260419 PROJ DESC.pdf
PDF 471 KB Posted
- Attached to
- Building 1005 and 1005F Painting Project
- Solicitation number
- N4008526R9035
About this file
This is a Statement of Work (SOW) for a comprehensive painting project at Building 1005 and auxiliary structure 1005F, located at Michael Road, Hadnot Point Industrial Area. The Contractor shall provide all plant, labor, materials, equipment, transportation, and supervision necessary to complete the painting work as specified in the project documentation.
The facility will remain operational throughout the entire construction period, requiring the Contractor to minimize interference with normal facility operations. The Contractor is responsible for moving furniture and other objects within rooms as needed to execute the work. Supervision requirements allow for a single qualified individual to serve concurrently as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualifications as defined in the project specification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| RFP 260419.pdf | ||
| Revised Contractor_Environmental_Guide.pdf | ||
| Combined DIV 01 DBB specs.pdf | ||
| 260419 SOW.pdf | ||
| 09 90 00 Painting and Coating Spec.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DESCRIPTION
This Statement of Work (SOW) defines the technical requirements for the execution of a comprehensive painting project for Building 1005 and its auxiliary structure, 1005F, located at Michael Road, Hadnot Point Industrial Area. The Contractor shall furnish all plant, labor, materials, equipment, transportation, and supervision necessary to prosecute and complete the work described herein.
SPECIAL SCHEDULING
The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity. The furniture and other objects in the room are to be moved by the contractor.
SUPERVISION
One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.
File details come from the government source that posted it. Updated .