This is Addendum #2 to an Invitation for Bid (IFB) issued by the Office of Facilities Planning and Support Services for Northern Virginia Community College (NVCC), referencing contract 260-B6260-003 for the replacement of a rooftop air conditioning unit (RTU-1) at the MTS building located at 10500 Battleview Parkway, Manassas, Virginia 20109. The project involves the demolition of the existing packaged rooftop air handler and installation of a new 40-ton Carrier 50K RTU with R-454B refrigerant, designed to serve the second-floor east area of the facility. The addendum modifies five mechanical drawing sheets (ME-002, ME-101, ME-201, ME-301, and ME-801) to adjust the Testing and Balancing (TAB) scope and identify the controls contact. The original bid due date is November 2, 2026, with all questions requiring submission no less than six days prior. A signed acknowledgement of Addendum #2 must be received by the bid due date or attached to the bid submission. The contract term and renewal options are not specified in this addendum document.
The addendum includes three pages of memorandum outlining additional Testing and Balancing scope requirements to establish baseline operating performance of the existing RTU-1 system prior to demolition. Pre-construction airflow measurements must be conducted on the rooftop unit, all VAV terminal units, and air outlets serving the second-floor east area, with detailed documentation and reporting to the Owner, Engineer of Record, and Commissioning Agent. Post-construction verification requires the replacement system to be balanced to documented pre-construction airflow values. Controls will be provided by Chesapeake Controls, with point of contact John Crane (johncrane@chesapeakecontrols.com, 757-717-5172). The new RTU must meet ASHRAE 90.1-2022 minimum efficiency requirements (IEER 13.2), include a 0-100% enthalpy economizer, 4-inch MERV 13 filters, and operate with BACnet communication interface. The maximum combined weight of the rooftop unit and curb adapter shall not exceed 6,800 pounds; any excess requires structural analysis and supplemental reinforcement at the contractor's expense. Pricing terms, set-asides, and funding information are not addressed in this addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office of Facilities Planning and Support Services 8333 Little River Turnpike, Suite 312 Annandale, Virginia 22003
Addendum #2
To All Bidders
Reference: 260-B6260-003
Title: NVCC MTS Replace Roof Top Unit
Dated: October 23, 2026
Bid Due: November 2, 2026
Bidders are reminded that all questions should be submitted no less than 6 days prior to the bid due date.
Note: A signed acknowledgement of this Addendum #2 must be received at the location indicated on the IFB either prior to the bid due date and hour or attached to your bid. Signature on this addendum does not substitute for your signature on the original bid document. The original bid document must be signed.
Sincerely, Merlin Espinal
Merlin A. Espinal Contracts Officer Phone 703-425-5689
Name of Firm
Signature
Addendum #2, Attachment
Reference: 260-B6260-003
Title: NVCC MTS Replace Roof Top Unit
Dated: October 23, 2026
Bid Due: November 2, 2026
The Following items represent changes, modifications and/or clarifications to the Contract Documents for this project.
This Addendum shall become a part of the Contract Documents, and all bidders shall include its provisions in their proposals. Receipt of this Addendum shall be acknowledged on the Bid Form where designated.
This Addendum consists of the following:
• (5) drawing sheets including:
o ME-002: Note added to identify controls contact.
o ME-101: Sheet notes modified to adjust TAB scope.
o ME-201: Sheet notes modified to adjust TAB scope.
o ME-301: Sheet notes modified to adjust TAB scope.
o ME-801: Note added to identify controls contact.
• (3) pages of memo describing additional Testing and Balancing scope to establish baseline operating performance of the existing RTU-1 system prior to demolition and equipment replacement.
MICHAEL L.
HATHORNE
Lic. No. 0402066441
10.23.2026
Multiple zone
RTU1
System name and number RTU1
Condition analyzed (impacts Ez, Vdz, Vpz and Vps) Heating
All zones are included in the VRP calculation Yes
Zone Name and Number
Occupancy Category
Zone Floor Area Are you using default value for zone population?
Zone Population
Zone Air Distribution
Effectiveness
Zone Outdoor Airflow
Zone Discharge
Airflow
Zone Primary Airflow
Zone Secondary Recirculation
Fraction Zone Primary Air
Fraction
Az Pz Ez Voz Vdz Vpz Er Ep (sq ft) (people) (cfm) (cfm) (cfm)
01-060 281 OPEN SPACE / CORRIDORS Corridors 700 Yes 0.00 0.80 52.50 1,100 330 0.50 0.30 01-070 281 TRAINING SUITE Classrooms (age 9 plus) 531 No 5.00 0.80 142.15 676 203 0.50 0.30 01-070 278 CORRIDOR Corridors 180 Yes 0.00 0.80 13.50 75 23 0.50 0.30 01-070 208 CORRIDOR Corridors 212 Yes 0.00 0.80 15.90 100 30 0.50 0.30 01-050 213-MENS RESTROOM 146 Yes 0.00 0.80 0.00 75 23 0.50 0.30 01-030 214-WOMENS RESTROOM 151 Yes 0.00 0.80 0.00 75 23 0.50 0.30 01-050 203-SECURITY ADMIN Office space 106 No 1.00 0.80 14.20 100 30 0.50 0.30 01-090 204-SKILL SOURCE Office space 842 No 12.00 0.80 138.15 1,350 405 0.50 0.30 01-080 206-WORKFORCE Office space 473 No 7.00 0.80 79.23 1,100 330 0.50 0.30 01-070 209-STORAGE CLOSET Storage rooms 60 Yes 0.00 0.80 9.00 50 15 0.50 0.30 01-110 215,218-SYSTEMIC SOLUTIONS Office space 450 No 5.00 0.80 65.00 500 150 0.50 0.30 01-110 216-STORAGE CLOSET Storage rooms 33 Yes 0.00 0.80 4.95 50 15 0.50 0.30 01-100 217-OFFICE Office space 126 No 1.00 0.80 15.70 200 60 0.50 0.30 01-050, 110 219 CORRIDOR Corridors 856 Yes 0.00 0.80 64.20 250 75 0.50 0.30 01-110 221-ROBOTIC STORAGE Storage rooms 277 Yes 0.00 0.80 41.55 150 45 0.50 0.30 01-100 222-ROBOTIC CLASSROOM Classrooms (age 9 plus) 535 No 18.00 0.80 305.25 1,200 360 0.50 0.30 01-010 229-CLASSROOM Classrooms (age 9 plus) 543 No 28.00 0.80 431.45 1,500 450 0.50 0.30 01-020 230-CLASSROOM Classrooms (age 9 plus) 543 No 25.00 0.80 393.95 1,500 450 0.50 0.30 01-030 231-CLASSROOM Classrooms (age 9 plus) 612 No 28.00 0.80 441.80 1,500 450 0.50 0.30 01-040 232-CLASSROOM Classrooms (age 9 plus) 614 No 28.00 0.80 442.10 1,600 480 0.50 0.30 01-050 234-STUDENT LOUNGE Break rooms (general) 403 Yes 10.08 0.80 93.19 1,200 360 0.50 0.30 01-090 282 WORK COPY Office space 63 No 1.00 0.80 10.98 250 75 0.50 0.30
System area As (sq ft) 8,456 Net occupiable floor area served by the ventilation system
System population Ps (people) 151.00
Sum of zone population sum of Pz (people) 169.07 ∑Pz
Occupant diversity D 0.89 Ps / ∑Pz
Uncorrected outdoor air intake Vou (cfm) 2,054.19 D ∑ (Rp Pz) + ∑(Ra Az)
System primary airflow (at condition analyzed) Vps (cfm) 4,380
Average outdoor air fraction Xs 0.46 Vou / Vps
Which method from ASHRAE 62.1 is being used to determine system ventilation efficiency (Ev)? Appendix A
Ventilation efficiency Ev 0.79 Ventilation efficiency from critical zone
Outdoor air intake flow (required by 62.1) Vot (cfm) 2,600 Vou / Ev
Outdoor air intake flow provided (measured or design) (cfm) 3,100
Multiple zone
RTU1 (DEMAND CONTROL VENTILATION MINIMUM)
Show simple view
System name and number RTU1
Condition analyzed (impacts Ez, Vdz, Vpz and Vps) Heating
All zones are included in the VRP calculation Yes
Zone Name and Number
Occupancy Category
Zone Floor Area Are you using default value for zone population?
Zone Population
Zone Air Distribution
Effectiveness
Zone Outdoor Airflow
Zone Discharge
Airflow
Zone Primary Airflow
Zone Secondary Recirculation
Fraction Zone Primary Air
Fraction
Az Pz Ez Voz Vdz Vpz Er Ep (sq ft) (people) (cfm) (cfm) (cfm)
01-060 281 OPEN SPACE / CORRIDORS **** Corridors 700 Yes 0.00 0.80 52.50 1,100 330 0.50 0.30 01-070 281 TRAINING SUITE Classrooms (age 9 plus) 531 No 0.00 0.80 79.65 676 203 0.50 0.30 01-070 278 CORRIDOR Corridors 180 Yes 0.00 0.80 13.50 75 23 0.50 0.30 01-070 208 CORRIDOR Corridors 212 Yes 0.00 0.80 15.90 100 30 0.50 0.30 01-050 213-MENS RESTROOM 146 Yes 0.00 0.80 0.00 75 23 0.50 0.30 01-030 214-WOMENS RESTROOM 151 Yes 0.00 0.80 0.00 75 23 0.50 0.30 01-050 203-SECURITY ADMIN Office space 106 No 0.00 0.80 7.95 100 30 0.50 0.30 01-090 204-SKILL SOURCE Office space 842 No 0.00 0.80 63.15 1,350 405 0.50 0.30 01-080 206-WORKFORCE Office space 473 No 0.00 0.80 35.48 1,100 330 0.50 0.30 01-070 209-STORAGE CLOSET Storage rooms 60 Yes 0.00 0.80 9.00 50 15 0.50 0.30 01-110 215,218-SYSTEMIC SOLUTIONS Office space 450 No 0.00 0.80 33.75 500 150 0.50 0.30 01-110 216-STORAGE CLOSET Storage rooms 33 Yes 0.00 0.80 4.95 50 15 0.50 0.30 01-100 217-OFFICE Office space 126 No 0.00 0.80 9.45 200 60 0.50 0.30 01-050, 110 219 CORRIDOR *** Corridors 856 Yes 0.00 0.80 64.20 250 75 0.50 0.30 01-110 221-ROBOTIC STORAGE Storage rooms 277 Yes 0.00 0.80 41.55 150 45 0.50 0.30 01-100 222-ROBOTIC CLASSROOM Classrooms (age 9 plus) 535 No 0.00 0.80 80.25 1,200 360 0.50 0.30 01-010 229-CLASSROOM Classrooms (age 9 plus) 543 No 0.00 0.80 81.45 1,500 450 0.50 0.30 01-020 230-CLASSROOM Classrooms (age 9 plus) 543 No 0.00 0.80 81.45 1,500 450 0.50 0.30 01-030 231-CLASSROOM Classrooms (age 9 plus) 612 No 0.00 0.80 91.80 1,500 450 0.50 0.30 01-040 232-CLASSROOM Classrooms (age 9 plus) 614 No 0.00 0.80 92.10 1,600 480 0.50 0.30 01-050 234-STUDENT LOUNGE Break rooms (general) 403 No 0.00 0.80 30.23 1,200 360 0.50 0.30 01-090 282 WORK COPY Office space 63 No 0.00 0.80 4.73 250 75 0.50 0.30
System area As (sq ft) 8,456 Net occupiable floor area served by the ventilation system
System population Ps (people) 151.00
Sum of zone population sum of Pz (people) 0.00 ∑Pz
Occupant diversity D 0.00 Ps / ∑Pz
Uncorrected outdoor air intake Vou (cfm) 714.42 D ∑ (Rp Pz) + ∑(Ra Az)
System primary airflow (at condition analyzed) Vps (cfm) 4,380
Average outdoor air fraction Xs 0.16 Vou / Vps
Which method from ASHRAE 62.1 is being used to determine system ventilation efficiency (Ev)? Appendix A
Ventilation efficiency Ev 0.67 Ventilation efficiency from critical zone
Outdoor air intake flow (required by 62.1) Vot (cfm) 1,066 Vou / Ev
Outdoor air intake flow provided (measured or design) (cfm) 1,100
ROOFTOP AIR CONDITIONING UNIT SCHEDULE
DESIGNATION
MANUFACTURER
MODEL
NUMBER
LOCATION /
SERVICE
NOMINAL
COOLING
CAPACITY
(TON)
REFRIGERANT
SUPPLY
AIR
CFM
OUTSIDE
AIR CFM
OUTSIDE AIR DATA SUPPLY FAN EXHAUST FAN COOLING COIL ELECTRIC HEATING COIL ELECTRICAL DATA
GEN.
POWER
(Y/N)
VFD
(Y/N)
OPER.
WEIGHT
(LB)
NOTES
SUMMER WINTER
C
FM ES
P
(IN
W G
R
PM
BR
AK
E H
P
M O
TO
R
H P
ES
P
Q
TY
M O
TO
R
H P
FL
A
/ M O
C (E
AC
H
EAT LAT CAPACITY
EA
T
(º F)
LA
T
(º F)
C
AP
AC
IT
Y (K
W
C O
N
TR
O L
VO
LT
AG
E/
PH
AS
E
M C
A/ M
O P
U N
IT
FL
A
D B
(º F)
W B
(º F)
D B
(º F)
D B
(º F)
W B
(º F)
D B
(º F)
W B
(º F)
TO
TA
L (M
BH
SE
N
SI
BL
E (M
BH
RTU-1 CARRIER 50K ROOF / SECOND FLOOR EAST 40 R-454B 13,000 3,100 93.0 74.8 11.7 13,000 2.10 980 13.4 15 0.11 4 1 3.1 80.0 67.0 56.5 55.4 469 329 70.0 87.5 72.0 SCR 460 / 3 131 / 150 86.6 N Y 5,680 ALL
GENERAL NOTES:
A) PROVIDE DOWNFLOW SUPPLY / UPFLOW RETURN AIRFLOW CONFIGURATION WITH POWER EXHAUST FAN.
B) PROVIDE UNIT WITH 0-100% ENTHALPY ECONOMIZER.
C) PROVIDE 4" MERV 13 FILTERS.
D) PROVIDE STAINLESS STEEL DRIP PAN AND COOLING COIL CASING.
E) PROVIDE HINGED AND LATCHED ACCESS DOORS THAT DO NOT REQUIRE TOOLS FOR ACCESS.
F) COMMUNICATION INTERFACE SHALL BE BACNET.
G) EQUIPMENT SHALL MEET OR EXCEED MINIMUM EFFICIENCY REQUIREMENTS OF IEER 13.2 (ASHRAE 90.1-2022).
H) PROVIDE NEMA 3R DISCONNECT SWITCH MOUNTED ON UNISTRUT FRAMING, INSTALLED INDEPENDENTLY OF THE AHU CABINET AND ROOF CURB.
I) PROVIDE UNIT-MOUNTED WEATHERPROOF GFCI 120V DUPLEX CONVENIENCE RECEPTACLE.
J) PROVIDE CURB ADAPTER.
K) OPERATING WEIGHT REPRESENTS RTU ONLY AND DOES NOT INCLUDE CURB ADAPTER.
L) MAXIMUM COMBINED WEIGHT OF ROOFTOP UNIT AND CURB ADAPTER SHALL NOT EXCEED 6,800 LB. WHERE THE COMBINED INSTALLED WEIGHT EXCEEDS THIS LIMIT, THE CONTRACTOR SHALL PROVIDE STRUCTURAL ANALYSIS AND DESIGN, AND SHALL FURNISH AND INSTALL ALL REQUIRED SUPPLEMENTAL STRUCTURAL REINFORCEMENT TO SAFELY SUPPORT THE IMPOSED LOADS.
M) PROVIDE UNIT EXHAUST FAN WITH MULTI-STAGE POWER EXHAUST WITH BUILDING PRESSURE CONTROL.
N) PROVIDE FACTORY FURNISHED RETURN AIR HUMIDITY SENSOR TO FACILITATE COOLING-ONLY DEHUMIDIFICATION MODE. COOLING-ONLY DEHUMIDIFICATION MODE SHALL BE IMPLEMENTED USING THE UNIT MANUFACTURER'S NATIVE CONTROLLER LOGIC.
O) PROVIDE ECONOMIZER FAULT DETECTION AND DIAGNOSTIC SYSTEM (FDDS) AS STANDARD FEATURE.
P) MINIMUM SYSTEM OUTSIDE AIRFLOW WITH ALL TERMINAL UNITS IN DEMAND CONTROL VENTILATION MODE SHALL BE 1,100 CFM AS CALCULATED IN MECHANICAL VENTILATION CALCULATIONS, DEMAND CONTROL VENTILATION - ASHRAE 62.1 TABLE BELOW.
Q) CONTROLS SHALL BE PROVIDED BY CHESAPEAKE CONTROLS. POINT OF CONTACT IS JOHN CRANE, JOHNCRANE@CHESAPEAKECONTROLS.COM, 757-717-5172.
WSP USA Buildings Inc wsp.com
1300 N 17TH ST, SUITE 1000
ARLINGTON VA, 22209
(202) 362-2800
NO. REVISION DATE
SCALE:
DWN. BY:
VCCS PROJECT NO.:
WSP PROJECT NO.:
CKD. BY:
OWNER NAME:
PROJECT TITLE:
TITLE
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL TAKE PRECEDENCE OVER
SCALED DIMENSIONS. THESE DRAWING SHALL BE COPIED FROM THE ORIGINAL
BLUEPRINTS AND ARE APPROXIMATELY TO SCALE. IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND
CONDITIONS ON THE PROJECT AND SHALL NOTIFY THE ENGINEER OF ANY
VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THESE
DRAWINGS.
N.T.S.
MEP Engineer:
PROJECT CODE:
Commissioning Agent:
10030 WINDY HOLLOW RD
GREAT FALLS, VA 22066
703.731.1509
US0027294.0531
260-B6260-003
MT MLH
VCCS - NORTHERN
VIRGINIA COMMUNITY
COLLEGE
MTS REPLACE ROOF
TOP UNIT
SCHEDULES AND
CALCULATIONS
ME-002
PROJECT ADDRESS:
10500 BATTLEVIEW PKWY
MANASSAS, VIRGINIA 20109
260-B6260-003
MECHANICAL VENTILATION CALCULATIONS - ASHRAE 62.1
1.
NOTES:
ZONE POPULATION IS BASED ON THE LARGEST OF THE DESIGN OCCUPANCY AND THE OCCUPANCY
CALCULATED USING DESIGNATED IMC / ASHRAE DEFAULT OCCUPANCY RATE UNLESS OTHERWISE
NOTED.
DEMAND CONTROL VENTILATION CALCULATIONS - ASHRAE 62.1
1 ISSUE FOR BID 09/04/2026
2 ADDENDUM #2 10/23/2026
MICHAEL L.
HATHORNE
A
B
C
D
11 12 13 14 15 16 17 18
WSP USA Buildings Inc wsp.com
1300 N 17TH ST, SUITE 1000
ARLINGTON VA, 22209
(202) 362-2800
SHEET NOTES GENERAL NOTES
NO. REVISION DATE
SCALE:
DWN. BY:
VCCS PROJECT NO.:
WSP PROJECT NO.:
CKD. BY:
OWNER NAME:
PROJECT TITLE:
TITLE
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL TAKE PRECEDENCE OVER
SCALED DIMENSIONS. THESE DRAWING SHALL BE COPIED FROM THE ORIGINAL
BLUEPRINTS AND ARE APPROXIMATELY TO SCALE. IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND
CONDITIONS ON THE PROJECT AND SHALL NOTIFY THE ENGINEER OF ANY
VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THESE
DRAWINGS.
MEP Engineer:
PROJECT CODE:
Commissioning Agent:
10030 WINDY HOLLOW RD
GREAT FALLS, VA 22066
703.731.1509
3/32" = 1'-0"
US0027294.0531
260-B6260-003
MT MLH
VCCS - NORTHERN
VIRGINIA COMMUNITY
COLLEGE
MTS REPLACE ROOF
TOP UNIT
OVERALL PLAN
ME-101
PROJECT ADDRESS:
10500 BATTLEVIEW PKWY
MANASSAS, VIRGINIA 20109
260-B6260-003
3/32" = 1'-0"
OVERALL PLAN
A.
B.
C.
D.
E.
THE NEW ROOFTOP EQUIPMENT MAY BE MOUNTED ON THE EXISTING ROOF CURB
OR CURB ADAPTER, IF COMPATIBLE. OTHERWISE, DEMOLISH CURB ADAPTER AND
PROVIDE NEW CURB ADAPTER DESIGNED FOR PROPOSED NEW EQUIPMENT.
COORDINATE INSTALLATION TIMING WITH THE OWNER.
COORDINATE THE OWNER'S REQUIREMENTS FOR POSITIONING OF THE MAIN CAB
AND PROTECTION OF THE OWNER'S GROUNDS.
CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS FOR CRANE RIGGING, ROAD
CLOSURES, ELECTRICAL WORK, AND THE REPLACEMENT OF EQUIPMENT.
CONTRACTOR SHALL NOT VOID ANY ROOF WARRANTIES. ROOFING SERVICE
COMPANY SHALL INSPECT THE ROOF PRIOR TO AND AFTER CONSTRUCTION FOR
DAMAGES CAUSED BY THE PROJECT. ROOFING WILL BE REPAIRED / RESTORED
AT CONTRACTOR'S EXPENSE.
F. REFER TO THE TABLE ON SHEET ME-301 FOR THE LIST OF SPACES SERVED BY
THE EXISTING RTU AND THE CORRESPONDING DESIGN AIRFLOW QUANTITIES.
THE INFORMATION PRESENTED IN THE SHEET ME-301 TABLE IS BASED ON 2015
CONSTRUCTION DOCUMENTS AND IT IS PROVIDED FOR REFERENCE ONLY.
G. PROVIDE TESTING, MEASUREMENT, DOCUMENTATION, AND REPORTING OF THE
EXISTING RTU-1 AIR DISTRIBUTION SYSTEM SERVING THE SECOND-FLOOR EAST
AREA PRIOR TO ANY DEMOLITION ACTIVITIES, INCLUDING ALL SPACES INDICATED
ON SHEET ME-301. REFER TO PRE-CONSTRUCTION AIRFLOW MEASUREMENT
SCOPE DOCUMENT INCLUDED IN PROJECT MANUAL.
H. BALANCE ASSOCIATED SYSTEM ACCORDING TO PRE-CONSTRUCTION
AIRFLOWS AS INDICATED IN NOTE G.
I. CONTRACTOR SHALL PROVIDE A MINIMUM 7-DAY NOTICE TO THE CxA AND A/E
PRIOR TO THE RTU START-UP AND FUNCTIONAL TESTING.
N
J. BEFORE CxA SITE VISIT, ALL PRE-FUNCTIONAL CHECKLISTS, START-UP
REPORTS, AND BAS INTEGRATION MUST BE VERIFIED BY THE
CONTRACTOR AS 'COMPLETE'. ANY RE-TESTING REQUIRED DUE TO
INCOMPLETE INSTALLATION WILL BE AT THE CONTRACTOR'S EXPENSE.
K. CONTRACTOR MUST PROVIDE WALKWAY PADS OR PLYWOOD
PROTECTION FROM THE ROOF HATCH OR ROOF ACCESS TO THE UNIT
TO PREVENT DAMAGE TO THE EXISTING MEMBRANE DURING THE
"TURNKEY" INSTALLATION.
L. COORDINATE NOISY WORK OR CRANE LIFTS A WEEK IN ADVANCE TO
AVOID DISRUPTING CLASSES
08' 4'
SCALE: 3/32" = 1' - 0"
GRAPHIC SCALE
8' 16' 32'24'
1 ISSUE FOR BID 09/04/2026
2 ADDENDUM #2 10/23/2026
MICHAEL L.
HATHORNE
A
B
C
D
11 12 13 14 15 16 17 18
(X)RTU
(E)RTU
(E)RTU
(E)RD
(E)RD
(E) L2E Sec 2/ 38,40,42
(X) RTU-1
S
S
(E)ROOF HATCH
A
B
C
D
11 12 13 14 15 16 17 18
RTU
2 3
(E)RTU
(E)RTU
2 4
(E)RD (E)RD
1 1/4" D
S
S
(E) L2E Sec 2/ 38,40,42
RTU-1
5 GFCI
WP (E)
(E)ROOF HATCH
(E)
(E)
WSP USA Buildings Inc wsp.com
1300 N 17TH ST, SUITE 1000
ARLINGTON VA, 22209
(202) 362-2800
NO. REVISION DATE
SCALE:
DWN. BY:
VCCS PROJECT NO.:
WSP PROJECT NO.:
CKD. BY:
OWNER NAME:
PROJECT TITLE:
TITLE
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL TAKE PRECEDENCE OVER
SCALED DIMENSIONS. THESE DRAWING SHALL BE COPIED FROM THE ORIGINAL
BLUEPRINTS AND ARE APPROXIMATELY TO SCALE. IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND
CONDITIONS ON THE PROJECT AND SHALL NOTIFY THE ENGINEER OF ANY
VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THESE
DRAWINGS.
MEP Engineer:
GENERAL NOTES
KEYNOTES
PROJECT CODE:
Commissioning Agent:
10030 WINDY HOLLOW RD
GREAT FALLS, VA 22066
703.731.1509
1/8" = 1'-0"
US0027294.0531
260-B6260-003
MT MLH
VCCS - NORTHERN
VIRGINIA COMMUNITY
COLLEGE
MTS REPLACE ROOF
TOP UNIT
ROOF PLANS
ME-201
PROJECT ADDRESS:
10500 BATTLEVIEW PKWY
MANASSAS, VIRGINIA 20109
260-B6260-003
1 REMOVE EXISTING RTU AND ASSOCIATED ACCESSORIES. EXISTING SMOKE
DETECTOR TO REMAIN.
2 PROVIDE NEW ROOF TOP UNIT RTU-1 AS SCHEDULED. PROVIDE NEW ADAPTER
CURB TO ACCOMMODATE NEW RTU-1. THE NEW UNIT AND CURB ADAPTER WILL
SIT ON AN EXISTING CURB WITH GASKETING AND SHALL BE INSTALLED PER
MANUFACTURER'S RECOMMENDATIONS.
3 THIS UNIT SERVES THE SECOND FLOOR EAST SPACES.
4 ROUTE PIPING DOWN TO ROOF AND DISCHARGE AT ROOF DRAIN. PROVIDE ROOF
PIPING SUPPORT PER SPECIFICATION 232113.
5 EXISTING VERTICAL SUPPLY AND RETURN AIR DUCTWORK AND SMOKE
DETECTORS SHOWN FOR REFERENCE ONLY. FIELD VERIFY EXACT DUCTWORK
LOCATION AND ADJUST CURB ADAPTER REQUIREMENTS AS NEEDED.
6 PROVIDE NEW EPDM PRESSURE-SENSITIVE MOLDED WALKWAY PADS AS SHOWN.
7 REFER TO ROOM 200-J ELECTRICAL FOR PANEL L2E ON SHEET ME-301.
1/8" = 1'-0"
ROOF DEMOLITION PLAN - EAST
1/8" = 1'-0"
ROOF NEW WORK PLAN - EAST
1 A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
THE NEW ROOFTOP EQUIPMENT MAY BE MOUNTED ON THE EXISTING ROOF
CURB OR CURB ADAPTER, IF COMPATIBLE. OTHERWISE, DEMOLISH CURB
ADAPTER AND PROVIDE NEW CURB ADAPTER DESIGNED FOR PROPOSED NEW
EQUIPMENT.
COORDINATE INSTALLATION TIMING WITH THE OWNER.
COORDINATE THE OWNER'S REQUIREMENTS FOR POSITIONING OF THE MAIN
CAB AND PROTECTION OF THE OWNER'S GROUNDS.
CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS FOR CRANE RIGGING, ROAD
CLOSURES, ELECTRICAL WORK, AND THE REPLACEMENT OF EQUIPMENT.
CONTRACTOR SHALL NOT VOID ANY ROOF WARRANTIES. ROOFING SERVICE
COMPANY SHALL INSPECT THE ROOF PRIOR TO AND AFTER CONSTRUCTION
FOR DAMAGES CAUSED BY THE PROJECT. ROOFING WILL BE REPAIRED /
RESTORED AT CONTRACTOR'S EXPENSE.
REFER TO THE TABLE ON SHEET ME-301 FOR THE LIST OF SPACES SERVED BY
THE EXISTING RTU AND THE CORRESPONDING DESIGN AIRFLOW QUANTITIES.
THE INFORMATION PRESENTED IN THE SHEET ME-301 TABLE IS BASED ON 2015
CONSTRUCTION DOCUMENTS AND IT IS PROVIDED FOR REFERENCE ONLY.
PROVIDE TESTING, MEASUREMENT, DOCUMENTATION, AND REPORTING OF THE
EXISTING RTU-1 AIR DISTRIBUTION SYSTEM SERVING THE SECOND-FLOOR
EAST AREA PRIOR TO ANY DEMOLITION ACTIVITIES, INCLUDING ALL SPACES
INDICATED ON SHEET ME-301. REFER TO PRE-CONSTRUCTION AIRFLOW
MEASUREMENT SCOPE DOCUMENT INCLUDED IN PROJECT MANUAL.
BALANCE ASSOCIATED SYSTEM ACCORDING TO PRE-CONSTRUCTION
AIRFLOWS AS INDICATED IN NOTE G.
CONTRACTOR SHALL PROVIDE A MINIMUM 7-DAY NOTICE TO THE CxA AND A/E
PRIOR TO THE RTU START-UP AND FUNCTIONAL TESTING.
BEFORE CxA SITE VISIT, ALL PRE-FUNCTIONAL CHECKLISTS, START-UP
REPORTS, AND BAS INTEGRATION MUST BE VERIFIED BY THE CONTRACTOR AS
'COMPLETE'. ANY RE-TESTING REQUIRED DUE TO INCOMPLETE INSTALLATION
WILL BE AT THE CONTRACTOR'S EXPENSE.
CONTRACTOR MUST PROVIDE WALKWAY PADS OR PLYWOOD PROTECTION
FROM THE ROOF HATCH OR ROOF ACCESS TO THE UNIT TO PREVENT DAMAGE
TO THE EXISTING MEMBRANE DURING THE "TURNKEY" INSTALLATION.
COORDINATE NOISY WORK OR CRANE LIFTS A WEEK IN ADVANCE TO AVOID
DISRUPTING CLASSES.
GFCI
WP (E)
N
N 08' 4'
SCALE: 1/8" = 1' - 0"
GRAPHIC SCALE
8' 16' 24'
08' 4'
SCALE: 1/8" = 1' - 0"
GRAPHIC SCALE
8' 16' 24'
(E)
(E)
1 ISSUE FOR BID 09/04/2026
2 ADDENDUM #2 10/23/2026
MICHAEL L.
HATHORNE
4'- 0"
4'-0"
4'- 0"
4'- 0"
4'- 0"3'-0"
4'- 0"
4'- 0"
4'-0"4'-0"
4'-0" 4'-0" 4'- 0"
4'- 0"
'-0
'-0
'-0
'-0
30'-0" 30'-0"
60'-0"
3'- 6"
3'- 5"
3'- 6"
3'- 6"
4'- 3"
3'- 5"
4'- 6"
7'- 6"
6'-0" 6'-0"
4'-0"5'-0"
1'-9"4'-0"
4'- 0"
4'- 0"
4'-0"
3' MIN.
" M
IN
5'-0" MIN
1'-8"
17'-6"
'-0
'-0
10'-0"
'-0
10'-0"9'-6"
27'-6"
27'-0"
'-0
27'-0"27'-0" 81'-0"
'-0
WZPE24
WZPE24
WZPE24
WZPE24
1 2 3 4 6 75
8 9 10 11 13 1412
15 16 17 18 20 2119
22 23 24 25 27 2826
1 2 3 4 5 6 7
8 9
15 16
22 23
10 11 12
17 18 19
24 25 26
13 14
20 21
27 28
1 2 3 4 6 75
8 9
15 16
22 23
A1 A2
10 11 13 1412
17 18 20 2119
24 25 27 2826
A1 A2 A1 A2
6 7 8 9 10
16 17 18 19 20
26 1
A1 A2
A1 A2
A1 A2
DN
DN
A
B
C
D
161514131211
B
A
MICRO
REQUIRED CLEAR
FLOOR AREA
*******REMEMBER---YOU NEED TO FIGURE OUT HOW MANY
STAIR TREADS YOU NEED FOR YOUR SLAB TO SLAB
HEIGHT--THIS IS INTENDED AS A HELPFUL PLACEHODER
AND STARTING POINTONLY!!*************
*******REMEMBER---YOU NEED TO FIGURE OUT HOW MANY
RACKS YOU HAVE, WHAT SIZE THEY ARE, WHAT HVAC
UNIT IS NEEDED, WHAT SIZE IT IS (ANDALL CLEARANCES ALSO)--THIS IS INTENDED AS A HELPFUL PLACEHODER AND STARTING POINTONLY!!*************
SHOULD BE ADJACENT TO ROOM(S)
REQUIRING AV EQUIPMENT. SIZE MAY VARY.
SHOULD BE ADJACENT TO DIVISIBLE OR
RECONFGURABLE CONFERENCE ROOM(S). ALSO
CONSIDER THE LENGTH OF THE RUN YOU'LL NEED TO
MAKE WITH YOUR DUCT TO THE BUILDING CORE, AND
THE FACT THAT ALONG THAT RUN, THE CEILING MAY
WELL HAVE TO BE FAIRLY LOW. SIZE MAY VARY,
CONTACT YOUR MEP ENGINEER FOR SIZING AND
CLEARANCES FOR EQUIPMENT.
WATCH PROPORTIONS--A ROOM THAT'S
NOT WIDE ENOUGH TO ACCOMODATE 6'6"
WIDE TABLES AND CHAIRS ON DOLLIES IS
USELESS. SHOULD HAVE A DOUBLE DOOR.
THIS BLOCK WAS CREATED DIRECTLY FROM KNOLL'S
"OPEN PLAN #1902", WHICH IS DIVIDENDS HORIZON
THIS BLOCK WAS CREATED DIRECTLY FROM KNOLL'S
"OPEN PLAN #405", WHICH IS AN ANTENNA WORKSPACE
OPEN FLOOR AREA
WE DON'T HAVE DEFINITE DESIGNS FOR WHAT THESE
LOOK LIKE, BUT THIS IS A GOOD STARTING POINT.
WE DON'T HAVE DEFINITE DESIGNS FOR WHAT THESE
LOOK LIKE, BUT THIS IS A GOOD STARTING POINT, BASED
ON A RECORDING SETUP THAT WE DID FOR
HEARST-ARGYLE DC.
T F
A
B
C
D
11 12 13 14 15 16 17
(E) L2E Sec 1
(E) L2E Sec 2
(E) P2E Sec 1
(E) P2E Sec 2
(E) P2E Sec 3
206 - WORKFORCE
SUITE
205 - WORK/COPY
203 -
SECURITY/ADMIN
OFFICE
213 - MENS
RESTROOM
214 - WOMENS
RESTROOM
217 - OFFICE218 - WORK/COPY
215 - SYSTEMIC
SOLUTION SUITE
216 - STORAGE
CLOSET
222 - ROBOTIC
CLASSROOM
221 - ROBOTICS
STORAGE 220 - STUDY NOOK
230 - TRAINING
CLASSROOM
231 - TRAINING
CLASSROOM
232 - TRAINING
CLASSROOM
234 - STUDENT
LOUNGE
200-J - EXISTING
ELECTRICAL
210 - NETWORK
CLOSET
209 - STORAGE
CLOSET
211 - CORRIDOR 219 - CORRIDOR
208 - CORRIDOR
204 - SKILL SOURCE
SUITE
200 - ATRIUM
281 - TRAINING SUITE
233 - STUDY NOOK
223 - ROBOTIC
CLASSROOM
229 - WORKFORCE
CLASSROOM
278 - CORRIDOR
TABLE 1.1 - LIST OF ROOMS AND CORRESPONDING AIRFLOWS SERVED BY EXISTING RTU
VAV
DESIGNATION
ROOM
NUMBER ROOM NAME
OUTLET AIRFLOW DATA
TOTAL CFM NUMBER OF SUPPLY
AIR DIFFUSERS COMMENT
VAV 200 ATRIUM 1100 3 3x375 CFM DIFFUSERS AT ATRIUM WALL
VAV
203 SECURITY ADMIN 100 1 1X100 CFM DIFFUSER
211 CORRIDOR 100 1 1X100 CFM DIFFUSER BY ATRIUM
213 MENS RESTROOM 75 1 1X75 CFM DIFFUSER AT DOOR
234 STUDENT LOUNGE 1200 4 4X300 CFM DIFFUSERS
VAV 204, 205 SKILL SOURCE 1350 6
3X250 CFM DIFFUSERS AT WINDOWS
3X200 CFM DIFFUSERS CENTER OF ROOM
218 WORK/COPY 250 1 1X250 CFM DIFFUSER AT WINDOWS
VAV 206 WORKFORCE 1100 4 4X275 CFM DIFFUSERS AT WINDOWS
VAV
208 CORRIDOR 100 1 1X100 CFM DIFFUSER
209 STORAGE CLOSET 50 1 1X50 CFM DIFFUSER
273 CORRIDOR 75 1 1X75 CFM DIFFUSER
281 TRAINING SUITE 675 3 3X225 CFM DIFFUSERS
VAV
215 SYSTEMIC SOLUTIONS 250 2 2X250 CFM DIFFUSERS BY CORRIDORS
216 STORAGE CLOSET 50 1 1X50 CFM DIFFUSER
219 CORRIDOR 250 1 1X150 CFM DIFFUSER AT ROOM 231 DOOR
220 STUDY NOOK 200 1 1X200 CFM DIFFUSER IN CORRIDOR
221 ROBOTIC STORAGE 150 1 1X150 CFM DIFFUSER
VAV
217 OFFICE 200 1 1X200 CFM DIFFUSER
222 ROBOTIC CLASSROOM 1200 4 4X300 CFM DIFFUSERS
VAV 229 CLASSROOM 1500 4 4X375 CFM DIFFUSERS
VAV 230 CLASSROOM 1500 4 4X375 CFM DIFFUSERS
VAV
214 WOMENS RESTROOM 75 1 1X75 CFM DIFFUSER AT DOOR
231 CLASSROOM 1500 4 4X375 CFM DIFFUSERS
VAV 232 CLASSROOM 1600 4 4X400 CFM DIFFUSERS
GENERAL:
A. THE INFORMATION PRESENTED IN THIS TABLE WAS DERIVED FROM THE EXISTING CONSTRUCTION DOCUMENTS DATED JULY 6, 2015 AND IS PROVIDED FOR REFERENCE PURPOSES ONLY. FIELD VERIFICATION OF ALL EXISTING CONDITIONS IS REQUIRED PRIOR TO CONSTRUCTION.
B. RETURN AIR GRILLES ASSOCIATED WITH THE SPACES IDENTIFIED IN THIS TABLE ARE CONNECTED TO THE EXISTING RETURN AIR PLENUM SYSTEM. AS PART OF A PLENUM RETURN CONFIGURATION, THESE RETURN AIR DEVICES ARE NOT INDIVIDUALLY BALANCED AND NO RETURN
AIRFLOW QUANTITIES ARE ASSOCIATED WITH THE GRILLES.
C. REFER TO EXISTING BUILDING AUTOMATION SYSTEM FOR VAV BOX DESIGNATION.
WSP USA Buildings Inc wsp.com
1300 N 17TH ST, SUITE 1000
ARLINGTON VA, 22209
(202) 362-2800
NO. REVISION DATE
SCALE:
DWN. BY:
VCCS PROJECT NO.:
WSP PROJECT NO.:
CKD. BY:
OWNER NAME:
PROJECT TITLE:
TITLE
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL TAKE PRECEDENCE OVER
SCALED DIMENSIONS. THESE DRAWING SHALL BE COPIED FROM THE ORIGINAL
BLUEPRINTS AND ARE APPROXIMATELY TO SCALE. IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND
CONDITIONS ON THE PROJECT AND SHALL NOTIFY THE ENGINEER OF ANY
VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THESE
DRAWINGS.
MEP Engineer:
GENERAL NOTES
KEYNOTES
PROJECT CODE:
Commissioning Agent:
10030 WINDY HOLLOW RD
GREAT FALLS, VA 22066
703.731.1509
As indicated
US0027294.0531
260-B6260-003
MT MLH
VCCS - NORTHERN
VIRGINIA COMMUNITY
COLLEGE
MTS REPLACE ROOF
TOP UNIT
PARTIAL FLOOR
PLANS
ME-301
PROJECT ADDRESS:
10500 BATTLEVIEW PKWY
MANASSAS, VIRGINIA 20109
260-B6260-003
A.
B.
C.
REFER TO THE TABLE ON SHEET ME-301 FOR THE LIST OF SPACES
SERVED BY THE EXISTING RTU AND THE CORRESPONDING DESIGN
AIRFLOW QUANTITIES. THE INFORMATION PRESENTED IN THE
SHEET ME-301 TABLE IS BASED ON 2015 CONSTRUCTION
DOCUMENTS AND IT IS PROVIDED FOR REFERENCE ONLY.
PROVIDE TESTING, MEASUREMENT, DOCUMENTATION, AND
REPORTING OF THE EXISTING RTU-1 AIR DISTRIBUTION SYSTEM
SERVING THE SECOND-FLOOR EAST AREA PRIOR TO ANY
DEMOLITION ACTIVITIES, INCLUDING ALL SPACES INDICATED ON
SHEET ME-301. REFER TO PRE-CONSTRUCTION AIRFLOW
MEASUREMENT SCOPE DOCUMENT INCLUDED IN PROJECT
MANUAL.
BALANCE ASSOCIATED SYSTEM ACCORDING TO PRE-
CONSTRUCTION AIRFLOWS AS INDICATED IN NOTE B.
1/8" = 1'-0"
SECOND FLOOR NEW WORK PLAN
N
1 PROVIDE A SPARE FUSE CABINET IN THE ELECTRICAL CLOSET. PROVIDE 1
COMPLETE SET OF FUSES FOR EACH TYPE OF FUSES USED FOR THIS PROJECT.
08' 4'
SCALE: 1/8" = 1' - 0"
GRAPHIC SCALE
8' 16' 24'
1 ISSUE FOR BID 09/04/2026
2 ADDENDUM #2 10/23/2026
MICHAEL L.
HATHORNE
SEQUENCE OF OPERATIONS
ROOFTOP AIR CONDITIONING UNIT WITH ELECTRIC HEAT
BUILDING AUTOMATION SYSTEM INTERFACE:
THE BUILDING AUTOMATION SYSTEM (BAS) SHALL SEND THE CONTROLLER OCCUPIED BYPASS,
MORNING WARM-UP / PRE-COOL, OCCUPIED / UNOCCUPIED AND HEAT / COOL MODES.
IF A BAS IS NOT PRESENT, OR COMMUNICATION IS LOST WITH THE BAS THE CONTROLLER SHALL
OPERATE USING DEFAULT MODES AND SETPOINTS.
THE BAS SHALL ALSO SEND THE CONTROLLER A DUCT STATIC PRESSURE SETPOINT, DISCHARGE AIR
TEMPERATURE SETPOINT, AND VENTILATION AIRFLOW SETPOINT, EACH CALCULATED BY
OPTIMIZATION ROUTINES IN THE BAS.
EXISTING BAS PROGRAMMING SHALL BE UPDATED TO ACCOMMODATE NEW EQUIPMENT WITH
CONTROLS POINTS AND GRAPHICS.
OCCUPIED MODE:
DURING OCCUPIED PERIODS, THE SUPPLY FAN SHALL RUN CONTINUOUSLY AND THE OUTSIDE AIR DAMPER SHALL OPEN TO MAINTAIN THE CURRENT AIRFLOW SETPOINT. THE UNIT CONTROLLER SHALL CONTROL THE SUPPLY FAN SPEED TO MAINTAIN THE CURRENT DUCT STATIC PRESSURE SETPOINT (ADJ.).THE DX COOLING AND ELECTRIC HEAT SHALL STAGE TO MAINTAIN THE CURRENT DISCHARGE
AIR TEMPERATURE SETPOINT. IF ECONOMIZING IS ENABLED THE OUTSIDE AIR DAMPER SHALL
MODULATE TO MAINTAIN THE CURRENT DISCHARGE AIR TEMPERATURE SETPOINT.
UNOCCUPIED MODE (VERIFY SEQUENCES ACCEPTABLE WITH EXISTING PROGRAMMING):
WHEN THE SPACE TEMPERATURE IS BELOW THE UNOCCUPIED HEATING SETPOINT OF 55.0 DEG. F (ADJ.) THE SUPPLY FAN SHALL START, THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED AND THE
ELECTRIC HEAT SHALL BE ENABLED. WHEN THE SPACE TEMPERATURE RISES ABOVE THE
UNOCCUPIED HEATING SETPOINT OF 55.0 DEG. F (ADJ.) PLUS THE UNOCCUPIED DIFFERENTIAL OF 4.0
DEG. F (ADJ.) THE SUPPLY FAN SHALL STOP AND THE ELECTRIC HEAT SHALL BE DISABLED.
WHEN THE SPACE TEMPERATURE IS ABOVE THE UNOCCUPIED COOLING SETPOINT OF 85.0 DEG. F (ADJ.) THE SUPPLY FAN SHALL START, THE OUTSIDE AIR DAMPER SHALL OPEN IF ECONOMIZING IS
ENABLED AND REMAIN CLOSED IF ECONOMIZING IS DISABLED AND THE DX COOLING SHALL BE
ENABLED. WHEN THE SPACE TEMPERATURE FALLS BELOW THE UNOCCUPIED COOLING SETPOINT OF
85.0 DEG. F (ADJ.) MINUS THE UNOCCUPIED DIFFERENTIAL OF 4.0 DEG. F (ADJ.) THE SUPPLY FAN SHALL STOP, THE DX COOLING SHALL BE DISABLED AND THE OUTSIDE AIR DAMPER SHALL CLOSE.
OPTIMAL START:
THE BAS SHALL MONITOR THE SCHEDULED OCCUPIED TIME, OCCUPIED SPACE SETPOINTS AND SPACE
TEMPERATURE TO CALCULATE WHEN THE OPTIMAL START OCCURS.
MORNING WARM-UP MODE (VERIFY SEQUENCES ACCEPTABLE WITH EXISTING PROGRAMMING):
DURING OPTIMAL START, IF THE AVERAGE SPACE TEMPERATURE IS BELOW THE OCCUPIED HEATING
SETPOINT A MORNING WARM-UP MODE SHALL BE ACTIVATED.
WHEN MORNING WARM-UP IS INITIATED, THE UNIT SHALL ENABLE THE HEATING AND SUPPLY FAN. THE
OUTSIDE AIR DAMPER SHALL REMAIN CLOSED.
WHEN THE AVERAGE SPACE TEMPERATURE REACHES THE OCCUPIED HEATING SETPOINT (ADJ.), THE
UNIT SHALL TRANSITION TO THE OCCUPIED MODE.
PRE-COOL MODE:
DURING OPTIMAL START, IF THE AVERAGE SPACE TEMPERATURE IS ABOVE THE OCCUPIED COOLING SETPOINT, PRE-COOL MODE SHALL BE ACTIVATED. WHEN PRE-COOL IS INITIATED, THE UNIT SHALL ENABLE THE FAN AND COOLING OR ECONOMIZER. THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED, UNLESS ECONOMIZING. WHEN THE AVERAGE SPACE TEMPERATURE REACHES OCCUPIED COOLING
SETPOINT (ADJ.), THE UNIT SHALL TRANSITION TO THE OCCUPIED MODE.
OPTIMAL STOP:
THE BAS SHALL MONITOR THE SCHEDULED UNOCCUPIED TIME, OCCUPIED SETPOINTS AND SPACE TEMPERATURE TO CALCULATE WHEN THE OPTIMAL STOP OCCURS. WHEN THE OPTIMAL STOP MODE IS ACTIVE THE UNIT CONTROLLER SHALL MAINTAIN THE SPACE TEMPERATURE USING AN ADJUSTED SPACE TEMPERATURE SETPOINT BASED ON THE CURRENT MODE OF OPERATION. IN COOLING MODE, THE ACTIVE SPACE TEMPERATURE SETPOINT SHALL BE EQUAL TO THE OCCUPIED COOLING SETPOINT
PLUS THE SPACE TEMPERATURE OFFSET. IN HEATING MODE, THE ACTIVE SPACE TEMPERATURE
SETPOINT SHALL BE EQUAL TO THE OCCUPIED HEATING SETPOINT MINUS THE SPACE TEMPERATURE OFFSET. UPON EXPIRATION OF THE OPTIMAL STOP PERIOD OR TRANSITION TO UNOCCUPIED MODE, THE UNIT SHALL REVERT TO NORMAL UNOCCUPIED CONTROL SEQUENCES. SETPOINT OFFSET SHALL
BE ADJUSTABLE BUT SHALL NOT BE REDUCED BELOW 2 DEG F.
OCCUPIED BYPASS:
THE BAS SHALL MONITOR THE STATUS OF THE “ON”AND “CANCEL”BUTTONS OF THE SPACE
TEMPERATURE SENSORS. WHEN AN OCCUPIED BYPASS REQUEST IS RECEIVED FROM A SPACE
SENSOR, THE UNIT SHALL TRANSITION FROM ITS CURRENT OCCUPANCY MODE TO OCCUPIED BYPASS
MODE AND THE UNIT SHALL MAINTAIN THE SPACE TEMPERATURE TO THE OCCUPIED SETPOINTS
(ADJ.).
COOLING MODE:
THE UNIT CONTROLLER SHALL USE THE DISCHARGE AIR TEMPERATURE SENSOR AND DISCHARGE AIR
TEMPERATURE COOLING SETPOINT TO DETERMINE WHEN TO INITIATE REQUESTS FOR COOLING.
DISCHARGE AIR SETPOINT SHALL BE MAINTAINED BY MODULATING THE ECONOMIZER OR STAGING
THE DX COOLING AS REQUIRED TO MAINTAIN THE DISCHARGE AIR SETPOINT.
COOLING-ONLY DEHUMIDIFICATION MODE:
THE UNIT SHALL BE CAPABLE OF OPERATING IN A COOLING-ONLY DEHUMIDIFICATION MODE WHEN A DEHUMIDIFICATION DEMAND IS PRESENT. A DEHUMIDIFICATION DEMAND SHALL BE GENERATED WHEN THE RETURN AIR RELATIVE HUMIDITY EXCEEDS THE DEHUMIDIFICATION SETPOINT OF 55% RH (ADJ.). WHEN A DEHUMIDIFICATION DEMAND IS PRESENT, THE UNIT CONTROLLER SHALL OVERRIDE THE NORMAL COOLING CONTROL SEQUENCE AND STAGE DX COOLING TO MAINTAIN A COOLING COIL TEMPERATURE SETPOINT OF 50°F (ADJ.), REGARDLESS OF THE
DISCHARGE AIR TEMPERATURE COOLING SETPOINT.
DURING COOLING-ONLY DEHUMIDIFICATION MODE:
THE SUPPLY FAN SHALL OPERATE.
THE OUTDOOR AIR DAMPER SHALL OPERATE AT THE MINIMUM OUTDOOR AIR POSITION.
ECONOMIZER OPERATION SHALL BE DISABLED.
DX COOLING SHALL BE STAGED AS REQUIRED TO MAINTAIN THE DEHUMIDIFICATION COOLING CONTROL
SEQUENCE SETPOINT.
ELECTRIC HEAT AND DISCHARGE AIR TEMPERATURE REHEAT SHALL BE DISABLED.
COOLING-ONLY DEHUMIDIFICATION MODE SHALL TERMINATE WHEN THE RETURN AIR RELATIVE HUMIDITY FALLS BELOW THE DEHUMIDIFICATION SETPOINT MINUS A 5% RH DIFFERENTIAL (ADJ.), AT WHICH TIME THE UNIT SHALL
RESUME NORMAL OCCUPIED COOLING OPERATION.
DURING COOLING-ONLY DEHUMIDIFICATION MODE, VAV TERMINAL UNITS SHALL BE PERMITTED TO REHEAT AS REQUIRED TO MAINTAIN SPACE TEMPERATURE SETPOINTS IN ACCORDANCE WITH THE TERMINAL UNIT CONTROL
SEQUENCES.
HEATING MODE:
WHEN DISCHARGE AIR TEMPERATURE FALLS BELOW THE SUPPLY DISCHARGE SETPOINT TEMPERATURE (53 DEGREES F. ADJUSTABLE), THE HEATING COIL SHALL ENERGIZE AND MODULATE TO MAINTAIN
DISCHARGE SETPOINT TEMPERATURE.
IF FOUR (4) OR MORE VAV BOXES ARE UNABLE TO REACH ZONE SETPOINT IN HEATING MODE, THE LEAVING AIR TEMPERATURE FROM THE RTU SHALL BE RESET TO 65 DEGREES (ADJ.) TO SATISFY SPACE TEMPERATURE.
ECONOMIZER:
THE ECONOMIZER SHALL BE ENABLED WHEN THE OUTDOOR AIR ENTHALPY IS AT LEAST 3.0 BTU/LB LESS THAN THE
RETURN AIR ENTHALPY.
WHEN ENABLED, THE OUTDOOR AIR AND RETURN AIR DAMPERS SHALL MODULATE TO MAINTAIN THE DISCHARGE AIR TEMPERATURE SETPOINT BETWEEN THE MINIMUM OUTDOOR AIR POSITION AND 100% OUTDOOR AIR.
IF THE OUTDOOR AIR DAMPER REACHES 100% OPEN AND THE DISCHARGE AIR TEMPERATURE REMAINS ABOVE
SETPOINT, MECHANICAL COOLING SHALL BE ENABLED AS REQUIRED.
WHEN THE OUTDOOR AIR ENTHALPY IS GREATER THAN OR EQUAL TO THE RETURN AIR ENTHALPY OR OUTDOOR AIR DRY BULB TEMPERATURE EXCEEDS 75°F", THE ECONOMIZER SHALL BE DISABLED AND THE OUTDOOR AIR DAMPER
SHALL RETURN TO THE MINIMUM OUTDOOR AIR POSITION.
THE ECONOMIZER SHALL BE DISABLED WHEN THE OUTDOOR AIR TEMPERATURE IS BELOW 38°F (ADJ.) OR ABOVE
75°F OUTSIDE AIR TEMPERATURE.
THE EXHAUST FAN SHALL MODULATE AS NECESSARY TO MAINTAIN BUILDING PRESSURE DURING ECONOMIZER
OPERATION.
SUPPLY FAN:
THE SUPPLY FAN SHALL BE ENABLED WHILE IN THE OCCUPIED MODE AND CYCLED ON DURING THE
UNOCCUPIED MODE.
THE SUPPLY FAN SHALL MODULATE MAINTAINING THE DUCT STATIC PRESSURE TO SETPOINT AT THE SENSOR
LOCATED 2/3 DOWNSTREAM. LOCATION SHALL BE COORDINATED WITH ENGINEEER.
ON SYSTEM STARTUP, THE SUPPLY FAN'S SPEED SHALL BE SLOWLY INCREASED TO THE INITIAL DUCT STATIC
PRESSURE SETPOINT (1.2" ADJ.).
IF THE SWITCH DOES NOT OPEN WITHIN 40 SECONDS AFTER A REQUEST FOR FAN OPERATION, A FAN FAILURE ALARM SHALL BE ANNUNCIATED AT THE BAS, THE UNIT SHALL STOP, REQUIRING A MANUAL RESET.
DEMAND CONTROL VENTILATION (DCV):
DURING OCCUPIED MODE, THE BAS SHALL CALCULATE A VENTILATION AIRFLOW SETPOINT BASED ON ZONE CO ₂ SENSOR MEASUREMENTS. THE BAS SHALL RESET THE VENTILATION AIRFLOW SETPOINT BETWEEN THE MINIMUM VENTILATION AIRFLOW AND THE DESIGN VENTILATION AIRFLOW BASED ON THE HIGHEST ZONE CO ₂ LEVEL RELATIVE TO ITS SETPOINT. THE UNIT CONTROLLER SHALL MODULATE THE OUTDOOR AIR DAMPER TO MAINTAIN THE CURRENT VENTILATION AIRFLOW SETPOINT PROVIDED BY THE BAS. THE MINIMUM OUTDOOR AIR POSITION SHALL CORRESPOND TO THE MINIMUM VENTILATION AIRFLOW SETPOINT AS DETERMINED DURING TESTING AND
BALANCING.
DURING PERIODS OF LOW OCCUPANCY, AS INDICATED BY ZONE CO₂ LEVELS BELOW SETPOINT, THE VENTILATION
AIRFLOW SETPOINT SHALL BE REDUCED TO THE MINIMUM VENTILATION AIRFLOW.
DURING PERIODS OF HIGH OCCUPANCY, AS INDICATED BY ZONE CO₂ LEVELS APPROACHING OR EXCEEDING SETPOINT, THE VENTILATION AIRFLOW SETPOINT SHALL INCREASE UP TO THE DESIGN VENTILATION AIRFLOW AS
REQUIRED TO MAINTAIN INDOOR AIR QUALITY.
DEMAND CONTROL VENTILATION SHALL BE ACTIVE ONLY DURING OCCUPIED MODES AND SHALL BE DISABLED DURING UNOCCUPIED OPERATION, AT WHICH TIME THE OUTDOOR AIR DAMPER SHALL REMAIN CLOSED UNLESS
REQUIRED FOR ECONOMIZER OPERATION.
DEMAND CONTROL VENTILATION OPERATION SHALL BE COORDINATED WITH ECONOMIZER CONTROL. WHEN ECONOMIZING IS ENABLED, THE OUTDOOR AIR DAMPER MAY EXCEED THE VENTILATION AIRFLOW SETPOINT AS
REQUIRED TO SATISFY THE DISCHARGE AIR TEMPERATURE SETPOINT.
BUILDING PRESSURE CONTROL:
A DIFFERENTIAL PRESSURE TRANSDUCER SHALL ACTIVELY MONITOR THE DIFFERENCE IN PRESSURE BETWEEN THE BUILDING (INDOORS) AND OUTDOORS. IF THE BUILDING PRESSURE INCREASES ABOVE THE DIFFERENTIAL PRESSURE SETPOINT, THE UNIT CONTROLLER SHALL TURN ON THE EXHAUST FAN AND VARY THE SPEED OF THE EXHAUST FAN. IF MODULATING THE EXHAUST FAN IS NOT SUFFICIENT TO CORRECT THE BUILDING PRESSURE TO SETPOINT, THEN THE SYSTEM WILL MODULATE THE EXHAUST FAN
DAMPER. IF THE BUILDING PRESSURE DECREASES BELOW THE DIFFERENTIAL PRESSURE
SETPOINT, THE CONTROLLER SHALL DEACTIVATE THE EXHAUST FAN AND CLOSE THE EXHAUST DAMPER.
EXHAUST FAN STATUS:
A DIFFERENTIAL PRESSURE SWITCH SHALL MONITOR THE DIFFERENTIAL PRESSURE ACROSS THE FAN. IF THE SWITCH IS DETECTED TO BE OPEN FOR 40 CONSECUTIVE SECONDS AFTER A REQUEST FOR EXHAUST FAN OPERATION A FAN FAILURE ALARM SHALL BE ANNUNCIATED AT THE BAS AND THE EXHAUST FAN
SHALL STOP. A MANUAL RESET SHALL BE REQUIRED.
FILTER STATUS:
A DIFFERENTIAL PRESSURE SWITCH SHALL MONITOR THE DIFFERENTIAL PRESSURE ACROSS THE FILTER WHEN THE FAN IS RUNNING. IF THE SWITCH CLOSES FOR 2 MINUTES AFTER A REQUEST FOR FAN
OPERATION A DIRTY FILTER ALARM SHALL BE ANNUNCIATED AT THE BAS.
SNOW DAY OVERRIDE:
PROVIDE A SNOW DAY BUTTON ON THE FRONT END GRAPHIC THAT PLACES ALL SYSTEMS IN THE BUILDING IN
UNOCCUPIED MODE.
ROOFTOP UNIT - SYSTEM POINTS LIST
CONTROLLER: MFR POINT TYPE ALARMS
SYSTEM POINT DESCRIPTION
G R
AP
H
IC
H
AR
D W
AR
E
IN
PU
T
H
AR
D W
AR
E
O U
TP
U
T
SO
FT
W
AR
E
PO
IN
T
H
AR
D W
AR
E
IN
TE
R
LO
C K
W
IR
EL
ES
S
N
ET
W O
R K
D
EF
AU
LT
V
AL
U E
H
IG
H A
N
AL
O G
L
IM
IT
LO
W
A N
AL
O
G L
IM
IT
BI
N
AR
Y
LA
TC
H D
IA
G
N O
ST
IC
SE
N
SO
R
F
AI
L
C O
M M
U N
IC
AT
IO
N
F
AI
L
DIAGNOSTICS NOTES
BUILDING STATIC PRESSURE LOCAL X AI X X X
DISCHARGE AIR TEMPERATURE X AI X X X
DUCT STATIC PRESSURE LOCAL X AI X X X
OUTDOOR AIR RELATIVE HUMIDITY LOCAL X AI X
OUTDOOR AIR TEMPERATURE LOCAL X AI
OUTSIDE AIR CFM LOCAL AI
RETURN AIR HUMIDITY LOCAL X AI X
RETURN AIR TEMPERATURE LOCAL X AI
DIRTY FILTER ALARM OPEN X BI X
EXHAUST FAN STATUS OPEN X BI
SUPPLY FAN STATUS OPEN X BI X X
EXHAUST AIR DAMPER COMMAND X AO
OUTDOOR AIR DAMPER COMMAND X AO
RETURN AIR DAMPER COMMAND X AO X
SUPPLY FAN SPEED COMMAND X AO
COMPRESSOR 1 COMMAND X BO
COMPRESSOR 2 COMMAND X BO
COMPRESSOR 3 COMMAND X BO
COMPRESSOR 4 COMMAND X BO
COMPRESSOR 5 COMMAND X BO
EXHAUST FAN START STOP COMMAND X BO
HEATING OUTPUT COMMAND X AO
ENTHALPY SENSOR X X
OCCUPANCY X
OCCUPIED COOLING SETPOINT X 74.0 deg. F OCCUPIED HEATING SETPOINT X 70.0 deg. F OCCUPIED STANDBY COOLING SETPOINT X 80.0 deg. F OCCUPIED STANDBY HEATING SETPOINT X 65.0 deg. F UNOCCUPIED COOLING SETPOINT X 85.0 deg. F UNOCCUPIED HEATING SETPOINT X 60.0 deg. F
OCCUPIED BYPASS TIMER X 2.0 HRS
ECONOMIZER MINIMUM POSITION X
HEATING MODE SETPOINT X
COOLING MODE SETPOINT X
SUPPLY AIR PRESSURE SETPOINT X
SETPOINT OFFSET X
COMPRESSOR ENABLE X AUTO
HEAT / COOL MODE X COOL
FAN MODE COMMAND X ON
APPLICATION MODE X AUTO
OUTSIDE AIR DAMPER MINIMUM POSITION X 10%
EFFECTIVE OCCUPANCY X X
EFFECTIVE HEAT / COOL MODE X X
EFFECTIVE SPACE TEMPERATURE X X
EFFECTIVE SPACE SETPOINT X
LOCAL SETPOINT X
HEAT OUTPUT X X
COOL OUTPUT X X
ALARM X X
SUPPLY AIR HEATING/COOLING SETPOINT X
MAINTENANCE REQUIRED X 600 HRS
BAS COMMUNICATION STATE X X
FILTER RUNTIME HOURS X
COMPRESSOR LOCKOUT STATUS X
TIME OVERRIDE STATUS X
GENERAL NOTES
3.0 deg. F
H L
BI
OPEN
FILT STS
H L
BI
OPEN
SF STS
AI
DA PRESS
DA TEMP
AI DI
SD
INTERLOCK TO
STOP UNIT
SA
RA
OA
EA
H L
BI
OPEN
EF STS AO
RA ACT
D-2
EA ACT
AO
D-1 CONFIGURABLE AHU
S/S BO
AI
HUMID
AI
TEMP
RA
TEMP/HUMIDITY
DI
SD
INTERLOCK TO
STOP UNIT
DX
C
AI
HUMID
AI
TEMP
OA TEMP/HUMIDITY
AOSPD
SF VFD
SF S/S AO
AO
TRAQ OA VCM
AO
TRAQ ACT
D-3
BUILDING PRESSURE SENSOR
BLD PRESS
OA PRESS SPACE PRESS
L H
AI
H
C
SCR
C.O. C.O.
DRAIN LINE SHALL BE
AT LEAST THE SAME
SIZE AS THE NIPPLE
ON THE DRAIN PAN.
DRAIN PAN
CONDENSATE TRAP
WITH SUFFICIENT TRAP
SEAL TO OFFSET
PRESSURE AT DRAIN
PAN
PITCH DOWN
TOWARD DRAIN,
MIN. 1/8" PER ft.
ROOF
DRAIN
C.O. @ EVERY
CHANGE IN DIRECTION
GREATER THAN 45°
AND AT MAX. OF 25
FEET INTERVALS
E.
S.
P.
O
F
FA
N
T.S.P. OF FAN PLUS
1" WATER
CURB ADAPTER
VIBRATION
ISOLATION
GASKETING
EXISTING CURB
ROOFING
MATERIALS
SCREWS SIZED AND
SPACED PER
MANUFACTURERS
RECOMMENDATIONS
WSP USA Buildings Inc wsp.com
1300 N 17TH ST, SUITE 1000
ARLINGTON VA, 22209
(202) 362-2800
NO. REVISION DATE
SCALE:
DWN. BY:
VCCS PROJECT NO.:
WSP PROJECT NO.:
CKD. BY:
OWNER NAME:
PROJECT TITLE:
TITLE
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL TAKE PRECEDENCE OVER
SCALED DIMENSIONS. THESE DRAWING SHALL BE COPIED FROM THE ORIGINAL
BLUEPRINTS AND ARE APPROXIMATELY TO SCALE. IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND
CONDITIONS ON THE PROJECT AND SHALL NOTIFY THE ENGINEER OF ANY
VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THESE
DRAWINGS.
N.T.S.
MEP Engineer:
PROJECT CODE:
Commissioning Agent:
10030 WINDY HOLLOW RD
GREAT FALLS, VA 22066
703.731.1509
US0027294.0531
260-B6260-003
MT MLH
VCCS - NORTHERN
VIRGINIA COMMUNITY
COLLEGE
MTS REPLACE ROOF
TOP UNIT
CONTROLS AND
DETAILS
ME-801
PROJECT ADDRESS:
10500 BATTLEVIEW PKWY
MANASSAS, VIRGINIA 20109
260-B6260-003
12" = 1'-0"1 AHU SEQUENCE
N.T.S.
ROOFTOP UNIT SYSTEM POINTS LIST
N.T.S.
ROOFTOP UNIT CONTROLS DIAGRAM
3N.T.S.
CONDENSATE DRAIN DETAIL
EXISTING CONTROLS SYSTEM AND VENDOR
THE BUILDING IS CONTROLLED BY A TRIDIUM NIAGARA BAC CONTROL SYSTEM BY HONEYWELL.
THE CONTROLS CONTRACTOR IS CHESAPEAKE CONTROLS INC.
POINT OF CONTACT IS JOHN CRANE, JOHNCRANE@CHESAPEAKECONTROLS.COM, 757-717-5172.
N.T.S.
CURB ADAPTER INSTALLATION DETAIL
1 ISSUE FOR BID 09/04/2026
2 ADDENDUM #2 10/23/2026
MICHAEL L.
HATHORNE
WSP
1300 North 17th Street, Suite 1000 Arlington, VA 22209 1
Memo
Subject: MTS Replace Rooftop Unit – Pre-Construction Airflow Measurement Scope
Purpose: Establish baseline operating performance of the existing RTU-1 system prior to demolition and equipment replacement.
I. Scope Overview
Provide testing, measurement, documentation, and reporting of the existing RTU-1 air distribution system serving the second-floor east area prior to any demolition activities. The intent is to document current operating conditions so the replacement RTU and associated controls can be adjusted to match existing space airflow distribution.
All measurements shall be taken with the associated systems, terminal units, and air outlets operating at full capacity in the applicable operating mode.
All work shall be in accordance with the Associated Air Balance Council or National Environmental
Balancing Bureau Standards.
II. Existing System Testing Requirements
A. Rooftop Unit Measurements
1. Measure and document:
• RTU supply fan airflow (CFM)
• Outside airflow
• Return airflow
• Fan operating status and speed
• Supply air temperature
• Return air temperature
• Supply duct static pressure
• Building automation system operating mode at time of testing
B. VAV Terminal Unit Measurements
1. For every VAV terminal unit served by RTU-1:
• VAV identification/tag number
• Space(s) served
• Current airflow setpoint
• Actual primary airflow
• Maximum cooling airflow setting
MTS Replace Rooftop Unit – Pre-Construction Airflow Measurement Scope 2
• Minimum airflow setting
• Heating airflow setting (if applicable)
• Damper position during testing
• Electric reheat operational status (if applicable)
• Electric heater stage operation and amperage verification (if applicable)
C. Air Outlet Measurements
1. Measure and document airflow at each diffuser, and balanceable register or grille served by RTU-1:
• Device designation/location
• Airflow (CFM)
• Supply, return, or exhaust classification
• Observed deficiencies or inoperative devices
III. Operating Conditions During Testing
A. Testing shall be performed:
▪ During normal occupied building operation.
▪ With the RTU operating under stable conditions.
▪ With the BAS controlling the system normally.
▪ During periods coordinated with Owner operations.
B. The contractor shall note:
▪ Outdoor air temperature.
▪ Building occupancy conditions.
▪ Any unusual operating conditions.
▪ Any overridden controls or equipment issues.
IV. Reporting Requirements
A. Provide a written report containing:
▪ Executive summary.
▪ RTU airflow measurements.
▪ VAV airflow data table.
▪ Air terminal airflow data table.
▪ Electric heater verification results.
▪ BAS screenshots or trend data supporting measured conditions (if available).
▪ Identification of deficiencies, failed components, or airflow discrepancies.
▪ Recommendations for issues that may affect final balancing.
B. Report shall be submitted to the following parties prior to demolition:
▪ Owner
▪ Engineer of Record
MTS Replace Rooftop Unit – Pre-Construction Airflow Measurement Scope 3
▪ Commissioning Agent
V. Deficiency Notification
A. Immediately notify the Owner and Engineer of:
▪ Inoperative VAV boxes.
▪ Failed actuators.
▪ Failed airflow sensors.
▪ Non-functioning electric reheat coils.
▪ Airflows that cannot be maintained within existing BAS setpoints.
▪ Any condition that may prevent balancing the replacement system to existing performance.
VI. Post-Construction Verification
A. Following installation of the new RTU:
▪ Balance the replacement system to the documented pre-construction airflow values.
▪ Re-verify VAV minimum and maximum airflow settings.
▪ Verify electric heater operation.
▪ Submit final TAB report demonstrating conformance with documented baseline conditions.