Bay Arenac ISD Parking Lot Resurfacing - Addendum No. 2
This is Addendum No. 2 to the bidding and contract documents for the Bay Arenac Intermediate School District (BAISD) parking lot resurfacing project, prepared by TSSF Architects, Inc. The addendum addresses revisions to demolition sites, paving lines, incoming drive configurations, and specification sections. The project encompasses parking lot resurfacing work including asphalt removal, subbase preparation, and installation of new pavement. Key revisions in this addendum include adjustments to the demolition site and sheet A1.0 for paving line modifications to accommodate paving machinery, repositioning of the incoming drive at the top of the sheet, and additions to specification sections 00300 and 01001 to include a testing allowance and unit pricing provisions. The addendum clarifies that the project is to be bid under prevailing wage requirements for Michigan-funded projects rather than Davis-Bacon wage rates.
The contract includes a $25,000 contingency allowance for use upon architect/engineer instruction and a $10,000 testing allowance for independent testing and inspection services. Unit pricing is required for two scenarios involving unstable subbase conditions: removal and replacement of 24 inches of subbase with 21AA stone, and removal of 24 inches of subbase with installation of geogrid and 21AA stone, both priced per cubic yard. Prevailing wage rates are provided for multiple Michigan classifications including laborers, equipment operators, and skilled trades. The bid documents require submission of a schedule of values within 15 days of the Notice to Proceed, monthly payment requests, and a bid security of at least 5 percent of the total bid amount. Contractors must provide performance and payment bonds as specified, complete project record documents, and submit operation and maintenance data prior to final inspection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BAISD Parking Lot Specifications.pdf | ||
| 2604 BAISD Parking Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bay Arenac ISD Parking Resurfacing TSSF Architects, Inc.
122 N. Washington Ave.
Saginaw, Michigan Saginaw, MI 48607
ADDENDUM NO. 2
Date: March 26, 2026 TSSF Project # 2604
This addendum authorizes the following revisions to the plans and specifications for the above-named project and will be considered fully a part of said documents.
ARCHITECTURAL:
Item A1: Revised Demolition Site. – Adjusted demolition line and updates demolition Key Note
#2
Item A2: Revised Sheet A1.0 – Adjusting paving line for paving machines.
Item A3: Revised Sheet A1.0 – Adjusted plan to show incoming drive at the top of the sheet.
Item A4: Revised Spec Section 00300 – Added Testing Allowance, and added Unit Pricing
Item A5: Revised Spec Section 01001 – Added 1.7 Testing Allowance, and added 1.8 Unit
Pricing
Item A6: The project is to be bid as Prevailing Wage and not Davis-Bacon. Wage rates are attached.
ATTACHMENTS:
Wage Rates Drawings: A1.0, A1.1 Specifications: 00300, 01001
Prevailing Wage Rates for State Of Michigan Funded Projects Official Rate Schedule
Bay
Classification Name Last Updated
1.1 Laborer Common 10/28/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $41.46 $55.30 $69.14 Apprentice: Level 1 0-1000 hours $34.54 $44.92 $55.30 Apprentice: Level 2 1001-2000 Hours $35.92 $46.99 $58.06 Apprentice: Level 3 2001-3000 hours $36.98 $48.75 $60.51 Apprentice: Level 4 3001-4000 hours $40.08 $49.43 $61.32
Four 10-hour days allowed? - Yes Make Up Day Allowed? - Yes
November | 2025 Page 1 of 49
Bay
Classification Name Last Updated
3.1 Power Equip. Operator - Highway & Heavy 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $71.46 $94.57 $117.67 Apprentice: Level 1 0 - 6 Months $57.61 $73.79 $89.97 Apprentice: Level 2 7 -12 Months $59.93 $77.28 $94.61 Apprentice: Level 3 13 - 18 Months $62.23 $80.73 $99.21 Apprentice: Level 4 19 - 24 Months $64.54 $84.19 $103.83 Apprentice: Level 5 25 - 30 Months $66.85 $87.66 $108.45 Apprentice: Level 6 31 - 36 Months $69.15 $91.10 $113.05
Four 10-hour days allowed? - Yes
November | 2025 Page 2 of 49
Bay
Classification Name Last Updated
3.2 Power Equip. Operator - Highway & Heavy 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $70.31 $92.84 $115.37 Apprentice: Level 1 0 - 6 Months $56.81 $72.59 $88.37 Apprentice: Level 2 7 -12 Months $59.06 $75.97 $92.87 Apprentice: Level 3 13 - 18 Months $61.31 $79.35 $97.37 Apprentice: Level 4 19 - 24 Months $63.56 $82.72 $101.87 Apprentice: Level 5 25 - 30 Months $65.81 $86.09 $106.37 Apprentice: Level 6 31 - 36 Months $68.06 $89.47 $110.87
Four 10-hour days allowed? - Yes
November | 2025 Page 3 of 49
Bay
Classification Name Last Updated
3.3 Power Equip. Operator - Highway & Heavy 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $63.58 $82.75 $101.91 Apprentice: Level 1 0 - 6 Months $52.10 $65.53 $78.95 Apprentice: Level 2 7 -12 Months $54.02 $68.41 $82.79 Apprentice: Level 3 13 - 18 Months $55.92 $71.26 $86.59 Apprentice: Level 4 19 - 24 Months $57.84 $74.14 $90.43 Apprentice: Level 5 25 - 30 Months $59.75 $77.00 $94.25 Apprentice: Level 6 31 - 36 Months $61.67 $79.89 $98.09
Four 10-hour days allowed? - Yes
November | 2025 Page 4 of 49
Bay
Classification Name Last Updated
3.4 Power Equip. Operator - Highway & Heavy 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $63.02 $81.91 $100.79 Apprentice: Level 1 0 - 6 Months $51.70 $64.93 $78.15 Apprentice: Level 2 7 -12 Months $53.59 $67.76 $81.93 Apprentice: Level 3 13 - 18 Months $55.48 $70.60 $85.71 Apprentice: Level 4 $57.36 $73.42 $89.47 Apprentice: Level 5 25 - 30 Months $59.25 $76.25 $93.25 Apprentice: Level 6 31 - 36 Months $61.13 $79.07 $97.01
Four 10-hour days allowed? - Yes
November | 2025 Page 5 of 49
Bay
Classification Name Last Updated
3.5 Power Equip. Operator - Highway & Heavy 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $44.80 $60.98 $77.15 Apprentice: Level 1 0 - 6 Months $35.09 $46.42 $57.73 Apprentice: Level 2 7 -12 Months $36.71 $48.84 $60.97 Apprentice: Level 3 13 - 18 Months $38.33 $51.27 $64.21 Apprentice: Level 4 19 - 24 Months $39.95 $53.71 $67.45 Apprentice: Level 5 25 - 30 Months $41.57 $56.13 $70.69 Apprentice: Level 6 31 - 36 Months $43.18 $58.55 $73.91
Four 10-hour days allowed? - Yes
November | 2025 Page 6 of 49
Bay
Classification Name Last Updated
4.1 Power Equip. Operator - Commercial 10/31/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $71.22 $94.21 $117.19 Apprentice: Level 1 0 - 6 Months $57.43 $73.52 $89.61 Apprentice: Level 2 7 - 12 Months $59.73 $76.97 $94.21 Apprentice: Level 3 13 - 18 Months $62.03 $80.42 $98.81 Apprentice: Level 4 19 - 24 Months $64.32 $83.86 $103.39 Apprentice: Level 5 25 - 30 Months $66.62 $87.31 $107.99 Apprentice: Level 6 31 - 36 Months $68.92 $90.76 $112.59
Four 10-hour days allowed? - Yes
November | 2025 Page 7 of 49
Bay
Classification Name Last Updated
4.2 Power Equip. Operator - Commercial 10/31/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $70.93 $93.77 $116.61 Apprentice: Level 1 0 - 6 Months $57.22 $73.21 $89.19 Apprentice: Level 2 7 - 12 Months $59.51 $76.65 $93.77 Apprentice: Level 3 13 - 18 Months $61.80 $71.52 $89.80 Apprentice: Level 4 19 - 24 Months $64.07 $83.48 $102.89 Apprentice: Level 5 25 - 30 Months $66.36 $86.92 $107.47 Apprentice: Level 6 31 - 36 Months $68.64 $90.33 $112.03
Four 10-hour days allowed? - Yes
November | 2025 Page 8 of 49
Bay
Classification Name Last Updated
4.3 Power Equip. Operator - Commercial 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $70.11 $92.55 $114.97 Apprentice: Level 1 0 - 6 Months $56.66 $72.37 $88.07 Apprentice: Level 2 7 - 12 Months $58.90 $75.73 $92.55 Apprentice: Level 3 13 - 18 Months $61.14 $79.09 $97.03 Apprentice: Level 4 19 - 24 Months $63.38 $82.45 $101.51 Apprentice: Level 5 25 -30 Months $65.63 $85.82 $106.01 Apprentice: Level 6 31 - 36 Months $67.87 $89.18 $110.49
Four 10-hour days allowed? - Yes
November | 2025 Page 9 of 49
Bay
Classification Name Last Updated
4.4 Power Equip. Operator - Commercial 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $69.25 $91.25 $113.25 Apprentice: Level 1 0 - 6 Months $56.05 $71.45 $86.85 Apprentice: Level 2 7 - 12 Months $58.25 $74.75 $91.25 Apprentice: Level 3 13 -18 Months $60.45 $78.06 $95.65 Apprentice: Level 4 19 - 24 Months $62.65 $81.35 $100.05 Apprentice: Level 5 25 - 30 Months $64.85 $84.66 $104.45 Apprentice: Level 6 31 -36 Months $67.05 $87.96 $108.85
Four 10-hour days allowed? - Yes
November | 2025 Page 10 of 49
Bay
Classification Name Last Updated
4.5 Power Equip. Operator - Commercial 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $68.28 $89.80 $111.31 Apprentice: Level 1 0 - 6 Months $55.37 $70.44 $85.49 Apprentice: Level 2 7 -12 Months $57.53 $73.68 $89.81 Apprentice: Level 3 13 - 18 Months $61.83 $80.12 $98.41 Apprentice: Level 5 25 - 30 Months $63.98 $83.35 $102.71 Apprentice: Level 6 31 - 36 Months $66.13 $86.58 $107.01
Four 10-hour days allowed? - Yes
November | 2025 Page 11 of 49
Bay
Classification Name Last Updated
4.6 Power Equip. Operator - Commercial 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $66.57 $87.24 $107.89 Apprentice: Level 1 0 - 6 Months $54.17 $68.64 $83.09 Apprentice: Level 2 7 -12 Months $56.24 $71.74 $87.23 Apprentice: Level 3 13 - 18 Months $58.30 $74.82 $91.35 Apprentice: Level 4 19 -24 Months $60.37 $77.93 $95.49 Apprentice: Level 5 25 - 30 Months $62.44 $81.04 $99.63 Apprentice: Level 6 31 - 36 Months $64.50 $84.13 $103.75
Four 10-hour days allowed? - Yes
November | 2025 Page 12 of 49
Bay
Classification Name Last Updated
4.7 Power Equip. Operator - Commercial 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $59.26 $67.72 $84.72 Apprentice: Level $54.15 $68.61 $83.05 Apprentice: Level 1 0 - 6 Months $49.05 $60.95 $72.85 Apprentice: Level 2 7 -12 Months $50.76 $63.52 $76.27 Apprentice: Level 3 13 - 18 Months $52.46 $66.07 $79.67 Apprentice: Level 5 25 - 30 Months $55.85 $71.16 $86.45 Apprentice: Level 6 31 - 36 Months $57.55 $73.71 $89.85
Four 10-hour days allowed? - Yes
November | 2025 Page 13 of 49
Bay
Classification Name Last Updated
4.8 Power Equip. Operator - Commercial 11/01/2025
Wage Rates Straight Time Time and a Half Double Time Journeyman $58.23 $74.72 $91.21 Apprentice: Level 1 0 - 6 Months $48.34 $59.88 $71.43 Apprentice: Level 2 7 -12 Months $49.99 $62.37 $74.73 Apprentice: Level 3 13 - 18 Months $51.63 $64.82 $78.01 Apprentice: Level 4 19 - 24 Months $53.29 $67.31 $81.33 Apprentice: Level 5 25 - 30 Months $54.93 $69.78 $84.61 Apprentice: Level 6 25 - 30 Months $56.59 $72.27 $87.93
Four 10-hour days allowed? - Yes
November | 2025 Page 14 of 49
Bay
Classification Name Last Updated
Articulated Hauler 10/28/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $63.02 $81.91 $100.79 Apprentice: Apprentice Level 1 $51.70 $64.93 $78.15 Apprentice: Apprentice Level 2 $53.59 $67.76 $81.93 Apprentice: Apprentice Level 3 $55.48 $70.60 $85.71 Apprentice: Apprentice Level 4 $57.36 $73.42 $89.47 Apprentice: Apprentice Level 5 $59.25 $76.25 $93.25 Apprentice: Apprentice Level 6 $61.13 $79.07 $97.01
Four 10-hour days allowed? - No Make Up Day Allowed? - No
November | 2025 Page 15 of 49
Bay
Classification Name Last Updated
Asbestos abatement worker or environmental remediation worker 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $56.20 $73.24 $90.28 Apprentice: Trainee 600 hours +1 year $43.12 $55.01 $66.90
Four 10-hour days allowed? - Yes
November | 2025 Page 16 of 49
Bay
Classification Name Last Updated
Boilermaker 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $79.64 $119.12 $158.58 Apprentice: 1st Period $58.07 $86.78 $115.44 Apprentice: 2nd Period $59.89 $89.50 $119.08 Apprentice: 3rd Period $61.81 $92.24 $122.74 Apprentice: 4th Period $63.50 $94.91 $126.30 Apprentice: 5th Period $65.26 $97.54 $129.82 Apprentice: 6th Period $68.89 $103.00 $137.08 Apprentice: 7th Period $72.46 $108.36 $144.22 Apprentice: 8th Period $76.07 $113.77 $151.44
Four 10-hour days allowed? - Yes
November | 2025 Page 17 of 49
Bay
Classification Name Last Updated
Boom Truck 10/28/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $70.31 $92.84 $115.37 Apprentice: Apprentice Level 1 $56.81 $72.59 $88.37 Apprentice: Apprentice Level 2 $59.06 $75.97 $92.87 Apprentice: Apprentice Level 3 $61.31 $79.35 $97.37 Apprentice: Apprentice Level 4 $63.56 $82.72 $101.87
Four 10-hour days allowed? - No
November | 2025 Page 18 of 49
Bay
Classification Name Last Updated
Bricklayer 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $59.07 $76.05 $93.02 Apprentice: Apprentice Level 1 $40.99 $51.90 $62.80 Apprentice: Apprentice Level 2 $42.83 $54.66 $66.48 Apprentice: Apprentice Level 3 $44.68 $57.43 $70.18 Apprentice: Apprentice Level 4 $46.53 $60.21 $73.88 Apprentice: Apprentice Level 5 $48.37 $62.97 $77.56 Apprentice: Apprentice Level 6 $50.22 $65.74 $81.26 Apprentice: Apprentice Level 7 & 8 $52.07 $68.52 $84.96
Four 10-hour days allowed? - No
November | 2025 Page 19 of 49
Bay
Classification Name Last Updated
Carpenter 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $60.20 $78.38 $96.56 Apprentice: Apprentice Level 1 $49.29 $62.02 $74.74 Apprentice: Apprentice Level 2 $51.11 $64.75 $78.38 Apprentice: Apprentice Level 3 $54.75 $70.21 $85.66 Apprentice: Apprentice Level 4 $58.95 $76.51 $94.06
Four 10-hour days allowed? - No
November | 2025 Page 20 of 49
Bay
Classification Name Last Updated
Carpet layers (linoleum) 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $53.72 $70.77 $87.81 Apprentice: Level 1 $43.49 $55.42 $67.35 Apprentice: Level 2 $45.20 $57.99 $70.77 Apprentice: Level 3 $48.61 $63.10 $77.59 Apprentice: Level 4 $52.02 $68.22 $84.41
Four 10-hour days allowed? - Yes
November | 2025 Page 21 of 49
Bay
Classification Name Last Updated
Cement Mason 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $55.78 $71.69 $87.60 Apprentice: Apprentice Level 1 $42.00 $53.93 $65.86 Apprentice: Apprentice Level 2 $43.73 $56.53 $69.32 Apprentice: Apprentice Level 3 $45.51 $59.20 $72.88 Apprentice: Apprentice Level 4 $47.19 $61.72 $76.24 Apprentice: Apprentice Level 5 & 6 $48.93 $64.33 $79.72
Four 10-hour days allowed? - No
November | 2025 Page 22 of 49
Bay
Classification Name Last Updated
Drywall taper 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $52.69 $67.80 $82.91 Apprentice: Level 1 $42.11 $51.93 $61.75 Apprentice: Level 2 $45.13 $56.46 $67.79 Apprentice: Level 3 $49.67 $63.27 $76.87
Four 10-hour days allowed? - Yes
November | 2025 Page 23 of 49
Bay
Classification Name Last Updated
Electrician 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $66.52 $94.69 $122.86 Apprentice: Apprentice Level 1 $26.27 $36.27 $46.26 Apprentice: Apprentice Level 2 $28.49 $39.60 $50.70 Apprentice: Apprentice Level 3 $30.71 $42.93 $55.14 Apprentice: Apprentice Level 4 $35.54 $50.17 $64.80 Apprentice: Apprentice Level 5 $37.98 $53.83 $69.68 Apprentice: Apprentice Level 6 $45.29 $64.80 $84.30
Four 10-hour days allowed? - No
November | 2025 Page 24 of 49
Bay
Classification Name Last Updated
Elevator Constructors 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $98.25 $130.76 $163.26 Apprentice: 1st Year Apprentice $63.80 $81.68 $99.56 Apprentice: 2nd Year Apprentice $72.84 $93.97 $115.10 Apprentice: 3rd Year Apprentice $76.28 $99.04 $121.79 Apprentice: 4th Year Apprentice $83.17 $109.18 $135.18
Four 10-hour days allowed? - Yes
November | 2025 Page 25 of 49
Bay
Classification Name Last Updated
Glaziers 10/31/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $56.55 $76.37 $96.20 Apprentice: Level 1 $40.70 $52.61 $64.50 Apprentice: Level 2 $44.66 $58.55 $72.42 Apprentice: Level 3 $48.63 $64.50 $80.36 Apprentice: Level 4 $52.59 $70.44 $88.28
Four 10-hour days allowed? - Yes
November | 2025 Page 26 of 49
Bay
Classification Name Last Updated
Ground Person 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $50.85 $72.32 $93.78
Four 10-hour days allowed? - Yes
November | 2025 Page 27 of 49
Bay
Classification Name Last Updated
Heating and frost Insulators 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $52.00 $68.89 $85.77 Apprentice: 1st year $26.38 $33.69 $40.99 Apprentice: 2nd year $30.15 $38.92 $47.68 Apprentice: 3rd year $33.92 $44.15 $54.37 Apprentice: 4th year $37.70 $49.39 $61.08 Apprentice: 5th year $41.48 $54.63 $67.78
Four 10-hour days allowed? - Yes
Friday for cancelled work in a 4 10 schedule
November | 2025 Page 28 of 49
Bay
Classification Name Last Updated
Ironworker 10/31/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $75.42 $93.70 $111.97 Apprentice: Apprentice Level 1 $57.42 $70.40 $83.37 Apprentice: Apprentice Level 2 $59.59 $73.12 $86.64 Apprentice: Apprentice Level 3 $61.54 $75.43 $89.32 Apprentice: Apprentice Level 4 $64.59 $79.40 $94.20 Apprentice: Apprentice Level 5 $67.64 $83.36 $99.07 Apprentice: Apprentice Level 6 $75.42 $93.70 $111.97
Four 10-hour days allowed? - No
November | 2025 Page 29 of 49
Bay
Classification Name Last Updated
Laborer, Common - Highway & Heavy 11/05/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $48.27 $62.46 $76.64 Apprentice: Level 1 $41.09 $51.73 $62.37 Apprentice: Level 2 $42.51 $53.86 $65.21 Apprentice: Level 3 $43.92 $55.98 $68.03 Apprentice: Level 4 $46.76 $60.24 $73.71
Four 10-hour days allowed? - Yes
November | 2025 Page 30 of 49
Bay
Classification Name Last Updated
Laborer, Landscaping 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $36.87 $49.23 $61.58 Apprentice: Apprentice Level 1 $30.69 $39.96 $49.22 Apprentice: Apprentice Level 2 $31.93 $41.82 $51.70 Apprentice: Apprentice Level 3 $33.16 $43.66 $54.16 Apprentice: Apprentice Level 4 $35.63 $47.37 $59.10
Four 10-hour days allowed? - No
November | 2025 Page 31 of 49
Bay
Classification Name Last Updated
Laborer, Skilled - Commercial 11/04/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $42.02 $56.13 $70.23
Four 10-hour days allowed? - Yes
November | 2025 Page 32 of 49
Bay
Classification Name Last Updated
Laborer, Skilled - Highway & Heavy 11/05/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $49.27 $63.96 $78.64 Apprentice: Apprentice Level 1 $41.84 $52.86 $63.87 Apprentice: Apprentice Level 2 $43.31 $55.06 $66.81 Apprentice: Apprentice Level 3 $44.68 $57.16 $69.64 Apprentice: Apprentice Level 4 $47.71 $61.66 $75.61
Four 10-hour days allowed? - No
November | 2025 Page 33 of 49
Bay
Classification Name Last Updated
Landscaping equipment 10/28/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $39.09 $52.56 $66.02
Four 10-hour days allowed? - No
November | 2025 Page 34 of 49
Bay
Classification Name Last Updated
Lineman 10/30/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $76.81 $111.26 $145.70 Apprentice: Level 1 0-1000 hours $49.26 $69.94 $90.60 Apprentice: Level 2 1001-2000 Hours $52.71 $75.11 $97.50 Apprentice: Level 3 2001-3000 Hours $56.15 $80.28 $104.38 Apprentice: Level 4 3001-4000 hours $59.60 $85.44 $111.28 Apprentice: Level 5 4001-5000 Hours $63.04 $90.60 $118.16 Apprentice: Level 6 5001-6000 Hours $66.48 $95.77 $125.04 Apprentice: Level 7 $69.93 $100.94 $131.94
Four 10-hour days allowed? - Yes
November | 2025 Page 35 of 49
Bay
Classification Name Last Updated
Millwright 11/05/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $82.65 $126.09 $165.30 Apprentice: Level 1 $60.79 $91.21 $121.58 Apprentice: Level 2 $68.09 $102.15 $136.18 Apprentice: Level 3 $75.36 $113.05 $150.72 Apprentice: Level 4 $79.01 $118.54 $158.02
Four 10-hour days allowed? - Yes
November | 2025 Page 36 of 49
Bay
Classification Name Last Updated
Off-Road Truck 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $63.02 $81.91 $100.79 Apprentice: Apprentice Level 1 $51.70 $64.93 $78.15 Apprentice: Apprentice Level 2 $53.59 $67.76 $81.93 Apprentice: Apprentice Level 3 $55.48 $70.60 $85.71 Apprentice: Apprentice Level 4 $57.36 $73.42 $89.47 Apprentice: Apprentice Level 5 $59.25 $76.25 $93.25 Apprentice: Apprentice Level 6 $61.13 $79.07 $97.01
Four 10-hour days allowed? - No
November | 2025 Page 37 of 49
Bay
Classification Name Last Updated
Painters 10/30/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $48.48 $63.10 $77.71 Apprentice: Apprentice Level 1 $36.79 $45.56 $54.33 Apprentice: Apprentice Level 2 $39.71 $49.94 $60.17 Apprentice: Apprentice Level 3 $42.63 $54.32 $66.01 Apprentice: Apprentice Level 4 $45.56 $58.72 $71.87
Four 10-hour days allowed? - No
November | 2025 Page 38 of 49
Bay
Classification Name Last Updated
Piledriver 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $60.20 $78.38 $96.56 Apprentice: Apprentice Level 1 $49.29 $62.02 $74.74 Apprentice: Apprentice Level 2 $51.11 $64.75 $78.38 Apprentice: Apprentice Level 3 $54.75 $70.21 $85.66 Apprentice: Apprentice Level 4 $58.95 $76.51 $94.06
Four 10-hour days allowed? - No
November | 2025 Page 39 of 49
Bay
Classification Name Last Updated
Pipefitters—Steamfitters 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $63.84 $84.35 $104.85 Apprentice: Level 1 $38.67 $48.92 $59.17 Apprentice: Level 2 $41.30 $52.58 $63.86 Apprentice: Level 3 $43.90 $56.21 $68.51 Apprentice: Level 4 $46.50 $59.83 $73.16 Apprentice: Level 5 $49.10 $63.46 $77.81 Apprentice: Level 6 $51.70 $67.08 $82.46 Apprentice: Level 7 $54.30 $70.71 $87.11 Apprentice: Level 8 $56.90 $74.33 $91.76 Apprentice: Level 9 $59.50 $77.95 $96.41
Four 10-hour days allowed? - Yes
November | 2025 Page 40 of 49
Bay
Classification Name Last Updated
Plasterer 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $57.16 $72.50 $87.84 Apprentice: Apprentice Level 1 $43.02 $54.40 $65.78 Apprentice: Apprentice Level 2 $44.75 $56.99 $69.24 Apprentice: Apprentice Level 3 $46.48 $59.59 $72.70 Apprentice: Apprentice Level 4 $48.20 $62.17 $76.14 Apprentice: Apprentice Level 5 & 6 $49.93 $64.77 $79.60
Four 10-hour days allowed? - No
November | 2025 Page 41 of 49
Bay
Classification Name Last Updated
Plumbers 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $69.18 $92.18 $115.18 Apprentice: Level 1 $41.55 $53.05 $64.55 Apprentice: Level 2 $44.39 $57.04 $69.69 Apprentice: Level 3 $47.24 $61.04 $74.84 Apprentice: Level 4 $50.09 $65.04 $79.99 Apprentice: Level 5 $52.94 $69.04 $85.14 Apprentice: Level 6 $55.79 $73.04 $90.29 Apprentice: Level 7 $58.64 $77.04 $95.44 Apprentice: Level 8 $61.49 $81.04 $100.59 Apprentice: Level 9 $64.34 $85.04 $105.74
Four 10-hour days allowed? - Yes
November | 2025 Page 42 of 49
Bay
Classification Name Last Updated
Roofer/Waterproofer 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $49.76 $63.95 $78.14 Apprentice: Apprentice 1 $35.27 $42.22 $49.16 Apprentice: Apprentice 2 $36.91 $44.68 $52.44 Apprentice: Apprentice 3 $36.31 $43.78 $51.24 Apprentice: Apprentice 4 $37.93 $46.20 $54.48 Apprentice: Apprentice 5 $34.45 $40.98 $47.52 Apprentice: Apprentice 6 $41.18 $51.08 $60.98 Apprentice: Apprentice 7 $42.51 $53.08 $63.64 Apprentice: Apprentice 8 $44.42 $55.94 $67.46
Four 10-hour days allowed? - Yes
November | 2025 Page 43 of 49
Bay
Classification Name Last Updated
Sheet Metal Workers 10/31/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $67.48 $86.53 $105.58 Apprentice: 1st Year Apprentice $36.88 $48.31 $59.74 Apprentice: 2nd Year Apprentice $38.98 $51.37 $63.75 Apprentice: 3rd Year Apprentice $45.95 $59.29 $72.62 Apprentice: 4th Year Apprentice $50.14 $65.38 $80.62
Four 10-hour days allowed? - No
November | 2025 Page 44 of 49
Bay
Classification Name Last Updated
Sprinkler Fitters 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $60.34 $78.45 $96.56 Apprentice: Class 1 $24.57 $32.72 $40.87 Apprentice: Class 10 $52.07 $68.37 $84.67 Apprentice: Class 2 $26.38 $35.43 $44.49 Apprentice: Class 3 $39.14 $49.10 $59.06 Apprentice: Class 4 $40.95 $51.82 $62.68 Apprentice: Class 5 $43.01 $54.78 $66.55 Apprentice: Class 6 $44.82 $57.49 $70.17 Apprentice: Class 7 $46.63 $60.21 $73.79 Apprentice: Class 8 $48.45 $62.94 $77.43 Apprentice: Class 9 $50.26 $65.65 $81.05
Four 10-hour days allowed? - Yes
November | 2025 Page 45 of 49
Bay
Classification Name Last Updated
Terrazzo Worker 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $53.82 $68.77 $83.72 Apprentice: Apprentice Level 1 $40.55 $49.87 $59.18 Apprentice: Apprentice Level 2 $42.29 $52.48 $62.66 Apprentice: Apprentice Level 3 $44.02 $55.07 $66.12 Apprentice: Apprentice Level 4 $45.76 $57.68 $69.60 Apprentice: Apprentice Level 5 $47.49 $60.28 $73.06 Apprentice: Apprentice Level 6 $49.23 $62.89 $76.54 Apprentice: Apprentice Level 7 & 8 $50.95 $64.75 $79.02
Four 10-hour days allowed? - No
November | 2025 Page 46 of 49
Bay
Classification Name Last Updated
Tile Finisher 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $49.30 $62.80 $76.30 Apprentice: Apprentice Level 1 $40.67 $50.86 $61.04 Apprentice: Apprentice Level 2 $42.20 $53.15 $64.10 Apprentice: Apprentice Level 3 $44.60 $55.94 $67.28 Apprentice: Apprentice Level 4 $43.72 $55.43 $67.14 Apprentice: Apprentice Level 5 & 6 $46.77 $46.77 $46.77
Four 10-hour days allowed? - No
November | 2025 Page 47 of 49
Bay
Classification Name Last Updated
Tile Setter 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $53.32 $68.02 $82.72 Apprentice: Apprentice Level 1 $40.24 $49.40 $58.56 Apprentice: Apprentice Level 2 $41.95 $51.97 $61.98 Apprentice: Apprentice Level 3 $43.65 $54.52 $65.38 Apprentice: Apprentice Level 4 $45.36 $57.08 $68.80 Apprentice: Apprentice Level 5 $47.06 $59.63 $72.20 Apprentice: Apprentice Level 6 $48.77 $62.20 $75.62 Apprentice: Apprentice Level 7 & 8 $50.47 $64.75 $79.02
Four 10-hour days allowed? - No
November | 2025 Page 48 of 49
Bay
Classification Name Last Updated
Tunnel Miner 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $52.82 $70.02 $87.22 Apprentice: Level 1 $44.22 $57.12 $70.02 Apprentice: Level 2 $45.94 $59.70 $73.46 Apprentice: Level 3 $47.66 $62.28 $76.90 Apprentice: Level 4 $51.10 $61.35 $75.66
Four 10-hour days allowed? - Yes
November | 2025 Page 49 of 49
00300 #2604
SECTION 00300
PROPOSAL FORM
Date___________________________
Name of Bidder
TO: Attn: Ken Kerr, Building Operations Supervisor Bay Arenac ISD
4228 Bay-Arenac Dr.
Bay City, MI 48706
PROPOSAL FOR: Parking Lot Resurfacing
1. BASE BID/ADDENDA
The undersigned has carefully examined the bidding and contract documents including the Instructions to Bidders, Agreement Between Owner and Contractor, General Conditions, Supplementary Conditions, Contract Requirements, General Requirements, Specifications, Drawings, and any and all Addenda issued, and has familiarized himself with all local conditions to be encountered affecting the cost of the work and does hereby propose to perform all work and to furnish all of the labor, materials, tools, equipment and services necessary to complete the contract in connection with the above project, all in accordance with the contract documents prepared by TSSF Architects, including the following addenda:
Addendum No. ____________, Dated ________________
Addendum No. ____________, Dated ________________
Addendum No. ____________, Dated ________________ for the following BASE BID AMOUNT:
Dollars
(Bid in words)
(Bid in figures)
Add Alternate No 1: Price to replace existing chain link fence with new chain link fence.
Unit Price:
1. Remove 24” of subbase & replace with 21AA $_________________cu yd.
2. Remove 24” of subbase & Install Geogrid with 21AA $_________________cu yd.
2. ALLOWANCES: Included in the above Base Bid are the following allowance amounts as described in Division 1: Basic Requirements
A. Contingency Allowance $ $25,000
B. Testing Allowance $ $10,000
3. STARTING and COMPLETION DATES: The undersigned agrees, if awarded the contract, that he will commence the work within ten (10) calendar days after the Owner gives the Bidder written notice to commence the work and shall complete the entire work within the following calendar days after the date of issuance of the notice to commence the work.
Bidder’s calendar days to complete the project _________________________
4. FEES FOR ADDITIONAL WORK – TO BE COMPLETED BY THE BIDDER:
For additional work performed upon instructions of the Owner by subcontractors of the undersigned, a fee of __________ percent of the subcontractor’s price will be charged by the undersigned for overhead, profit, etc. For additional work performed upon instructions of the Owner by work forces of the undersigned, the charges shall be the actual cost of all labor and materials (less all discounts) plus a fee of__________percent, which includes all charges of the undersigned for overhead, profit, etc.
5. BID BOND/INSURANCE/BONDS
In compliance with the requirements, this proposal is accompanied by a bid security in the form of a certified check or a surety company bond in the sum of at least 5% of the total bid to guarantee that a contract will be executed if the above proposal is accepted and the contract awarded to the undersigned. It is agreed that the bid security will be retained as liquidated damages by the Owner if the bidder fails to execute a contract in accordance with his bid within forty-five days after receipt of bids. Also included in this proposal are premiums for insurance coverage and performance and payment bonds as described in Sections 00610 and 00650.
6. ADDRESS, LEGAL STATUS and SIGNATURE OF BIDDER
The undersigned bidder does hereby designate the information given below as the legal name and address to which all notices, directions, or other communications may be served or mailed.
NAME:
ADDRESS:
CITY: STATE:_____________________ZIP:______________
PHONE NUMBER: ( ) FAX NUMBER: ( )
The undersigned bidder does hereby declare that the bidder has the legal status checked below:
Individual
Co-partnership
Corporation incorporated under the laws of the State of
If a Corporation, affix corporate seal here Date:
Signed:
Note: If Bid Form is signed by an Agent, attach a certified Power of Attorney
NOTE: Submit two (2) original copies of this proposal unless otherwise instructed.
END OF DOCUMENT
01001 #2604
SECTION 01001
BASIC REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Summary:
1. Contract description.
2. Work by Owner.
3. Contractor’s use of premises.
4. Specification conventions.
B. Price and Payment Procedures:
1. Testing and inspection allowances.
2. Schedule of values.
3. Applications for payment.
4. Change procedures.
C. Administrative Requirements:
1. Coordination.
2. Field engineering.
3. Meetings.
4. Equipment electrical characteristics and components.
5. Cutting and patching.
D. Submittals:
1. Submittal procedures.
2. Construction progress schedules.
3. Proposed products list.
4. Product data.
5. Shop drawings.
6. Samples.
7. Manufacturer’s instructions.
8. Manufacturer’s certificates.
E. Quality Requirements:
1. Quality control.
2. Tolerance.
3. References.
4. Labeling.
5. Testing and inspection laboratory services.
6. Manufacturer’s field services and reports.
7. Examination.
8. Preparation.
F. Temporary Facilities and Controls:
1. Temporary electricity.
2. Temporary lighting for construction purposes.
3. Temporary heating and cooling.
4. Temporary ventilation.
5. Telephone and facsimile service.
6. Temporary water service.
#2604
7. Temporary sanitary facilities.
8. Field offices and sheds.
9. Access roads.
10. Parking.
11. Progress cleaning and waste removal.
12. Project identification.
13. Fire prevention facilities.
14. Barriers and fencing.
15. Enclosures.
16. Protection of installed work.
17. Security.
18. Water control.
19. Pollution and environmental control.
20. Removal of utilities, facilities, and controls.
G. Product Requirements:
1. Products.
2. Delivery, handling, storage, and protection.
3. Product options.
4. Substitutions.
H. Execution Requirements:
1. Closeout procedures.
2. Final cleaning.
3. Starting of systems.
4. Demonstration and instructions.
5. Testing, adjusting, and balancing.
6. Protecting installed construction.
7. Project record documents.
8. Operation and maintenance data.
9. Spare parts and maintenance materials.
10. Warranties.
1.2 CONTRACT DESCRIPTION
A. Perform Work of Contract under a stipulated sum contract with Owner in accordance with Conditions of Contract.
1.3 WORK BY OWNER
A. Owner will award contracts for supply and installation of security, signage, audio/visual (A/V), which will commence during the execution of this contract.
B. Items noted as NIC (Not in Contract), movable cabinets, furnishings and minor equipment will be furnished and installed by Owner after Substantial Completion.
1.4 CONTRACTOR’S USE OF PREMISES
A. Limit use of premises to allow:
1. Work by others and work by Owner.
#2604
1.5 SPECIFICATION CONVENTIONS
A. These specifications are written in imperative mood and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise.
The words “shall be” are included by inference where a colon (:) is used within sentences
1.6 CONTINGENCY ALLOWANCE
A. Include in the contract, $25,000 for use upon architect/engineers’ instruction.
B. Contractor’s costs for products, delivery installation, labor, insurance, payroll taxes, bonding equipment rental, overhead, and profit are included in change orders authorizing expenditure from this allowance.
1.7 TESTING ALLOWANCE
A. Include in the contract, $10,000 for payment of testing services.
B. Costs included in Allowance: Cost of engaging testing or inspection firm, execution of tests or inspection, and reporting of results.
1.8 UNIT PRICING
A. Unstable Subbase
1. Remove 24” of subbase & replace with 21AA
2. Remove 24” of subbase & Install Geogrid with 21AA
B. Provide cubic yard price for each.
1.9 ALTERNATE
A. None
1.10 SCHEDULE OF VALUES
A. Submit schedule on AIA Form G703.
B. Submit Schedule of Values in duplicate within 15 days after date established in Notice to Proceed.
1.11 APPLICATION FOR PAYMENT
A. Submit three copies of each application on AIA Form G702 and G703.
B. Content and Format: Utilize Schedule of Values for listing items in Application for Payment.
C. Payment Period: Monthly. Pay requests due on the 30th of every month, payment to go out by 21ST of the month following.
1.12 CHANGE PROCEDURES
A. Stipulated Sum/Price Change Order: Based on Proposal Request and Contractor’s fixed price quotation.
B. Change Order Forms AIA G701.
1.13 COORDINATION
A. Coordinate scheduling, submittals, and Work of various sections of specifications to ensure efficient and orderly sequence of installation of interdependent construction elements.
B. Verify utility requirement characteristics of operating equipment are compatible with building utilities.
C. Coordinate space requirements and installation of mechanical and electrical work indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable.
1.14 FIELD ENGINEERING
A. Employ experienced instrument technician to locate reference datum and protect survey control and reference points.
B. Establish elevations, lines, and levels and certify elevations and locations of the Work conform with Contract Documents.
C. Verify field measurements are as indicated on shop drawings or as instructed by manufacturer.
1.15 PRECONSTRUCTION, SITE MOBILIZATION AND PREINSTALLATION MEETINGS
A. Contractor shall schedule preconstruction and site mobilization meeting after Notice of Award for affected parties.
B. When required in individual specification section, convene preinstallation meeting at Project site prior to commencing work of section.
1.16 PROGRESS MEETINGS
A. Contractor shall schedule and administer meetings throughout progress of the Work at maximum bi-monthly intervals.
B. Contractor shall preside at meetings, record minutes, and distribute copies within two days to those affected by decisions made.
1.17 EQUIPMENT ELECTRICAL CHARACTERISTICS AND COMPONENTS
A. Motors: NEMA MG1 Type; specific motor type is specified in individual specification sections.
B. Wiring Terminations: Terminal lugs to match branch circuit conductor; size terminal lugs to NFPA 70.
C. Cord and Plug: Minimum 6-foot cord and plug including grounding connector; cord of longer length is specified in individual sections.
#2604
1.18 CUTTING AND PATCHING
A. Employ skilled and experienced installer to perform cutting and patching new Work;
restore Work with new Products.
B. Execute cutting, fitting, and patching including excavation and fill, to complete Work, and to:
1. Fit several parts together, to integrate with other Work.
2. Uncover Work to install or correct ill-timed Work.
3. Remove and replace defective and non-conforming Work.
4. Remove samples of installed Work for testing.
5. Provide openings in elements of Work for penetrations of mechanical and electrical Work.
C. Cut masonry and concrete materials using masonry saw or core drill. Restore Work with new Products in accordance with requirements of Contract Documents.
Fit Work tight to adjacent elements. Maintain integrity of wall, ceiling, or floor construction, completely seal voids.
D. Fit Work tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
E. Refinish surfaces to match adjacent finishes.
1.19 SUBMITTAL PROCEDURES
A. Submittal form to identify Project, Contractor, subcontractor or supplier; and pertinent Contract Document references.
B. Apply Contractor's stamp, signed or initialed, certifying that review, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with requirements of the Work and Contract Documents.
C. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of completed Work.
D. Revise and resubmit submittals as required; identify changes made since previous submittal.
1.20 PROPOSED PRODUCTS LIST
A. Within 15 days after date of Notice to Proceed, submit list of major Products proposed for use, with name of manufacturer, trade name, and model number of each product.
1.21 PRODUCT DATA
A. Product Data:
1. Submitted to Architect/Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.
2. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents purposes as specified.
B. Submit number of copies which Contractor requires, plus two copies which will be retained by Architect/Engineer.
#2604
C. Mark each copy to identify applicable products, models, options, and other data.
Supplement manufacturer’s standard data to provide information unique to this project.
1.22 SHOP DRAWINGS
A. Shop Drawings:
1. Submitted to Architect/Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.
2. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents purposes as specified.
B. When required by individual specification sections, provide shop drawings signed and sealed by professional engineer responsible for designing components shown on shop drawings.
1. Include signed and sealed calculations to support design.
2. Submit drawings and calculations in form suitable for submission to and approval by authorities having jurisdiction.
3. Make revisions and provide additional information when required by authorities having jurisdiction.
C. Submit number of opaque reproductions Contractor requires, plus two copies which will be retained by Architect/Engineer.
1.23 SAMPLES
A. Samples for Review:
1. Submitted to Architect/Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.
2. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents purposes as specified.
B. Samples for Selection:
1. Submitted to Architect/Engineer for aesthetic, color, or finish selection.
2. Submit samples of finishes from full range of manufacturer’s standard colors, textures, and patterns for Architect/Engineer selection.
3. After review, provide copies and distribute in accordance with SUBMITTAL
PROCEDURES article and for record documents purposes as specified.
C. Submit samples to illustrate functional and aesthetic characteristics of Product.
D. Submit samples of finishes from full range of manufacturer’s standard colors, textures, and patterns for Architect/Engineer's selection.
1.24 MANUFACTURER’S INSTRUCTIONS
A. When specified in individual specification sections, submit manufacturer printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, in quantities specified for Product Data.
#2604
1.25 MANUFACTURER’S CERTIFICATES
A. When specified in individual specification sections, submit certifications by manufacturer to Architect/Engineer, in quantities specified for Product Data.
B. Indicate material or Product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
1.26 QUALITY CONTROL
A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply with manufacturer’s instructions.
C. Comply with specified standards as minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
1.27 TOLERANCES
A. Monitor fabrication and installation tolerance control of installed Products over suppliers, manufacturers, Products, site conditions, and workmanship, to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply fully with manufacturer’s tolerances.
1.28 REFERENCES
A. Conform to reference standards by date of issue current as of date of Contract Documents.
B. When specified reference standard conflict with Contract Documents, request clarification from Architect/Engineer before proceeding.
1.29 LABELING
A. Attach label from agency approved by authority having jurisdiction for products, assemblies, and systems required to be labeled by applicable code.
B. Label Information: Include manufacturer's or fabricator's identification, approved agency identification, and the following information, as applicable, on each label.
1. Model number.
2. Serial number.
3. Performance characteristics.
4. Mock-ups.
1.30 TESTING AND INSPECTION LABORATORY SERVICES
A. Owner will appoint and employ services of independent firm to perform testing and inspection. Pay for services from specified Cash Allowance.
B. Independent firm will perform tests, inspections, and other services as required.
C. Cooperate with independent firm; furnish samples as requested.
#2604
D. Re-testing required because of non-conformance to specified requirements will be charged to Contractor.
1.31 MANUFACTURER’S FIELD SERVICES AND REPORTS
A. When specified in individual specification sections, require material or Product suppliers or manufacturers to furnish qualified staff personnel to observe site conditions and to initiate instructions when necessary.
B. Report observations and site decisions or instructions that are supplemental or contrary to manufacturer’s written instructions.
1.32 EXAMINATION
A. Verify existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.
B. Verify utility services are available, of correct characteristics, and in correct location.
1.33 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying new material or substance in contact or bond.
1.34 TEMPORARY ELECTRICITY
A. Pay cost of electricity used.
B. Provide temporary electricity and power outlets for construction operations, connections, branch wiring, distribution boxes, and flexible power cords as required. Do not disrupt Owner's need for continuous service.
1.35 TEMPORARY LIGHTING FOR CONSTRUCTION PURPOSES
A. Provide and maintain temporary lighting for construction operations.
B. Provide branch wiring from power source to distribution boxes with lighting conductors, pigtails, and lamps as required.
C. Permanent building lighting may be utilized during construction. Repair, clean, and replace lamps at end of construction.
1.36 TEMPORARY HEATING AND COOLING
A. Provide heating and cooling devices, extend and supplement with temporary units and heat and cool as needed to maintain specified conditions for construction operations.
B. Pay cost of energy used.
C. Provide and pay for operation, maintenance, and regular replacement of filters and worn or consumed parts.
#2604
D. Maintain minimum ambient temperature of 50 degrees F in areas where construction is in progress, unless indicated otherwise in specifications.
1.37 TEMPORARY VENTILATION
A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.
1.38 TELEPHONE AND INTERNET SERVICE
A. Provide, maintain, and pay for telephone service to field office at time of project mobilization. Allow Architect/Engineer incidental use.
1.39 TEMPORARY WATER SERVICE
A. Provide, maintain, and pay for suitable quality water service required. Connect to existing water source for construction operations.
1.40 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. New facilities may not be used.
B. Maintain clean and sanitary condition.
1.41 FIELD OFFICES AND SHEDS
A. Office: Weather tight, with lighting, electrical outlets, heating, cooling and ventilating equipment, and equipped with sturdy furniture and drawing display table.
B. Provide space for Project meetings, with table and chairs to accommodate 10 persons.
1.42 ACCESS ROADS
A. Construct and maintain temporary roads accessing public thoroughfares to serve construction area.
B. On-site roads may be used for construction traffic.
1.43 PARKING
A. Construct on-site parking areas for accommodating construction personnel.
1.44 PROGRESS CLEANING AND WASTE REMOVAL
A. Collect and maintain areas free of waste materials, debris, and rubbish. Maintain site in clean and orderly condition. This is to include maintaining both M-25 and Bay Roads.
1.45 PROJECT IDENTIFICATION
A. Provide 8-foot-wide x 8-foot-high project sign of exterior grade plywood and wood frame construction, painted, to Architect/Engineer's design and colors.
B. Erect on site at location established by Architect/Engineer.
#2604
1.46 FIRE PREVENTION FACILITIES
A. Prohibit smoking within buildings under construction. Designate area on site where smoking is permitted.
B. Establish fire watch for cutting and welding and other hazardous operations capable of starting fires. Maintain fire watch before, during, and after hazardous operations until threat of fire does not exist.
C. Portable Fire Extinguishers: NFPA 10; 10-pound capacity, 4A-60B: C UL rating.
1. Provide one fire extinguisher at each stair on each floor of buildings under construction.
2. Provide minimum one fire extinguisher in every construction trailer and storage shed.
3. Provide a minimum of one fire extinguisher on roof during roofing operations using heat producing equipment.
1.47 BARRIERS AND FENCING
A. Provide fencing to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from damage.
B. Construction: Contractor's option.
C. Provide a 6-foot-high fence around construction site; equip with vehicular gates with locks.
1.48 PROTECTION OF INSTALLED WORK
A. Protect installed Work and provide special protection where specified in individual specification sections.
B. Prohibit traffic or storage upon waterproofed or roofed surfaces.
1.49 SECURITY
A. Provide security and facilities to protect Work and Owner's operations from unauthorized entry, vandalism, or theft.
1.50 WATER CONTROL
A. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.
B. Provide erosion control.
1.51 POLLUTION AND ENVIRONMENTAL CONTROL
A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations.
B. Provide dust control, erosion and sediment control, noise control, pest control and rodent control to allow for proper execution of the Work.
C. Comply with pollution and environmental control requirements.
#2604
1.52 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior to Substantial Completion review.
B. Remove underground installations to minimum depth of 2 feet.
C. Clean and repair damage caused by installation or use of temporary work.
D. Restore existing facilities used during construction to their original condition. Restore permanent facilities used during construction to specified condition.
1.53 PRODUCTS
A. Products: Means new material, machinery, components, equipment, fixtures, and systems forming the Work, but does not include machinery and equipment used for preparation, fabrication, conveying and erection of the Work.
B. Do not use materials and equipment removed from existing premises, except as specifically identified or allowed by the Contract Documents.
C. Provide interchangeable components of same manufacture for components being replaced.
1.54 DELIVERY, HANDLING, STORAGE, AND PROTECTION
A. Deliver, handle, store, and protect Products in accordance with manufacturer's instructions.
1.55 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Any Product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: Products of manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with Provision for Substitutions: Submit request for substitution for manufacturers not named.
1.56 SUBSTITUTIONS
A. Substitutions will only be considered when the Product becomes unavailable through no fault of Contractor.
B. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.
C. Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution.
#2604
1.57 CLOSEOUT PROCEDURES
A. Submit written certification Contract Documents have been reviewed, Work has been inspected, and Work is complete in accordance with Contract Documents and ready for Architect/Engineer's inspection.
B. Submit final Application for Payment identifying total adjusted Contract Sum/Price, previous payments, and amount remaining due.
1.58 FINAL CLEANING
A. Execute final cleaning prior to final inspection.
B. Clean interior and exterior surfaces exposed to view. Vacuum carpeted and soft surfaces.
C. Clean debris from site, roofs, gutters, downspouts, and drainage systems.
D. Replace filters of operating equipment.
E. Remove waste and surplus materials, rubbish, and construction facilities from site.
1.59 STARTING OF SYSTEMS
A. Provide seven days notification prior to start-up of each item.
B. Ensure each piece of equipment or system is ready for operation.
C. Execute start-up under supervision of responsible persons in accordance with manufacturer’s instructions.
D. Submit written report stating equipment or system has been properly installed and is functioning correctly.
1.60 DEMONSTRATION AND INSTRUCTIONS
A. Demonstrate operation and maintenance of Products to Owner's personnel two weeks prior to date of final review.