24-43 Addendum 03 05-19-2026.pdf

PDF 4 MB Posted

Attached to
Forest Hill Nature Center - New Building
Solicitation number
RFP GIR 260000001926 5
Issued by
Ingham County, Huntington Woods City, Michigan

About this file

This file contains Addendum #3, a Bid Proposal Form, and a Questions & Answers document for a construction contract issued by Roger L. Donaldson, AIA P.L.C. on behalf of the Gratiot-Isabella Residential Educational Service District (RESD) for the Forest Hills Nature Center new building project located at 11297 N. Rich Road, Alma, Michigan 48801. The project, designated as Project #24-43, involves construction of a new nature center with demolition of two existing structures and is divided into two phases: Phase 1 includes the new nature center and demolition of existing structures, while Phase 2 includes additional classrooms and hallway additions. Addendum #3 was issued on May 19, 2026, following Addendum #1 (May 13, 2026) and Addendum #2 (May 18, 2026), and includes modifications to door frame schedules, mechanical room fire dampers, electrical fixture specifications, smoke detector removals, fire alarm device replacements, and circuit designations for mechanical equipment. Bids are due on May 26, 2026, at 2:00 p.m. local time at the Gratiot-Isabella RESD office located at 1131 E. Center, Ithaca, Michigan 48847. The contractor must note receipt of all addenda on the proposal form, and failure to do so may result in bid disqualification. The project is anticipated to begin in August 2026 and is expected to take 12 to 18 months depending on product delivery schedules, with the contractor having 24-hour access to the site.

The bid proposal requires separate pricing for Phase 1, Phase 2, and a combined Phase 1 & Phase 2 option, with pricing presented in both words and figures. Three alternates are available: Alternate #1 for asphalt shingles roofing, Alternate #2 for a geothermal system in lieu of propane and cooling tower, and Alternate #3 for a new well installation. The contractor is responsible for site control and coordination of all trades, with all costs included in the bid. A $10,000 allowance is required for asbestos testing and abatement, and a $40,000 allowance for water filter and water softener equipment and installation. The contractor must obtain temporary power from Consumers Energy and cover all associated costs, provide all bonds (100% Performance & Payment and 5% Bid Bond), and carry builders risk insurance. Change order work performed by the contractor's own forces includes a 5% markup for overhead and profit, while subcontracted work includes a 5% markup on the subcontract sum. The project is not subject to prevailing wage requirements and is not a "Buy America" project. No liquidated damages apply to this contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Member International Code Council U.S. Green Building Council

American Institute of Architects Association of Licensed Architects National Fire Protection Association National Frame Builders Association

Construction Specifications Institute National Council of Architectural Registration Boards

4787 Tartan Lane • Holt, Michigan 48842-1935

RogerAIA@comcast.net (517) 694-0011 email voice

D E S I G N I N G A B E T T E R F U T U R E

ROGER L. DONALDSON, AIA P.L.C.ROGER L. DONALDSON, AIA P.L.C.ROGER L. DONALDSON, AIA P.L.C.ROGER L. DONALDSON, AIA P.L.C.

ARCHITECTARCHITECTARCHITECTARCHITECT

ADDENDUM #3

PURPOSE:

This addendum is issued for the purpose of modifying and/or clarifying the original plans and specifications and shall take precedence over them. This addendum forms a part of the Contract Documents.

All work included herein shall be in accordance with the original plans and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.

This addendum is being submitted to the State of Michigan SIGMA website.

Receipt of this addendum shall be noted on the Proposal Form in the appropriate locations. Failure to note receipt of any addendum may disqualify the Bidder.

Note: Addendum items are consecutively numbers.

Addendum #1 issued May 13, 2026 Items 1-19

Addendum #2 issued May 18, 2026 Items 20-29

ITEMS INCLUDED WITH ADDENDA:

ADDENDUM #3 ................................................................................................... Issued 05/18/2026

SECTION 00 41 13 BID PROPOSAL FORM .............................................................. Reissued 05/19/2026

QUESTIONS & ANSWERS .............................................................................................. ISSUED 05/13/2026

DRAWING SHEET M-702 .................................................................................... REIssued 05/19/2026

DRAWING SHEET E-100 ..................................................................................... REIssued 05/19/2026

DRAWING SHEET E-500 ..................................................................................... REIssued 05/19/2026

DRAWING SHEET E-700 ..................................................................................... REIssued 05/19/2026

30. SHEET A4.2 ROOM FINISH SCHEDULE: Under Remarks, change reference to “Note #4” to “Note #3”.

31. SHEET A4.2 DOOR & FRAME SCHEUDLE: Change

a. Door 102 to Frame VIII.

b. Door 108A to Frame V.

c. Door 110 to Frame V.

d. Door 111A to Frame V.

e. Door 1112A to Frame V.

f. Door 201 to Frame VIII.

g. Door 202 to Frame VII.

h. Door 202A to Frame VII.

i. Door 203 to Frame VIII.

j. Door 204A to Frame V.

k. Door 207A to Frame V.

32. SHEET M-702 (SHEET RE-ISSUED):

a. Added a fire damper at 114-Mechanical room wall to Outside Air duct serving HP-4.

33. SHEET E-100 (SHEET RE-ISSUED):

a. Added equals fixture for fixture types “LH”, “LJ”, “LL”, “XA”, and “XB”.

b. Modified part number for fixture type “LJ” to provide a more budget friendly exterior fixture.

34. SHEET E-500 (SHEET RE-ISSUED):

a. Modified drawings to remove smoke detectors in Hall 124, Entry Hall 102, and Hall 202.

b. Modified drawings to add/remove various fire alarm devices.

c. Modified drawings to show circuit designation for mechanical equipment ERV-3.

d. Modified drawings to replace horn & strobe fire alarm devices for speaker & strobe fire alarm devices per code requirements.

35. SHEET E-700 (SHEET RE-ISSUED):

NEW NATURE CENTER

GRATIOT-ISABELLA RESD

FOREST HILLS NATURE CENTER

11297 N. RICH ROAD

ALMA, MICHIGAN 48801

ARCHITECTS PROJECT #24-43

Date: May 19, 2026

FOREST HILLS NATURE CENTER3 Project #24-43 d:\projects\clients\24\24-43\24-43 bidding\addendum 3\24-43 addendum 03.docx

4787 Tartan Lane • Holt, Michigan 48842-1935

RogerAIA@comcast.net (517) 694-0011 email voice

D E S I G N I N G A B E T T E R F U T U R E

ROGER L. DONALDSON, AIA P.L.C.ROGER L. DONALDSON, AIA P.L.C.ROGER L. DONALDSON, AIA P.L.C.ROGER L. DONALDSON, AIA P.L.C.

ARCHITECTARCHITECTARCHITECTARCHITECT

a. Modified drawings to show circuit designation for mechanical equipment GFU-1.

b. Modified drawings to show carbon monoxide detector in mechanical room.

END OF ADDENDUM #3

GRATIOT-ISABELLA RESD

NEW NATURE CENTER - FOREST HILLS NATURE CENTER

ROGER L DONALDSON, AIA P.L.C.

PROJECT #24-43 00 41 13 - 1

SECTION 00 41 13

BID PROPOSAL FORM

BIDDERS NAME: _________________________________________________________

LEGAL ADDRESS: _________________________________________________________

TELEPHONE NO.: _________________________________________________________

FACSIMILE NO.: _________________________________________________________

EMAIL ADDRESS: _________________________________________________________

CONTACT NAME: _________________________________________________________

CONTACT MOBILE PHONE _________________________________________________________

PROPOSAL FOR: ALL TRADES CONSTRUCTION WORK

PROJECT NAME: GRATIOT-ISABELLA RESD

NEW NATURE CENTER

ROGER L. DONALDSON, AIA P.L.C.

PROJECT #24-43 - FOREST HILLS NATURE CENTER

11297 N. RICH RD

ALMA, MICHIGAN 48801

PROPOSAL

In response to your invitation to bid, the undersigned submits the following offer to enter into a contract with you and extends this offer for 90 calendar days subsequent to the opening of bids. This offer has been prepared after our examination of the complete plans and specifications, together with their related documents, and our examination of the site and conditions surrounding the construction of the proposed work including the availability of materials, equipment and labor. Included in this offer are all costs necessary to complete the

ALL CONSTRUCTION WORK in accordance with the contract documents prepared by Roger L. Donaldson, AIA P.L.C. within the time set forth herein for the sum of:

Bids Due – May 26, 2026 - 2:00 pm pm local time

GRATIOT-ISABELLA RESD – 1131 E. CENTER, ITHACA, MI 48847

ADDENDUM SCHEDULE:

The above proposed bids and schedule includes the following addenda:

No. 1 dated No. 2 dated No. 3 dated

BID PROPOSALS:

Contractor shall submit a separate Proposal Number for all Trades for that Project Work is to be performed. Contractor is not required to submit a proposal for each project.

PROJECT #24-43 - NEW NATURE CENTER

FOREST HILLS NATURE CENTER - PHASE 1

Provide all work for New Nature Center and Demoltiono of 2 existing structures and related Work:

Dollars

(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)

The undersigned hereby agrees to complete the above buildings area work within calendar days.

PROJECT #24-43 - NEW NATURE CENTER

FOREST HILLS NATURE CENTER – PHASE 2

Provide all work for additional classrooms and hallway for New Nature Center and related Work:

Dollars

(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)

The undersigned hereby agrees to complete the above buildings area work within calendar days.

SECTION 00 41 13

BID PROPOSAL FORM

GRATIOT-ISABELLA RESD

NEW NATURE CENTER - FOREST HILLS NATURE CENTER

ROGER L DONALDSON, AIA P.L.C.

PROJECT #24-43 00 41 13- 2

PROJECT #24-43 - NEW NATURE CENTER

FOREST HILLS NATURE CENTER – COMBINED PHASE 1 & PHASE 2

Provide all work for New Nature Center and Demoltiono of 2 existing structures and related Work:

Dollars

(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)

The undersigned hereby agrees to complete the above buildings area work within calendar days.

Alternates

ALTERNATE #1 PROJECT #24-43 - NEW NATURE CENTER

ALTERNATE #1 – ASPHALT SHINGLES

Provide Asphalt Shingles, and related work as shown, (Add/Deduct ) $

Dollars

(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)

If awarded this Alternate the undersigned hereby agrees to complete the work within (additional / decreased) calendar days, ALTERNATE #2 PROJECT #24-43 - NEW NATURE CENTER

ALTERNATE #2 – GEOTHERMAL SYSTEM

Provide all work for providing a Design/Build Geothermal System instead of Propane & Cooling Tower

(Add/Deduct ) $

Dollars

(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)

If awarded this Alternate the undersigned hereby agrees to complete the work within (additional / decreased) calendar days, ALTERNATE #3 PROJECT #24-43 - NEW NATURE CENTER

ALTERNATE #3– NEW WELL

Provide alternate pricing for providing and installing a new well, pump, piping, pressure tank, and all associated accessories for the building.

(Add/Deduct ) $

Dollars

(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)

If awarded this Alternate the undersigned hereby agrees to complete the work within (additional / decreased) calendar days, FORFEITURE OF BID SECURITY

If within the 90 days this offer is valid, a letter is sent notifying the undersigned of the acceptance of this proposal, the undersigned agrees to deliver within the 10 succeeding days surety bonds in the form specified or will forfeit the enclosed certified or cashier's check or bid bond which accompanies this proposal.

FEE FOR CHANGES IN THE WORK

The undersigned hereby agrees to perform all additional changes in the work ordered by the Owner on the basis of reasonable expenditures, plus reasonable allowance of said cost for overhead and profit. Cost shall be limited to the following: Cost of materials, including sales tax and cost of delivery; cost of labor, including social security, old age and unemployment insurance and fringe benefits required by agreement or custom; workers' or workmen's compensation insurance; bond premiums; rental value of equipment and machinery; and the additional costs of supervision and field office personnel directly attributable to the change.

The undersigned hereby agrees to charge the following fees, based on a mark-up percentage of the actual cost for overhead and profit combined, as stated hereinafter:

- For all additional work performed by the contractor's own forces, a fee of 5% percent of the actual cost as defined above.

GRATIOT-ISABELLA RESD

NEW NATURE CENTER - FOREST HILLS NATURE CENTER

ROGER L DONALDSON, AIA P.L.C.

PROJECT #24-43 00 41 13- 3

- For all additional work subcontracted by the contractor, a fee of 5% percent of the subcontract sum for management, overhead and profit.

JOB CONTROL AND COORDINATION

If awarded the All Trades Construction Work Contract, the undersigned will assume control of the site and will coordinate the work of all the trades. All costs of controlling the site and coordinating the work of the subcontractors are included in this proposal.

SUBCONTRACTOR LISTING

The following is a list of the subcontractor(s) that will be performing work or manufacturer supplying material(s) on this project:

Excavation ___________________________________________

Building Structures ___________________________________________

Concrete ___________________________________________

Mechanical ___________________________________________

Plumbing ___________________________________________

Electrical ___________________________________________

Fire Alarm ___________________________________________

REGULATORY REQUIREMENTS

It is the Contractor's responsibility to confirm that all subcontractors are properly licensed and that all necessary permits are obtained before starting work.

The Owner reserves the right to reject any subcontractor not considered competent to prosecute the work. The Owner representative (s) may request the removal of any contracted person who is deemed unfit to perform the specified work in a competent and professional manner.

The site will be available for the contractor will have full access to the building, 24 hours a day..

The contractor will take every precaution to minimize the migration of dust and debris and to minimize noise where possible. The corridors will remain free of stored materials and debris during business hours. The Contractor will remove all debris created by this contract from the premises at the end of each workday.

If awarded this Contract, the undersigned agrees to commence work immediately upon receipt of Notice to Proceed.

In submitting this Proposal, it is understood that the right is reserved by the Owner to reject any and all Proposals.

The Owner reserves the right to accept or reject all alternates or to accept any one or more alternates without accepting those remaining.

TIME OF COMPLETION

1. Completion in general is defined as all work required and included in the Bid Documents, Specifications, Drawings, Federal and State Regulations, including clean-up, restoration, acceptable visual inspections, completion of change orders approved by the Owner, Architect and Contractor and do not add days to the construction calendar.

2. The Contractor agrees that by submitting a Bid, for base bid, to complete the project within the stipulated number of day to complete using regular and premium work hours as required to complete the project.

3. Contractor realizes he may need to work multiple shifts, weekends and holidays. Any premium wages are included in his Bid.

4. Days are noted as calendar days.

5. The Contractor has full access to the site during all hours.

SIGNATURE

The bidder declares the following legal status in submitting this proposal: (check one)

( ) A Corporation (INC or LLC) organized and existing under the laws of the state of Michigan, ( ) A Partnership, ( ) An Individual doing business as .

Respectfully submitted, By:

Title:

Date:

GRATIOT-ISABELLA RESD

NEW NATURE CENTER - FOREST HILLS NATURE CENTER

ROGER L DONALDSON, AIA P.L.C.

PROJECT #24-43 00 41 13- 4

Fed. Employer Identification No.:

State License No.:

END OF SECTION 00 41 13

GRATIOT-ISABELLA RESD

NEW NATURE CENTER - FOREST HILLS NATURE CENTER

ROGER L DONALDSON, AIA P.L.C.

PROJECT #24-43 00 41 13- 5

4787 Tartan Lane • Holt, Michigan 48842-1935

RogerAIA@comcast.net (517) 694-0011

RRRROGER OGER OGER OGER L.L.L.L. DDDDONALDSONONALDSONONALDSONONALDSON,,,, AIAAIAAIAAIA P.L.C.P.L.C.P.L.C.P.L.C.

AAAARCHITECTRCHITECTRCHITECTRCHITECT

Member International Code Council

American Institute of Architects Association of Licensed Architects

National Fire Protection Association National Frame Builders Association

Construction Specifications Institute National Council of Architectural Registration Boards

NEW NATURE CENTER

GRATIOT-ISABELLA RESD

FOREST HILL HATURE CENTER

11297 N. RICH ROAD

ALMA, MICHIGAN 48801

ARCHITECTS PROJECT #24-43

DATE: May 19, 2026

Questions & Answers

The following clarifications, modifications and/or revisions to the above project shall be considered a part of the original specifications:

1. What is the project Schedule Response: Plan on Starting by August. Project is likely a 12-18 month project depending on product delivery schedules.

2. Is this a “Buy America” project?

Response: No

3. Who will be responsible for contacting and payment for the power company to relocate the existing Power Pole(s)?

Response: Contractor or Electrical Contractor

4. Do you have a preference for a well drilling contractor, I assume this is by GC?

Response: Owner has used Trayers out of Vestaburg, but not mandatory to use them.

5. Are there any Liquidated Damages on the project?

Response: No

6. Builders Risk to be by Contractor or the owner?

Response: By Contractor

7. What are the requirements for temp power on the buildings Response: 240/120 volt, single phase, 100 amps to the granary building plus whatever power is required for new construction.

8. Has consumers energy been contacted for power removal/temp power?

Response: Not for temporary power

9. Is contractor to pay for temp power? If so, what are the past couple months of usage on buildings so they can be calculated into price?

Response: Yes

10. Is there an asbestos report or does contractor need to include report and allowance for abatement?

Response: Provide an $10,000 Allowance for the report and any abatements that is required.

11. To confirm only bonds on project are 100% Performance & Payment and 5% Bid Bond?

Response: Refer to Section 00 52 24 AIA A101- Exhibit A for insurance and bond requirements.

12. On the Forest Hills Nature Center the plans call for 84’7” trusses in 1 piece. Both of my truss suppliers I work with can’t/won’t make them or ship them. Wondering how you want me to approach that.

d:\projects\clients\24\24-43\24-43 bidding\addendum 1\24-43 question answer.docx

4787 Tartan Lane • Holt, Michigan 48842-1935

RogerAIA@comcast.net (517) 694-0011

RRRROGER OGER OGER OGER L.L.L.L. DDDDONALDSON ONALDSON ONALDSON ONALDSON AIAAIAAIAAIA PLCPLCPLCPLC

Response: We can accept 2-piece trusses, piggyback trusses may be used the top over 2x4 purlins as directed by the Truss Engineer.

13. The exterior walls call for 7/16 OSB with Rigid R5 insulation or zip. My zip options are R3.6 or R6.6. which would you prefer?

Response: Code minimum is R-5, so we need to use the R6.6.

14. I see in Specification Section 84200-Aluminum Glass Doors it appears Cross Aluminum is a sole supplier. Will any other Door Suppliers be considered as equal such as Specialite, Vale Doors, Kawneer, or Tubelite?

Response: Main Entrance Door to be Cross, Kawneer, Tubelite, SpecialLite or Vale

15. Regarding the FRP Doors called out in the door schedule, I am not seeing a FRP Door specification. Will Specialite or Vale Doors be viable suppliers for the FRP Doors.

Response: Yes, Special Lite is basis of design, Spec to be issued with Addendum #1.

16. At Doors 118A and 201, a hollow metal door frame is called for. Shouldn’t these door frames be Aluminum, typical to the rest of the FRP Door /aluminum frames in the door schedule?

Response: FRP Door in AL frame.

17. Confirm requirements / responsibility for third party testing, commissioning, etc. Or if any scope will be owner direct.

Response: Contractor is responsible

18. Confirm whether Owner or Contractor carries geotechnical/testing agency costs, including SME observations, proofrolling, compaction testing, and special inspections.

Response: Owner has paid for test to date; Contractor will include cost for during construction

19. Clarify base-bid assumptions for unsuitable soils, undercutting, existing fill removal, proofrolling, engineered fill, and unit prices/allowances.

Response: See Section 00 31 32 - Geotechnical Data

20. Confirm all allowances to include in base bid, including testing, inspections, controls, signage, utility work, or owner-directed items.

Response: Contractor is responsible

21. Confirm responsibility for temporary utilities, temporary heat, snow removal, site access, staging, fencing, and site security.

Response: Contractor is responsible

22. Identify existing utilities to remain, be relocated, abandoned in place, or removed; provide a utility responsibility matrix.

Response: Utility is shown on the Site Civil sheets developed by KEBS, sheets 1 through 9

23. Confirm demolition scope for existing Nature Center and adjoining/northern storage or ancillary building, including foundations, slabs, utilities, septic, salvage, disposal, and restoration.

Response: Contractor to remove all and restore surfaces with grass seeding. Existing Septic field may be abandoned in place.

4787 Tartan Lane • Holt, Michigan 48842-1935

RogerAIA@comcast.net (517) 694-0011

RRRROGER OGER OGER OGER L.L.L.L. DDDDONALDSON ONALDSON ONALDSON ONALDSON AIAAIAAIAAIA PLCPLCPLCPLC

24. Confirm whether hazardous material testing has been completed. Age and condition of existing buildings and infrastructure isn't clear from documents included.

Response: No testing has been completed. Provide an $10,000 Allowance for the report and any abatements that is required.

25. Clarify asphalt shingle alternate scope, including underlayment, ice/water shield, flashing, gutters, fascia/trim, snow guards, roof penetrations, warranty, and structural/loading changes.

Response: See Section 07 31 13 Asphalt Shingles.

26. Clarify propane provider scope and cost responsibility, including tank lease/purchase, pad/protection, trenching/backfill, regulator, piping limits, coordination, startup, and initial fuel fill.

Response: The propane provider shall provide and install the propane tank, regaulator, piping, and all associated accessories between the tank and regulator. Tank to be filled full.

27. Confirm well provider scope and cost responsibility, including pressure tank, piping/accessories between well and pressure tank, controls, power, startup, and where plumbing scope begins.

Response: The well drilling contractor is responsible for extending a new 2” water line from the existing well to the new building. The contractor is responsible for providing and installing the piping, pressure tank, and all associated accessories. Plumbing contractors scope starts after the pressure tank.

See Addedum #1, Note added to Sheet C-400

28. Confirm water filter and water softener basis of design and whether an addendum will be issued before bid; if not, provide required allowance.

Response: Provide $40,000 allowance for equipment and labor to install water filter and water softener.

29. Confirm Owner vs Contractor responsibility for access control software, credentials, programming, cloud/subscription fees, commissioning, and training.

Response: Contractor to furnish and install all equipment, wiring, and conduit and to coordinate integration into the RESD's existing multi-building system. New software for this building, commissioning and training are to be provided by the contractor. Coordinate programming with owner. All costs associated with this project are to be included in the bid.

30. Can you please specify the window materials, or is there a desired manufacturer Response: Anderson “A” Series, Spec to be issued with Addendum #1.

31. Can you please specify the desired fence around the electrical equipment.

Response: See KEBS Drawings, Sheet 9, “TYPICAL WOOD SCREEN FENCE ELEVATION”

32. Will there be a landscaping plan, or should we include an allowance?

Response: By Owner

33. Is there a spec for the exterior signage, or is this owner provided?

Response: By Owner

34. Is this a prevailing wage project?

Response: No

35. The wood door veneer sates cut red oak, but this cut is not available in red oak. Only plain sliced is available for this door is that acceptable?

Response: Yes, plain sliced is acceptable

36. Door 118A - Reads FRP to HM but is an AL callout on drawing, Please Confirm the correct door type.

Response: FRP Door in AL frame.

4787 Tartan Lane • Holt, Michigan 48842-1935

RogerAIA@comcast.net (517) 694-0011

RRRROGER OGER OGER OGER L.L.L.L. DDDDONALDSON ONALDSON ONALDSON ONALDSON AIAAIAAIAAIA PLCPLCPLCPLC

37. Door 201 - Reads FRP to HM but is an AL callout on drawing. Please Confirm the correct door type.

Response: FRP Door in AL frame.

38. Door113 shows 1 hour rating but that is actually 114. Please confirm which door is fire rated.

Response: Yes, Door 113 should be 1 hour rated.

39. What finish level of concrete polishing is required.

Response: Class B “salt & pepper”, Level 3 (gloss) finish, Spec to be issued with Addendum #1.

40. Will the ductwork (spiral) be painted?

Response: No, exposed

41. Will the T&G need to be stained and finished?

Response: Yes

42. Will the exposed trusses need and stain and finish?

Response: Yes

43. What will be the finish on the FRP doors?

Response: FRP Doors are prefinished

44. Door #118A and 201 – Frames and door slab styles do not match.

Response: FRP Doors in AL frames

45. We would like to know if there is a spec for 27 0000 or bid category or if the owner installs this.We need clarification on the key notes for Print E-500.

Response: Keyynotes #9, 10 addeed, Sheet E-500 Reisssued with Addendum #1.

46. I can’t find the thickness of the Tectum ceiling panels, can you please provide that information?

Response: Tectum Pinacle Panels are standard 1” Thick.

Issued with Addendum #3:

47. Are the Tectum panels natural and getting painted or are they factory white? Are the panels square edge or beveled?

Response: The Tectum Finale PB panels come standard with beveled edges and have 26 available colors to select from..

48. What is the Occupany Type and Number for the project.

Response: Occupancy Type: E-Educational, Combined Phase 1 and 2 Occupancy of 250.

49. Specs reference Fire suppression.

Response: No Fire Suppression is required.

50. A1.1 references section 6/A3.3. This detail does not exist on sheet A3.3.

Response: Section 6/A3.3 is shown on Sheet A3.2.

51. A1.1 references section 5/A3.1, but no detail exist Response: Section 5/A3.1 is shown on Sheet 3.2, Detail 5/A3.2

52. Addendum sheet A3.3 shows a blow-up on the outside wall, but not detail is referenced Response: Typical Exterior wall, Detail 1/A5.1

53. Is there a detail for the canopy columns

4787 Tartan Lane • Holt, Michigan 48842-1935

RogerAIA@comcast.net (517) 694-0011

RRRROGER OGER OGER OGER L.L.L.L. DDDDONALDSON ONALDSON ONALDSON ONALDSON AIAAIAAIAAIA PLCPLCPLCPLC

Response: Not show, basic 8” Concrete Masonry base with stone veneer finish and limestone cap. Steel Column to extend to top of Concrete Foundation Pier.

54. Frame elevation IX – Does not match the building elevations Response: Elevation does not show the perimeter frame that is shown on Elevation IX.

55. FrIs the clerestory opening shown on A2.1 West Elevation to be storefront?

Response: Windows to match the fixed windows below, Anderson Series “A” Stationary or equal.

EG-1 400

20"x10" ---

EG-1 400

20"x10" ---

RG-1 325

22"x10" ---

RG-1 325

22"x10" ---

RG-1 325

22"x10" ---

EG-1 400

20"x10" ---

STORAGE

CLOSET

STORAGE

CLOSET

CLOSET

STORAGE

HALL

EA

EA EA

14" Ø

10"x8"

10"x8"

(ATTIC)

10"x8"

OA

SA

OA

10"x10" (ATTIC)14"x12"

(ATTIC)

EAEA

10"x8" 20"x16"EA UP TO RLH-1

SD-1 50

6"Ø ---

HP-5HP-6

HP-7

8"x6"

SD-1 150

8"Ø TYP. 3

12"x12"

(ATTIC)

16"x12"

(ATTIC)

14"x10"

(ATTIC)

12"x8" OA DN 12"x8" OA DN

12"x8" OA DN 20" Ø 20" Ø

20"x16" OA

UP TO IAH-1

OA

SA

18"x12"

(ATTIC)

10"x10"

(ATTIC)

ERV-1

(2150 CFM)

SA

SA

SA

OA

14" Ø

14" Ø

EG-1 250

12"x10" ---

EG-1 100

6"x6" ---

14"x10"

(ATTIC)

14"x12"

16"x10" RA DN

16"x10" RA DN 16"x10" RA DN

8" Ø

8" Ø 10"x10"

(ATTIC)

6"x6" (ATTIC) 6"x6"

(ATTIC)

12"x8"

(ATTIC)

12"x8"

(ATTIC)

14"x12"

(ATTIC)

16" Ø

14"x12"

10"x10"

(ATTIC)

6"x6"

18"x18" SA DN 18"x18" SA DN

8"x8"

(ATTIC)

18"x18" SA DN

HVAC KEY NOTES

INSTALL INTAKE/RELIEF AIR HOOD AND ASSOCIATED CURB ON

ROOF AT LOCATION SHOWN. INTAKE AIR HOOD SHALL BE

INSTALLED AT LEAST 10' AWAY FROM BUILDING AND PLUMBING

EXHAUST/VENT TERMINATIONS.

INSTALL ENERGY RECOVERY VENTILATOR IN ATTIC AT LOCATION

SHOWN. ASSOCIATED OUTSIDE AIR AND EXHAUST DUCTWORK

SHALL BE INSULATED AND ROUTED THROUGH THE ATTIC FROM

THE ENERGY RECOVERY VENTILATOR TO THE ASSOCIATED

EXHAUST GRILL/HEAT PUMP. COORDINATE THE INSTALLATION

ATTIC ACCESS WITH GENERAL TRADES CONTRACTOR PRIOR TO

CONSTRUCTION. COORDINATE THE UNIT SIZE AND CLEARANCES

WITH THE GENERAL TRADES CONTRACTOR PRIOR TO THE

TRUSSES BEING ORDERED TO CONFIRM THERE IS ADEQUATE

SPACE AND SUPPORT FOR THE UNIT WITHIN THE TRUSS WEBBING.

INSTALL WATER SOURCE HEAT PUMP AT LOCATION SHOWN. LINE

THE FIRST 10' OF SUPPLY AND RETURN DUCTWORK. PROVIDE AND

INSTALL UNIT ON 3' TALL CUSTOM SUPPORT STAND BUILT OUT OF

1-1/2"x1-1/2" ANGLE IRON WELDED TOGETHER. SUPPORT STAND

SHALL NOT INTERFERE WITH UNIT ACCESS OR DUCT/PIPE

CONNECTIONS.

INSTALL WATER SOURCE HEAT PUMP ON 4" CONCRETE PAD AT

LOCATION SHOWN. LINE THE FIRST 10' OF SUPPLY AND RETURN

DUCTWORK.

INSTALL ENERGY RECOVERY VENTILATOR AT LOCATION SHOWN IN

ATTIC. MOUNT TO EXTERIOR WALL

GENERAL NOTES

1. ALL ASSOCIATED ENERGY RECOVERY VENTILATION

DUCTWORK SHALL BE INSULATED.

RA

ERV-2

(850 CFM)

HP-2

EG-1 700

24"x14" ---

RG-1 2350

40"x20" ---

STORAGE

MECHANICAL

EA

OA

HP-3

HP-1

16"x10"

10"x10"

(ATTIC)

L-1 L-2

16"x10"

10"x10"

14"x8" OA DN

14"x8" OA DN14"x8" OA DNOA

SA

18" Ø 18" Ø

20"x14" RA DN20"x14" RA DN

16"x12" RA DN 14"x8"

16"x12"

16"x10" EA

16"x10" EA

& OA DN

16"x10" EA

& OA DN

18"x18" SA DN

18"x18" SA DN

22"x16" RA

EG-1 150

12"x10" ---

-4

F o re st H il ls

N a tu re C en te r N ew N a tu re C en te r

N

R ic h R d

A lm a

M I

S ev il le T o w n sh ip

G ra ti o t C o u n ty

A lm a M ic h ig a n

M A

T R

I X

M-702

1 HVAC ENLARGEMENT - 124 HALL

SCALE: 1/4" = 1'-0"

0 1 5 10

2 HVAC ENLARGEMENT - 110 MECHANICAL

SCALE: 1/4" = 1'-0"

0 1 5 10

FCPS

V

M C

VI

AV

B

C

DC

M

B

KP

SSCP

CR

SS

AS

TS

G

NCC

M P

E

A L B1 B2

S

SRS

X

X

X

CB

EMERGENCY PUSH STATION

CODE BLUE STATION

TVSS

VFD

TRANSIENT VOLTAGE SURGE SUPPRESSION

VARIABLE FREQUENCY DRIVE

GLASS BREAK

DS

DUPLEX RECEPTACLE

TEACHER STATION

ADMINISTRATION STATION

STUDENT STATION

CARD READER

CO CARBON MONOXIDE DETECTOR

H

DOCK LIGHT FIXTURE

CONTROL MODULE

S

TELEPHONE / DATA OUTLET

DUTY STATION

STAFF STATION

STAFF REGISTER STATION

DOME LIGHT

DUAL BED STATION

SINGLE BED STATION

BED / LIGHT INTERFACE

PENDENT INTERFACE

EMERGENCY PULL STATION

MASTER STATION

NURSE CALL CONTROLLER

NURSE CALL

ADDENDUM NOTE

PLAN NOTE

DEMOLITION NOTE

THREE PHASE MOTOR

BELL

AUDIO / VIDEO INPUT

VIDEO INPUT

WALL MOUNTED SPEAKER / CLOCK COMBO

WALL MOUNTED SPEAKERS

DUAL FACE CLOCK

CCTV CONTROL PANELCCTV

SECURITY SYSTEM CONTROL PANEL

KEY PAD

BEAM DETECTOR

MOTION DETECTOR

DOOR CONTACT

CAMERA

MONITOR MODULE

FIRE CONTROL POWER SUPPLY

VISUAL ONLY UNIT

ELECTRICAL SYMBOLS LEGEND

DH

V

S

C

M

I

J

SINGLE RECEPTACLE (120 VOLT)

EMERGENCY RECEPTACLE

DOUBLE DUPLEX RECEPTACLE

SINGLE FACE CLOCK

FLUSH FLOOR BOX

SURFACE FLOOR BOX

SPECIAL EQUIPMENT RECEPTACLE

TELEPHONE OUTLET

DATA OUTLET

POWER POLE

JUNCTION BOX

WALL JUNCTION BOX

PULL (JUNCTION) BOX

UNDERFLOOR JUNCTION BOX

OUTLETS

LIGHT FIXTURE

STRIP FIXTURE

IN-GRADE LIGHT FIXTURE

SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)

WALL MOUNT LIGHT FIXTURE

CEILING LIGHT FIXTURE

TRACK & FIXTURE

STREET TYPE POLE FIXTURE

POLE MOUNTED LIGHT FIXTURE

EXTERIOR WALL MOUNT LIGHT FIXTURE

WALLPACK LIGHT FIXTURE

SPECIAL PURPOSE LIGHT FIXTURE

HIGH BAY LIGHT FIXTURE

EMERGENCY EGRESS LIGHT FIXTURE

(number of heads shown)

EMERGENCY LIGHT FIXTURE

FIXTURES

SWITCHES

SINGLE-POLE SWITCH

DIMMER SWITCH

TIME SWITCH

KEY SWITCH

MANUAL MOTOR SWITCH

THERMAL OVERLOAD SWITCH

SWITCH WITH PILOT LIGHT

FOUR-WAY SWITCH

THREE-WAY SWITCH

CIRCUITRY and RACEWAYS

UNDERFLOOR DUCT

BUS DUCT

PLUGMOLD AS SPECIFIED

WIREMOLD AS SPECIFIED

FLEXIBLE PIGTAILS/CONNECTIONS

"CONDUIT RUN CONTINUES" INDICATION

END OF CONDUIT RUN, CAP AND STAKE

END OF CONDUIT RUN

HOME RUN (with circuit numbers)

CONDUIT STUB DOWN

CONDUIT STUB UP

CONDUIT INSTALLED

CONDUIT INSTALLED

MECHANICAL

ELECTRIC WATER HEATER

ELECTRIC UNIT HEATER

PIPE TRACE HEATER

RESISTANCE HEATER, KW SHOWN

SINGLE PHASE MOTOR

SOUND and SIGNAL

INTERCOM OUTLET

MICROPHONE OUTLET

TELEVISION OUTLET

CHIME

BUZZER

VOLUME CONTROL

SPEAKER

SERVICE and EQUIPMENT

THERMOSTAT

CAPACITOR

ENCLOSED CIRCUIT BREAKER

TRANSFER SWITCH

WIREWAY

GROUND CONNECTION PER N.E.C.

TELEPHONE TERMINAL BOARD

GENERATOR, KW SHOWN

CURRENT TRANSFORMERS

UTILITY METER, AS REQUIRED

WEATHERHEAD

PANELBOARD, FLUSH MOUNTED

PANELBOARD, SURFACE MOUNTED

COMB. STARTER

MAGNETIC STARTER

FUSED DISCONNECT SWITCH

TRANSFORMER

CONTROL

xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt

LIGHTING CONTACTOR

CONTROL TRANSFORMER

buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)

PHOTOCELL (voltage as required)

HUMIDISTAT

FIRE ALARM

TAMPER SWITCH (furnished by FP/C) FLOW SWITCH (furnished by FP/C)

FIREFIGHTER COMMUNICATION JACK

MAGNETIC DOOR HOLDER

REMOTE INDICATING LIGHT, CLG. MTD.

REMOTE INDICATING LIGHT, WALL MTD.

END OF LINE DEVICE

ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

PULL STATION

SPEAKER & LIGHT

SPEAKER

HORN

DUCT SMOKE DETECTOR

HEAT DETECTOR

SMOKE DETECTOR

HORN & LIGHT

DESIGNATIONS

(by E.C.)

(by others)

TT

FACP

ANN

EOL

G

WW

PC

CT

TS

T

H

TC

IC

F

FC

F

T

1,3

OR

PM

WM

BD

UFD

B

F S

J

J

D

WH

PP

J

SWITCH STYLE OCCUPANCY SENSOROC

DIGITAL TIME SWITCH

POWER PACK

DUAL TECHNOLOGY SENSOR - 360° - 500 SQ FT

DUAL TECHNOLOGY SENSOR - 360° - 1000 SQ FT

ULTRASONIC SENSOR - 360° - 2 CIRCUIT

OCCUPANCY SENSOR / PHOTOCELL

WALL MOUNT DUAL TECHNOLOGY SENSOR

OS5

OS4

T

OS2

OS3

OS1

PP

DUCT SMOKE DETECTORF/S

CEILING MOUNTED WIFI

DIGITAL EQUIPMENT METER, AS REQUIRED

POLE

PUMP

PANEL

P

PNL

PVC

PRV-

P-

PB

POLY VINYL CLORIDE

POWER ROOF VENTILATOR

PULL BOX

GENERAL CONTRACTOR

GROUND

HUMIDIFIERH-

GND

GFI

GC

GROUND FAULT INTERRUPTER

ABBREVIATIONS LEGEND

POWER

SWITCH

RECEPT

SF-

SWBD

TCC

SPEC

SW

RGC

RTU-

PWR

VOLTS

WATTS

UF

V

W

UL

VL

UNO

UH-

TS

TYP

TR

ROOF TOP UNIT

RECEPTACLE

SWITCHBOARD

UNDER FLOOR

SPECIFICATIONS

RIGID GALVANIZED STEEL CONDUIT

UNLESS NOTED OTHERWISE

UNDERWRITERS' LABORATORIES, INC.

TAMPER PROOF RECEPTACLE

TAMPER PROOF SWITCH

TEMPERATURE CONTROL CONTRACTOR

VERIFY LOCATION WITH OWNER

TYPICAL

UNIT HEATER

SUPPLY FAN

WITH

WITHOUT

W/

XFMR

W/O

WP

TRANSFORMER

WEATHER PROOF

HOUR

LIGHT

JUNCTION BOX

LIGHT CONTROL

ISOLATED GROUND

HORSEPOWER

MINIMUM

MOUNT

MAKE-UP AIR UNIT

MOTOR CONTROL CENTER

MAIN LUG ONLY

MOUNTED

MOUNTING

MAXIMUM

LIGHTING

LT FLEX

MTD

MUAU-

MTG

MLO

MIN

MT

MC

MAX

MCC

LTG

IG

LC

LT

IMC

JB

HR

HVAC

HOA

HP

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

NIGHT LIGHTNL

NTS

NO

NIC

NC

HAND-OFF-AUTO SELECTOR SWITCH

HEATING/VENTILATING/AIR CONDITIONING

INTERMEDIATE METAL CONDUIT

LIQUID TIGHT FLEXIBLE METAL CONDUIT

MECHANICAL CONTRACTOR

HID HIGH INTENSITY DISCHARGE

A

AC

AFF

ACU-

AHJ

AHU-

AS

B-

BC

AIC

ATS

BLDG

CHLR-

CND (C)

CKT BKR

CKT

CUH-

CU-

DISC

DFU-

EF-

EC

DWH-

EBB-

DWG

CT-

EXIST./EX.

EWC

FLEX

FLA

FLR

FSES

FLUOR

EMT

ABOVE FINISHED FLOOR

AIR CONDITIONING UNIT

AMPS

ABOVE COUNTER

AIR HANDLING UNIT

AUTOMATIC TRANSFER SWITCH

AMPS INTERRUPTING CAPACITY

AUTHORITY HAVING JURISDICTION

ABOVE SHELF

BOILER

BUILDING

BELOW COUNTER

CHILLER

DOMESTIC WATER HEATER

CABINET UNIT HEATER

CIRCUIT

CIRCUIT BREAKER

CONDUIT

CONDENSING UNIT

COOLING TOWER

DUCT FURNACE

DRAWING

DISCONNECT

FOOD SERVICE EQUIP. SUPPLIER

ELECTRIC WATER COOLER

ELECTRICAL CONTRACTOR

ELECTRIC BASEBOARD

ELECTRICAL METALLIC TUBING

EXISTING

EXHAUST FAN

FLOOR

FLUORESCENT

FLEXIBLE CONDUIT

FULL LOAD AMPS

EM EMERGENCY

F/S FIRE/SMOKE

FU- FURNACE

4' SURFACE MOUNTED LINEAR FIXTURE.

FIXTURE

MOUNTING

HEIGHT

LIGHT ENGINEDESCRIPTION AND COMMENTSTYPE MANUFACTURER CATALOG NO.

LIGHTING FIXTURE SCHEDULE

LITHONIA

ELITE

OR EQUAL

CSS-L48-ALO3-MVOLT-MIN10-ZT-40K-80CRI

OEC4-LED-3000L/4000L/5000L-DIM10-MVOLT-25K/40K/50K-85

SL2L-XXFT-FLP-80CRI-40K-400LMF-MIN1-MVOLT-NLTAIR2-API

EV1D-A-HE-840-XX-G1-U-FSD-1-W

LDN6-40/10-LO6-MVOLT-GZ1

6DR-L10-8-40-DIM-UNV-O-M-CS

LITHONIA

H.E. WILLIAMS

OR EQUAL

LG

LD

LA

RECESSED LINEAR FIXTURE WITH INTEGRATED OCCUPANCY SENSORS. COORDINATE

FIXTURE RUN LENGTH WITH FLOORPLAN.

6" LED DOWNLIGHT

SURFACE

MOUNTED

3000 LUMENS

25W, 4000K

LED

RECCESSED

1000 LUMENS

9W, 4000K

LED

RECESSED

DIMMING INFO

S2PID-XXFT-MSL8-80CRI-40K-400LMF-I80CRI-140K-I300LMF-MIN1

-FLL-MVOLT-NLTAIR2-APIR-SAPIR

EX2DI-A-HE-840-840-XX-ACXJB-U-OL5-1-W-SNSLM

SUSPENDED LINEAR FIXTURE WITH DIRECT/INDIRECT LIGHTING AND INTEGRATED

SENSORS. COORDINATE FIXTURE RUN LENGTH WITH FLOORPLAN. PROVIDE REQUIRED

SUSPENSION MOUNTING HARDWARE.

700LUMENS/FT

5.1W/FT, 4000K

LED

LC 8'-6" AFF0-10V

400LUMENS/FT

3.14W/FT, 4000K

LED

0-10V

0-10V

4' SURFACE MOUNTED LINEAR FIXTURE WITH 10W EMERGENCY BATTERY PACK.

LITHONIA

ELITE

OR EQUAL

CSS-L48-ALO3-MVOLT-MIN10-ZT-40K-80CRI-E10W

OEC4-LED-3000L/4000L/5000L-DIM10-MVOLT-25K/40K/50K-85-

O-EMG-LED

LAEM SURFACE

MOUNTED

3000 LUMENS

25W, 4000K

LED

S2PID-XXFT-MSL4-80CRI-40K-600LMF-I80CRI-I40K-I300LMF-MIN1

-FLL-MVOLT-1E10WLCP-NLTAIR2-APIR-SAPIR

EX2DI-A-HE-840HO-840-XX-ACXJB-U-OL5-1-W-FSB-SNSLM

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

LBEM

4' SUSPENDED LINEAR FIXTURE WITH DIRECT/INDIRECT LIGHTING, INTEGRATED

SENSORS, AND 10W EMERGENCY BATTERY PACK. PROVIDE REQUIRED SUSPENSION

MOUNTING HARDWARE.

0-10V

900LUMENS/FT

6.6W/FT, 4000K

LED

S2PID-XXFT-MSL4-80CRI-40K-400LMF-I80CRI-140K-I300LMF-MIN1

-FLL-MVOLT-1E10WLCP-NLTAIR2-APIR-SAPIR

EX2DI-A-HE-840-840-XX-ACXJB-U-OL5-1-W-FSB-SNSLM

4' SUSPENDED LINEAR FIXTURE WITH DIRECT/INDIRECT LIGHTING, INTEGRATED SENSORS

AND 10W EMERGENCY BATTERY PACK. PROVIDE REQUIRED SUSPENSION MOUNTING

HARDWARE.

700LUMENS/FT

5.1W/FT, 4000K

LED

LCEM 8'-6" AFF0-10V

SL2L-XXFT-FLP-80CRI-40K-400LMF-MIN1-MVOLT-NLTAIR2-API

-1E10WLCP

EV1D-A-HE-840-XX-G1-U-FSD-1-W-FSB

LDEM

4' RECESSED LINEAR FIXTURE WITH INTEGRATED SENSORS AND 10W EMERGENCY

BATTERY PACK.

400LUMENS/FT

3.14W/FT, 4000K

LED

0-10V

LE

RECESSED 2X4 TROFFER WITH INTEGRATED SENSORS

3000 LUMENS

21W, 4000K

LED

0-10V

LATSM2-A-120-L07-40K-CR90-MFR

H2-L562S-4090-40D

LUMENPULSE

JESCO

OR EQUAL

LH

LED TRACK LIGHTING

700 LUMENS

7W, 4000K

LED

SURFACE0-10V

WHSPR-LCTR-2X4-80CRI-40K-3000LM-MIN1-MVOLT-SWC-

NLTAIR2-PIR

TR24-W-G9-U-OL2-1-W

RECCESSED

RECCESSED

REFER TO

FLOOR PLAN

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

S2PID-60FT-MSL8-80CRI-40K-600LMF-I80CRI-I40K-I300LMF-MIN1

-FLL-MVOLT-NLTAIR2-APIR-SAPIR

EX2DI-A-HE-840HO-840-60-ACXJB-U-OL5-1-W-SNSLM

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

LB60

60' SUSPENDED LINEAR FIXTURE WITH DIRECT/INDIRECT LIGHTING AND INTEGRATED

SENSORS. PROVIDE REQUIRED SUSPENSION MOUNTING HARDWARE.

REFER TO

FLOOR PLAN0-10V

42000LUMENS

396W, 4000K

LED

VIAWETS-D-PYC-HLO-SW-90CRI-500LMF-27K-4FT-UNV-D1

EX3-WET-N-827-XX-BOR-S-U-FSD-1

LUMENWERX

PINNACLE

OR EQUAL

LI

SURFACE MOUNTED WET RATED FIXTURE

2000 LUMENS

23W, 2700K

LED

SURFACE0-10V

WDGE2-LED-P2-27K-80CRI-TFTM-MVOLT

HRM-1-T4TW-16L-27K8-UNV-WM

LITHONIA

NLS

OR EQUAL

LJ

EXTERIOR WALLPACK. 2700K COLOR TEMPERATURE FOR OUTDOOR USE.

1847 LUMENS

19W, 2700K

LED

BUILDING

MOUNTED0-10V

LF

4' SURFACE MOUNTED LINEAR FIXTURE WITH INTEGRATED OCCUPANCY SENSORS.

600LUMENS/FT

4.7W/FT, 4000K

LED

0-10V

S2SD-LLP-XXFT-80CRI-40K-600LMF-SCT-MIN1-FLL-MVOLT-

NLTAIR2-APIR

EV1D-A-HE-840HO-XX-G1-U-FSD-1-W-FSB

SURFACE

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

LFEM

4' SURFACE MOUNTED LINEAR FIXTURE WITH INTEGRATED OCCUPANCY SENSORS AND

10W EMERGENCY BATTERY PACK.

0-10V

S2SD-LLP-XXFT-80CRI-40K-400LMF-SCT-MIN1-FLL-MVOLT-

E10WLCP-NLTAIR2-APIR

EV1D-A-HE-840HO-XX-G1-U-FSD-1-W-FSB

SURFACE

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

600LUMENS/FT

4.7W/FT, 4000K

LED

LQM-S-3-G-MVOLT-EL-HO

EXIT-G-EM-BLK-D

LITHONIA

H.E. WILLIAMS

OR EQUAL

XA

LED EXIT SIGN WITH BLACK FACE AND GREEN LETTERING

LEDUNIVERSAL0-10V

AIP AI PHONE

LEEM

RECESSED 2X4 TROFFER WITH INTEGRATED SENSORS AND 10W EMERGENCY BATTERY

PACK.

3000 LUMENS

21W, 4000K

LED

0-10V

WHSPR-LCTR-2X4-80CRI-40K-3000LM-MIN1-MVOLT-SWC-E10W

NLTAIR2-PIR

TR24-W-G9-U-OL2-1-FSB-W

RECCESSED

MARK ARCHITECTURAL

PINNACLE

OR EQUAL

ERE-GY-T-SQ-WP

BBXWSEHOB

LITHONIA

BEGHELLI

OR EQUAL

XB

LED BATTERY POWERED EXTERIOR EM LIGHTING

LEDUNIVERSAL0-10V

0-10V

0-10V

GENERAL ELECTRICAL NOTES:

1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST ACCEPTED EDITION OF THE NATIONAL

ELECTRICAL CODE, NEC, AND ALL STATE AND LOCAL CODES.

2. COORDINATE THE INSTALLATION OF ALL ELECTRICAL EQUIPMENT AND CONNECTIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND EQUIPMENT DRAWINGS.

3. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL ALL POWER, CONDUITS, CABLETRAY, AND OTHER COMPONENTS AS SHOWN ON THE EQUIPMENT PROVIDER DRAWINGS FOR INSTALLATION OF SYSTEM.

4. "BACK TO BACK" OR THROUGH THE WALL BOXES SHALL NOT BE USED.

5. INSTALL HANDLE LOCK-ON, ON ALL CIRCUIT BREAKERS CONTROLLING NIGHT LIGHT, EMERGENCY LIGHT AND EXIT

LIGHT CIRCUITS.

6. ALL RECEPTACLES SHALL BE HARD USE, SPECIFICATION GRADE.

7. PROVIDE TAMPER RESISTANT RECEPTACLES WHERE REQUIRED BY APPLICABLE CODES.

8. RECEPTACLES INDICATED AS GROUND FAULT CIRCUIT INTERRUPTER TYPE SHALL BE MOUNTED IN AN ACCESIBLE

LOCATION, PER CODE OR PROVIDED WITH A GFCI BREAKER.

9. ALL CONDUCTORS SHALL BE COPPER. ALUMINUM WIRES SHALL NOT BE USED.

10. MINIMUM CONDUIT SIZE SHALL BE 3/4" FOR POWER FEEDS AND 1" FOR DATA FEEDS.

11. FINAL CONNECTION TO ITEMS SUBJECT TO VIBRATION SHALL BE MADE WITH LIQUIDTIGHT FLEXIBLE METALLIC

CONDUIT.

12. 120/208VAC CIRCUIT WIRING FOR ANY ROOM OR AREA MAY BE GROUPED INTO RACEWAYS UNLESS SEPARATE RACEWAYS ARE REQUIRED BY THE NEC. COMPLY WITH NEC REQUIREMENTS FOR CONDUCTOR DERATING.

13. PROVIDE EQUIPMENT GROUNDING CONDUCTORS FOR ALL POWER AND LIGHTING CIRCUITS.

14. ALL LIGHTING AND POWER CONDUCTORS SHALL BE 12 AWG MINIMUM. ALL CONTROL CONDUCTORS SHALL BE

14 AWG MINIMUM OR AS SPECIFIED BY MANUFACTURER.

15. DEDICATED NEUTRAL SHALL BE PROVIDED FOR ALL CIRCUITS. SHARED NEUTRALS ARE NOT ALLOWED.

16. BASIS OF DESIGN IS FOR A COMPLETE ELECTRICAL SYSTEM, INSTALLED PER CODE REQUIREMENTS.

17. PROVIDE AN UNSWITCHED HOT TO ALL EMERGENCY BATTERY PACKS, LIGHTING INVERTERS AND EMERGENCY LIGHTING UNITS AHEAD OF AN LIGHTING CONTROLS FROM THE BRANCH CIRCUIT SERVING LIGHTING IN THE

SURROUNDING AREA.

18. ALL RECEPTACLES IN GARAGE AREA SHALL BE MOUNTED AT 48" AFF UNLESS OTHERWISE NOTED.

LL

LITHONIA

H.E. WILLIAMS

OR EQUAL

LDN6-27/10-LO6-MVOLT-GZ1

6DR-L10-8-27-DIM-UNV-R-M-0F-CS-CS-IP

6" WET RATED LED DOWNLIGHT. 2700K COLOR TEMPERATURE FOR OUTDOOR USE.

1000 LUMENS

9W, 2700K

LED

RECESSED0-10V

#2 4-

Fo re st H ill s N at ur e C en te r N ew N at ur e C en te r

N

R ic h Rd

, A lm a, M

I 4

Se vi lle

T ow ns hi p, G ra tio t C ou nt y

Al m a, M ic hi ga n

M A

T R

I X

E-100

Propane

CT

SE G

48" AFF

GFI

48" AFF

GFI

GFI J

CHANGING

STATION

GFI

EWC

EWC

F

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

WP

GFI

DRYER

48" AFF

GFI

48" AFF

GFI

GFI

HP-3

HP-2

HP-1

CT-1

18.2A-240V-1Ø

MAIN HALL

VESTIBULE

ENTRY HALL

STAFF

103OFFICE

OFFICE

LAUNDRY

TOILET

STORAGE

109 MECHANICAL

MEN

111 WOMEN

JANITOR

MECHANICAL

CLASSROOM

CLASSROOM

CLASSROOM

HALL

WP

GFI

F

GFI

WP

GFIGFI

GFI GFI

GFI

GFI

GFI

UTILITY

TRANSFORMER

MP1-6

MP1-6

MP1-6

MP1-7

MP1-7

MP1-7

MP1-7

MP1-8

MP1-8MP1-8

MP1-8

MP1-8

MP1-9MP1-10

MP1-10

MP1-10

MP1-11

MP1-11

MP1-12

MP1-12

MP1-12

MP1-12

MP1-13

MP1-14MP1-14MP1-14

MP1-14 MP1-14

MP1-15

MP1-16

MP1-14

MP1-17

MP1-17

MP1-18

MP1-18MP1-18

MP1-19MP1-19

MP1-22

MP1-22

MP1-23

MP1-23

MP1-24

MP1-24

MP1-24

MP1-25

MP-27,29

MP1-31

48" AFF

GFI

NEW

GENERATOR

HP-7

240V-1Ø, 14.3FLA

HP-5

240V-1Ø, 14.3FLA

HP-6

240V-1Ø, 14.3FLA

240V-1Ø, 29.4 FLA

240V-1Ø, 29.4 FLA

240V-1Ø, 17.5FLA

E-700

FENCE

PANEL MP2

240/120V-1Ø

MP2-3

UTILITY METER4

30A/2P N.F.

60A/2P N.F.

MDP-3MDP-4MDP-5

ERV-1

240V-1Ø, 20FLA

ERV-2

240V-1Ø, 6.6A

30A/2P N.F.

MDP-12

30A/2P N.F.

MDP-116

30A/2P N.F.

30A/2P N.F.

30A/2P N.F.

MDP-7MDP-8

MDP-9

J

J

J

J

MP1-26

MP1-28

MP1-30

MP1-32

J

J J

J

J

J

J

MP1-34

MP1-36

MP1-33

MP1-35

MP1-37 MP1-39

WP

GFI

MP2-5

J

J

WP

BATTERY CHARGER

8.3A-120V

BLOCK HEATER

20.8A-240V-1Ø

MP2-1

MP2-27

7 7

CR

CR

CR

CR

CR

CR

CR

CRCR

CR

CR

CR

CRCR

CR

CR CR

CRCR

CR

CR

AIP

MP1-38

F

FACP

S

F

F

F

F

F F

F F

F

CUH-1

240V-1Ø, 3kW

CUH-2

240V-1Ø, 3kW

MP1-41,43

MP1-40,42

CUH-3

240V-1Ø, 3kW

MP1-45,47

MP2-4

MP2-46

WP

GFI

MP1-22

MP1-24

WP

GFI

MP1-49 MP1-50

MP1-23

WP

GFI

MP1-10

GEN E-STOP

GFI

GP-1

240V-1Ø, 9FLA

GP-2

240V-1Ø, 9FLAMP2-8

MP2-7

HD

HD

CT9

MP1-51

WP

WP

48" AFF

GFI

V

WP

GFI

WP

GFI

WP

GFI HP-9

240V-1Ø, 14.3FLA

HP-8

240-1Ø, 14.3FLA

VESTIBULE

VESTIBULE

HALL

CLASSROOM

CLASSROOM

WP

GFI

MP1-20

MP1-21

MP1-22

MP1-22

MP1-22

MP1-23

MP1-23

MP1-18

MDP-10

MDP-14

30A/2P N.F.

30A/2P N.F.

CR

CR

CR

CR

CR

CR

F

F F

F

WP

GFI

MP1-23

ERV-3

240V-1Ø, 7.7 MCA

30A/2P

MDP-19

ELECTRICAL KEY NOTES - PHASE 1

CONTRACTOR SHALL INSTALL SPECIFIED RECEPTACLES ABOVE

DECORATIVE STONE WAINSCOT.

COORDINATE FINAL LOCATION WITH LOCAL UTILITY COMPANY.

(3) #10, (1) #10 GND, (1) 3/4" CND.

COORDINATE MOUNTING HEIGHT AND LOCATION WITH DECORATIVE STONE

WAINSCOT.

GENERAL RECEPTACLES SHALL BE SWITCHED WITH LIGHTING. REFER TO

RECEPTACLE CONTROL DETAILS. PROVIDE POWERPACKS PER BRANCH

CIRCUIT IN BREAKROOMS, OFFICES, AND CLASSROOMS AS REQUIRED.

(2) #8, (1)#10 GND. (1) 3/4" CND.

(2) #10, (1) #10 GND, (1) 3/4" CND.

VERIFY EQUIPMENT LOCATIONS WITH OWNER PRIOR TO INSTALLATION.

FLOOR PEDESTAL SERVICE FITTING WITH GFI RECEPTACLE. SEE SPEC

SECTION 262726 FOR FURTHER INFORMATION.

OWNER FURNISHED. COORDINATE INSTALLATION WITH ACTUAL PHONE

FURNISHER.

ELECTRICAL KEY NOTES - PHASE 2

GENERAL RECEPTACLES SHALL BE SWITCHED WITH LIGHTING. REFER TO

RECEPTACLE CONTROL DETAILS. PROVIDE POWERPACKS PER BRANCH

CIRCUIT IN BREAKROOMS, OFFICES, AND CLASSROOMS AS REQUIRED.

CONTRACTOR SHALL INSTALL SPECIFIED RECEPTACLES ABOVE

DECORATIVE STONE WAINSCOT.

(2) #10, (1) #10 GND, (1) 3/4" CND.

#2 4-

Fo re st H ill s N at ur e C en te r N ew N at ur e C en te r

N

R ic h Rd

, A lm a, M

I 4

Se vi lle

T ow ns hi p, G ra tio t C ou nt y

Al m a, M ic hi ga n

M A

T R

I X

E-500

N FLOOR PLAN - PHASE 1 - POWER NEW

SCALE: 1/8" = 1'-0"

0 1 5 10 20

N FLOOR PLAN - PHASE 2 - POWER NEW

SCALE: 1/8" = 1'-0"

0 1 5 10 20

GEN E-STOP

B-1 6A-120V

HP-4

240V-1Ø, 14.3FLA

GFI

GFI

MP1-18

MECHANICAL

PANEL MDP

240/120V, 1Ø

MDP

ATS

MP1-44

MP1-46

B-2 6A-120V

BOILER E-STOP

MDP-61

SE RATED

DISC

GENERATOR REMOTE

ANNUNCIATOR

PANEL MP1

240/120V, 1Ø

DWH-1

240V-1Ø, 4500W

MDP-13

30A/2P N.F.

30A/2P

GFI

GFU-1

P-4

1.5HP-240V-1Ø

P-3

1.5HP-240V-1Ø

P-1

2HP-240V-1Ø

P-2

2HP-240V-1Ø

MDP-15 MDP-16

MDP-18

MDP-17

GFIF

VFD

VFD

VFD

120V-1/2HP

H

MP1-48 3

CO

ELECTRICAL KEY NOTES

(2) #10, (1) #10 GND, (1) 3/4" CND.

COORDINATE ATTIC ACCESS WITH CONDUITS/DUCTWORK/PIPING TO AVOID

CONFLICTS WITH THE ATTIC ACCESS PANEL.

CONTRACTOR SHALL PROVIDE APPROVED FIRE STOPPING MATERIALS AT

ALL WALL PENETRATIONS OF MECHANICAL ROOMS.

#2 4-

Fo re st H ill s N at ur e C en te r N ew N at ur e C en te r

N

R ic h Rd

, A lm a, M

I 4

Se vi lle

T ow ns hi p, G ra tio t C ou nt y

Al m a, M ic hi ga n

M A

T R

I X

E-700

N

ENLARGED FLOOR PLAN

MECHANICAL ROOM

POWER1

E-700

SCALE: 1/4" = 1'-0"

0 1 5 10