26059 Avon Road Crosswalk Improvemens AD Specifications.pdf
PDF 2 MB Posted
- Attached to
- Avon Rd I-70 & US-6 Crosswalk Improvements
- Solicitation number
- CIP - 32030
- Issued by
- Eagle County, Colorado
About this file
This document is a comprehensive bid specification file for a Colorado Department of Transportation (CDOT) and Town of Avon local agency project involving crosswalk improvements. The project will install rectangular rapid flashing beacons and reconstruct curb ramps to meet ADA compliance at nine pedestrian crossings along Avon Road from the I-70 Interchange to US-6. Estimated construction is scheduled to start on September 2, 2025, with completion anticipated in Fall 2025. The total project duration is set at 64 working days, and the project involves multiple technical specifications for roadway improvements, including pavement markings, concrete work, traffic control, and erosion management.
The project is funded through state aid and will be bid competitively, with a proposal guaranty requirement of 5% of the total bid. Bidders must comply with federal and state regulations, including Buy America requirements, Davis-Bacon wage rates, and equal employment opportunity guidelines. The specifications indicate detailed technical requirements for materials, construction methods, and quality control, with specific provisions for concrete placement, asphalt paving, utility coordination, and environmental protections. Contractors will be required to submit detailed documentation, including a Public Information Management plan, and adhere to strict water quality, erosion control, and safety standards throughout the project's implementation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State Aid Project No. SHO 006A-074 Town of Avon Project No. 2024-CIP32030 Construction Project Code 26059 June 13, 2025
Page | 1
TOWN OF AVON
SPECIAL PROVISIONS
AVON I-70 & US-6 CROSSWALK IMPROVEMENTS
The specifications for this project shall be the Colorado Department of Transportation’s “Standard Specifications for Road and Bridge Construction,” (SSRBC) 2023 Edition. Reference to “Division”, “Department”, or “CDOT” in the SSRBC shall be considered to mean the Owner, the Town of Avon. References to “Engineer”, “Project Engineer” or “Inspector” shall be considered to mean the owner’s field representative, a Town of Avon Construction Coordinator. The following modified Project Technical Specifications take precedence over the SSRBC.
PROJECT SPECIAL PROVISIONS
Name Date Pages
PROJECT SPECIAL PROVISIONS INDEX JUNE 13, 2025 1
STANDARD SPECIAL PROVISIONS INDEX JUNE 13, 2025 2
NOTICE TO BIDDERS JUNE 13, 2025 3-4
COMMENCEMENT AND COMPLETION OF WORK (WORKING DAY) JUNE 13, 2025 5
REVISION OF SECTION 100 – GENERAL PROVISIONS JUNE 13, 2025 6
REVISION OF SECTION 102 – PROJECT PLANS AND OTHER DATA JUNE 13, 2025 7
REVISION OF SECTION 202 – REMOVAL OF PAVEMENT MARKING JUNE 13, 2025 8-9
(STENCIL GRINDING)
REVISION OF SECTION 203 – POTHOLING JUNE 13, 2025 10
REVISION OF SECTION 210 – GRINDING: CURB RAMP REPAIR JUNE 13, 2025 11
REVISION OF SECTIONS 210 AND 608 – BRICK PAVERS JUNE 13, 2025 12
REVISION OF SECTION 212 - LANDSCAPE RESTORATION JUNE 13, 2025 13-14
REVISION OF SECTIONS 304 AND 703 – AGGREGATE BASE COURSE JUNE 13, 2025 15
REVISION OF SECTION 608 – DETECTABLE WARNINGS JUNE 13, 2025 16-17
REVISION OF SECTION 614 – FLASHING BEACONS JUNE 13, 2025 18
REVISION OF SECTION 626 – PUBLIC INFORMATION MANAGEMENT JUNE 13, 2025 19-23
(TIER IV)
REVISION OF SECTION 627 – PREFORMED THERMOPLASTIC JUNE 13, 2025 24
MATERIAL (SPECIAL)
REVISION OF SECTION 630 – PEDESTRIAN BARRICADE (ADA) JUNE 13, 2025 25-26
REVISION OF SECTION 630 – PEDESTRIAN ACCESS JUNE 13, 2025 27
TRAFFIC CONTROL PLAN – GENERAL JUNE 13, 2025 28-29
UTILITIES JUNE 13, 2025 30-33
FORCE ACCOUNT ITEMS JUNE 13, 2025 34
2 | P a g e
TOWN OF AVON
SPECIAL PROVISIONS
AVON I-70 & US-6 CROSSWALK IMPROVEMENTS
STANDARD SPECIAL PROVISIONS
No. of
Name Date Pages
Revision of Section 101 – Definitions and Section 106 – Control (January 8, 2024) 2 of Materials Revision of Sections 101 and 106 – Buy America and Build America, (January 8, 2024) 9 Buy America Requirements For Projects Containing $500,000 or More in Federal-Aid Highway Funding Highway Funding in the Amount Less Than $500,000 Revision of Section 105 – Asphalt Mat Density (Dec 26, 2024) 1 Revision of Section 105 – Control of Work (October 1, 2023) 1 Revision of Section 105 – Dispute Review Board and Claims for (October 1, 2023) 9 Unresolved Disputes Revision of Section 105 – E-Signature (January 8, 2024) 1 Revision of Section 105 – Pavement Smoothness (July 1, 2024) 11 Revision of Sections 105, 106, 412, and 601 – PCCP Acceptance (Sept 30, 2024) 15 and Recycled Concrete Aggregate Revision of Section 106 – Control of Materials (Sept, 30 2024) 1 Revision of Section 107 – Water Quality Control (Under One Acre of (October 1, 2023) 9 Disturbance) Revision of Section 207 – Topsoil (October 1, 2023) 9 Revision of Section 208 – Erosion Control (Under One Acre of (October 1, 2023) 38 (Disturbance) Revision of Section 401 – Plant Mix Pavements-General (January 8, 2024) 4 (Subsection 401.17) Revision of Section 401 – Plant Mix Pavements-General (Sept 30, 2024) 1 (Subsection 401.10) Revision of Section 601 – Concrete Acceptance (April 9, 2024) 4 Revision of Section 614 – Galvanized Steel Poles (October 1, 2023) 1 Revision of Section 627 – Pavement Marking Paint (March 21, 2025) 13 Revision of Section 615 – Conduit and Pull Box Revisions (Dec 26, 2024) 1 Affirmative Action Requirements Equal Employment Opportunity (October 1, 2023) 13 Disadvantaged Business Enterprise (DBE) Requirements (October 1, 2023) 15 Minimum Wages, Colorado, U.S. Department of Labor General (January 3, 2025) 8 Decision Number CO20250013, Highway Construction for Eagle, Garfield, Grand, Jackson, Lake, Pitkin, Rio Blanco, Routt, and Summit Counties Required Contract Provisions – Federal-Aid Construction Contracts (October 23, 2023) 15 Special Construction Requirements, Fire Protection Plan (October 1, 2023) 2
3 | P a g e
NOTICE TO BIDDERS
The Proposal guaranty shall be a certified check, cashier’s check or bid bond in the amount of 5 percent of the Contractor’s total bid.
Pursuant to subsections 102.04 and 102.05, it is recommended that bidders on this project review the work site and plan details with an authorized Department representative.
Prospective bidders shall contact one of the following listed authorized Department representatives at least 12 hours in advance of the time they wish to go over the project.
Project Engineer - Will Kearney, PE Office Phone: 970-748-4134
Engineering Manager - Eva Wilson, PE, PTOE, CFM Office Phone: 970-390-2014
The above referenced individuals are the only representatives of the Townwith authority to provide any information, clarification, or interpretation regarding the plans, specifications, and any other contract documents or requirements.
Questions received from bidders along with Town responses will be posted on the Town website as they become available.
If the bidder has a question or requests clarification that involves the bidder's innovative or proprietary means and methods, phasing, scheduling, or other aspects of construction of the project, the Project Engineer will direct the bidder to contact the Resident Engineer directly to address the question or clarification. The Resident Engineer will keep the bidder’s innovation confidential and will not share this information with other bidders.
The Public Works Director will determine whether questions are innovative or proprietary in nature. If the Public Works Director determines that a question does not warrant confidentiality, the bidder may withdraw the question. If the bidder withdraws the question, the Public Works Director will not answer the question and the question will not be documented on the Town web site. If the bidder does not withdraw the question, the question will be answered, and both the question and Town answer will be posted on the web site. If the Public Works Director agrees that a question warrants confidentiality, the Public Works Director will answer the question, and keep both question and answer confidential. The Town will keep a record of both question and answer in their confidential file.
4 | P a g e
NOTICE TO BIDDERS
All questions shall be directed to the Town contacts listed above no later than 7:00 A.M.
Monday of the week of bid opening. Final questions and answers will be posted no later than Tuesday morning of bid opening week.
Questions and answers shall be used for reference only and shall not be considered part of the Contract
5 | P a g e
COMMENCEMENT AND COMPLETION OF WORK
(WORKING DAY)
The Contractor shall commence work under the Contract on or before the 15th day following Contract execution or the 30th day following the date of award, whichever comes later, unless such time for beginning the work is changed by the Contract Manager in the "Notice to Proceed." The Contractor shall complete all work within 64 working days in accordance with the "Notice to Proceed.
6 | P a g e
REVISION OF SECTION 100
GENERAL PROVISIONS
Revise Section 100 of the Standard Specification for this project as follows:
All references to the State, the Department, the Engineer, the Chief Engineer, etc. shall be understood to mean the Town of Avon, Colorado or the Town’s designated representatives.
7 | P a g e
REVISION OF SECTION 102
PROJECT PLANS AND OTHER DATA
Revise Section 102 of the Standard Specifications for this project as follows:
Subsection 102.05 shall include the following:
Supplemental data is provided in Land XML and DGN file formats. The supplemental data transmitted consists of:
(a) Surfaces – LandXML files of the following:
(1) Existing Terrain Model
(b) DGN files:
(1) 2D Components of the Project Design Model
(2) Right of Way
(3) Topography
The Town does not warrant the supplemental data and this information is not considered to be a part of the Contract. If bidders use or modify the supplemental data in preparing a proposal or planning and prosecuting the work, all associated data is used at their own risk, and bidders are responsible for all conclusions, deductions, and inferences drawn from the original or modified supplemental data.
After the proposals have been opened, the low responsible bidder may obtain electronic plans and special provisions from the Town.
8 | P a g e
REVISION OF SECTION 202
REMOVAL OF PAVEMENT MARKING
(STENCIL GRINDING)
Section 202 of the Standard Specifications is hereby revised for this project as follows:
Subsection 202.01 shall include the following:
At all locations where the existing stencil is applied to the surface of the pavement, the existing stencils shall be removed from the hot mix asphalt or concrete pavement by hand or mechanical grinding. The asphalt pavement or concrete pavement shall then be removed to a depth of 90 mils + 10 mils to prepare an inlaid area for the new stencil to be installed.
Subsection 202.05 shall include the following:
For stencils that are already inlaid, the inlaid depth shall be checked to confirm it meets the requirement of 90 mils + 10 mils. If the inlaid depth is not deep enough, it shall be milled to the required depth of 90 mils + 10 mils and paid as Removal of Pavement Marking (Grinding).
Existing stencils that are not inlaid shall be removed and a grinding machine shall be used to produce a recessed area to a depth of 90 mils + 10 mils and paid as Removal of Pavement Marking (Grinding).
The grinding machine shall be capable of adjusting from 4-inch wide passes to 12-inch wide passes. The grinding procedure shall produce a horizontal, smooth surface to a depth of 90 mils + 10 mils or as approved by the Engineer. The procedure shall be capable of grinding a 10 foot straight line with a tolerance of + 1 inch. The area of removal shall be a maximum of 1 inch larger than the stencil that is to be applied with the following exceptions:
• Turn arrows shall be ground with multiple passes to minimize extra grinding; no rectangular grinds shall be allowed.
• All words shall be one large rectangular grind.
After grinding, all loose dust, dirt and debris shall be removed prior to application of pavement marking material.
On concrete pavement, all loose dust, dirt and debris shall be removed prior to application of pavement primer and pavement marking material.
On hot mix asphalt pavements with a competent chip seal surface, grinding shall not be allowed as determined by the engineer. Stencils shall be applied directly on the existing, cleaned surface of the chip seal in accordance with the manufacturer’s specifications.
9 | P a g e
REVISION OF SECTION 202
REMOVAL OF PAVEMENT MARKING
(STENCIL GRINDING)
Removal of Pavement Marking (Grinding) will be measured as actual square feet of the new stencil to be installed for lines and symbols. For word stencils or where additional grinding is required to remove existing stencils that will not be replaced, payment shall be for the measured square feet of ground area.
Payment will be made under:
Pay Item Pay Unit Removal of Pavement Marking Square Foot
Payment will be full compensation for all work, material and equipment required to complete the grinding. Removal of material after grinding will not be measured and paid for separately but shall be included in the work.
10 | P a g e
REVISION OF SECTION 203
POTHOLING
Revise Section 203 of the Standard Specifications for this project as follows:
In Subsection 203.11, paragraph (e), add the following:
Labor and materials required for subsurface and surface restoration following potholing activities shall not be measured and paid separately but shall be considered included in the unit cost for this item. Subsurface restoration shall include flow fill to backfill the void created during potholing activities.
Pay Item Pay Unit
Potholing Hour
11 | P a g e
REVISION OF SECTION 210
GRINDING: CURB RAMP REPAIR
Section 210 of the Standard Specifications is hereby revised for this project as follows:
Subsection 210.02 shall include the following:
Curb Ramps. The Contractor is to mill or diamond grind joints and grade breaks with an existing vertical displacement of 1/8-inch to 2 inches. If contractor chooses to mill joints or grade breaks finished surfaces shall be diamond ground. Locations are existing ramp joints between the roadway surface and gutter pan and the ramp grade breaks. If the ramp contains a displacement greater than 2 inches, advise the Engineer before proceeding with repairs.
Completed grinds shall be smooth and sloped back at a maximum of a 7.5% slope and have a visually pleasing appearance as approved by the Engineer.
Where necessary, the adjacent curb surface shall be ground to match.
Repair locations shall be as shown on the plans or as directed by the Engineer.
Subsection 210.12 shall include the following:
Curb ramp repair will be measured by the linear foot of ramp-roadway joints and ramp grade breaks that are repaired by diamond grinding.
Subsection 210.13 shall include the following:
Payment will be made under:
Pay Item Pay Unit Grinding: Sidewalk and/or Curb Ramp Repair LF
Payment includes all labor, equipment, and materials necessary to complete the work.
12 | P a g e
REVISION OF SECTIONS 210 AND 608
BRICK PAVERS
Section 210 of the Standard Specifications is hereby revised for this project as follows:
Subsection 210.02 shall include the following:
Brick Pavers. Brick pavers removed to construct the median concrete curb ramp at US 6 East Crossing will be recycled and reset next to newly constructed curb ramp to fill voids from removal of existing curb ramp.
Section 608 of the Standard Specifications is hereby revised for this project as follows:
Subsection 608.02 shall include the following:
Brick pavers shall be 8 CM Holland Parkway in Shady Red II/Parkway.
Reset Brick Pavers Square Yard Brick Pavers Square Foot
13 | P a g e
REVISION OF SECTION 212
LANDSCAPE RESTORATION
Section 212 of the Standard Special Specifications is hereby revised for this project as follows:
Subsection 212.01 shall include the following:
This work applies to the landscaping near rectangular rapid flashing beacon and curb ramp installation areas that the project is disturbing. Existing irrigation withing landscaping areas is to be protected in place. In areas where landscaping is disturbed, the work consists of restoration of disturbed landscape areas. Restoration shall include seeding in areas of removed curb ramp or sidewalks adjacent to existing landscaping areas. Topsoil and seeding shall conform to Sections 207 and 212 of the CDOT Specifications and Standard Special Provisions.
Seed mixes are to be acquired from Pawnee Buttes Seed Inc. (605 25th St, Greeley, CO 80632). Low grow native mix to be used for landscape restoration areas at the I-70 Ramps.
Drought tolerant mix to be used at E Beaver Creek, Benchmark Rd, and US 6 landscape restoration areas.
ECCD Low Grow Native Mix Rocky Mountain Fescue 49.66% Sandberg Bluegrass 24.18% Canby Bluegrass 24.06% Inert 2.10% Crop 0.00% Weed 0.00%
ECCD Drought Tolerant Lawn Mix Hard Fescue 32.96% Creeping Blue Fescue 16.78% Chewings Fescue 15.38% Inert 33.88% Crop 0.99% Weed 0.01%
The Contractor shall replace any damaged landscape, including topsoil, grass, sod, irrigation system components, trees, shrubs, ground covers and mulch, to its original condition. Sod shall match existing. The Contractor shall coordinate with the Town of Avon Landscape Specialist and Town of Avon’s landscape maintenance personnel at least 5 working days in advance of starting work in the area. With proper and timely notification, the owner’s landscape maintenance personnel shall mark and identify the irrigation system components.
This is no way all-inclusive of all utilities or all of the irrigation system. No landscape shall be without watering services during the growing season as directed by the Engineer. If the irrigation service is interrupted for more than three days, the Contractor shall be liable to hand/truck water and possibly all plant replacement in the affected landscape. Landscape Restoration shall be considered complete when the landscape and irrigation system is restored to its original condition and approved by the maintaining personnel. The Town of Avon’s landscape maintenance forces shall inspect all repair work to any irrigation components prior to burial and acceptance of said work. The Contractor shall obtain from the owner’s landscape maintenance forces written acceptance of said work and provide it to
14 | P a g e
REVISION OF SECTION 212
LANDSCAPE RESTORATION
the Engineer prior to the Engineer approving the work. The owner’s landscape maintenance forces shall provide written acceptance of said work to the Engineer prior to the Engineer approving the work. [For questions regarding the landscape/irrigation areas, call the Town of Avon Senior Engineer Will Kearney 970-977-0063]
The work shall be in accordance with the Contract and accepted horticultural practices.
Subsection 212.02 shall include the following:
Restoration shall include new landscape weed barrier fabric, restoration of damaged or altered irrigation systems, replanting, topsoil, sod, and resetting of landscape boulders.
Restoration shall also include installing landscaping components including sod, mulch, etc to areas disturbed by removal of existing signposts, removal of existing sidewalk or curb ramps, installing of rectangular rapid flashing beacons and trenching.
Subsection 212.07 shall include the following:
The quantities of weed barrier fabric, irrigation systems, rock mulch, plants, sod, topsoil, landscape boulders, materials and labor will not be measured individually but shall be incidental to the task of restoring the landscaped area.
Subsection 212.08 shall include the following:
Payment will be made under:
Pay Item Pay Unit Landscape Restoration LS
Materials and labor associated with the removal and installation of weed barrier fabric, rock mulch, restoration of irrigation systems, resetting of boulders, plants, topsoil, sod, and protecting existing signs and vegetation shall not be paid for separately but shall be included in the cost of the work.
Landscape damages outside of the designated work areas and not approved by the project Engineer shall be repaired at the expense of the Contractor.
15 | P a g e
REVISION OF SECTIONS 304 AND 703
AGGREGATE BASE COURSE
Revise Section 304 of the Standard Specifications for this project as follows:
Subsection 304.02 shall include the following:
Materials for the base course shall be Aggregate Base Course (Class 6) as shown in subsection 703.03
The aggregate base course (Class 6) must meet the gradation requirements and have a resistance value of at least 78 when tested by the Hveem Stabilometer method.
Section 703 of the Standard Specifications is hereby revised for this project as follows:
Subsection 703.03 shall include the following:
When tested by the Hveem Stabilometer in accordance with AASHTO T190, aggregate for bases shall meet the minimum R value requirements of Table 703-03A for the classes specified for the project, unless otherwise noted.
Table 703-03A, Minimum R Value for Aggregate Base Course
ABC Class Class 1 Class 2 Class 3 Class 6 Class 7
Minimum R Value
70 65 59 78 60
The Contractor shall sample the proposed aggregate base course in the presence of the Engineer or his designee. Sampling methods shall be in accordance with the current edition of the Field Materials Manual.
16 | P a g e
REVISION OF SECTION 608
DETECTABLE WARNINGS
Section 608 of the Standard Specifications is hereby revised for this project as follows:
Subsection 608.01 shall include the following:
This work includes the installation of detectable warnings on concrete curb ramps as shown on the plans.
Subsection 608.02 shall include the following:
Detectable warnings on curb ramps shall be truncated domes of the dimensions shown on the plans. Truncated domes shall be manufactured as a pattern on cast iron plates that are designed to set in wet concrete or shall be one of the products approved for use as detectable warnings listed on CDOT’s Approved Products List.
Detectable warning surfaces shall consist of cast iron material. Pavers will not be allowed.
The domes and their underlying surface shall have a discernible contrast of color from the adjacent surface. The contrasting colors shall not be black and white. Truncated dome panel color shall be as approved by the Engineer. Concrete for curb ramp construction shall never be stained or have color added.
When plates are used, prior to the start of work, the Contractor shall submit appropriate documentation from the manufacturer verifying that the contrast has been met, along with a sample plate, to the Engineer for approval.
Subsection 608.03 shall include the following:
(g) Detectable Warnings for curbs ramps.
1. Plates. Prior to installation of the plates, concrete conforming to subsection 608.02 shall be installed and consolidated as a base for the plates. The concrete shall be placed to a thickness that will allow the base surface of the plates to be at the same elevation as the adjacent concrete. The plates shall be embedded into the plastic concrete in accordance with the manufacturer’s specifications.
Subsection 608.05 shall include the following:
Detectable warnings on new curb ramps, including plates, alternate materials, and all other work and materials necessary for fabrication, transport, saw cutting, removal of concrete and other installation will not be measured and paid for separately, but shall be included in the cost of item 608 concrete curb ramp.
17 | P a g e
REVISION OF SECTION 608
DETECTABLE WARNINGS
Detectable Warnings added to existing curb ramps will be measured and paid as item 608 – Detectable Warnings.
Detectable Warnings will be paid as:
Detectable Warnings Square Foot
18 | P a g e
REVISION OF SECTION 614
FLASHING BEACONS
Section 614 of the Standard Specifications is hereby revised for this project as follows:
Subsection 614.13 shall include the following:
Flashing beacon pole and equipment will be powder coated using Avon pole color RAL # 7021 (Grey/Black/Green).
19 | P a g e
REVISION OF SECTION 626
PUBLIC INFORMATION MANAGEMENT
(TIER IV)
Section 626 of the Standard Specifications for this project to include the following:
DESCRIPTION
This work consists of providing Public Information Management for the duration of the project. The Contractor shall submit all documentation associated with the Public Information Management item to the Project Engineer. Before approval, the Engineer will coordinate review and approval with the Region Communications Manager (RCM).
This project (26059) is located on Avon Road in Eagle County at multiple crossroads, to include I-70 on- and off-ramps. The work consists of reconstructing curb ramps at nine different pedestrian crossings and installing rectangular rapid flashing beacons (RRFB).
Anticipated communications issues on this project include:
• Consistent and timely communication is required with stakeholders potentially impacted by the project.
• Consistent and timely communication will also be necessary with representatives of known utilities within the project limits, municipal government entities, and other major organizations or businesses within project limits.
• The key to a successful project shall be accuracy, timeliness of communications, and full transparency on any setbacks.
• Awareness of special events in area communities is important as well (i.e. annual festivals, tourism, etc…)
• Awareness of weather-related issues including snow events and the potential for diverted traffic through the project area, snow melt, high water, etc…
CONSTRUCTION REQUIREMENTS
(1) Public Information Manager (PIM) submittal and qualifications. The Construction Project (Contractor) shall provide a Public Information Manager (PIM) who will be the responsible charge for all activities associated with public information services. As part of the key project staff submittal prior to the Preconstruction Conference, the Contractor shall submit the name, contact information, and resume of the PIM to the Local Agency Representative. The PIM may be a qualified member of the Contractor’s personnel, with approval by the Local Agency.
The PIM and Backup PIM shall have a minimum of five years of professional experience in public or media relations, marketing, or other related field and appropriate verbal and
20 | P a g e written communication skills. Experience in administrative or business office duties is not a related field.
(2) Activities of the PIM. Throughout the duration of the project, the PIM shall be responsible for the following:
1. Project Meetings. The PIM shall participate in the weekly (or regular) project meetings to discuss communication issues with the project team and provide a status on the items in this specification.
2. On Call/On Site. The PIM shall be available on call or on-site on every working day and available upon request at other than normal working hours. The PIM shall maintain communications with the Contractor and Local Agency Representative regarding all aspects of public information related to this project.
3. Public Information Line/Communications. The PIM shall establish a unique telephone number with voicemail (which becomes the Project Hotline) and a unique email address for the project. The Project Hotline telephone number shall be printed on the Project’s traffic control signs. The PIM shall record an updated voicemail greeting/message with the project’s anticipated completion date, activities and traffic impacts for the upcoming week. If unable to answer the Project Hotline, the PIM shall check and respond to voicemail messages by the end of each day of construction operations. The PIM shall maintain a tracking log with inquiries made by citizens and businesses, including names, addresses, phone numbers, and subsequent action taken as follow-up to the inquiries. All inquiries and complaints shall be followed up with a return phone call or email from either the PIM or, when necessary, the Local Agency Representative. The PIM shall provide the updated tracking log to the Contractor and Local Agency Representative each week.
4. Public Information Plan. The PIM shall develop a Public Information Plan (PIP) and submit the PIP to the Contractor and Local Agency Representative for review and approval. The PIP shall be specific to the project. The PIP shall include public information strategies detailing the use of the Public Information Collateral; the expected work zone impacts and closure details; commuter alternatives; community, government and business relations; media relations; identification of public information issues; proposed outreach strategies; approach to crisis communications;
the Stakeholder List; and the Project Management Team Emergency Contact List. The PIM shall update the plan when necessary and as directed by the Contractor or Local Agency Representative.
21 | P a g e
PUBLIC INFORMATION MANAGEMENT
(TIER IV)
5. Public Information Collateral. The PIM shall develop a variety of Public Information Collateral to share information about project activities such as project start, long-term closures, impactful construction activities, significant milestones, and project completion. Collateral includes the following:
a. Stakeholder and Media List. The PIM shall submit a Stakeholder and Media List with each media outlet and stakeholder’s name, telephone number, email address, and notes on communication needs of the stakeholders for the project.
b. Project Management Team Emergency Contact List. The PIM shall prepare and regularly update an Emergency Contact List with the names and contact information of the individuals pertinent to the project’s public information. At a minimum, the Contact List shall include the Local Agency Representative, Project Engineer, CDOT Representatives (Local Agency Engineer and Regional Communications Manager), Contractor Superintendent, and Traffic Control Supervisor.
c. Photographs and Video Recordings. The PIM shall take digital photographs and video recordings at regular intervals and submit them to the Contractor and Local Agency Representative. The PIM may use a cell phone camera.
Photographs and video recordings shall capture various work activities and other areas of work as identified by the Contractor and Local Agency Representative. CDOT requests any imagery of this project that directly correlates to locations that CDOT manages, i.e. I-70 on/off-ramp interaction or CO 6 interaction. Imagery or links to imagery should be sent to CDOT regional communication managers. These are: Austyn.dineen@state.co.us and Charles.marsh@state.co.us.
d. Maps and Graphics. The PIM shall develop map(s) and graphic(s) of the project site to be used in other Public Information Collateral such as press releases, project updates, or fliers.
e. Lane Closure Updates. The PIM shall submit the project’s lane closure information to CDOT weekly, by Thursday close-of-business. As this project has the potential to impact traffic on I-70 EB and WB on/off-ramps as well as the US 6 intersection, the PIM shall work with the CDOT Regional Communications Manager to ensure highway traffic impacts are reported to CDOT for input into the electronic lane closure reporting system.
f. Project Flyers. The PIM shall develop a (printed or digital) Project Flyer(s) to include the following pertinent information: project start and end dates, project location, description of work, traffic impacts, scheduled work hours and workdays, the Project Hotline, email address, web address, project map.
22 | P a g e
An email containing a digital form of the Project Flyer shall be sent to stakeholders and media identified in the Stakeholder and Media List.
g. Press Releases. The PIM shall prepare Press Releases as needed throughout the duration of the project. The initial/project start Press Release shall announce the project, summarizing the project scope, construction phasing, construction activities that affect traffic, the project end date, and a summary of project benefits. The release shall also include maps, other graphics or photos. An email containing a digital form of the Press Release shall be sent to the media identified in the Stakeholder and Media List. The PIM shall develop additional Press Release(s) for major construction milestones, traffic control or lane shifts, closures, project completion, and as directed by the Contractor and Local Agency Representative.
i. project start,
ii. project completion,
iii. public outreach/special event announcement,
iv. additional releases may be required to communicate significant changes in work activity, construction milestones, traffic control or lane shifts, or closures as directed by the Contractor and Local Agency Representative.
The PIM shall include the CDOT regional communication managers to any press release distribution. These are: Austyn.dineen@state.co.us and Charles.marsh@state.co.us.
h. Site Visits. At least five days prior to the start of work, the PIM shall visit, in-person, businesses that are directly impacted by the entire project work zone corridor and provide printed Project Flyers and Project Team/PIM contact information.
i. Project Updates. The PIM shall develop weekly Project Updates which shall include information about completed activities and upcoming project activities such as construction phasing and construction activities that will affect traffic.
An email containing a digital form of the Project Update shall be sent to the stakeholders identified in the Stakeholder and Media List.
23 | P a g e
METHOD OF MEASUREMENT
The Contractor and Local Agency Representative will monitor the PIM and all public information services. Failure to provide acceptable public information services will result in a withholding of payment for this item.
BASIS OF PAYMENT
Pay under:
Pay Item Pay Unit
Public Information Management (Tier IV) LS
Payment for Public Information Services will be full compensation for all work, materials, and equipment to provide public information throughout the project per this specification.
24 | P a g e
REVISION OF SECTION 627
PREFORMED THERMOPLASTIC MATERIAL (SPECIAL)
Section 627 of the Standard Specifications is hereby revised for this project as follows:
Subsection 627.09 shall include the following:
Preformed Thermoplastic Pavement Marking stencils shall have a thickness of 125 mils.
Marking shall be able to be applied at ambient and surface temperatures down to 32oF without any preheating of the pavement, special storage, preheating or treatment of the material before application. The top surface of the stencils (the same side as the factory applied surface beads) shall have an indicator system for the Contractor and inspector to properly gauge the correct amount of heat to apply during installation. The indicator system shall have a positive visual indication, such as indents closing together when the material has reached the correct installation temperature. The indicator system must also provide a positive, visual indication if the material has not reached the correct installation temperature.
All stencils shall have beads on the surface of the stencil. No reversible stencils will be allowed. Stencil installation shall conform to manufacturer’s recommendations.
The Contractor shall be required to provide on-site training prior to installation of the first stencil. The training shall be conducted by an authorized manufacturer representative. All crew members on the work site shall be certified by the stencil manufacturer. The training shall include surface preparation and stencil installation for both hot bituminous pavement and concrete pavement. The training shall be coordinated with, and attended by CDOT project engineer and inspector. All costs associated with providing this training will not be measured and paid for separately, but shall be included in the work.
The Project Engineer may waive the training requirement if the specific crew members working on this project have extensive experience installing Preformed Thermoplastic Pavement Markings per these specifications. The Contractor must submit a list of the crew members and proof of their prior experience to the Project Engineer in order for the training requirement to be waived.
All leading edges of stencils shall be beveled at a 45o angle.
Payment will be made under one of the following items:
Pay Item Pay Unit Preformed Thermoplastic Pavement Marking SF (Xwalk-Stop Line) (Special)
25 | P a g e
REVISION OF SECTION 630
PEDESTRIAN BARRICADE (ADA)
Revise Section 630 of the Standard Specifications for this project as follows:
Subsection 630.01 shall include the following:
This work consists of the installation of temporary pedestrian barricades that are fully ADA compliant. When used, Pedestrian Barricade (ADA) shall be used to delineate a walkable surface.
Subsection 630.02 shall include the following:
The pedestrian barricade shall conform to MUTCD 6F.71 for pedestrian traffic control.
The barricade shall be made of High Density Polyethylene (HDPE) with Ultraviolet (UV) stabilizers, or other approved material. It shall be able to interlock with adjacent barricades of the same product such that it forms a wall or a rail.
The pedestrian barricade shall comply with the crash test requirements contained in MASH Level TL3.
The pedestrian barricade shall have a continuous detectable bottom and top surface to be detectable to users of long canes. The bottom of barricade shall be no more than 2 inches above the ground. The top of barricade shall be no lower than 32 inches above the ground. The gap to the bottom of the barricade may be used for drainage. The barricade shall be reflectorized in accordance with subsection 630.02. No extended bases or protrusions shall extend into the walkway.
The Contractor shall submit manufacturer’s documentation confirming that the barricade meets all applicable ADA requirements for barricades or rail.
Subsection 630.13 shall include the following:
Placement of the Pedestrian Barricade (ADA) shall be in accordance with manufacturer recommendations.
The ADA pedestrian barricade may be moved to other locations as shown on the plans or as directed upon completion of use at one location.
Subsection 630.17 shall include the following:
Pedestrian Barricade (ADA) will be measured as the actual linear feet of barricade installed and accepted.
26 | P a g e
PEDESTRIAN BARRICADE (ADA)
Subsection 630.18 shall include the following:
Payment will be made under:
Pay Item Pay Unit Pedestrian Barricade (ADA) Linear Foot
Movement of the Pedestrian Barricade (ADA) to different locations, when required, will not be measured, and paid for separately, but shall be included in the work.
27 | P a g e
PEDESTRIAN ACCESS
Revise Section 630 of the Standard Specifications for this project as follows:
Subsection 630.10 shall include the following:
The Contractor shall always maintain ADA Accessible pedestrian routes for existing crosswalks. When crosswalk closures are required, the Contractor shall utilize Flaggers and Traffic Cones to guide pedestrians around the work area.
All costs associated with providing Pedestrian Access shall be included in the Cost of 630 – Flagging (HOUR) and 630 – Traffic Cones (EACH).
28 | P a g e
TRAFFIC CONTROL PLAN - GENERAL
The Contractor shall submit a Traffic Control Plan (TCP) for approval by the Engineer prior to the beginning of any construction. The key elements of the Contractor’s method of handling traffic (MHT) are outlined in subsection 630.10(a).
The components of the TCP for this project are included in the following:
(1) Subsection 104.04 and Section 630 of the specifications.
(2) Standard Plan S-630-1, Traffic Controls for Highway Construction Cases 18 and 19
(3) Schedule of Construction Traffic Control Devices.
(4) CDOT R3 Lane Closure Strategy, Latest Edition
Unless otherwise approved by the Engineer, the Contractor’s equipment shall follow normal and legal traffic movements. The Contractor’s ingress and egress of the work area shall be accomplished with as little disruption to traffic as possible. Traffic control devices shall be removed by picking up the devices in a reverse sequence to that used for installation. This may require moving backwards through the work zone. When located behind barrier or at other locations shown on approved traffic control plans, equipment may operate in a direction opposite to adjacent traffic.
CDOT or the Town may have entered into operating agreements with one or more law enforcement organizations for cooperative activities. Under such agreements, at the sole discretion of CDOT or the Town, law enforcement personnel may enter the work zone for enforcement purposes and may participate in the Contractor’s traffic control activities. The responsibility under the Contract for all traffic control resides with the Contractor and any such participation by law enforcement personnel in Contractor traffic control activities will be referenced in either the Special Provisions or General Notes of the plans depending on whether the Contractor is to hire local law enforcement or if CDOT or the Town is contracting with law enforcement for uniformed traffic control. Nothing in this Contract is intended to create an entitlement, on the part of the Contractor, to the services or participation of the law enforcement organization.
Special Traffic Control Plan requirements for this project are as follows:
During the construction of this project, traffic shall use the present traveled roadway unless identified on the plans or approved by the Engineer.
The Contractor shall not have construction equipment or materials in the lanes open to traffic at any time, unless approved by the Engineer.
29 | P a g e
TRAFFIC CONTROL PLAN - GENERAL
Vehicle and pedestrian access shall be maintained to adjacent properties at all times.
Pedestrian and bicycle traffic on the existing recreational path shall be maintained at all times unless otherwise approved by the Engineer and Town of Avon.
Traffic shall not be delayed for more than 15 minutes or as directed by the Engineer.
The Region 3 Lane Closure Strategy outlines permissible lane closure hours for US Hwy 6 under summertime weekday, summertime weekend, spring/fall weekday, spring/fall weekend, winter weekday, and winter weekend conditions.
Allowable single lane closure hours (R3 Lane Closure Strategy):
US 006E Lane Closure Strategy (MP 159.46-170.45) Allowed Hours
Summer Weekday Schedules Summer Weekend Schedules
Milepost Direction Multilane Hwy – Any
Length
2-lane Hwy Lane Closure Length – 0.25 mile / Multilane
Hwy.
2-lane Hwy Lane Closure Length – 1.0 mile
Multilane Hwy – Any
Length
2-lane Hwy Lane Closure Length – 0.25 mile / Multilane
Hwy.
2-lane Hwy Lane Closure Length – 1.0 mile
170.12-170.45 Both 9 AM to 11 AM 6 PM to 7 AM
7 PM to 7 AM 5 PM to 9 AM 7 PM to 8 AM
Spring-Fall Weekday Schedules Spring-Fall Weekend Schedules
Milepost Direction Multilane Hwy – Any
Length
2-lane Hwy Lane Closure Length – 0.25 mile / Multilane
Hwy.
2-lane Hwy Lane Closure Length – 1.0 mile
Multilane Hwy – Any
Length
2-lane Hwy Lane Closure Length – 0.25 mile / Multilane
Hwy.
2-lane Hwy Lane Closure Length – 1.0 mile
170.12-170.45 Both 8 AM to 4 PM 6 PM to 7 AM
6 PM to 7 AM Anytime 6 PM to 9 AM
Work along Avon Road in the Town of Avon will follow the CDOT R3 Lane Closure Strategy
No lane closures will occur after noon on Fridays on US 6.
No work will be permitted between Memorial Day and Labor Day; Thanksgiving Day through the following Sunday, and Christmas Day through January 5th.
Working hours shall be Monday through Friday 7 am to 7 pm. Night work and weekend work will not be permitted unless approved by the Engineer.
At least one week prior to starting construction, the Contractor shall notify the Town of Avon Engineer of the date the Contractor intends to start construction.
All costs incidental to the foregoing requirements shall be included in the original contract prices for the project.
30 | P a g e
UTILITIES
Potential utilities within the limits of this project are:
TYPE CONTACT PHONE EMAIL
Eagle River Water & Sanitation District
(ERWSD)
Sanitary Sewer Water
Ivy Todd 970-477-5449 itodd@erwsd.org
Micah Schuette 970-477-5496 mschuette@erwsd.org
Holy Cross Energy
Electric Todd Foral 970-748-4307 tforal@holycross.com
Lumen Technologies (Represented by Terra Tech)
Fiber Optic Telephone
Al Perez 970-589-4536 al.perez1@lumen.com
Rob McLeod (Terra Tech)
303-949-2187 rmcleod@congruex.com
Comcast Fiber Optic Television
Brett Westphall 970-930-4713 brett.westphall@comcast.com
Michael Johnson 970-930-4713 Michael.johnson@comcast.com
Xcel Energy Gas
Austin Shorr 303-915-5178 Austin.E.Shorr@xcelenergy.com
Len Feroldi 303-915-5178 Len.R.Feroldi@xcelenergy.com
The work described in these plans and specifications requires full cooperation between the Contractor and the utility owners in accordance with Subsection 105.11 in conducting their respective operations, so the utility work can be completed with minimum delay to all parties concerned. Also, in accordance with the plans and specifications, and as directed by the Engineer, the Contractor shall keep each utility owner advised of any work being done to its facility, so that each utility owner can coordinate its inspections for final acceptance of the work with the Engineer.
31 | P a g e
PART 1 CONTRACTOR SHALL PERFORM THE WORK LISTED BELOW:
The Contractor shall coordinate the work with the owners of the utilities impacted by the work. Coordination with utility owners includes, but is not limited to, staking construction features, providing and periodically updating an accurate construction schedule which includes all utility work elements, providing written notification of upcoming required utility work elements as the construction schedule indicates, allowing the expected number of working days for utilities to complete necessary relocation work, conducting necessary utility coordination meetings, applying for and obtaining power or communication services in Town of Avon’s name, and all other necessary accommodations as directed by the Project Engineer. Surveying and/or staking of utility relocations to be performed by the owner shall be the responsibility of the utility owner.
Prior to excavating or performing any earthwork operations, the Contractor shall positively locate all potential conflicts with existing underground utilities and proposed construction, as determined by the Contractor according to proposed methods and schedule of construction. The Contractor shall modify construction plans to avoid existing underground facilities as needed, and as approved by the Engineer. Please note that UNCC marks only its member’s facilities – Other facilities, such as ditches and drainage pipes and Town of Avons’s fiber optic system may exist, and it is the Contractor’s responsibility to investigate, locate and avoid such facilities. The Contractor shall pothole all of the listed potential conflicts prior to starting any underground or earthwork well in advance of the work so that the utility companies can be given the required notification and to avoid delays to the Contractor’s work.
The Contractor shall provide traffic control for any utility work expected to be coordinated with construction, as directed by the Engineer.
THE WORK LISTED BELOW SHALL BE PERFORMED BY THE CONTRACTOR:
For any utility work by the Contractor or by a utility company necessary during the construction of the project, the following shall apply:
The Contractor shall be responsible for coordinating the adjustment of all utilities on this project. The Contractor shall keep each utility company advised of any work being performed on or around their facilities, so that each utility company can coordinate any needed inspections, including inspections with the Engineer.
The Contractor shall provide written notice to each utility company, with a copy to the
32 | P a g e
Engineer, prior to any work by a utility company that is to be coordinated with project construction. A minimum of two (2) calendar weeks of prior notice is required.
If appropriate, the Contractor shall provide traffic control for any utility work to be coordinated with the project’s construction, in accordance with an approved Method of Handling Traffic (MHT). Payment to be made via contract bid item(s).
The work listed below shall be performed by the Contractor in accordance with the plans and specifications, and as directed by the Owner. The Contractor shall keep the Town and utility company/companies advised of any work being done to their facility, so that the utility company/companies can coordinate their inspections for final acceptance of the work with the Owner.
PART 2 - UTILITY OWNERS SHALL PERFORM THE WORK LISTED BELOW:
Traffic control for utility work shall be the responsibility of the utility owner. The utility owner shall prepare and submit to the Engineer a Method of Handling Traffic for utility work to be performed outside typical project work hours or outside of project limits. The utility owner shall obtain acceptance of the Method of Handling Traffic from the Engineer prior to beginning the utility work to be performed outside typical project work hours or outside of project limits.
This work will be performed by the utility owners as necessary to avoid conflicts with construction activities. All work is anticipated to be completed prior to project construction start. New locations shall be as indicated in the plans. Utility owners shall comply with schedule requirements of the Contractor and make every effort not to impact the overall construction schedule. Unless otherwise approved by the Engineer, abandoned aboveground appurtenances such as pedestals shall be removed.
Utility owners are responsible for coordinating all work with the Contractor.
Utility owners are responsible for obtaining all necessary permits from the Town of Avon as required.
Exact limits and offset of relocations will be determined by the utility owner based on project design requirements. Work will be performed prior to start of construction project.
33 | P a g e
GENERAL:
The Contractor shall comply with Article 1.5 of Title 9, CRS ("Excavation Requirements") when excavating or grading is planned in the area of underground utility facilities. The Contractor shall notify all affected utilities at least two (2) business days, not including the actual day of notice, prior to commencing such operations. The Contractor shall contact the Utility Notification Center of Colorado (UNCC) at phone no. 811 or 1-800-922-1987, to have locations of UNCC registered lines marked by member companies. All other underground facilities shall be located by contacting the respective owner. Utility service laterals shall also be located prior to beginning excavation or grading.
Utilities are depicted on these plans in accordance with their achieved “Quality Levels” as defined in the American Society of Civil Engineer’s document ASCE 38, “Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data.” The Contractor’s attention is directed to subsection 105.11 of the Standard Specifications concerning utilities.
The location of utility facilities as shown on the plan and profile sheets, and herein described, were obtained from the best available information.
All costs incidental to the foregoing requirements will not be paid for separately but shall be included in the work.
34 | P a g e
FORCE ACCOUNT ITEMS
DESCRIPTION
This special provision contains the Department's estimate for force account items included in the Contract. The estimated amounts marked with an asterisk will be added to the total bid to determine the amount of the performance and payment bonds. Force Account work shall be performed as directed by the Engineer.
BASIS OF PAYMENT
Payment will be made in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .