This document is a set of architectural and mechanical design drawings for the Mackinac State Historic Park (MSHP) Day Use Restroom Renovation project, a state of Michigan Department of Technology, Management and Budget initiative located at 526 North Huron Avenue, Mackinaw City, Michigan 49701. The project scope involves comprehensive renovation of three public restrooms (men's, women's, and family) plus a janitor's closet, including demolition of existing fixtures, installation of new plumbing and mechanical systems, roof replacement, window infill, exterior siding, interior wall tile, epoxy flooring, and ADA accessibility upgrades. The drawings encompass demolition plans, proposed floor and ceiling plans, exterior and interior elevations, detailed sections, mechanical and plumbing plans with fixture schedules, and electrical schematics. The project was issued for bid on September 17, 2026, following owner review in June 2026, a progress set in August 2026, and 50%, 90%, and 98% design review phases completed by mid to late August 2026.
The construction specifications reference the 2021 Michigan Building Code and 2021 Michigan Energy Code, with rehabilitation classified as Level 2 (refinishing, HVAC, and window replacement) using Type III-B construction. Key materials include new architectural shingles, aluminum fascia and soffit, Certainteed composite panel siding in natural clay, Daltile urban putty ceramic wall tile (6"x6"), fluid-applied epoxy flooring, new plumbing fixtures with thermostatic mixing valves, and new fiberglass fixed windows by Pella. The project manager is Jeremy Gagnon of U.P. Engineers & Architects, Inc., with oversight from Michigan DTMB Project Director Alan Goschka, AIA, and MSHP representative Robert Strittmatter. The renovation addresses accessibility requirements including grab bars, accessible toilet stalls, appropriate fixture mounting heights, and new concrete ramps and landings to accommodate the family restroom addition.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI QU EREI S PENI NSULAM AMOENA
M
FILE NO.: 751 / 26365.ABG
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
CONTACT LIST:
STATE OF MICHIGAN DTMB
ALAN GOSCHKA, AIA - PROJECT DIRECTOR - (517)-388-3489
EMAIL: GOSCHKAA@MICHIGAN.GOV
BRIAN GUIGUE - FIELD REPRESENTATIVE - (517)-281-4994
EMAIL: GUIGUEB@MICHIGAN.GOV
MACKINAC STATE HISTORIC PARKS (MSHP)
ROBERT STRITTMATTER - (906)-934-3712
EMAIL: STRITTMATTERR@MICHIGAN.GOV
PROFESSIONAL SERVICE CONTRACTOR
JEREMY GAGNON - PRIMARY CONTACT
PROJECT MANAGER
U.P. ENGINEERS & ARCHITECTS, INC.
707 ASHMUN STREET
SAULT STE. MARIE, MI 49783
(906)-635-0511
EMAIL: JGAGNON@UPEA.COM
BUILDING CODE SUMMARY
2021 MICHIGAN BUILDING CODE
USE GROUP:
CONSTRUCTION TYPE:
2021 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS
2021 MICHIGAN ENERGY CODE
EXTERIOR WALLS:
ROOF CONSTRUCTION:
FLOOR CONSTRUCTION:
EXISTING U; REHABILITATION LEVEL: 2 - REFINISHING, HVAC, & WINDOW REPLACEMENT
III-B
MASONRY
WOOD TRUSSES
SLAB ON GRADE
BUILDING LOCATION
33 G5
30 65
17 139
55 52
32 180
14 12
CEDARVILLE
HESSEL
WHITEFISH
POINT
SAULT
STE
MARIE
NATIONAL PARK
ISLE ROYALE
NORWAY
MARENISCO
WHITE PINE
BERGLAND
NEWBERRY
SILVER
CITY
BESSEMER
IRONWOOD
WAKEFIELD
GREEN BAY
GWINN
HERMANSVILLE
MENOMINEE
IRON MOUNTAIN
VULCAN
CASPIAN
TROUT
WATERSMEET
CREEK
CROSSING
MASS
CITY
BRUCE
ONTONAGON
ROCKLAND BARAGA
ARNHEIM
CRYSTAL
FALLS
ISHPEMING
MICHIGAMME
L'ANSE
AURA SKANEE
MARQUETTE
NEGAUNEE
MANISTIQUE
ESCANABA
FAYETTE
GARDEN
MUNISING
CURTIS
CITY
GOULD
HARBOR
CALUMET
RIPLEYHOUGHTON
CHASSELL
HANCOCK
DELAWARE
LAKE
LINDEN
LAURIUM
EAGLE
HARBOR
COPPER
MACKINAC
ISLAND
IGNACE
ST
INDIAN
RIVER
CHEBOYGAN
MACKINAW CITY
PELSTON
ONAWAY
GAYLORD
PETOSKEY
CHARLEVOIX
MANCELONA
KALKASKA
TRAVERSE
CITY
EMPIRE
ELBERTA
ARCADIA
MANISTEE
SCOTTVILLE
BALDWINLUDINGTON
SHELBY
BIG RAPIDS
MOUNT
PLEASANT
CADILLAC
GRAYLING
EAST
TAWAS
ROSCOMMON
LACHINE ALPENA
WOLVERINE
ATLANTA
ROGERS CITYALANSON
CROSS
VILLAGE
BOYNE CITY
BELLAIRE
JORDAN
E.
EASTPORTNORTHPORT
LELAND
BUCKLEY
FIFE
LAKE
FRANKFORT
MESICK
MANTON
BEAR
LAKE
LILLEY
HESPERIA
WHITE
CLOUD
EVART
REMUS
MIDLAND
SAGINAW
BAY
CITY
HARRISVILLE
CURRAN
MIO
OSCODA
TAWAS CITY
WEST
BRANCH
STANDISH
GLADWIN
McBAIN
LAKE CITY
CLARE
CARO
TROUT LAKE
BREVORT
IRON RIVERBRULE
WASHBURN
POPLAR
ASHLAND
PORT WING BAYFIELD
ODARRAH
MELLEN
UPSON
HURLEY
GLIDDEN
PARK FALLS
CLAM LAKE
MERCER
PRESQUE
ISLE
LAND O'LAKES
EAGLE
RIVER
PHELPS
FLORENCE
NIAGRA
CRANDON
SUPERIOR
HAYWARD
MINONG
CABLE
SHELL LAKE
GRANTSBURG
BALSAM
LAKE BARRON
MENOMONIE
DURAND
ALMA
WHITEHALL
BLACK
RIVER
FALLS
SPARTA
LA CROSSE
FRIENDSHIP
MONTELLO
WAUTOMA
GREEN
LAKE
FOND DU LAC
OSHKOSH
APPLETON
DE PERE
GREEN BAY
KEWAUNEE
STURGEON BAY
MARINETTE
OCONTO
SHAWANO
KESHENA
WAUSAU
STEVENS
POINT
WAUPACA
RHINELANDERPHILIPS
MEDFORD
MERRILL
ANTIGO
EAU CLARE
LADYSMITH
THREE
LAKES
MICHIGAN
WISCONSIN
LAKE
MICHIGAN
LAKE
SUPERIOR
HURON
LAKE
100 PORTAGE STREET
HOUGHTON, MI 49931
P (906) 482-4810 F (906) 482-9799
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
U.P. ENGINEERS &
ARCHITECTS, INC.
2906 N. STEPHENSON AVE, SUITE 2
IRON MOUNTAIN, MI 49801
P (906) 779-0937 F (906) 779-0947
424 S. PINE ST.
ISHPEMING, MI 49849
P (906) 485-1011 F (906) 485-1013
1701 DUNLAP AVE., SUITE B
MARINETTE, WI 54143
P (715) 732-4188 F (715) 732-4189
707 ASHMUN STREET
SAULT STE. MARIE, MI 49783
P (906) 635-0511 F (906) 635-0612
PR
OJ
EC
T N
O:
w w w .u pe a.
co m
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
STATE OF MICHIGAN
MACKINAC STATE HISTORIC PARK
MSHP DAY USE RESTROOMS REMODEL
G001
COVER SHEET
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
6 N
. H ur on A ve , M ac kin aw C ity , M
I 4
M
-0
G S/
D C
JA JGG
S/
D C
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
526 N. Huron Ave, Mackinaw City, MI 49701
SHEET INDEX
NUMBER SHEET NAME
G001 COVER SHEET
A001 ARCHITECTURAL NOTES AND LEGENDS
AD100 DEMOLITION PLAN
AD101 DEMOLITION CEILING PLAN
AD102 ROOF DEMOLITION PLAN
A101 PROPOSED FLOOR PLAN
A102 PROPOSED CEILING PLAN
A103 PROPOSED ROOF PLAN
A201 EXTERIOR ELEVATIONS
A202 INTERIOR ELEVATIONS
A301 SECTIONS AND DETAILS
A501 DETAILS
A601 SCHEDULES
P001 MECHANICAL AND PLUMBING ABBREVIATIONS AND SYMBOLS
PD101 EXISTING PLUMBING PLAN
P100 PROPOSED UNDERSLAB PLUMBING PLAN
P101 PROPOSED PLUMBING PLAN
P601 PLUMBING DETAILS & SCHEDULES
MD101 EXISTING MECHANICAL PLAN
M101 PROPOSED MECHANICAL PLAN
M601 MECHANICAL DETAILS & SCHEDULES
E001 ELECTRICAL ABBREVIATIONS
ED101 ELECTRICAL DEMO POWER PLAN
E101 ELECTRICAL PLAN
E501 ELECTRICAL SCHEDULES & DETAILS
PROJECT LOCATION
PROJECT VICINITY MAP
O W
N
ER
R
EV
IE
W
6-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
-2
FLUSH CONTROLS ON
APPROACH SIDE OF
TOILET
42"12"
7" -9"
H.
C.
" M
AX
" S
TD
" M
IN
" M
AX
15" MIN.
6"
" S
TD
" H
.C
16"- 18"
39"- 41"
VERT. GRAB BAR
1-1/2"Ø GRAB BAR w/
1-1/2" GAP FROM WALL (TYP)
1 1/2"
TYP TOILET PAPER
MOUNTING AREA
VERT. GRAB
BAR
WATER CLOSET SIDE WALL WATER CLOSET BACK WALL
12"24"
MIN. MIN.
URINAL
LAVATORY OR VANITY
SINK
COUNTER WHERE
OCCURS
ACCESSIBLE SINK
BOWL
9" M
IN
11" MIN
OFFSET
WASTE
" M
AX
KNEE
CLEARANCE
TOILET ROOM ACCESSORIES
PAPER
TOWEL
DISPENSER- SAN.
NAPKIN
DISPENSER
CLOTHES
HOOKS
" M
AX
SHELF
WASTE
RECEPTACLE
HAND
DRYER
DRINKING FOUNTAINS
HIGH-
LOW
4" M
IN
W
AT
ER
F
LO
W
" M
IN
" M
AX
SP
OU
T
17" MIN.
9" M
IN
11" MIN.
" M
IN
8" MIN.
" S
TA
ND
AR
D
HG
T
12"
12"
STAIR RAMP
TYPICAL RAMP & STAIR RAILINGS
12"
12"
1 1/2"
TYPICAL SECTION
1 1 /2"
1. ENDS OF HANDRAILS SHALL RETURN TO WALL.
2. PROVIDE HANDRAILS ON BOTH SIDES OF STAIR OR RAMP.
3. HANDRAILS SHALL BE CIRCULAR IN CROSS-
SECTION w/ 1-1/2" TO 2" OUTSIDE DIAMETER.
SIGNAGE
TEXT
BA
SE
LIN
E
OF
H
IG
HE
ST
LI
NE
SOAP
DISPENSER
8" MIN
" M
AX
MIRROR
TEXT
MOUNT SIGNAGE ON
LATCH SIDE OF DOOR
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A001
ARCHITECTURAL
NOTES AND
LEGENDS
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
G S
JA JGG
S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
3/8" = 1'-0"
MOUNTING HEIGHTS
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
DEMO ALL PLUMBING FIXTURES
DEMO EXISTING LOUVERS
(TYP. @ LONG WALLS)
DEMO EXISTING
WINDOWS, PREP FOR INFILL
DEMO EXISTING
WINDOWS (TYP.)
MENS
LAUNDRY
WOMENS
DEMO EXISTING CMU CHIMNEY AND REPAIR
WALLS WHERE CHIMNEY REMOVAL CAUSES
DAMAGE
ENSURE WALLS ARE PATCHED TO SMOOTH
DEMO AREAS OF SLAB AS REQUIRED TO REMOVE AND REPLACE SANITARY LINES
SEE SHEET A301 VIEW 9 FOR INFILL DETAIL & PLUMBING SHEET PD101
DEMO EXISTING DOOR AND FRAME, TYP. OF (3)
DEMO CONC. FLOOR
KEEP DOOR AND FRAME
DEMO WOOD AND CONCRETE RAMPS AND LANDINGS
POST TO REMAIN, TYP.
DEMO WOOD AND CONCRETE RAMPS AND LANDINGS
DEMO ALL PLUMBING FIXTURES
DEMO AREAS OF SLAB AS REQUIRED TO REMOVE AND REPLACE SANITARY LINES
SEE SHEET A301 VIEW 9 FOR INFILL DETAIL & PLUMBING SHEET PD101
DEMO EXISTING DOOR AND FRAME, TYP. OF (3)
DEMO EXISTING DOOR AND FRAME TYP. OF (3)
DEMO EXISTING TOILET STALL PARTITIONS AND
DOORS
GRIND AND PATCH CONCRETE FLOORS UNDER
EXISTING PARTITIONS AFTER DEMO'ING THE
PARTITIONS UNTIL SURFACE IS SMOOTH AND EVEN
FOR NEW EPOXY
DEMO EXISTING GLAZZED CMU TOILET PARTITIONS
AND DOORS
GRIND AND PATCH CONCRETE FLOORS UNDER
EXISTING PARTITIONS AFTER DEMO'ING THE
PARTITIONS UNTIL SURFACE IS SMOOTH AND EVEN
FOR NEW EPOXY
DEMO ALL ACCESSORIES
DEMO ALL ACCESSORIES
POST TO REMAIN, TYP.DEMO EXISTING LOUVERS
(TYP. @ LONG WALLS)
REMOVE AND STORE
EXISTING WOOD
PLATFORM AND STEP
FOR RE-INSTALLATION
DEMO EXISTING PLYWOOD
ABOVE AND BELOW DEMO'D
LOUVERS
DEMO EXISTING PLYWOOD
ABOVE AND BELOW DEMO'D
LOUVERS
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
AD100
DEMOLITION
PLAN
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
D C
/G S
JA JGD
C
/G S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/2" = 1'-0"1 DEMO/EXISTING PLAN
NOTE: SEE ROOF PLAN AD101 FOR ADDITIONAL DEMO NOTES
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
DEMO EXISTING SHINGLES, DRIP EDGE, AND UNDERLAYMENT
DEMO ALL EXISTING FASCIA AND SOFFIT
DEMO EXISTING SHINGLES, DRIP EDGE, AND UNDERLAYMENT
CUT AND REMOVE 2" SHEATHING BOTH SIDES OF RIDGE FOR NEW RIDGE VENT
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
AD102
ROOF
DEMOLITION
PLAN
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
D C
/G S
JA JGD
C
/G S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/2" = 1'-0"1 ROOF DEMO PLAN
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
PATCH AND REPAIR
CEILING WHERE EXISTING
LIGHT FIXTURES ARE
REMOVED
PATCH AND REPAIR
CEILING WHERE EXISTING
LIGHT FIXTURES ARE
REMOVED
PATCH AND REPAIR
CEILING WHERE CEILING
GRILLES ARE REMOVED
PATCH AND REPAIR
CEILING WHERE CEILING
GRILLES ARE REMOVED
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
AD101
DEMOLITION
CEILING PLAN
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
Au th or C he ck er
JGD
es ig ne r
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/2" = 1'-0"1 DEMO CEILING PLAN
BI
D
SE
T
9-
A201
A201
A2016
MENS
WOMENS
FAMILY RESTROOM
N
EW
L
AN
D
IN
G W
ID
TH
5'
6" N
EW
R
AM
P
LE
N
G
TH
7'
9" N
EW
R
AM
P
AN
D
L
AN
D
IN
G W
ID
TH
5'
6"
BABY CHANGING
STATION
NEW WINDOWS IN
EXISTING MASONRY
OPENINGS (TYP.)
NEW FLUID APPLIED EPOXY
FLOORING
NEW FLUID APPLIED EPOXY
FLOORING
NEW TOILETES
MOP
SINK
JANITOR CLO.
NEW WINDOWS IN
EXISTING MASONRY
OPENINGS (TYP.)
NEW TOILET STALL
PARTITIONS (TYP.)
NEW TOILET STALL
PARTITIONS (TYP.)
A201 5
A202
2A
2C
2B 2D
A202
1A
1C
1D 1B
A202 3A
3D
3C
3B
A301
A301
A201 1 A2012
A201
A201
B2 ø 5' - 7
A1A1A1
NEW WALL TILE ON
FIBER CEMENT BACKER
BOARD ON ALL
PERIMETER WALLS
SEE SHEET A601 FOR
WALL SCHEDULE
NEW WALL TILE ON
FIBER CEMENT BACKER
BOARD ON ALL
PERIMETER WALLS
SEE SHEET A601 FOR
WALL SCHEDULE
104A
NEW LANDING
4' - 11"
NEW RAMP
7' - 9"
12' - 8"
NEW RAMP WIDTH
5' - 0"
NEW LANDING LENGTH
17' - 8"
1"
1' -0
1" / 1'-0"
SL
OP
E
SLOPE
A301
A501
A301
A501
NEW URINALS NEW LAVS
NEW LAVS
NEW 2'x 3' MIRROR
ABOVE EACH SINK
NEW 2'x 3' MIRROR
ABOVE EACH SINK
NEW 2'x 3' MIRROR
ABOVE EACH SINK
NEW 2'x 3' MIRROR
ABOVE EACH SINK
NEW HANDRYER
NEW HAND DRYER
NEW HANDRYER
3' - 4" 3' - 4" 3' - 4" 3' - 4"
6' - 6" 3' - 4" 3' - 4" 3' - 4" 3' - 4"
A1 A1 A1 A1 A1 A1
A1 A1 A1
CONTROL JOINTS
ADA STALL
ADA STALL
7" 7"
7"
5'
1"
6' - 6"
DUAL STAINLESS STEEL TOILET
PAPER DISPENSERS MOUNTED
O.C. 7" FORM FACE OF TOILET
DUAL STAINLESS STEEL TOILET
PAPER DISPENSERS MOUNTED
O.C. 7" FROM FACE OF TOILET
DUAL STAINLESS STEEL TOILET
PAPER DISPENSERS MOUNTED
O.C. 7" FROM FACE OF TOILET
(1) SAMITARY NAPKIN
DISPOSAL PER STALL IN
WOMEN'S RESTROOM
ADA GRAB BARS MOUNTED
PER SHEET A001
5'
1"
1'
6"
EXISTING POST
EXISTING POST
5 1/2" 3' - 0" 5 1/2" 3' - 0" 3' - 3 1/4" 3' - 0" 5 1/2" 3' - 0" 3' - 3 1/4" 3' - 0" 5 1/2" 3' - 0" 5 1/2"
5 1/2" 3' - 0" 5 1/2" 3' - 0" 3' - 3 1/4" 3' - 0" 5 1/2" 3' - 0" 3' - 3 1/4" 3' - 0" 5 1/2" 3' - 0" 5 1/2"
SOFFIT ABOVE
FUR OUT WALL FOR PLUMBING
TO DRINKING FOUNTAINS
SEE PLUMBING PLANS FOR
DRINKING FOUNTAIN DETAILS
PIPES TO BE SLOPED AS SHOWN
IN PLUMBING DETAILS FOR
DRAINING AND WINTERIZING
A301
6x6/6 WWF
6x6/6 WWF
A301
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A101
PROPOSED
FLOOR PLAN
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
D C
/G S
JA JGD
C
/G S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/2" = 1'-0"A1 PROPOSED FLOOR PLAN
TYP.
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
LIGHTING FIXTURES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
LIGHTING FIXTURES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
LIGHTING FIXTURES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
LIGHTING FIXTURES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
LIGHTING FIXTURES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
LIGHTING FIXTURES
NOTE: PAINT ALL CEILINGS IN SW7004 SNOWBOUND
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
LIGHTING FIXTURES
PATCH AND REPAIR ANY
CRACKS OR
IMPERFECTIONS IN THE
EXISTING CEILING
PATCH AND REPAIR ANY
CRACKS OR
IMPERFECTIONS IN THE
EXISTING CEILING
PATCH AND REPAIR ANY
CRACKS OR
IMPERFECTIONS IN THE
EXISTING CEILING
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
CEILING GRILLES PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
CEILING GRILLES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
CEILING GRILLES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
CEILING GRILLES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
CEILING GRILLES
PATCH AND REPAIR ANY
DAMAGE CAUSE TO
EXISTING CEILING DURING
INSTALLATION OF NEW
CEILING GRILLES
INFILL CEILING ABOVE DEMO'D
CHIMNEY WITH GWB ON 2x4
FRAMING, FINISH AND PAINT TO
MATCH EXISTING CEILING
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A102
PROPOSED
CEILING PLAN
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
Au th or C he ck er
JGD
es ig ne r
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/2" = 1'-0"1 PROPOSED CEILING PLAN
BI
D
SE
T
9-
NEW SHINGLES AND UNDERLAYMENT FOR ALL ROOFS
NEW CERTAINTEED "NATURAL CLAY" ALUMINUM FASCIA AND
SOFFIT AROUND ENTIRE PERIMETER AND GABLE ENDS
NEW RIDGE VENT
NEW ICE AND WATER SHIELD
AROUND PERIMETER AND IN VALLEYS5'
2"
2' - 0"
5'
2"
5' - 2"
5'
2"
5'
2"
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A103
PROPOSED
ROOF PLAN
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
D C
/G S
JA JGD
C
/G S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/2" = 1'-0"1 PROPOSED ROOF PLAN
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
PAINT EXISTING WOOD PANELS IN GABLE ENDS
B2
101102
A1 A1 A1 A1 A1 A1
A301
INFILL W/ CERTAINTEED
COMPOSITE PANEL IN NATURAL
CLAY
SEE DETAIL 5 ON SHEET 301
A1 A1 A1A1 A1 A1
A301
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A201
EXTERIOR
ELEVATIONS
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
G S
JA JGG
S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/4" = 1'-0"5 EAST ELEVATION
1/4" = 1'-0"6 WEST ELEVATION
1/4" = 1'-0"7 NORTH ELEVATION
1/4" = 1'-0"8 SOUTH ELEVATION
1/4" = 1'-0"1 EAST ELEVATION DEMO
1/4" = 1'-0"2 WEST ELEVATION DEMO
1/4" = 1'-0"4 SOUTH ELEVATION DEMO
1/4" = 1'-0"3 NORTH ELEVATION DEMO
DEMO LOUVERS AND EXTERIOR PANELLING
PREP FOR NEW WINDOWS
DEMO ALL EXISTING EXTERIOR DOORS, FRAMES, AND WINDOWS
DEMO WOOD AND CONCRETE RAMPS AND LANDINGS BOTH SIDES
DEMO ALL EXISTING SOFFIT AND FASCIA, TYP.
NEW VENTED SOFFIT AND FASCIA
WRAP COLUMNS IN NEW COMPOSITE FINISH TYP.
NEW CONCRETE RAMP AND LANDING TO ACCOMMODATE FAMILY RESTROOM NEW CONCRETE RAMP AND LANDING
INSTALL NEW DOORS, WINDOWS, AND FRAMES
NEW VENTED SOFFIT AND FASCIA
WRAP COLUMNS IN NEW FINISH TYP.
NEW CONCRETE RAMPS AND LANDINGS
NEW WINDOWS
DEMO EXISTING SHINGLES,
UNDERLAYMENT, AND DRIP EDGE
NEW RIDGE VENT
DEMO ALL EXISTING EXTERIOR
DOORS, FRAMES, AND WINDOWS
DEMO WOOD AND CONCRETE RAMPS AND LANDINGS BOTH SIDES
DEMO ALL EXISTING SOFFIT AND FASCIA,
TYP.
DEMO EXISTING SHINGLES,
UNDERLAYMENT, AND DRIP EDGES
DEMO FOR NEW MECH LOUVERS
COORDINATE WITH MECHANICAL
NEW MECHANICAL LOUVERS
COORDINATE WITH MECHANICAL
NEW MECHANICAL LOUVERS
COORDINATE WITH MECHANICAL
NEW MECHANICAL LOUVERS
COORDINATE WITH MECHANICAL
PAINT EXISTING WOOD PANELS IN GABLE ENDS
NEW SHINGLES AND UNDERLAYMENT
NEW PLUMBING VENT NEW PLUMBING VENT
NEW PLUMBING VENTNEW PLUMBING VENT
POSTS TO REMAIN, TYP.
NEW CERTAINTEED COMPOSITE PANEL
SIDING AND TRIM IN NATURAL CLAY
NEW CERTAINTEED COMPOSITE PANEL SIDING
AND TRIM IN NATURAL CLAY @ AREAS OF
INFILL TYP.
SEE PLUMBING SHEETS FOR NEW DRINKING FOUNTAIN DETAILS
SEE PLUMBING SHEETS FOR NEW
DRINKING FOUNTAIN DETAILS
PREP AND APPLY BRICK WATER
REPELANT SEALANT PER SPECS
PREP AND APPLY BRICK WATER
REPELANT SEALANT PER SPECS
PREP AND APPLY BRICK WATER
REPELANT SEALANT PER SPECS
PREP AND APPLY BRICK WATER REPLANT
SEALANT PER SPECS
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
C O
N
TI
N U
O U
S C
O
VE
B
AS
E 6"
ECH-1 ECH-1 ECH-1
A1 A1 A1 A1 A1 A1
EM
N
EW
P
LY
W O
O D
, P
AI
N T
W / S
W
S
N O
W
BO
U N
D 3'
4"
N
EW
T
IL
E, D
AL
TI
LE
U
R
BA
N P
U
TT
Y 6" x6
4'
9" L-1
WC-2
MIRROR
A501
SOAP
DISPENSER
WC-2WC-2WC-2WC-2
L-1 L-1
MIRROR MIRROR
ELECTRIC
HAND DRYER
2'
2"
TOILET PAPER
DISPENSER
SANITARY NAPKIN
DISPOSAL
L-1
ELECTRIC HAND DRYER
MIRROR
C O
N
TI
N U
O U
S C
O
VE
B
AS
E 6"
A1 A1 A1
ECH-1 ECH-1 ECH-1
A1 A1 A1
EM
N
EW
P
LY
W O
O D
, P
AI
N T
W / S
W
S
N O
W
BO
U N
D 3'
4"
N
EW
T
IL
E, D
AL
TI
LE
U
R
BA
N P
U
TT
Y 6" x6
4'
9" L-1
ELECTRIC HAND DRYER
MIRROR
SOAP
DISPENSER
L-1 L-1 U-1
U-2
WC-2 WC-2
MIRROR MIRROR
ELECTRIC
HAND DRYER
SOAP
DISPENSER
TOILET
PAPER
DISPENSER
L-1
WC-2
MIRROR
SOAP DISPENSER
C O
N
TI
N U
O U
S C
O
VE
B
AS
E 6"
CHANGING STATION
B2
ECH-2
L-1
MIRROR
EM
WC-1
L-1 104A
ELECTRIC HAND DRYERMIRROR
SOAP
DISPENSER
TOILET
PAPER
DISPENSER
SANITARY
NAPKIN
DISPOSAL
CHANGING STATION
L-1
WC-1
MIRROR
ELECTRIC
HAND DRYER
SOAP
DISPENSER
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A202
INTERIOR
ELEVATIONS
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
G S
JA JGG
S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/4" = 1'-0"2A WOMEN'S ELEVATION 102: 2A: NORTH
1/4" = 1'-0"1A MEN'S ELEVATION 101: 1A: SOUTH
1/4" = 1'-0"3A FAMILY RESTROOM ELEVATION 103:
1B: WEST 1C: NORTH 1D: EAST
2B: EAST 2C: SOUTH 2D: WEST
3B: NORTH 3C: EAST 3D: SOUTH3A: WEST
SOAP
DISPENSER
GRAB BARS
GRAB BARS
SCHEDULE OF ACCESSORIES
TOILET PARTITIONS
ITEM MODEL MANUFACUTER FINISH COMMENTS
SOAP DISPENSERS
TOILET PAPER DISPENSERS
SANITARY NAPKIN DISPOSAL
GRAB BARS
SIERRA SERIES SCRC
GOJO MANUAL #5271-06
DOUBLE ROLL HOLDER
B-270 CONTURA SERIES
812 SERIES
BOBRICK
GOJO
BRADLEY
BOBRICK
BRADLEY
FOREST GREEN SC04
BLACK/CHROME
STAINLESS STEEL
STAINLESS STEEL
STAINLESS STEEL
MIRRORS B-165 BOBRICK -- 24" x 36"
CHANGING STATION KB208 KOALA KARE --
NEW PARTITIONS
NEW PARTITIONS NEW PARTITIONS
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
A301
8'
1"
6'
9"
6'
9"
8'
1"
A501
2'
0"
6 5/16"
MIN R-49 INSULATION
EXISTING TRUSSES
NEW RIDGE VENT
DOWEL IN NEW CONCRETE
W/ 18" #5 BAR @ 16" O.C.
SEE DETAIL 9
DOWEL IN NEW CONCRETE
W/ 18" #5 BAR @ 16" O.C.
SEE DETAIL 7
NEW CONCRETE INFILL NEW CONCRETE INFILL
NEW 5/16" TILE ON 5/8" BACKER
BOARD ADHERED TO EXISTING
MASONRY WALLS
SEE WALL TYPE 1 ON SHEET A601
NEW 5/16" TILE ON 5/8" BACKER
BOARD ADHERED TO EXISTING
MASONRY WALLS
SEE WALL TYPE 1 ON SHEET A601
RETAIN EXISTING HEADER
NEW FIBERGLASS FIXED WINDOW
SEE WINDOW SCHEDULE ON SHEET A601
REPLACE EXISTING PLYWOOD
W/ NEW 5/8" PLYWOOD
PAINTED WITH SHERWIN
WILLIAMS SW7004
SNOWBOUND TO MATCH
CEILING. SEE SPECIFICATIONS
FOR PAINT COLOR AND
MANUFACTURER
WRAP SILL IN 5/16" BULLNOSE
TILE TO MATCH WALL
INSTALL NEW TILE UP
TO WINDOW SILLS
TILE TRANSITION TO SILL
MIN R-49 INSULATION
@ ATTIC
ADD 1" MINIMUM INSULATION BAFFLE
PLYWOOD FURRING AS
REQUIRED TO BUILD OUT
WINDOW INFILL TO NEW
BACKER BOARD
PLYWOOD FURRING AS
REQUIRED TO MATCH
EXISTING HEADER WIDTH
SEAL @ ALL WINDOW PERIMETERS PER MANUFACTURERS INSTRUCTIONS
REPLACE EXISTING 2X4 STUD AT BASE OF
HEADER
NEW 2x4 FRAMING FOR SUPPORT AND
NAILING
CERTAINTEED COMPOSITE PANEL
SIDING AND TRIM IN NATURAL CLAY
CAULK HEAD AND JAMBS @ PERIMETER TRIM
MIN R-13 INSULATION
@INFIL WALL CAVITIES, TYP.
EXISTING LINTELS TO
REMAIN
6'-8" HOLLOW METAL DOOR W/ STANDARD 8 3/4" FRAME
NEW TILE TO TERMINATE AT
INTERSECTION W/ HM FRAME
CAULK HEAD JOINT
2"
TRIM AND INFILL PANELING TO BE
CERTAINTEED COMPOSITE SIDING
CAULK AND SEAL @ ALL PERIMETERS
3/
8"
5/ 8"
3/ 4"
1/ 2"
V.
I.F
2'
3/
4"
NEW 5/16" TILE
5/8" SHEATHING
5/8" FIBER CEMENT BACKER BOARD
2x6" HEADER
MIN R-13 INSULATION
5/8" SHEATHING
WEATHER BARRIER
CERTAINTEED COMPOSITE PANELING
FLASH AND SEAL @ SILL
2X6 PLATE
2X6 16" O.C. FRAMING
NEW PLYWOOD PAINTED IN SW7004
SNOWBOUND TO MATCH CEILING
INFILL CAVITY WITH MIN R-13 INSUL.
5"
WRAP SILL IN 5/16" BULLNOSE
TILE TO MATCH WALL
SEAL WINDOW PERIMETER PER
MANUFACTURERS INSTRUCTIONS
CAULK INTERIOR PERIMETER
2X4 FURRING WALL
WRAP HEAD AND JAMB IN
5/16" BULLNOSE WALL TILE
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A301
SECTIONS AND
DETAILS
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
G S
JA JGG
S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1/2" = 1'-0"2 SECTION 01
1 1/2" = 1'-0"1 WINDOW DETAIL
1 1/2" = 1'-0"4 HM HEAD DETAIL
REPLACE WD SOFFIT W/ NEW ALUM. SOFFIT PROVIDE
CONTINUOUS SOFFIT VENT AROUND PERIMETER
NEW ALUMINUM FASCIA TO MATCH NEW SOFFIT
NEW ARCHITECTURAL SHINGLES
NEW ICE AND WATER SHIELD
PROVIDE REQUIRED FLASHING, DRIP EDGE,
AND FASTENERS TO MATCH NEW FASCIA AND
SOFFIT
1 1/2" = 1'-0"3 WINDOW JAMB DETAIL
1 1/2" = 1'-0"5 WALL INFILL
2x4 JACK STUDS @ 12" O.C. AND @ PERIMETER OF EACH WINDOW EXISTING 6x4 POSTS TO REMAIN
2x4 PLATES
SEE SECTION 01 FOR
INFILL DIMENSIONS
NEW ARCHITECTURAL SHINGLES
NEW ICE AND WATER SHIELD
PROVIDE REQUIRED FLASHING
AND ACCESSORIES TO MATCH
NEW FASCIA AND SOFFIT
1 1/2" = 1'-0"6 INFILL END CONDITION DETAIL
CAULK HEAD AND JAMB @ PERIMETER TRIM
18" #4 BAR @ 16" O.C.
1 1/2" = 1'-0"7 CONCRETE FLOOR INFILL DETAIL
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
-2
FRAME HEAD AN D JAMB
WITH 1x3 SOLID SAWN
AND PAINT TO MATCH
PLYWOOD
1 1/2" = 1'-0"8 FAMILY RESTROOM SILL DETAIL
BIRDS-BEAK TERMINATION STRIP
INTEGRATED EPOXY BASE
6"
NEW 5/16" TILE
NEW 5/8" FIBER-CEMENT BACKER BOARD
NEW EPOXY FLOOR POURED OVER EXISTING CONCRETE
EXISTING MASONRY
EXISTING GLAZED CMU
EXISTING CONCRETE FLOOR
M
IN
D
EP
TH
4"
#4 BARS @ 12" O.C. BOTH WAYS
MIN 3" COVER
CENTER REBAR IN CONCRETE
FOLLOW SLOPE OF RAMP
1/4" EXPANSION JOINT
DOWEL INTO EXISTING CONCRETE
#5 18" BARS @ 16" O.C. EMBEDDED 8" INTO EXISTING CONCRETE
ADA SILL
DOOR SWEEP
8"
4" GRAVEL BELOW NEW CONCRETE SLAB AND RAMP
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A501
DETAILS
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
G S
JA JGG
S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
1 1/2" = 1'-0"2 WALL BASE DETAIL
1 1/2" = 1'-0"1 DRAIN DETAIL
1" = 1'-0"4 CONCRETE LANDING AND RAMP DETAIL
1 1/2" = 1'-0"5
STALL/WINDOW CONDITION
MOUNTING DETAIL
MOUNT ADA STALLS TO FLOOR AND CEILING
DO NOT WALL MOUNT ADA STALLS WHERE
WINDOW IS PRESENT
MOUNT ADA STALLS TO FLOOR AND CEILING
DO NOT WALL MOUNT ADA STALLS WHERE
WINDOW IS PRESENT
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
BI
D
SE
T
9-
F
SEE SCHEDULE
SE
E
SC
H
ED
U
LE
2"
2"
3' - 4"
A1 B1
2'
0"
3' - 0"
6' - 8"
2'
8"
EQ EQ EQ
FLOOR
CEILINGS
TYPE 1:
5/8" BACKER BOARD
ADHERED TO EXISTING TILE
W/ THIN-SET MORTAR AND
CORROSION RESISTANT
MECHANICAL ANCHORS
SPACED MAX 8" APART O.C.
ACROSS ENTIRE PANEL
5/16" TILE ADHERED TO
BACKER BOARD WITH THIN-
SET MORTAR
1. ALL PERIMETER WALLS IN RESTROOMS SHALL
RECEIVE TYPE 1 WALL TREATMENT.
NEW FIBER CEMENT BACK BOARD SHALL BE
FASTENED TO EXISTING GLAZED CMU TILE WITH
THIN SET MORTAR AND MECHANICAL FASTENERS.
NEW TILE SHALL BE ADHERED DIRECTLY TO NEW
BACKER BOARD WITH THIN-SET MORTAR.
2. PREP EXISTING TILE TO RECEIVE BACKER
BOARD BY FILLING ANY HOLES AND PATCHING
UNTIL EACH WALL SURFACE IS LEVEL. SCUFF THE
GLAZED SURFACE USING COURSE SANDER TO
ALLOW MORTAR TO GRIP THE TILE.
3. INSTALL BACKER BOARD UNIFORMLY AND
ENSURE SURFACE IS LEVEL BEFORE APPLYING
NEW TILE.
4. ENSURE CMU WALL IS LEVEL BEFORE APPLYING
NEW TILE. ENSURE TILE IS APPLIED EVENLY AND
UNIFORMLY.
WALL NOTES:
TYPE 2:
4" CMU
5/16" TILE ADHERED TO CMU
WITH THIN-SET MORTAR
TYPE 3:
2x4 STUD
5/8" BACKER BOARD
5/16" TILE ADHERED TO
BACKER BOARD WITH THIN-
SET MORTAR
6' - 8"
EQ EQ EQ
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T N
O:
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
A
TE
P:
\M
-0
D
TM
B- M
SH
P
D ay
U se
R es tro om
R en ov at io ns
\D es ig n\
D ra w in gs \M
-0
.rv t
9/
/2
:1 8:
P
M
A601
SCHEDULES
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
N H ur on
A ve
, M ac ki na w C ity , M
I 4
M
-0
G S
JA JGG
S
ST
A
TE
O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S
TA
TE
H
IS
TO
R
IC
P A
R K
M
SH
P D
A Y
U
SE
R
ES
TR
O
O M
S R
EM
O
D
EL
DOOR & FRAME SCHEDULE
DOOR
NO.
DOOR
TYPE
FRAME
SIZE
WIDTHWIDTH HEIGHT
101 3' - 0" 6' - 8" F 3' - 4" 102 3' - 0" 6' - 8" F 3' - 4" 103 3' - 0" 6' - 8" F 3' - 4" 104A 3' - 0" 6' - 8" F 3' - 4"
ROOM FINISH SCHEDULE
ROOM
NO. ROOM NAME
FLOOR WALLS CEILING
REMARKSMATERIAL FINISH BASE NORTH SOUTH EAST WEST MATERIAL FINISH HGT.
101 MENS EPOXY SHERWIN WILLIAMS "NEW GRANITE" 6" CONTINOUS FLUID APPLIED DALTILE URBAN PUTTY 6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
EXTG PATCH AND REPAIR WHERE NEEDED,
REPAINT W/ SW7004 SNOWBOUND
8'-1"
102 WOMENS EPOXY SHERWIN WILLIAMS "NEW GRANITE" 6" CONTINOUS FLUID APPLIED DALTILE URBAN PUTTY 6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
EXTG PATCH AND REPAIR WHERE NEEDED,
REPAINT W/ SW7004 SNOWBOUND
8'-1"
103 FAMILY RESTROOM EPOXY SHERWIN WILLIAMS "NEW GRANITE" 6" CONTINOUS FLUID APPLIED DALTILE URBAN PUTTY 6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
DALTILE URBAN PUTTY
6"x6" TILE
EXTG PATCH AND REPAIR WHERE NEEDED,
REPAINT W/ SW7004 SNOWBOUND
8'-1"
104 JANITOR CLO. EPOXY SHERWIN WILLIAMS "NEW GRANITE" 6" CONTINOUS FLUID APPLIED EXTG EXTG EXTG CMU EXTG PATCH AND REPAIR WHERE NEEDED, REPAINT W/ SW7004 SNOWBOUND
8'-1"
WINDOW SCHEDULE
Type Mark Count
R.O.
Type Manufacturer Model Material Finish
Glazing Head Height CommentsWidth Height Type
A1 12 3' - 0" 2' - 0" Window-Direct_Set-Pella-Impervia-Fixed_Frame_Window Pella Direct Set FIBERGLASS TAN/WHITE FROSTED 6' - 1" VERIFY ALL RO MEASURMENTS IN FIELD B2 1 6' - 8" 2' - 8" Window-Direct_Set-Pella-Impervia-Fixed_Frame_Window-Multi-Wide Pella Direct Set FIBERGLASS TAN/WHITE FROSTED 6' - 6" VERIFY ALL RO MEASURMENTS IN FIELD, TRIPLE UNIT
PROVIDED BY PELLA WITH EQUAL SPACING OF MULLIONS
1/4" = 1'-0"
DOOR & FRAME TYPES
1/4" = 1'-0"
WINDOW TYPES
1 1/2" = 1'-0"
WALL LEGEND
1 1/2" = 1'-0"1 PELLA TRIPLE UNIT FRAME DETAIL
O W
N
ER
R
EV
IE
W
6-
-2
O W
N
ER
R
EV
IE
W
7-
-2
PR
O
G R
ES
S
SE
T
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
8-
-2
R
EV
IE
W
9- 9-
BI
D
SE
T 9-
STM
STM
PLUMBING PIPING MECHANICAL PIPING
DUCTWORK
CDS
CDR
CHWS
CHWR
CDS
CDR
CHWR
CHWS
AIR
ST
G
G
AIR
HWR
HWR
HWS
HWS
FP
FP
C
C
ST
V
V
SAN
HWC
SAN
EA24x14
EA24x14
EA24x14
HW
CW
HWC
OA24x14
OA24x14
OA24x14
RA24x14
SA24x14
SA24x14
S D
SA24x14
RA24x14
RA24x14
CW
HW
STM
CDR
CDS
CHWR
CHWS
HWR
HWS
G
AIR
FP
C
ST
CW
V
SAN
HWC
HW
HYDRONIC HOT WATER SUPPLY - NEW
HYDRONIC HOT WATER SUPPLY - EXISTING
HYDRONIC HOT WATER SUPPLY - DEMO
HYDRONIC HOT WATER RETURN - NEW
HYDRONIC HOT WATER RETURN - EXISTING
HYDRONIC HOT WATER RETURN - DEMO
COMPRESSED AIR - NEW
COMPRESSED AIR - EXISTING
COMPRESSED AIR - DEMO
GAS - NEW
GAS - EXISTING
GAS - DEMO
DOMESTIC COLD WATER - EXISTING
DOMESTIC COLD WATER - DEMO
DOMESTIC COLD WATER - NEW
DOMESTIC HOT WATER - EXISTING
DOMESTIC HOT WATER - DEMO
DOMESTIC HOT WATER - NEW
DOMESTIC HOT WATER RECIRC - EXISTING
DOMESTIC HOT WATER RECIRC DEMO
DOMESTIC HOT WATER RECIRC - NEW
SANITARY - EXISTING
SANITARY - DEMO
SANITARY - NEW
VENT - EXISTING
VENT - DEMO
VENT - NEW
STORM - EXISTING
STORM - DEMO
STORM - NEW
CONDENSATE - EXISTING
CONDENSATE - DEMO
CONDENSATE - NEW
FIRE PROTECTION - EXISTING
FIRE PROTECTION - DEMO
FIRE PROTECTION - NEW
ABBREVIATIONS
PIPING "T"
PIPING 90
STRAINER
SYMBOL LEGEND
CAP
NOTES
INLINE PUMP
BALANCE VALVE
PRESSURE RELIEF VALVE
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
GLOBE VALVE
GATE VALVE
CHECK VALVE
CIRCUIT SETTER
BUTTERFLY VALVE
BALL VALVE
EXHAUST AIR DUCT DOWN
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
RETURN AIR DUCT UP
SUPPLY AIR DUCT DOWN
SUPPLY AIR DUCT UP
AIR FLOW
HUMIDISTAT - 60" A.F.F.
THERMOSTAT - 60" A.F.F.
DUCT SMOKE DETECTOR
MOTORIZED DAMPER
FIRE / SMOKE DAMPER
(RATING DETERMINED BY WALL TYPE)
VOLUME CONTROL DAMPER
SQUARE TO ROUND TRANSITION
RETURN OR EXHAUST REGISTER
SUPPLY REGISTER
RELIEF AIR HOOD - ROOF
FRESH AIR INTAKE HOOD - ROOF
EXHAUST FAN - ROOF
RETURN OR EXHAUST AIR GRILLE
LINEAR DIFFUSER
SUPPLY AIR DIFFUSER PIPE BREAK
PIPE DOWN
PIPE UP
CLEAN OUT
GAS METER
UNION
HOSE BIBB
ELECTRIC BELL
SIAMESE CONNECTION
BARE FIN TUBE ELEMENT
FIN TUBE ELEMENT WITH COVER
EXTERNALLY INSULATED DUCTWORK
INTERNALLY LINED DUCTWORK
SUPPLY AIR DUCT - EXISTING
SUPPLY AIR DUCT - DEMO
SUPPLY AIR DUCT - NEW
RETURN AIR DUCT - EXISTING
RETURN AIR DUCT - DEMO
RETURN AIR DUCT - NEW
OUTSIDE AIR DUCT - EXISTING
OUTSIDE AIR DUCT - DEMO
OUTSIDE AIR DUCT - NEW
EXHAUST AIR DUCT - EXISTING
EXHAUST AIR DUCT - DEMO
EXHAUST AIR DUCT - NEW
CONDENSOR WATER SUPPLY
CONDENSOR WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSOR WATER SUPPLY - DEMO
CONDENSOR WATER SUPPLY - EXIST
CONDENSOR WATER RETURN - DEMO
CONDENSOR WATER RETURN - EXIST
CHILLED WATER SUPPLY - DEMO
CHILLED WATER SUPPLY - EXIST
CHILLED WATER RETURN - DEMO
CHILLED WATER RETURN - EXIST
METER
STEAM - NEW
STEAM - EXISTING
STEAM - DEMO
CONNECTION TO EXISTING
ACCU AIR COOLED CONDENSING UNIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
AS AIR SEPERATOR
B BOILER
BB BASEBOARD
BC BOOSTER COIL
BDD BACKDRAFT DAMPER
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTER
BHP BRAKE HORSE POWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BT BATH TUB
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
C CONVECTOR
CA COMPRESSED AIR
CB CATCH BASIN
CC COOLING COIL
CCF 100 CUBIC FEET
CD CEILING DIFFUSER
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFP CLEAN OUT FERRULE AND PLUG
CH CHILLER
CI CAST IRON
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEAN OUT
CO CARBON MONOXIDE
COND CONDENSATE
CO2 CARBON DIOXIDE
CT COOLING TOWER
CU CONDENSING UNIT
CU FT CUBIC FOOT
CUH CABINET UNIT HEATER
CW COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DIFFUSER
DB DRY BULB
DEG F DEGREE FAHRENHEIT
DF DRINKING FOUNTAIN
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DWV DRAIN, WASTE AND VENT
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EXHAUST AIR GRILLE
ELEV ELEVATION
ER EXHAUST AIR REGISTER
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
F FURNACE
FAI FRESH AIR INTAKE
FBO FURNISHED BY OTHERS
FC FAN COIL
FD FLOOR DRAIN
FD FIRE DAMPER
FIN FIN TUBE RADIATION
FLG FLANGE
FP FIRE PROTECTION
FPM FEET PER MINUTE
FT FOOT OR FEET
F&T FLOAT AND THERMOSTATIC TRAP
G GAS (NATURAL)
GAL GALLON
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GT GREASE TRAP
H HYDROGEN
HB HOSE BIBB
HC HEATING COIL
HCO HORIZONTAL CLEANOUT
HP HORSE POWER
HTR HEATER
HVAC HEATING, VENTILATING & AIR COND
HW HOT WATER
HWC HOT WATER RECIRCULATING
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IE INVERT ELEVATION
IF INLINE FAN
IN INCH OR INCHES
IP IRON PIPE
INV INVERT
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
JC JANITOR'S CLOSET
JS JANITOR'S SINK
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LBS POUNDS
LHWR LOW TEMPERATURE HOT WATER
RETURN
LHWS LOW TEMPERATURE HOT WATER
SUPPLY
LIQ LIQUID (REFRIGERATION)
LV LOUVER
LP PROPANE GAS (LIQUID)
LWT LEAVING WATER TEMPERATURE
M METER
MAU MAKE-UP AIR HANDLING UNIT
MAX MAXIMUM
MB MOP BASIN
MBH BRITISH THERMAL UNITS (1000)
MBTUH BRITISH THERMAL UNITS (1000)
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT
PROTECTION
OA OUTDOOR AIR
OAI OUTDOOR AIR INTAKE
OC ON CENTER
OD OVERFLOW DRAIN
ODP OPEN DRIP PROOF
OXY OXYGEN
P PUMP
PC PLUMBING CONTRACTOR
PD PNEUMATIC OPERATED DAMPER
PIV POST INDICATING VALVE
PRV PRESSURE REDUCING VALVE
PT PRESSURE TEMPERATURE PLUG
PTAC PACKAGED TERMINAL AIR COND. UNIT
PVAC PROCESS VACUUM
S SINK
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAF SUPPLY AIR FAN
SAN SANITARY SEWER
SD SMOKE DETECTOR
SG SUPPLY AIR GRILLE
SH SHOWER HEAD
SHC STEAM HEATING COIL
SR SUPPLY REGISTER
SS STAINLESS STEEL
ST STORM
STM STEAM
SUCT SUCTION (REFRIGERATION)
TCC TEMPERATURE CONTROL CONTRACTOR
TCD TEMPERATURE CONTROL DAMPER
TCP TEMPERATURE CONTROL PANEL
TD TRANSFER DUCT
TG TRANSFER AIR GRILLE
TT THERMOSTATIC TRAP
TW TEMPERED WATER
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UV UNIT VENTILATOR
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME BOX
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VS VENT STACK (SANITARY)
VTR VENT THRU ROOF (SANITARY)
VUV VERTICAL UNIT VENTILATOR
W WASTE
WB WET BULB
WC WATER CLOSET
W/O WITHOUT
WH WATER HEATER
WSHP WATER SOURCE HEAT PUMP
NOTE:
NOT ALL ABBREVIATIONS AND/OR SYMBOLS ARE
USED IN THIS SET OF DOCUMENTS.
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NIC NOT INCLUDED OR NOT IN CONTRACT
NIT NITROGEN
NO NORMALLY OPEN
KW KILOWATT
R REGISTER
RA RETURN AIR
RD ROOF DRAIN
RET RETURN
RF RETURN FAN
RG RETURN AIR GRILLE
RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER
RR RETURN REGISTER
RTU ROOF TOP UNIT
MECHANICAL/PLUMBING AND FIRE PROTECTION GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE
EVERY OFFSET, VALVE, FITTING, ETC. REQUIRED. CONTRACTOR IS RESPONSIBLE FOR FIELD ROUTING
ALL DUCTWORK AND PIPING AT NO ADDITIONAL COST.
2. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS AND OPERATIONS AND
PERFORM ALL LABOR REQUIRED FOR INSTALLATIONS AS INDICATED THE DRAWINGS, IN THE
SPECIFICATIONS AND AS REQUIRED BY LOCAL, STATE AND FEDERAL CODES, AND AS MAY BE
REASONABLY IMPLIED TO ACCOMPLISH COMPLETE MECHANICAL, PLUMBING AND FIRE PROTECTION
SYSTEMS.
3. ALL ELECTRICAL DISCONNECTS REQUIRED PER NEC CODE SHALL BE FURNISHED AND
INSTALLED BY THE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE.
4. CONTRACTOR SHALL PROVIDE PRODUCTS AS SPECIFIED ON THE DRAWINGS AND
SPECIFICATIONS, HOWEVER, WHERE THE WORDS "EQUAL TO" ARE USED, ADDITIONAL PRODUCTS
MAY BE SUBMITTED AS PROPOSED SUBSTITUTIONS, BUT REQUIRE APPROVAL FROM
ARCHITECT/ENGINEER.
5. DESIGN DRAWINGS SHOW GENERAL ARRANGEMENT AND EXTENT OF WORK. THE DRAWINGS
ARE DIAGRAMMATIC AND MAY NOT NECESSARILY BE DRAWN TO SCALE FOR PURPOSE OF CLARITY AND LEGIBILITY. IT IS INTENDED THAT ALL ITEMS BE LOCATED SYMMETRICALLY WITH ARCHITECTURAL
ELEMENTS WHERE FEASIBLE AND BE INSTALLED TO AVOID OBSTRUCTIONS AND PRESERVE
HEADROOM. CONTRACTOR SHALL REVIEW PLANS OF OTHER TRADES WITH HIS OWN WORK TO AVOID CONFLICTS AND INTERFERENCES. CONTRACTOR MUST MAKE USE OF ALL SOURCES OF INFORMATION
INCLUDING DRAWINGS OF EQUIPMENT FURNISHED BY OTHERS. FAILURE TO REVIEW WORKING
SPACES OR CHECK DIMENSIONS IN QUESTION SHALL NOT WARRANT CONFLICTS.
6. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. WHERE DRAWINGS
AND SPECIFICATIONS CONFLICT EACH OTHER, IT IS THE CONTRACTORS RESPONSIBILITY TO GET CLARIFICATION FROM THE ARCHITECT/ENGINEER PRIOR TO BIDDING. FAILURE TO GET CLARIFICATION SHALL NOT RESULT IN ADDITIONAL COST AND THE MORE STRINGENT SHALL BE USED AS INTENDED
BASIS FOR BIDDING.
7. PLANS AND SPECIFICATIONS ARE INTENDED TO CONFORM TO GOVERNING CODES AND
STANDARDS. IF NON-CONFORMITIES ARE DISCOVERED WHILE BIDDING, OR PERFORMING THE WORK IMPLIED, BRING THE SAME TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR CLARIFICATION IN WRITING PRIOR TO SUBMITTING BID OR PROCEEDING WITH WORK. NON-CONFORMITIES OF CODE COMPLIANCE WORK INSTALLED AND CORRECTIONS REQUIRED WITHOUT CONSULTION AND WRITTEN RESPONSE OF SAME BY THE ENGINEER WILL BE THE CONTRACTORS FINANCIAL RESPONSIBILITY.
8. MOTORS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AS REQUIRED BY THE
EQUIPMENT FURNISHED BY THE MECHANICAL CONTRACTOR. MOTORS TO BE SUITABLE FOR LOAD, DUTY, VOLTAGE, FREQUENCY, HAZARD, SERVICE AND LOCATION INTENDED. SINGLE PHASE MOTORS MUST HAVE INTEGRAL THERMAL OVERLOAD PROTECTION IN ADDITION TO THAT PROVIDED IN MOTOR
CONTROLLERS. MOTORS TO CONFORM IN DESIGN AND PERFORMANCE TO THE MOTOR STANDARDS
OF NEMA. MOTORS RATED FOR CONTINUOUS DUTY UNDER FULL LOAD WITH A MAXIMUM
TEMPERATURE RISE OF 105 DEG F FOR OPEN, 125 DEG F FOR DRIP PROOF AND 130 DEG F FOR
EXPLOSION PROOF AND TOTALLY ENCLOSED TYPES. SUPPLY MOTORS WITH BELT DRIVES WITH
ADJUSTABLE BASES, REMOVABLE BELT GUARDS AND VARIABLE PITCH DRIVE PULLEY SELECTED SO THAT MIDPOINT OF VARIABLE RANGE OF PULLEY WILL DRIVE EQUIPMENT AT RATED SPEED. MOTORS
1 HP AND LARGER SHALL BE THREE PHASE (UNLESS OTHERWISE LISTED).
9. MOTOR CONTROLLERS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR FOR
MOTORS FURNISHED BY THE MECHANICAL CONTRACTOR. MOTOR CONTROLLERS SHALL BE OF SIZES AND TYPES AS NEEDED TO MEET THE OPERATIONAL CONDITIONS AS REQUIRED BY THE SEQUENCE OF OPERATION. ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL THE POWER CIRCUIT, LOCAL
DISCONNECT AND CONNECTION TO MOTOR TERMINALS. MECHANICAL CONTRACTOR TO MOUNT
MOTOR CONTROLLERS AND CONTROL COMPONENTS AND WIRE AND MAKE ALL FINAL CONTROL
CONNECTIONS BETWEEN DEVICES.
10. THE DRAWINGS INDICATE KNOWN UTILITY AND DRAINAGE LINES IN ACCORDANCE WITH THE
INFORMATION FURNISHED TO THE ENGINEER. RESPONSIBILITY FOR LOCATING, UNCOVERING,
DISPOSING OR MAINTAINING ALL EXISTING UTILITY LINES TO REST SOLELY WITH THE CONTRACTOR.
VERIFY LOCATIONS AND DEPTHS OF SERVICE CONNECTION POINTS BEFORE PROCEEDING WITH
CONSTRUCTION.
11. CONTRACTOR SHALL CHECK EXISTING PREMISES BEFORE SUBMISSION OF BIDS TO CHECK
ALL CONDITIONS WHICH MAY EFFECT THE PERFORMANCE OF THE WORK INVOLVED. NO
ALLOWANCES OR EXTRA PAYMENT WILL BE MADE DUE TO CONTRACTOR'S FAILURE TO EXAMINE SITE
AND FULLY DISCERN WORKING CONDITIONS.
12. MECHANICAL CONTRACTOR SHALL RECEIVE, PROPERLY HOUSE, HANDLE, HOIST, AND
DELIVER TO PROPER LOCATION EQUIPMENT AND OTHER MATERIALS REQUIRED FOR THIS CONTRACT.
13. THE CONTRACTOR SHALL OBTAIN PERMITS, ARRANGE FOR INSPECTIONS, AND PAY FEES AND EXPENSES IN CONNECTION THEREWITH, AS A PART OF THE WORK REQUIRING SUCH PERMITS. EVERY
EFFORT IS MADE TO DESCRIBE THE WORK REQUIREMENTS IN CONFORMITY WITH APPLICABLE
CODES.
14. THE CONTRACTOR SHALL REVIEW ANY ALTERNATES OF OTHER TRADES, AND PRICE THEIR BID
TO ACCOUNT FOR ITEMS AFFECTING HIS WORK.
15. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE CONSIDERED FOR
PROPER DRAINAGE. CONSULT WITH THE OTHER CONTRACTORS AND AVOID CONFLICT WITH
LOCATION OF PIPING. ORDER OF PRIORITY FOR ALL PIPING AND CONDUITS TO BE INSTALLED SHALL
BE AS FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST.
A. PLUMBING DRAIN LINES
B. CONDENSATE LINES
C. DUCTWORK
D. FIRE PROTECTION
E. HOT AND COLD WATER PIPING
F. ELECTRICAL CONDUIT
16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE PROJECT
DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE BIDDING
CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND COORDINATED
PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK ASSIGNMENTS TO
SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING CONTRACTOR.
17. ALL DUCTS SERVING SUPPLY, RETURN AND EXHAUST TERMINALS SHALL BE PROVIDED WITH
BALANCE DAMPERS. FOR CLARITY, ALL DAMPERS MAY NOT BE SHOWN ON PLANS.
18. PROVIDE DIELECTRIC UNIONS/CONNECTIONS AT ALL JUNCTIONS OF DISSIMILAR METALS.
M
M
H
T
M
OD
OD
OD
OVERFLOW STORM - EXISTING
OVERFLOW STORM - DEMO
OVERFLOW STORM - NEW
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
M -0
D
T M
B -M
S H
P D a y
U s e R e st ro o m
R e n o va ti o n s \D e s ig n \D ra w in g s\
M e ch a n ic a l\ M
-0
D
T M
B
M S
H P
D a y
U s e R e s tr o o m
R e n o va ti o n s M e c h a n ic a l R
.r v t
/1
/2
:5
:5
A
M
P001
MECHANICAL AND
PLUMBING
ABBREVIATIONS
AND SYMBOLS
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
N
H U
R O
N A
V E
, M A
C K
IN
A
W C
IT
Y
, M I 4
M -0
E S
S P
J G
E S
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
R E
V
IE
W
-1
-2
R E
V
IE
W
-2
-2
B
ID
S E
T
-1
1 2
3 3
SAN
CW TW
TW
CW
CW
HW
SAN
CW2"ø
4"ø
2"ø
EXISTING
UNDERGROUND
WATER SERVICE
33 3 3 3
2 2
2 2
EXISTING
UNDERGROUND
SANITARY SERVICE
= REMOVE AND REPLACE CONCRETE SLAB AS REQUIRED FOR DEMO AND PROPOSED PLUMBING. COORDINATE WITH GENERAL CONTRATOR.
GENERAL NOTES
1. IT IS THE INTENT TO REMOVE ALL EXISTING PLUMBING PIPING AND FIXTURES AND
REPLACE WITH NEW. THE EXISTING SANITARY SERVICE AND DOMESTIC WATER SERVICE
TO THE BUILDING SHALL REMAIN.
2. CONTRACTOR SHALL SEAL ALL PENETRATIONS, USED AND UNUSED, THROUGH EXISTING
FOUNDATION WALLS FROM THE PLUMBING CHASE.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
M -0
D
T M
B -M
S H
P D a y
U s e R e st ro o m
R e n o va ti o n s \D e s ig n \D ra w in g s\
M e ch a n ic a l\ M
-0
D
T M
B
M S
H P
D a y
U s e R e s tr o o m
R e n o va ti o n s M e c h a n ic a l R
.r v t
/1
/2
:5
:5
A
M
PD101
EXISTING
PLUMBING PLAN
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
N
H U
R O
N A
V E
, M A
C K
IN
A
W C
IT
Y
, M I 4
M -0
E S
S P
J G
E S
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
1/2" = 1'-0"A1
EXISTING PLUMBING PLAN
KEYNOTES
1 REMOVE EXISTING WATER HEATER AND ASSOCIATED PLUMBING AND SUPPORTS.
2 REMOVE EXISTING LAVATORY/SINK AND ASSOCIATED PLUMBING AND SUPPORTS.
3 REMOVE EXISTING WATER CLOSET/URINAL AND ASSOCIATED PLUMBING AND SUPPORTS.
4 REMOVE EXISTING MIXING VALVE AND ASSOCIATED PLUMBING AND SUPPORTS.
5 REMOVE FLOOR DRAIN AND ASSOCIATED PLUMBING.
R E
V
IE
W
-1
-2
R E
V
IE
W
-2
-2
B
ID
S E
T
-1
EXISTING SANITARY
SERVICE SEE SITE PLAN
FOR CONTINUATION
EXISTING WATER
SERVICE SEE SITE PLAN
FOR CONTINUATION
2"ø
CW
3"ø
MENS
WOMENS
JANITOR
CLO.
FAMILY
RESTROOM
3" CIRCUIT VENT
4"ø
CLEANOUT
2" ø 1
1/ 2" ø
1 1/2"ø
1/
2" ø
1 1/2"ø
3"ø
2"ø
2" ø
2"ø
"ø
1½" V
4" UP
2" SAN UP TO U-1 AND U-2
"ø
"ø
3" ø
2" ø
1½" V
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
M -0
D
T M
B -M
S H
P D a y
U s e R e st ro o m
R e n o va ti o n s \D e s ig n \D ra w in g s\
M e ch a n ic a l\ M
-0
D
T M
B
M S
H P
D a y
U s e R e s tr o o m
R e n o va ti o n s M e c h a n ic a l R
.r v t
/1
/2
:5
:5
A
M
P100
PROPOSED
UNDERSLAB
PLUMBING PLAN
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
N
H U
R O
N A
V E
, M A
C K
IN
A
W C
IT
Y
, M I 4
M -0
E S
S P
J G
E S
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
1/2" = 1'-0"A1
PROPOSED UNDERSLAB PLUMBING PLAN
R E
V
IE
W
-1
-2
R E
V
IE
W
-2
-2
B
ID
S E
T
-1
1 1/4"ø
3/4"ø
3" VTR
1 1/4"ø1"ø
/4
"ø
3/4"ø2"ø 2"ø 1 1/2"ø
1 1/2"ø 1 1/2"ø
/2 "ø
1 1/2"ø 1 1/4"ø 3/4"ø
WC-1
WC-1
WC-2
U-2 U-1
L-1 L-1
L-1L-1
L-1
FD-1
CW
CW CW
C W
H W
HW
HW
EWH-1
SS-1
FD-1
1 1/2"ø
2" SAN DN
3"ø V
2"ø
4" CLEANOUT
2"ø 1 1/2"ø
V
WC-2
WC-2WC-2WC-2WC-2
WC-1
FD-1
FD-1
2"ø
1" CW DOWN TO WC-1
/2
"ø
1 1/4"ø
DF-1
2"ø
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
M -0
D
T M
B -M
S H
P D a y
U s e R e st ro o m
R e n o va ti o n s \D e s ig n \D ra w in g s\
M e ch a n ic a l\ M
-0
D
T M
B
M S
H P
D a y
U s e R e s tr o o m
R e n o va ti o n s M e c h a n ic a l R
.r v t
/1
/2
:5
:5
A
M
P101
PROPOSED
PLUMBING PLAN
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
N
H U
R O
N A
V E
, M A
C K
IN
A
W C
IT
Y
, M I 4
M -0
E S
S P
J G
E S
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
1/2" = 1'-0"A1
PROPOSED PLUMBING PLAN
NOTE: SLOPE ALL DOMESTIC WATER PIPING AND ARRANGE SYSTEMS TO DRAIN AT LOW POINTS.
R E
V
IE
W
-1
-2
R E
V
IE
W
-2
-2
B
ID
S E
T
-1
34"
8"
27"
FAUCET
WATTS USG-B
THERMOSTATIC
MIXING VALVE
WATTS USG-B
THERMOSTATIC MIXING
VALVE
FLEXIBLE SUPPLY
LINES (TYP.)
CHROME P-TRAP
WITH OUTLET
AND TRAP WRAP
CHROME P-TRAP WITH
OUTLET AND TRAP
WRAP
PROVIDE ADA WRAP ON ALL
SUPPLY LINES AND P-TRAP M
H C
9"
6" MAX.
MIXED WATER
SUPPLY TO FAUCET
FAUCET
1/4 TURN ANGLE
SHUT-OFF VALVE
W/ ESCUTCHEON
STRAINER PER
SCHEDULE
TRAP SEAL
"QUAD-CLOSE" BY
J.R.SMITH MFG. CO.
FLOOR DRAIN BODY WITH
ADJUSTABLE STRAINER
AND
MEMBRANE CLAMP PER
SCHEDULE
PVC DRAIN PIPING TO MAIN
(SEE PLAN FOR SIZE)
MINIMUM OF 24" FROM
ANY WALL OR
STRUCTURE
ROOF CONSTRUCTION
AS INDICATED ON PLANS
INCREASER IF REQUIRED
VENT PIPE
12"
MINIMUM
HEIGHT
C L
1. VENT THRU ROOF (VTR) FOR PIPE
SIZES SMALLER THAN 3" MUST BE
INCREASED TO MINIMUM OF 3".
2. INCREASE IN PIPE DIAMETER MUST BE
MADE A MINIMUM OF 12" INSIDE THE
BUILDING.
FRICTION FIT NEOPRENE COLLAR
METAL CONE FLASHING
GENERAL PLUMBING NOTES:
1. INSTALLATION SHALL BE IN ACCORDANCE WITH THE 2021 MICHIGAN PLUMBING CODE, OR LATEST ADOPTED EDITION, ALL LOCAL CODES
AND AUTHORITIES HAVING JURISDICTION.
2. PLUMBING CONTRACTOR RESPONSIBLE FOR DOMESTIC SANITARY AND STORM PIPING TO 5 FEET OUTSIDE OF THE BUILDING FOUNDATION.
3. EVERY TRAP AND TRAPPED FIXTURE SHALL BE VENTED IN ACCORDANCE WITH ONE OF THE VENTING METHODS SPECIFIED IN THE
PLUMBING CODE.
4. ESTABLISH ELEVATIONS OF BURIED PIPING OUTSIDE OF THE BUILDING TO INSURE NOT LESS THAN 4 FEET OF COVER. CONSULT WITH
ENGINEER PRIOR TO BURYING PIPE IF THIS CANNOT BE ACCOMPLISHED.
5. SLOPE ALL NEW SANITARY PIPING A MINIMUM OF 1/4" PER FOOT FOR PIPE SIZES 2-1/2" AND LESS, 1/8" PER FOOT FOR PIPE SIZES 3" TO 6", AND 1/16" PER FOOT FOR PIPE SIZES 8" AND LARGER.
6. PLUMBING VENT STACKS WITHIN 10'-0" SHALL BE 3'-0" MINIMUM ABOVE ANY SUPPLY AIR INTAKE, OPERABLE BUILDING OPENING OR
ADJACENT BUILDING.
7. PROVIDE CLEANOUTS WITHIN BUILDINGS 100 FEET APART MAXIMUM, AND AT LOCATIONS WHERE A CHANGE IN DIRECTION GREATER THAN 45 DEGREES OCCURS. WHERE MORE THAN ONE CHANGE OF DIRECTION OCCURS ONLY ONE CLEANOUT IS REQUIRED FOR EACH 40 FEET
OF PIPING.
8. TEST NEW SANITARY PIPING TO BE FREE OF LEAKS. TEST SHALL BE WITNESSED BY THE CODE OFFICIAL.
9. IN CONCEALED LOCATIONS WHERE PIPING, OTHER THAN CAST-IRON OR GALVANIZED STEEL IS INSTALLED THROUGH HOLES OR NOTCHES IN STUDS, JOISTS, RAFTERS OR SIMILAR MEMBERS LESS THAN 1 1/2 INCHES FROM THE NEAREST EDGE OF THE MEMBER, THE PIPE SHALL
BE PROTECTED BY STEEL SHIELD PLATES.
10. DOMESTIC WATER PIPING SHALL BE 1/2" MINIMUM UNLESS NOTED OTHERWISE.
11. EACH BRANCH OF FIXTURES AND EQUIPMENT SHALL HAVE WATER SUPPLY ISOLATION BALL VALVES.
12. A WATER HAMMER ARRESTOR, CONFORMING TO ASSE 1010 & PDI WH201, SHALL BE INSTALLED WHERE QUICK-CLOSING VALVES ARE UTILIZED (E.G. TOILET FLUSH VALVES, FOOD DISPOSALS AND AUTOMATIC DISHWASHING WASHING MACHINES).
13. TEST NEW DOMESTIC WATER PIPING TO BE FREE OF LEAKS. TEST SHALL BE WITNESSED BY THE CODE OFFICIAL AND DOCUMENTED.
14. MOUNTING HEIGHT OF ACCESSIBLE LAVATORIES, URINALS AND WATER CLOSETS SHALL MEET ADA AND MICHIGAN BARRIER FREE
REQUIREMENTS.
15. ALL FIXTURES AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' RECOMMENDATIONS. ATTACH ALL
FIXTURES TO SUPPORTING SURFACES PLUMB AND LEVEL.
16. AT EACH ACCESSIBLE WATER CLOSET AND URINAL INSTALL THE FLUSH HANDLE TOWARD THE "OPEN" SIDE OF THE WATER CLOSET STALL.
17. PROVIDE INDIVIDUAL WATER SUPPLIES, STOP VALVES, TRAPS AND TRIM AT ALL PLUMBING FIXTURES.
18. INSTALL POTABLE WATER CROSS CONNECTION PROTECTION DEVICES ON WATER LINES WHERE CONTAMINATION OF DOMESTIC WATER MAY OCCUR (E.G.. ON FIRE PROTECTION SYSTEM, JANITOR ROOM MOP/SERVICE SINKS, AND HOSE BIBBS).
19. SANITIZE ALL NEW HOT & COLD-WATER LINES PER LOCAL WATER DEPARTMENT REQUIREMENTS. FLUSH AND TEST SYSTEM FOR LEAKS.
20. PROVIDE ESCUTCHEON PLATES FOR ALL PIPES PASSING THROUGH WALLS, FLOORS AND CEILINGS.
21. PIPE INSULATION: WHEN EXPOSED PROVIDE PVC PIPE INSULATION JACKETING TO 10 FEET ABOVE FINISHED FLOOR WITH SOLVENT WELD
SEAMS AND JOINTS IN FOOD FACILITIES.
22. NO SHARP OR ABRASIVE SURFACES SHALL REMAIN EXPOSED UNDER LAVATORIES.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
M -0
D
T M
B -M
S H
P D a y
U s e R e st ro o m
R e n o va ti o n s \D e s ig n \D ra w in g s\
M e ch a n ic a l\ M
-0
D
T M
B
M S
H P
D a y
U s e R e s tr o o m
R e n o va ti o n s M e c h a n ic a l R
.r v t
/1
/2
:5
:5
A
M
P601
PLUMBING DETAILS
& SCHEDULES
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
N
H U
R O
N A
V E
, M A
C K
IN
A
W C
IT
Y
, M I 4
M -0
E S
S P
J G
E S
S T
A T
E O
F M
IC
H
IG
A
N M
A C
K
IN
A C
S T
A T
E H
IS
T
O R
IC
P
A R
K M
S H
P D
A Y
U S
E R
E S
T R
O O
M S
R E
M O
D E
L
NOT TO SCALEC2
MIXING VALVE DETAIL
NOT TO SCALEB3
FLOOR DRAIN DETAIL
NOT TO SCALEC1
VENT THROUGH ROOF DETAIL
a. These thicknesses are based on energy efficiency considerations only. Additional insulation my be necessary for safety.
b. For direc-buried service water heating system piping, reduction of these thicknesses by
1.5 in. shall be permitted (before thickness adjustment required in Section 7.4.3 but not to thicknesses less than 1 in.
≤140 0.22 to 0.28 100 1.0 1.0 1.5 1.5 1.5
>140 to 200 0.25 to 0.29 125 1.0 1.0 2.0 2.0 2.0
>200 0.27 to 0.30 150 1.5 1.5 2.5 3.0 3.0
Service Water Heating System Piping Located in Partitions within Conditioned Spaces
≤140 0.22 to 0.28 100 1.0 1.0 1.5 2.0 2.0
>140 to 200 0.25 to 0.29 125 1.5 1.5 2.5 2.5 2.5
>200 0.27 to 0.30 150 2.5 2.5 3.0 3.0 3.0
Service Water Heating System Piping not…