
LITTLE RIVER
(PERENNIAL STREAM)
NELSON CREEK
(PERENNIAL STREAM)
WETLAND (TYP)
FLOOD ZONE A (TYP.)
PROPERTY BOUNDARY (TYP.)
25' STATE WATERS
BUFFER (TYP)
25' STATE WATERS
BUFFER (TYP.)
SOIL SERIES
DELINEATION (TYP.)
DRAINAGE BASIN (TYP.)
BASIN 1
9.1 ACRE
BASIN 2
6.0 ACRE
LIMITS OF CLEARING (TYP.)
Dn1 - 18" HDPE (TYP.)
6.0 ACRES DRAINED
6 DOWNDRAINS
Dn1 - 18" HDPE (TYP.)
9.1 ACRES DRAINED
10 DOWNDRAINS
Di
Cd-Fs
Cd-Fs
Cd-Fs
Di
Sd3
Sd3
St
Sk
Du Ds1 Ds2 Ds3
Cd-Fs
Sk
St
Cd-Fs
Sd1-S Sd1-S
St
1" = 100'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-P L0
2.
D
W G
M ay
6,
- 8 :1
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL PLAN -
CONSTRUCTION - FINAL PHASE
EC2.2
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
100 FEET
100 50 100
CONSTRUCTION SEQUENCE - CONSTRUCTION AND STABILIZATION
1. ONCE ALL INITIAL PHASE CONTROLS ARE IN PLACE AND THE 7-DAY LETTER IS ISSUED, THE CONTRACTOR
CAN THEN COMPLETE THE REMAINING CLEARING AND GRUBBING.
2. ALL TREES WITHIN THE LIMITS OF DISTURBANCE WILL BE REMOVED.
3. DISTURBED SLOPES SHALL BE ROUGHENED WITH TRACKED MACHINERY.
4. ALL BMPs SHALL BE INSPECTED DAILY AND REPAIRED AS NECESSARY.
5. THE ONLY STORM WATER POLLUTANT ANTICIPATED DURING CONSTRUCTION IS SEDIMENT. THE BMPs
INCLUDED ON THIS PLAN ARE DESIGNED TO REDUCE THE SEDIMENT DEPOSITION ONTO DOWNSTREAM
PROPERTIES & RECEIVING WATERS.
6. ALL CLEARED AND GRUBBED AREAS SHALL BE STABILIZED USING TEMPORARY SEEDING AND MULCHING
WITHIN 14 DAYS OF THE END OF DISTURBANCE.
7. THE CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES FOR ALL DISTURBED AREAS BY WATER
TRUCK OR TEMPORARY MULCHING.
8. THE CONSTRUCTION EXITS SHALL BE REMOVED PRIOR TO COMPACTION OF SUB-BASE AND INSTALLATION
OF GRADED AGGREGATE BASE FOR ROAD CONSTRUCTION.
9. THE CONTRACTOR SHALL SEED ALL DISTURBED AREAS WITH PERMANENT GRASSES AND TEMPORARY GRASSES IN ACCORDANCE WITH THE "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA."
10. ONCE GRASSING HAS A 70% DENSITY OF THE ENTIRE COVERAGE AREA AND THE FINAL LOT NOTICE OF TERMINATION IS ACCEPTED, THE EROSION CONTROL BMPs CAN BE REMOVED, INCLUDING PERIMETER
SILT FENCE AND TEMPORARY SEDIMENT TRAPS AND BASINS.
11. ANY AREAS OF EROSION THAT OCCUR PRIOR TO FINAL STABILIZATION SHALL BE REPAIRED BY THE
CONTRACTOR.
12. ALL TEMPORARY BMP'S TO BE REMOVED AFTER THE SITE ACHIEVES FINAL STABILIZATION.
EROSION CONTROL
LEGEND
DESCRIPTION PLAN SYMBOL
DISTURBED AREA STABILIZATION
(MULCHING ONLY)
DISTURBED AREA STABILIZATION
(TEMPORARY SEEDING)
DISTURBED AREA STABILIZATION
(PERMANENT VEGETATION)
DUST CONTROL
COMPOST FILTER SOCK
CONSTRUCTION EXIT
DIVERSION
DOWNDRAIN STRUCTURES
(TEMPORARY)
ROCK FILTER DAM
SILT FENCE - TYPE S
TEMPORARY SEDIMENT BASIN
TEMPORARY SEDIMENT TRAP
FLOATING SURFACE SKIMMER
STORM DRAIN OUTLET PROTECTION
Ds1
Ds2
Ds3
Du
Cd-Fs
Co
Di
Dn1
Rd
Sd1-S
Sd3
Sd4
Sk
St
SOIL SERIES LEGEND
SOIL SERIES SOIL DESCRIPTION
ArF ASHLAR SANDY LOAM
CCA CARTECAY AND CHEWACLA
CeC CECIL SANDY LOAM
GeC GWINNETT SANDY LOAM
GwD2 GWINNETT SANDY CLAY LOAM
Heb HIWASSEE SANDY LOAM
HwB2 HIWASSEE SANDY CLAY LOAM 2-6%
SLOPE
HwC2 HIWASSEE SANDY CLAY LOAM 6-10%
SLOPE
PaC PACOLET SANDY LOAM
PfC2 PACOLET SANDY CLAY LOAM 2-10%
SLOPE
PfD2 PACOLET SANDY CLAY LOAM 10-15%
SLOPE
PfE2 PACOLET SANDY CLAY LOAM 15-25%
SLOPE
Rk ROANOKE SILT LOAM
TCA TOCCOA AND CONGAREE
HATCHING LEGEND
WETLANDS:
FLOOD ZONE A:
LIMITS OF MULCH ONLY:
http://www.thomasandhutton.com rutt.z Snapshot
DOWNDRAIN PIPE AND INLET DETAIL
LEVEL SECTION
INLET DETAIL SECTION A-A
SILT FENCE - TYPE NON-SENSITIVE
SIDE VIEW
FRONT VIEW
SILT FENCE - TYPE SENSITIVE
SIDE VIEW
FRONT VIEW
TEMPORARY SEDIMENT TRAP
COMBINATION OUTLET
COMPOST SOCKS FOR CHECK DAMS
TYPICAL PLAN
PIPE OUTLET TO WELL DEFINED CHANNEL
PIPE OUTLET TO FLAT AREA -- NO WELL DEFINED CHANNEL
RIPRAP OUTLET PROTECTION
CRUSHED STONE CONSTRUCTION EXIT
EXIT DIAGRAM
ENTRANCE ELEVATION
SILT FENCE MAINTENANCESILT FENCE MAINTENANCE
Sd1-S Sd1-NS Co Dn1
Sd4 StCd-Fs
1" = 1'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-D T.
D W
G
M ay
6,
- 8
:1
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL DETAILS
EC4.1
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
1 FEET
1 .5 1 http://www.thomasandhutton.com rutt.z Snapshot
SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN
SEEDING RATES FOR TEMPORARY & PERMANENT COVER
2*
* 1*
* 1*
1*
APPLY AGGRICULTURAL LIME AT A
RATE OF 1-2 TONS/ACRE UNLESS SOIL
TESTS INDICATE OTHERWISE. PLEASE
REFER TO TABLE 2 FOR INITIAL
FERTILZATION, NITROGEN,
OPDRESSING, AND MAINTENANCE
FERTILIZER REQUIREMENTS FOR EACH
SPECIES.
NOTES
1. UNSCARIFIED
2. SCARIFIED
3. CENTIPEDE SOD CAN BE USED AS PERMANENT COVER ANYTIME
EXCEPT JUNE THRU OCTOBER ALL
PERMANENT GRASS PLANTINGS SHALL BE MULCHED
* INDICATES MARGINAL (BUT PERMISSIBLE) PLANTING DATE
Di
Ds1
Ds2
Ds3
1" = 1'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-D T.
D W
G
M ay
6,
- 8
:1
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL DETAILS
EC4.2
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
1 FEET
1 .5 1 http://www.thomasandhutton.com rutt.z Snapshot
PLAN VIEW
BASIC COMPONENTS OF TEMPORARY
CROSS SECTION
SEDIMENT BASIN Sd3
1" = 1'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-D T.
D W
G
M ay
6,
- 8
:1
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL DETAILS
EC4.3
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
1 FEET
1 .5 1 http://www.thomasandhutton.com rutt.z Snapshot
ROCK FILTER DAM
Rd
1" = 1'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-D T.
D W
G
M ay
6,
- 8
:1
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL DETAILS
EC4.4
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
1 FEET
1 .5 1 http://www.thomasandhutton.com rutt.z Snapshot
Sk Sk
1" = 1'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
EC
-D T.
D W
G
M ay
6,
- 8
:1
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EROSION CONTROL DETAILS
EC4.5
26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
1 FEET
1 .5 1 http://www.thomasandhutton.com rutt.z Snapshot
M
''F
M
''F
M
''F M
''F
M
''F M
''F
M
''F M
12''FM
12''FM
12''FM
12''FM
''F
M
''F M
''F
M
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
12''FM
X X X
X X
X X
X
XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X
X X
X
X X
X X
X X
X X
X
X
X X X X X
X X
X X
X X
X
X
X
X
X
XX
X X X
X X
X X X X X X X
X X X
X X
X
X
X
X
X X
X
X
X
X
X X
X X
X
X
X
XX
X
X X
X X
X
X
X
W W
W
W
W
W
W
W
W W
W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
O
HP
O
HP
O
HP
O
HP
O
HP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
OHP OHP OHP OHP
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UGC
UGC
UGC
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UGC
UGG
UGG
UGG
UGG
UGG
UGG
UGG UGG
UGG
UGG
UGG
UGG
UGG
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
60 LF 24" RCP
@ 1.00%
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
10+68.87
CCA
PfD2PfC2
HwC2
Rk
HwB2 HwC2
GwD2
HwC2
PfD2
PaC
PfE2
TCA
HeB GeC
72472
65665
652654656658
664666668672674
682684
62 LF 18" RCP
@ 0.57%
FES #1
INV. OUT: 701.60 (NE)
FES #2
INV. IN: 701.00 (SW)
FES #3
INV. OUT: 707.65 (E)
FES #4
INV. IN: 707.30 (W)
12" CMP
DOWNDRAIN (Dn1) -
18" HDPE (TYP.)
ENTRY ROAD ALIGNMENT
ENTRY ROAD
STATIONS: -0+25 - 11+50
SCALE: HORZ.: 1" = 100'
VERT.: 1" = 10'
-0+250+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 11+50
4.
1.
0.
8.
6.
5.
5.
4.
7.
9.
1.
2.
2.
2.
1.
4.
7.
8.
7.
4.
3.
3.
PVI STA: 0+10.54
PVI ELEV: 714.06
PV
I S
TA
: 1
0+
.8
PV
I E
LE
V
: 7
.6
16.5' COMMUNICATIONS
EASEMENT
136' VC
K=40.00
A.D.=3.40
PVI ELEV=712.67
PVI STA=0+80
BV
C
S:
+1
BV
C
E:
.0
EV
C
E:
.0
EV
C S:
+4
8 148' VC
K=20.00
A.D.=7.39
PVI ELEV=719.72
PVI STA=8+93.93
BV
C
S:
+2
BV
C
E:
.1
EV
C
E:
.8
EV
C S:
+6
7.
H.P. ELEV=718.58
H.P. STA=8+63.60
24" RCP
2.
1'
EP
: 1
0+
.8
0.
PC: 1+18.44
710.49
PC
: 6
+6 6.
4.
PT: 2+06.70
706.11
PT
: 7
+5 8.
6.
76' VC
K=10.00
A.D.=7.58
PVI ELEV=705.05
PVI STA=2+21.09
BV
C
S:
+8 3.
BV
C E:
.1
EV
C
E:
.8
EV
C S:
+5
8.
L.P. ELEV=705.64
L.P. STA=2+37.19
-2.00%
-5.40%
-5.21% 2.18%
26900.0015 - Drainage - Run 1
STATIONS: -0+25 - 2+50
SCALE: HORZ.: 1" = 100'
VERT.: 1" = 10'
-0+250+00 1+00 2+00 2+50
0.
2.
4.
6.
FE
S
IN
V
. O
UT
: 7
.6
(N E)
60 LF 24" RCP
@ 1.00%
FE
S
IN
V
. I N
: 7
.0
(S W
50 YR HGL
PROPOSED GRADE
EXISTING GRADE
26900.0015 - Drainage - Run 2
STATIONS: -0+50 - 2+00
SCALE: HORZ.: 1" = 100'
VERT.: 1" = 10'
-0+50 0+00 1+00 2+00
2.
8.
4.
0.
4.
8.
FE
S
IN
V
. O
UT
: 7
.6
(E
62 LF 18" RCP
@ 0.57%
FE
S
IN
V
. I N
: 7
.3
(W
EXISTING GRADE
PROPOSED GRADE
50 YR HGL
1" = 100'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
PG
D -P
L.
D
W G
M ay
6,
- 8 :1
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GRADING AND DRAINAGE
PLAN AND PROFILE
C3.1 26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
100 FEET
100 50 100 http://www.thomasandhutton.com rutt.z Snapshot
12''FM
''F
M
''F
M
''F
M
12''FM
''F
M
''F M
''F
M
''F
M
''F M
''F
M
''F
M
''F
M
''F
M
''F
M
''F
M
''F
M
X X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X X
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
9+00
10+00
10+68.87
PaC TCA
PfD2
HeB GeC
ArF
CCA
CeC
CCA
HeB
670680
6688692
694696698
702704
65665
6 706 706
662 664 666 668
642644646648
65465
704 702 700 698 696 694 692
700 698
690 686
686688
692690
62 LF 18" RCP
@ 0.57%
FES #3
INV. OUT: 707.65 (E)
FES #4
INV. IN: 707.30 (W)
12" CMP
12" CMP
DOWNDRAIN (Dn1) -
18" HDPE (TYP.)
DOWNDRAIN (Dn1) -
18" HDPE (TYP.)
1" = 100'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
PG
D -P
L.
D
W G
M ay
6,
- 8 :1
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GRADING AND DRAINAGE
PLAN
C3.2 26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
100 FEET
100 50 100 http://www.thomasandhutton.com rutt.z Snapshot
1" = 1'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
0.
PG
D -D
T.
D
W G
M ay
6,
- 8 :1
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GRADING AND DRAINAGE
DETAILS
C3.3 26900.0015
ESPC GRADING PLAN
MOORE TRACT
13924 HWY 278
SOCIAL CIRCLE, GA 30025
NAD-83 GAW NAVD 88
JDA STANTON SPRINGS
ANDREA GRAY
300 E CHURCH STREET
ZR
1 FEET
1 .5 1 http://www.thomasandhutton.com rutt.z Snapshot
| Sheets and Views |
| C0 COVER SHEET |
| C1.1 EXISTING CONDITIONS - OVERALL SITE |
| EC0.1 EROSION CONTROL NOTES |
| EC0.2 EROSION CONTROL NOTES |
| EC0.3 EROSION CONTROL NOTES |
| EC1.1 EROSION CONTROL PLAN - INITIAL PHASE |
| EC1.2 EROSION CONTROL PLAN - INITIAL PHASE |
| EC2.1 EROSION CONTROL PLAN - CONSTRUCTION - FINAL PHASE |
| EC2.2 EROSION CONTROL PLAN - CONSTRUCTION - FINAL PHASE |
| EC4.1 EROSION CONTROL DETAILS |
| EC4.2 EROSION CONTROL DETAILS |
| EC4.3 EROSION CONTROL DETAILS |
| EC4.4 EROSION CONTROL DETAILS |
| EC4.5 EROSION CONTROL DETAILS |
| C3.1 GRADING AND DRAINAGE PLAN AND PROFILE |
| C3.2 GRADING AND DRAINAGE PLAN |
| C3.3 GRADING AND DRAINAGE DETAILS |
File details come from the government source that posted it. Updated .