260424 - Forest Hills Nature Center - Bid set - Civil.pdf

PDF 1 MB Posted

Attached to
Forest Hill Nature Center - New Building
Solicitation number
RFP GIR 260000001926 5
Issued by
Ingham County, Huntington Woods City, Michigan

About this file

This is a civil engineering bid set document for the Forest Hills Nature Center New Building project located at 1297 N Rich Road in Alma, Michigan 48801, within Seville Township, Gratiot County. The document contains detailed technical specifications and construction drawings for the facility's mechanical and civil infrastructure systems. Key project components include a duplex sump pump station with redundant high water alarms and alternating pump operation controls, a septic tank system designed per AASHTO 17th Edition and ASTM specifications with H-25 loading capacity, a drain field with 40-foot width, sanitary cleanout details, and a rock riprap dissipator. The specifications require Schedule 80 PVC pipe with tracer wire and warning tape for force mains, perforated HDPE N12 pipe for cooling tower drainage, 5000 PSI concrete reinforcement per ASTM standards, and KOR-N-SEAL sealant. All technical drawings are provided at various scales with detailed elevation and dimension specifications for proper installation and operation.

The document specifies that contractors are responsible for providing and installing all control systems necessary to meet the sequence of operations for the pump station, which includes five operational levels triggered by water level alarms. Pipe and fittings for inlets and outlets are noted as not included in the septic tank specifications. The septic tank and drain field design criteria are based on Mid-Michigan Health Department standards. Material specifications reference MDOT 6A standards and require adherence to manufacturer specifications for tie-downs and equipment installation. The project drawings are dated 24-0569 and prepared by Matrix, indicating this is a professional engineering design package for competitive bidding purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-4

GENERAL NOTES

1. PIPE/ FORCE MAIN - SCHEDULE 80 PVC WITH

TRACER WIRE AND WARNING TAPE.

2. COOLING TOWER DRAIN - PERFORATED HDPE

N12 PIPE.

EXISTING LEGEND

-4

F o re st

H il ls N a tu re C en te r N ew N a tu re C en te r N

R ic h R d A lm a

M I

S ev il le

T o w n sh ip , G ra ti o t

C o u n ty

A lm a , M ic h ig a n 4

M A

T R

I X

C-400

BASIN COVER

BASIN

NON-SLAM

(TYPICAL)

CHECK VALVE

2"

GATE VALVE

LEVEL 4: PUMP 2 (LAG)

'ON' HIGH WATER ALARM

2"-OUTLET AS

NOTED ON PLANS

LEVEL 5: REDUNDANT

HIGH WATER ALARM

GAS TIGHT COVER

EXISTING GRADE

BASIN (60"Øx112" DEEP)

DISCHARGE PIPE

PUMP CASE

VOLUTE

LEVEL 1: LOW WATER ALARM

NOTE:

WATER LEVEL MINIMUM 1'-6" ABOVE PUMP

CASE

PROVIDE TIE DOWNS PER THE

MANUFACTURER'S WRITTEN SPECIFICATIONS.

4' 6"

6" 1'-

6"

SUPPORT POLE

6'x6' CONCRETE PAD

#4 REBAR 8" O.C.

EACH DIRECTION

GATE VALVE

2"

3'- 9"

LEVEL 3: PUMP 1 'ON'

LEVEL 2: PUMPS 'OFF'

FF ELEV. = 815.27

2"

2' 6"

4" SAN

812.00

PUMP STATION SEQUENCE OF OPERATION:

- LEVEL 1 - LOW WATER ALARM

- LEVEL 2 - BOTH PUMPS 'OFF'

- LEVEL 3 - START LEAD PUMP; PUMPS SHALL

ALTERNATE ON EACH CALL

- LEVEL 4 - START LAG PUMP; BOTH PUMPS

RUNNING SIMULTANEOUSLY; HIGH WATER

ALARM

- LEVEL 5 - REDUNDANT HIGH WATER LEVEL

ALARM

*CONTRACTOR IS RESPONSIBLE FOR PROVIDING

AND INSTALLING ALL CONTROLS ON THE BUILDING

AS NEEDED TO MEET THE SEQUENCE OF

OPERATIONS.

LIFT STATION

4D

2.5D

1D

D FLOW

1D

8"

24"

PVC FEMALE CLEANOUT ADAPTER WITH

INVERTED NUT SCREW CAP OR FLAT SLOTTED

SCREW CAP

PVC PIPE

45° BEND

SEWER LATERAL

E.J.I.W. 1040 M3 MANHOLE FRAME LID

INSTALLED FLUSH WITH FINISHED SURFACE

EXISTING GRADE

CONCRETE COLLAR POURED AROUND

CLEANOUT COVER (3,500 PSI)

KOR-N-SEAL NO. S406-10 AWS*

6"x6" TWO-WAY TEE

SEWER LATERAL

45° BEND

SEWER

TOP ELEVATION

4"

6"6" 10'-8-1/2" 11'-8-1/2"

6'- 0-

1/4

PVC SCHEDULE

40 BY OTHERS

5'- 6-

1/2

11'-8-1/2"

4"

4"x24" OPENING

7K KOR-N-SEAL

FOR 4" PVC

TYP-(2) PLACES

24" ACCESS (ABOVE)

TYP-(2) PLACES

7'-2-1/2" 3'-6"

5"x1" KEYWAY

TYP-(3) SIDES

CAULK ALL AROUND

TYP- BOTH SIDES

4'- 0-

1/4

2'- 0"

6"

4'-

-1 /4"

7"

5'-6-1/2" 4'-6-1/2"6" 6"

56"

CASTING & ADJUSTMENT TO

FINISH GRADE NOT INCLUDED

NOTES:

SEPTIC TANK SECTIONS TO BE MANUFACTURED PER AASHTO 17TH ED. AND

ASTM SPECIFICATIONS W/H-25 LOADING AND 0.0' TO 3.0' OF EARTH COVER.

CONCRETE: 5000 PSI @ 28 DAYS

REINFORCEMENT PER ASTM A-615 & A-496

COVER TO BE SEALED W/1-1/2" EZ-STIK OR EQUAL

PIPE AND FITTINGS FOR INLETS & OUTLETS ARE NOT INCLUDED

4" I.E.=814.80

I.E.=814.90

RIM ELEV. = 818.40 RIM ELEV. = 818.20

6'x6' CONCRETE PAD

12" 12"6"

6" OVERFILL

4" PERF.

PVC, TYP. 5 MDOT 6A

DRAIN FIELD WIDTH - 40'

NOTE: SEPTIC TANK AND DRAINFIELD DETAILS AND DESIGN

CRITERIA BASED ON THE MID-MICHIGAN HEALTH DEPARTMENT

4' 3'

18"

C-800

-4

F o re st

H il ls N a tu re C en te r N ew N a tu re C en te r

N

R ic h R d

A lm a M

I

S ev il le

T o w n sh ip

, G ra ti o t C o u n ty

A lm a , M ic h ig a n 4

M A

T R

I X

2 ROCK RIPRAP DISSIPATOR

SCALE: NTS

3 DOUBLE SANITARY CLEANOUT DETAIL

SCALE: NTS1 SUMP PUMP DUPLEX DETAIL

SCALE: NTS

4 SEPTIC TANK DETAIL

SCALE: NTS

1 DRAIN FIELD SECTION VIEW

SCALE: NTS

24-0569 TOPO_PRELIMINARY-new-Layout1-Ttlb 30x42
C800-25034900-Layout1