About this file

This document is an Amendment of Solicitation/Subcontract Modification issued by SLAC National Accelerator Laboratory for Solicitation 367827(RE). The amendment, effective November 16, 2026, incorporates the Technical Evaluation Team's responses to offeror requests for clarification and supersedes prior versions of several solicitation documents. The offer deadline has been extended to November 18, 2026, at 5:00 PM PST. Offerors must acknowledge receipt of this amendment through one of three specified methods prior to the submission deadline, or their offers may be rejected.

The scope of work involves procuring crane inspection/troubleshooting services and equipment rental, as detailed in the Statement of Work (SOW) for Crane Inspection Services, Rev04, dated November 13, 2026. Services include quarterly, annual, and quadrennial inspections of approximately 275 lifting assets throughout SLAC; preventative maintenance; troubleshooting and diagnostic services; and emergency response support with a four-hour onsite response requirement during standard operating hours. The subcontract type is Firm-Fixed-Price/Labor-Hour. Key evaluation factors include past performance, responsiveness and emergency support, inspection reporting and documentation, personnel qualifications and certifications (a Meets/Does Not Meet criterion), troubleshooting capability, and safety program compliance. Personnel must meet Cal/OSHA and ASME definitions of a Qualified Person with current crane and hoist inspection credentials. Award will be made using a Best Value Trade-off source selection based on integrated assessment of technical factors (weighted more heavily than business factors) and price. The contract is administered by Ryan Enos, Sr. Subcontracts Administrator, at SLAC National Accelerator Laboratory.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA

Operated by Stanford University for the U.S. Department of Energy

AMENDMENT OF SOLIC. – SUBCONT.MOD. (REV. 05/24/12) SLAC-SCM-GEN-015 PAGE 1 OF 2

SUPPLY CHAIN MANAGEMENT

AMENDMENT OF SOLICITATION/SUBCONTRACT MODIFICATION

Acting Under Contract DE-ACO2-76-SF00515

1. Amendment/Modification Number:

2. Effective Date:

11/16/2026

3. Solicitation/Subcontract Number:

367827(RE)

4. Issued By:

The Board of Trustees of the Leland Stanford, Jr. University SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025

5. Administered By:

SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025 Bldg. 041, M/S: 01

6. Name and Address of Seller:

To: All Offerors

7A. Amendment of Solicitation Number: 367827(RE) 7B. Dated (See Item 9):

8A. Modification of Subcontract Number:

8B. Dated (See Item 14D):

9. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 11.

The hour and date specified for receipt of Offers is extended to November 18, 2026 at 5PM, PST, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 13, and return 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE

RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted you may do so as long as it is received prior to the opening hour and date specified.

10. THIS ITEM ONLY APPLIES TO MODIFICATION OF SUBCONTRACTS

A. This change order is issued pursuant to (specify authority) . The changes set forth in Item 11 are made in the subcontract order number stated in Item 8A.

B. The above numbered subcontract is modified to reflect the administrative changes set forth in Item 11.

C. This supplemental agreement is entered into pursuant of authority of: .

D. Other (Specify type of modification and authority): .

11. Description of Amendment/Modification:

The purpose of this Amendment is to incorporate the Technical Evaluation Team's responses to Offeror requests for clarification into the Solicitation package.

The following attachment is hereby incorporated into Solicitation SLAC RFP 367827 (RE):

1. Offerors' Requests for Clarifications and SLAC Responses dated November 13, 2026

In addition, the following solicitation documents have been revised as a result of the clarification responses and hereby supersede and replace the previously issued versions:

1. Section A - Subcontract Form Block 3, Type of Subcontract revised to: Firm-Fixed-Price / Labor-Hour

2. Section C - Statement of Work SOW for Crane Inspection Services, Rev. 04, dated November 13, 2026

3. Section L - Instructions, Conditions, and Notices to Offerors Attachment 01, Factor 4 - Personnel Qualifications and Certifications (Meets/Does Not Meet Criteria)

4. Section M - Evaluation Factors for Award Factor 4 - Personnel Qualifications and Certifications (Meets/Does Not Meet Criteria)

Except as expressly amended herein, all other terms and conditions of the Solicitation remain unchanged and in full force and effect.

AMENDMENT OF SOLIC. – SUBCONT.MOD. (REV. 05/24/12) SLAC-SCM-GEN-015 PAGE 2 OF 2

Except as provided herein, all terms and conditions of the document referenced in Item 7a or 8a, remains unchanged and in full force and effect.

12. Accounting Information:

Previous total value: Change in total value: Revised total value:

Previous funded value: Change in funded value: Revised funded value:

Seller is required to sign and return a copy of this document. (Check if applicable)

The Board of Trustees of the Leland Stanford, Jr.

University SLAC National Accelerator Laboratory

13A. Signature of authorized person for seller:

14A. Signature of authorized person:

13B. Name of signer:

14B. Name of signer:

Ryan Enos

13C. Title of signer:

14C. Title of signer:

Sr. Subcontracts Administrator

13D. Date

14D. Date:

November 16, 2026

SECTION A (REV.07/08/22) SLAC-SCM-GEN-028 PAGE 1 OF 1

SUBCONTRACT

Section A – Subcontract Form

1. Subcontract Number: TBD 3. Type of Subcontract: Firm Fixed Price / Labor Hour

2a. Solicitation Number:

367827(RE)

2b. Offers Due By (Date): November 18, 2c. Offers Due By (Time): 5:00pm

PDT

4a. Subcontract Administrator:

Ryan Enos

4b. Email Address:

ryane@slac.stanford.edu

4c. Telephone:

(315) 730-7927

5. Issued By:

The Board of Trustees of the Leland Stanford, Jr.

University as Manager Operator of SLAC National Accelerator Laboratory (SLAC) 2575 Sand Hill Road Menlo Park, CA 94025

6. Submit Invoices To:

SLAC National Accelerator Laboratory Accounts Payable 2575 Sand Hill Road Menlo Park, CA 94025 or preferably ap@slac.stanford.edu

7. Name and Address of Seller:

To All Offerors

8. Project Site:

SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025

9. TABLE OF CONTENTS

(X) Sec Description (X) Sec Description

A Subcontract Award Form H Special Terms and Conditions

B Supplies or Services and Prices/Costs I Specific Subcontract Clauses

C Specifications/Statement of Work J List of Attachments

D Delivery, Shipping, Packing K Representations and Certifications

E Inspections and Acceptance L Instructions to Offerors

F Deliveries or Performance M Evaluation Factors for Award

G General Terms and Conditions

10. Brief description of supplies or services being acquired:

The purpose of this acquisition is to procure crane inspection/troubleshooting services and equipment rental.

11. Total Amount of Subcontract:

See Section B for Total Amount of Subcontract

12. Negotiated Agreement. The subcontractor agrees to furnish and deliver the items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this subcontract. The rights and obligations of the parties to this subcontract shall be governed by (a) this subcontract award, (b) the solicitation, and (c) the clauses, terms and conditions, representations, certifications, and specifications incorporated by reference in or attached to this contract.

13. Award. The Board of Trustees of the Leland Stanford, Jr. University, SLAC National Accelerator Laboratory, accepts your offer dated on this solicitation identified in item 2 above as reflected in this subcontract, which is subject to and governed by (a) this subcontract award, (b) the solicitation, and (c) the clauses, terms and conditions, representations, certifications, and specifications incorporated by reference in or attached to this contract.

Seller is required to sign and return a copy of this document (Check if applicable)

The Board of Trustees of the Leland Stanford, Jr.

University as Manager Operator of SLAC National Accelerator Laboratory (SLAC)

12b. Signature of person authorized to sign for seller:

13b. Signature of person authorized to sign:

12c. Name of Signer: 13c. Name of Signer: Ryan Enos

12d. Title of Signer: 13d. Title of Signer: Sr. Subcontract Adminstrator

12e. Date: 13e. Date: November 16, 2026

SECTION C (REV. 6/01/12) SLAC-SCM-GEN-030 PAGE 1 OF 1

Section C – Statement of Work / Specifications

Amendment 01 – Dated 11/16/2026

The following document is attached hereto and incorporated by reference:

• Statement of Work (SOW) for Crane Inspection Services, Rev03, November 14, 2026

SITE-WIDE INSPECTION, CRANE TECH, INC. PAGE 1 OF 8

Statement of Work (SOW) for Crane Inspection Services Rev04 – November 13, 2026

SLAC Author: Kay Ganapathi: kayg@slac.stanford.edu

1. INTRODUCTION

This Statement of Work (SOW) defines the requirements for crane inspection, preventative maintenance, reporting, and troubleshooting services for lifting equipment located throughout the SLAC National Accelerator Laboratory site.

The Subcontractor shall provide all labor, supervision, tools, equipment, materials, transportation, and technical expertise necessary to perform the required services.

All work shall comply with applicable federal, state, and local regulations, including but not limited to:

• OSHA 29 CFR 1910

• Cal/OSHA requirements

• ASME B30 Standards

• CMAA Standards

• ANSI Standards

• National Electrical Code (NEC)

• SLAC Environmental, Safety and Health (ES&H) requirements

2. BACKGROUND

SLAC National Accelerator Laboratory is operated by Stanford University for the United States Department of Energy (DOE) Office of Science.

SLAC occupies more than 400 acres and consists of approximately 140 buildings containing approximately 275 lifting assets, including cranes, hoists, monorails, lifting devices, and associated material-handling equipment.

These assets support critical research, operations, maintenance, and facility activities and require periodic inspection and maintenance to ensure safe and reliable operation.

SITE-WIDE INSPECTION, CRANE TECH, INC. PAGE 2 OF 8

3. SCOPE OF WORK

The Subcontractor shall perform inspection, preventative maintenance, testing, reporting, and troubleshooting services for approximately 275 lifting assets throughout the SLAC site.

Services shall include:

• Quarterly inspections

• Annual inspections

• Quadrennial inspections

• Troubleshooting and diagnostic services

• Emergency response support

• Inspection reporting and documentation

Corrective repairs are not included within this SOW and shall require separate authorization by

SLAC.

3.1 Equipment Covered

Equipment included under this SOW includes, but is not limited to:

Air Hoist (AH) - 1

Chain Falls (CF) - 42

Gantry (G) - 23

Electric Hoists (EH) - 9

Fixed Mount (FM) - 5

Floor Crane (FC) - 28

Jib Cranes (JC) - 17

Lever Hoist (LH) - 71

Lifting Point (LP) - 2

Mobile Crane (MC) - 1

Monorails (M) - 32

Top Running Cranes (TR) - 28

Trolleys (T) - 2

Truck Mounted JIB (TMJ) - 3

Underhung Cranes (UH) – 19

SLAC may add or remove equipment at any time during the contract term. The covered inventory is capped at 283 assets. If it exceeds that number, the Subcontractor may request an equitable adjustment based on agreed per-asset unit pricing, to be executed through a formal Subcontract Modification.

3.2 Inspection Services

The Subcontractor shall conduct inspections required by applicable regulations, standards, and manufacturer recommendations.

SITE-WIDE INSPECTION, CRANE TECH, INC. PAGE 3 OF 8

Inspection services shall include:

Quarterly Inspections

• Three (3) quarterly inspections per contract year.

• Visual and operational inspections of all covered assets.

• Verification of equipment safety and operating condition.

Annual Inspections

• One (1) annual inspection per contract year.

• Detailed inspection of mechanical, structural, electrical, and operational systems.

• Documentation of deficiencies and recommended corrective actions.

Quadrennial Inspections

• One (1) quadrennial inspection for applicable assets.

• Comprehensive inspection consistent with regulatory and manufacturer requirements.

The Subcontractor shall immediately notify SLAC of any condition requiring equipment restriction or removal from service.

3.3 Preventative Maintenance

The Subcontractor shall perform routine preventative maintenance as needed during quarterly, annual, and quadrennial inspections, including but not limited to cleaning, lubrication/consumables, gearbox oil changes, wire rope lubrication, brake and limit switch adjustments, minor part replacements (e.g., fuses, contacts, pendant buttons) and adjustments.

3.4 Troubleshooting and Diagnostic Services

The Subcontractor shall provide troubleshooting services on an as-needed basis when requested by SLAC.

The Subcontractor shall demonstrate capability to evaluate and diagnose issues related to:

• Mechanical

• Electrical

• Controls

• Motor/Brakes

• Hoists

• Variable Frequency Drives (VFDs)

• Programmable Logic Controllers (PLCs)

Troubleshooting services shall include:

• Identification of deficiencies

SITE-WIDE INSPECTION, CRANE TECH, INC. PAGE 4 OF 8

• Diagnostic testing

• Root cause analysis, where feasible

• Operational risk assessment

• Recommended corrective actions

• Identification of required replacement components

Troubleshooting Deliverables

For each troubleshooting event, the Subcontractor shall provide a written report containing:

• Description of equipment condition

• Diagnostic findings

• Probable root cause

• Operational risks

• Recommended corrective actions

• Recommended replacement parts

• Cost proposal for repair work, if requested

3.5 Responsiveness & Emergency Support

The Subcontractor shall provide emergency crane service and troubleshooting support as needed.

Emergency Support means any unscheduled response required to address a crane malfunction, failure, or condition that presents an immediate threat to personnel safety, risks damage to equipment or facilities, results in loss of critical lifting capability, or prevents the crane from being operated or secured in a safe condition. Emergency Support typically requires immediate response outside normal maintenance scheduling.

Emergency services shall address mechanical, structural, electrical, control-system, and operational failures affecting safe equipment operation.

The Subcontractor shall:

• Acknowledge emergency service requests within one (1) hour

• Provide qualified personnel onsite within four (4) hours of notification.

• Maintain communication with the SLAC Technical Representative during response activities.

• Submit written findings and recommendations within twenty-four (24) hours of completion of emergency services.

Emergency Support response times apply only during standard SLAC operating hours (Monday through Friday, 7:00 AM to 5:00 PM), excluding SLAC holidays and shutdown periods. For

SITE-WIDE INSPECTION, CRANE TECH, INC. PAGE 5 OF 8

requests received outside these hours, the response window begins at the start of the next SLAC business day.

3.6 Repair Work

Corrective repairs are outside the scope of this SOW. If the Subcontractor is selected to perform repairs, a separate contract will be required.

When repairs are identified, the Subcontractor shall submit:

• Description of required repair

• Material requirements

• Labor estimate

• Schedule estimate

• Total repair cost proposal

3.6 Subcontractor-Furnished Equipment

The Subcontractor shall furnish, operate, and maintain all aerial access equipment necessary to safely perform the required inspection services at each job site. Equipment may include, but is not limited to, boom lifts and scissor lifts.

Based on site-specific building configurations, inspection locations, and access constraints, the Subcontractor shall determine the appropriate equipment required to complete the work.

Depending on the building being serviced, access may require one of the following:

• 60-foot boom lift

• 80-foot boom lift

• Scissor lift

The Subcontractor shall be solely responsible for evaluating site conditions prior to mobilization and selecting the appropriate lift equipment necessary to perform all inspections in accordance with applicable safety regulations, manufacturer requirements, and project specifications. The Subcontractor's determination of equipment type shall not relieve the Subcontractor of its obligation to complete all required inspections within the scope of work.

4. SUBCONTRACTOR QUALIFICATIONS

All work shall be performed by qualified personnel.

Personnel performing inspections shall:

• Meet applicable Cal/OSHA and ASME definitions of a Qualified Person.

SITE-WIDE INSPECTION, CRANE TECH, INC. PAGE 6 OF 8

• Possess current crane and hoist inspection credentials issued by recognized training organizations, manufacturers, or equivalent programs.

• Maintain certifications throughout contract performance.

• Provide qualification documentation upon request.

The Subcontractor shall immediately notify SLAC of any changes affecting worker qualification status.

5. PERFORMANCE REQUIREMENTS

The Subcontractor shall:

• Perform all services safely and professionally.

• Follow applicable regulations and industry standards.

• Maintain complete inspection records.

• Protect SLAC property and operations.

• Coordinate work with SLAC representatives.

• Tag and report unsafe equipment immediately.

• Maintain documentation of inspections, maintenance, and troubleshooting activities.

Any condition presenting an immediate safety concern shall be reported within twenty-four

(24) hours of discovery.

6. REPORTING REQUIREMENTS

All reports shall be submitted electronically to the SLAC Technical Representative.

6.1 Deficiency Reports

Deficiencies identified during inspections or troubleshooting shall be reported within twenty-four (24) hours.

Deficiency reports shall include:

• Asset identification number

• Equipment location

• Description of deficiency

• Applicable code or standard reference

• Operational impact

• Recommended corrective action

SITE-WIDE INSPECTION, CRANE TECH, INC. PAGE 7 OF 8

6.2 Inspection Reports

Complete inspection reports shall be submitted within forty-eight (48) hours following completion of inspection activities.

Each inspection report shall include:

• Asset identification number

• Equipment location

• Inspection date

• Inspector name

• Inspector qualifications

• Inspection checklist results

• Deficiencies identified

• Photographic documentation

• Recommended corrective actions

• Operational status determination:

o Acceptable for Service o Restricted Service o Remove from Service

6.3 Annual Summary Report

At the completion of each annual inspection cycle, the Subcontractor shall provide a consolidated annual report identifying:

• Inspection activities completed

• Deficiencies identified

• Repetitive equipment issues

• Reliability trends

• Maintenance priorities

• Recommended repair or replacement planning actions

7. SAFETY REQUIREMENTS

The Subcontractor shall comply with all SLAC Environmental, Safety and Health requirements.

Prior to beginning work, the Subcontractor shall provide:

• Injury and Illness Prevention Program (IIPP)

• Daily Job Safety Analysis (JSA)

• Required Subcontractor safety documentation

• Any additional documentation requested by SLAC ES&H personnel

SITE-WIDE INSPECTION, CRANE TECH, INC. PAGE 8 OF 8

The Subcontractor shall ensure all personnel have completed required SLAC training and site-access requirements.

Required training may include:

• ES&H Orientation Training

• General Employee Radiological Training (GERT), when applicable

• Site badging and access training

8. SCHEDULING

Services shall be performed in accordance with schedules coordinated with the SLAC Technical Representative.

Section L – Attachment 01 – Offeror’s Technical & Business Proposal

Qualifications Matrix Checklist

Site-wide Crane Inspection & Troubleshooting

TECHNICAL SUBMISSION

REQUIREMENTS

TECHNICAL EVALUATION CRITERIA EXCEEDS MEETS DOES NOT

MEET

IF DOES NOT

MEET,

REASON

1. Past Performance

Provide a list of relevant crane inspection, preventative maintenance, testing, maintenance, and/or troubleshooting services performed by the Offeror within the previous five years. The examples provided should demonstrate experience with work of similar scope, complexity, and safety requirements to the services described in this solicitation.

Offerors with no relevant past or present performance history shall receive the rating of "Does Not Meet Requirements".

1. Past Performance

EXCEEDS: The Offeror provides three

(3) or more successfully completed or ongoing contracts/projects within the past five (5) years involving crane/hoist inspection and preventative maintenance comparable in scope and complexity to this requirement. At least two (2) examples shall include periodic inspections, testing/certification, or services performed in regulated industrial, research, or similarly controlled environments. References demonstrate successful performance with no material performance concerns.

MEETS: The Offeror provides at least two (2) successfully completed or ongoing contracts/projects within the past five (5) years involving crane/hoist inspection and preventative maintenance comparable to the required services, with satisfactory supporting past-performance information.

DOES NOT MEET: The Offeror provides fewer than two (2) relevant contracts/projects within the past five (5) years, the experience is not comparable to the required services, or submitted past-performance information identifies material performance concerns.

2. Responsiveness and Emergency Support

Provide a description of the Offeror’s capability and approach for providing responsive crane inspection, preventative maintenance, troubleshooting, and emergency support services, including support for unplanned equipment issues that may affect crane availability or operations.

The response shall include, at a minimum:

•The Offeror’s proposed response time after notification of an urgent or emergency service request;

•The Offeror’s ability to provide on-site troubleshooting and technical support, including availability outside normally scheduled inspection activities;

•The location and availability of qualified technicians who may be assigned to support the services;

•The process for receiving, prioritizing, and responding to urgent service requests;

•The Offeror’s ability to provide appropriate personnel, tools, test equipment, and other resources necessary to diagnose crane-related problems;

•The Offeror’s approach to communicating initial findings, identified deficiencies, safety concerns, and recommended corrective actions to the customer;

•The anticipated timeframe for providing inspection findings, troubleshooting results, service reports, and recommended corrective actions following completion of the work;

•The Offeror’s ability to provide follow-up technical support when additional troubleshooting or clarification is required;

and

2. Responsiveness and Emergency Support

EXCEEDS: The Offeror commits to having qualified personnel arrive onsite at SLAC within 2 hours of notification of an emergency crane service or troubleshooting request.

MEETS: The Offeror commits to having qualified personnel arrive onsite at SLAC within 4 hours of notification of an emergency crane service or troubleshooting request.

DOES NOT MEET: The Offeror proposes an onsite response time of more than 4 hours, does not provide a firm response-time commitment, or cannot demonstrate availability of qualified personnel to meet the required response time.

•Any limitations, exclusions, or conditions that could affect the Offeror’s ability to meet the proposed response times.

3. Inspection Reporting and Documentation

Provide a description of the Offeror’s approach to documenting crane inspections, preventative maintenance, troubleshooting activities, identified deficiencies, and recommended corrective actions. The Offeror shall demonstrate its ability to provide clear, complete, and technically accurate documentation sufficient for the customer to understand equipment condition, inspection results, and any required or recommended follow-up actions.

The response shall include, at a minimum:

•A description of the inspection report format and content normally provided to customers;

•Identification of the information recorded for each crane or piece of equipment inspected, including inspection results and equipment condition;

•The method used to document deficiencies, discrepancies, abnormal conditions, or safety-related concerns identified during inspection or troubleshooting;

•The approach for categorizing or prioritizing findings based on severity or recommended urgency of corrective action, where applicable;

•Documentation of troubleshooting activities, including the problem investigated, diagnostic activities performed, findings, and recommended corrective actions;

3. Inspection Reporting and Documentation

EXCEEDS: The Offeror commits to providing written findings or deficiencies within 12 hours of discovery and completed individual inspection reports within 24 hours following completion of the inspection. Reports shall include the photographs, findings, and recommendations required by SOW.

MEETS: The Offeror commits to providing written findings or deficiencies within 24 hours of discovery and completed individual inspection reports within 48 hours following completion of the inspection, consistent with the SOW requirements.

DOES NOT MEET: The Offeror proposes written findings or deficiency reporting greater than 24 hours after discovery and/or individual inspection reports greater than 48 hours following completion of the inspection or does not provide a firm commitment to the required reporting timeframes.

•Identification of any applicable inspection criteria, manufacturer requirements, or codes and standards referenced in determining equipment condition or deficiencies;

•The process for communicating significant or safety-related findings requiring immediate attention to the customer;

•The anticipated timeframe for providing completed inspection reports and supporting documentation following completion of the work;

•The process for correcting, revising, or providing clarification regarding submitted reports when necessary; and

•Representative sample inspection reports demonstrating the Offeror’s standard level of detail, organization, and documentation quality.

4. Personnel Qualifications and Certifications

Provide the qualifications and certifications of personnel proposed to perform the crane inspection and troubleshooting services. The response shall include:

• Relevant years of crane inspection and troubleshooting experience;

• Applicable licenses, certifications, and specialized training;

• Experience with crane systems of similar type and complexity; and

• Resumes or other documentation demonstrating the qualifications of proposed personnel.

4. Personnel Qualifications and Certifications

MEETS: The Offeror demonstrates that proposed inspection personnel are qualified to perform crane inspections in accordance with applicable Cal/OSHA Title 8 and ASME B30 standards through relevant experience, training records, professional credentials, and, where applicable, accreditation by a Cal/OSHA Crane Certifying Agency. All required personnel qualifications and credentials are current and valid.

DOES NOT MEET: The Offeror does not adequately demonstrate personnel competency, qualifications, experience, training, or required credentials necessary to perform the inspection services specified in the SOW, or proposes personnel whose required credentials are missing, expired, or otherwise invalid.

5. Troubleshooting & Diagnostic Capability

Provide a description of the Offeror’s capability to diagnose and troubleshoot crane equipment deficiencies and operational issues. The response shall include:

• Experience diagnosing mechanical, electrical, control, and operational issues;

• Methods and equipment used to identify and isolate equipment problems;

• Ability to determine probable root causes and recommend corrective actions; and

• Examples of comparable troubleshooting services successfully performed.

5. Troubleshooting & Diagnostic Capability

MEETS: The Offeror demonstrates capability to troubleshoot and diagnose identified crane system areas, including mechanical, electrical, controls, motors/brakes, hoists, VFDs, and PLCs

DOES NOT MEET: The offeror’s troubleshooting experience is limited, unclear, or insufficient to support the required services.

6. Safety Program & Compliance

Provide a description of the Offeror’s safety program and approach to regulatory compliance for crane inspection and troubleshooting services. The response shall include:

• Applicable safety policies and procedures;

• Relevant employee safety training and certifications;

• Procedures for identifying and addressing workplace hazards; and

• Compliance with applicable crane safety requirements, codes, and standards.

6. Safety Program & Compliance

MEETS: The Offeror provides or demonstrates its ability to provide all required safety documents and plans, including the Injury and Illness Prevention Plan (IIPP) and daily Job Safety Analysis (JSA), in accordance with the SOW.

DOES NOT MEET: The Offeror fails to provide or demonstrate its ability to provide one or more required safety documents or plans, or the documentation does not satisfy the SOW requirements.

BUSINESS SUBMISSION REQUREMENTS BUSINESS EVALUATION CRITERIA MEETS DOES NOT

MEET

IF DOES NOT

MEET, REASON

Factor 7. Financial Standing/Organizational Factor 5. Financial

Standing/Organizational

Provide Dun & Bradstreet (D&B) report

OR

If Offeror does not participate in Dun & Bradstreet, Offeror will provide audited financial statement reports for the past two years.

Dun & Bradstreet report will be reviewed to verify a SER score of 6 or lower – SER scores higher than 6, audited financials will be reviewed for risk

MEETS: SER Score 6 or lower

DOES NOT MEET: SER Score 7 or higher

– audited Financial Statements will be reviewed for risk

Section J – Small Business Subcontracting Plan –

Offerors are to fill out, sign and return with proposal

(if applicable) – Only required for large businesses when cost proposal is over $900,000

MEETS: Section J Attachment 02 is filled out and returned

DOES NOT MEET: Section J Attachment 02 is not filled out and returned

Section J – Injury and Illness Prevention Plan

Acknowledgment Form

MEETS: IIPP is filled out and returned

DOES NOT MEET: IIPP is not filled out and returned

Section J – Certificate of Liability Insurance (COI) MEETS: COI is filled out and returned and meets SLAC standards for acceptance

DOES NOT MEET: COI is not returned or does not meet SLAC standards for acceptance

Section K –Representation and Certifications

Supplement dated August 2022 – Offerors are to fill out, sign and return with proposal

MEETS: Representation and Certification Supplement is completed and signed

DOES NOT MEET: Representation and

Certification Supplement is not completed, signed and submitted

Section L – Attachment 01 - Offeror’s Technical &

Business Proposal Qualification Matrix Checklist

MEETS: Qualification Matrix Checklist is completed, signed and submitted with proposal.

DOES NOT MEET: Qualification Matrix Checklist is not completed, signed and submitted with proposal.

Factor 8. Price Factor 6. Price MEETS DOES NOT

MEET

IF DOES NOT

MEET, REASON

Submit RFP Section A (completed form), acknowledgement of issued amendments

MEETS: Section A is signed and submitted. If applicable, addendums are signed and submitted.

DOES NOT MEET: Section A or addendums if applicable are not signed and submitted

RFP Section B – Offerors are to submit filled out

Section B with firm fixed prices for each item

Price Certification – Offerors are to submit price certification (i.e. published price list, redacted invoice or redacted quotes for items procured)

If no price certification method list above is available, Offerors are to submit an Offeror certificate on company letterhead indicating SLAC is receiving the best price

MEETS: Section B Submitted with pricing and company information completed

DOES NOT MEET: Section B is not submitted with pricing and company information completed

I. BASIS FOR AWARD

A. This is a Best Value Trade-off source selection conducted in accordance with SLAC Policies, Procedures, and Terms and Conditions. SLAC will select the best overall offer, based upon an integrated assessment of all the technical and business factors and sub-factors including price with technical evaluation factors and subfactors being more important than business factors and subfactors, including price. Key evaluation factors and subfactors are listed in descending order of importance for selecting a Subcontractor.

B. The subcontract may be awarded to the responsible Offeror whose proposal conforms to the solicitation’s requirements to include all stated terms, conditions, representations, certifications, and all other information required by Section A of this solicitation and is judged, based on the evaluation factors and sub-factors to represent the best value to SLAC.

C. SLAC seeks to award to the Offeror who gives SLAC the greatest confidence that it best meets, or exceeds, the requirements. This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation factors, and the SSA reasonably determines that the technical superiority and/or overall business approach of the higher price Offeror supersedes the cost difference.

The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation. While SLAC’s source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; and therefore, professional judgment is implicit throughout the entire process. The evaluation process shall proceed as follows: Offeror is cautioned to submit sufficient information in the format specified in Section L. Offeror may be asked to clarify certain aspects of their proposal. Communication conducted to resolve minor or clerical errors will not constitute discussions and the Subcontract Administrator reserves the right to award a contract without the opportunity for proposal revision. SLAC intends to award without discussions with respective Offerors. SLAC, however, reserves the right to conduct discussions if deemed in its best interest.

D. Rejection of Unrealistic Offers. SLAC may reject any proposal that is evaluated to be unrealistic in terms of program commitments, contract terms and conditions, or unrealistically high or low in cost when compared to SLAC’s estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

E. Correction Potential of Proposals. SLAC will consider, throughout the evaluation, the “correction potential” of any deficiency or uncertainty. The judgment of such “correction potential” is within the sole discretion of SLAC. If an aspect of an Offeror’s proposal Does Not Meet SLAC’s requirements and is not considered correctable, the Offeror may be eliminated.

F. Evaluation Factors. Key evaluation factors and subfactors are listed in descending order of importance for selecting a Subcontractor. SLAC will select the best overall offer, based upon an integrated assessment of all the technical factors and subfactors, and business factors and subfactors, including price. Technical evaluation factors and subfactors are more important than business factors and sub- factors, including price.

G. This action requires a degree of technical, personnel and managerial capability, capacity, experience, and management excellence. This selection process will involve submittal of a Technical Proposal (Volume I) and submittal of a Business Proposal (Volume II). After initial evaluation of the Technical and Business Proposals, SLAC may establish a competitive range, and conduct interviews with Offerors who are within the competitive range. Further instructions on the interviews will be provided to the Offerors after the competitive range is established.

Section M – Evaluation of Offers

H. The following evaluation factors and sub-factors will be used to evaluate each proposal. Award will be made to the Offeror(s) proposing the combination most advantageous to SLAC based upon the evaluation factors and subfactors as described in instructions in Section L and the criteria of the evaluation factors in Section M.

II. EVALUATION METHOD

Although price is important it will not be used for the sole basis for award. A qualitative assessment based on the Evaluation Factors will be evaluated. The technical differences shall be noted between the proposal offers and adequately documented to determine any price/technical tradeoff to support the final award.

The focus of the proposal evaluation and selection process will be to identify the individual proposal strengths, weaknesses and deficiencies. The evaluation will analyze each Offeror’s resources available to perform under the contract and how they will be used during contract performance. This includes the

Offeror’s analysis of their resources for this project and their proven ability through demonstrated past experience to satisfy all the requirements.

Volume I – Technical Proposal Evaluation

All proposals shall be evaluated utilizing a technical rating based on “Exceeds, Meets, and/or Does Not

Meet” the technical requirements. Additionally, each rating shall include a descriptive statement or comment providing a written rationale for the rating based on overall strengths, weaknesses, value additions and deficiencies in the proposal responses.

Technical Evaluation Criteria Factors

Factor 1. Past Performance

EXCEEDS: The Offeror provides three (3) or more successfully completed or ongoing contracts/projects within the past five (5) years involving crane/hoist inspection and preventative maintenance comparable in scope and complexity to this requirement. At least two (2) examples shall include periodic inspections, testing/certification, or services performed in regulated industrial, research, or similarly controlled environments. References demonstrate successful performance with no material performance concerns.

MEETS: The Offeror provides at least two (2) successfully completed or ongoing contracts/projects within the past five (5) years involving crane/hoist inspection and preventative maintenance comparable to the required services, with satisfactory supporting past-performance information.

DOES NOT MEET: The Offeror provides fewer than two (2) relevant contracts/projects within the past five

(5) years, the experience is not comparable to the required services, or submitted past-performance information identifies material performance concerns.

Offerors with no relevant past or present performance history shall receive the rating "Does Not Meet

Requirements".

Factor 2. Responsiveness and Emergency Support

EXCEEDS: The Offeror commits to having qualified personnel arrive onsite at SLAC within 2 hours of notification of an emergency crane service or troubleshooting request.

MEETS: The Offeror commits to having qualified personnel arrive onsite at SLAC within 4 hours of notification of an emergency crane service or troubleshooting request.

DOES NOT MEET: The Offeror proposes an onsite response time of more than 4 hours, does not provide a firm response-time commitment, or cannot demonstrate availability of qualified personnel to meet the required response time.

Factor 3. Inspection Reporting and Documentation

EXCEEDS: The Offeror commits to providing written findings or deficiencies within 12 hours of discovery and completed individual inspection reports within 24 hours following completion of the inspection. Reports shall include the photographs, findings, and recommendations required by SOW.

MEETS: The Offeror commits to providing written findings or deficiencies within 24 hours of discovery and completed individual inspection reports within 48 hours following completion of the inspection, consistent with the SOW requirements.

DOES NOT MEET: The Offeror proposes written findings or deficiency reporting greater than 24 hours after discovery and/or individual inspection reports greater than 48 hours following completion of the inspection or does not provide a firm commitment to the required reporting timeframes.

Factor 4. Personnel Qualifications and Certifications

MEETS: The Offeror demonstrates that proposed inspection personnel are qualified to perform crane inspections in accordance with applicable Cal/OSHA Title 8 and ASME B30 standards through relevant experience, training records, professional credentials, and, where applicable, accreditation by a Cal/OSHA Crane Certifying Agency. All required personnel qualifications and credentials are current and valid.

DOES NOT MEET: The Offeror does not adequately demonstrate personnel competency, qualifications, experience, training, or required credentials necessary to perform the inspection services specified in the SOW, or proposes personnel whose required credentials are missing, expired, or otherwise invalid.

Factor 5. Troubleshooting and Diagnostic Capability

MEETS: The Offeror demonstrates capability to troubleshoot and diagnose identified crane system areas, including mechanical, electrical, controls, motors/brakes, hoists, VFDs, and PLCs

DOES NOT MEET: The offeror’s troubleshooting experience is limited, unclear, or insufficient to support the required services.

Factor 6. Safety Program and Compliance

MEETS: The Offeror provides or demonstrates its ability meet safety standards and commits to providing all required safety documents and plans, including the Injury and Illness Prevention Plan (IIPP) and daily Job Safety Analysis (JSA), in accordance with the SOW.

DOES NOT MEET: The Offeror fails to provide or demonstrate its ability to provide one or more required safety documents or plans, or the documentation does not satisfy the SOW requirements.

Volume II – Business Proposal Evaluation

Business Evaluation Criteria Factors

Factor 7. Financial / Organizational

Dun & Bradstreet report will be reviewed to verify a SER score of 6 or lower. For Offerors with a SER score greater than 6, audited Financial Statements will be reviewed for risk

a. SER Score 6 or lower OR reviewed financial statements are accepted = MEETS

b. SER Score 7 or higher OR reviewed financial statements are not accepted = DOES NOT MEET

The following require no action by Offerors – for information purposes only under Section J

• Section J – Attachment 01 – Tax Resale and Exempt Certificate

• Section J – Attachment 02 – Certificate of Liability Insurance Example

• Section J – Attachment 03 – SLAC Entry Real ID

• Section J – Attachment 04 – Wage Determination (No. 2015-5637)

The following are to be filled out, signed and returned with your proposal

• Section A – Subcontract Form and acknowledgment of any amendments

• Section J – Attachment 05 – Small Business Subcontracting Plan

• Section J – Attachment 06 – Injury and Illness Prevention Plan Acknowledgement Form

• Section K – Attachment 01 – Representation and Certification Supplement dated August 2022

• Section L – Attachment 01 – Offeror’s Technical & Business Proposal Qualification Matrix Checklist

• Section L – Attachment 02 – Offeror’s Request for Clarifications, to be filled out if applicable

Factor 8. Price

RFP Section B (Supplier or Service Prices) will be reviewed for completeness and reasonableness

• Proposal price will be evaluated against SLAC’s cost estimate or compared with other Offerors

• Proposal will be evaluated on submission on price certification method (i.e. published price list, redacted invoice, redacted quote)

• If no price certification method listed above is available, Offeror certificate on company letterhead indicating SLAC is receiving the best price offered and provide a redacted invoice of previously sold services of similar specifications or exact specifications

The Business proposal submissions will be evaluated with the following adjectival ratings:

Meets

Requirements

Acceptable Overall Proposal. The proposal meets SLAC’s requirements for submission of complete and correct documentation, shows a satisfactory level of financial health, and meets

SLAC’s funding profile.

Does Not Meet

Requirements

Unacceptable Overall Proposal. The proposal Does Not Meet

SLAC’s requirements for submission of complete and correct documentation, shows an unsatisfactory level of financial health, and/or fails to meet SLAC’s funding profile.

III. DEBRIEFINGS

Debriefings may be requested within 3 days after receipt of an unsuccessful award notification. The discussion shall not include comparisons with the other proposals. An explanation of the evaluation of significant elements in the Offeror’s proposal, summary of the rationale for eliminating the Offeror from the competition and assure the Offeror that its proposal was treated fairly, impartially, and objectively. The Sr. Subcontracts Administrator will aim to conduct debriefing(s) within 5 days of the written request.

File details come from the government source that posted it. Updated .