This is a Scope of Work document for Collier County's Clam Pass Park Hurricane Ian Repairs project, a grant-funded construction initiative located at 465 Seagate Drive, Naples, Florida. The project scope includes replacing the support system for utilities along the full length of the timber boardwalk and completing all mechanical, electrical, and plumbing (MEP) work at the Concessions Platform. The Base Bid consists of MEP repairs at the Concession Platform, including replacement of damaged hangers and clamps for plumbing systems, replacement of broken PVC pipe for the soda dispenser line, replacement of a floor sink, installation of hangers for propane gas piping, replacement of electrical components and GFCI receptacles, rerouting of communications cabling, and replacement of the exterior transformer and panel. The MEP work along the timber boardwalk includes removal of existing straps and supports, installation of new 316 stainless steel trapeze and clevis style hangers, and re-support of free-air cabling with new conduit. Sealed bids are due no later than May 22, 2026, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for April 21, 2026, at 12:00 p.m. at Collier County Procurement Services Conference Room A. A site visit prior to bidding is strongly recommended, particularly for contractors bidding on the bid alternates.

The project includes two bid alternates: Bid Alternate No. 1 consists of selective repair and replacement of hardware, tie-downs, and handrails at identified locations; Bid Alternate No. 2 consists of full replacement of lumber members across the boardwalk, excluding piles and bents 62-68, with an estimated 5,000 square feet of new Ipe deck boards required. The contractor must deploy multiple crews working concurrently and schedule work during weekends, evenings, and outside standard working hours as necessary to meet the required completion date, which coincides with a planned shutdown and renovation of the adjacent Naples Grande Hotel. The contractor must maintain the ability to halt work within 25 calendar days of notification and turn over the facility for use, with liquidated damages tied to this timeframe. Complete bid documents are available through the Collier County Procurement Services portal at https://procurement.opengov.com/portal/collier-county-fl.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Document for Collier County Clam Pass Park Hurricane Ian Repairs

1.1 Location: Clam Pass Park (465 Seagate Dr, Naples, FL 34103)

1.2 Base Bid: Base Bid Work generally consists of replacing the support system for the existing utilities along the full length of the Timber Boardwalk and all MEP work at the Concessions Platform shown on sheets E-0 through P-2 of the Construction Drawings. No structural work is included in the Base Bid.

1.2.1 MEP Repairs at Concession Platform

1.2.1.1 Replace damaged hangers and clamps below the pavilion/platform to properly support the plumbing systems which includes domestic cold and hot water supply piping, and sanitary and grease waste pipe.

1.2.1.2 Replace broken 4-inch PVC Schedule 40 pipe supporting the soda dispenser line (Approximately 5 feet of pipe). Provide hangers on the soda dispenser conduit lines to support the pipe from movement.

1.2.1.3 Replace floor sink in the Concession area that is not flush with the finished floor.

1.2.1.4 Replace domestic water service shut-off valve and enclosure.

1.2.1.5 Remove and clean sand and debris from the water pit.

1.2.1.6 Clean and remove mold growth on exposed pipe below the southern end of the Concession area (Approximately 50 feet of pipe).

1.2.1.7 Provide hangers and supports for propane gas piping below the Concession area platform.

1.2.1.8 Extend/rework grease interceptor and sewage ejector vents per detail.

1.2.1.9 Replace all electrical components related to the power distribution below the Concession

Platform area (wiring, conduit, junction boxes, corroded ground connections and supports). Remove all electrical debris and unused conduit, boxes and fasteners below the platform.

1.2.1.10 Replace and relocate GFCI receptacles below the concession platform to face deck of fascia. Coordinate exact location with the Owner.

1.2.1.11 Reroute all communications cabling below the Concession Platform securely and neatly supported in latched j-hooks.

1.2.1.12 Replace exterior 480-120/240V transformer and exterior panel PP for the Concession Building.

1.2.1.13 Contractor responsible for coordination with related service providers/public utilities to facilitate work.

https://www.google.com/maps/place/465+Seagate+Dr,+Naples,+FL+34103/@26.2112378,-81.8144779,17z/data=!3m1!4b1!4m6!3m5!1s0x88db1e48736e59e9:0x8a13140f5668b26b!8m2!3d26.211233!4d-81.811903!16s%2Fg%2F11c21cs6zg?entry=ttu https://www.google.com/maps/place/465+Seagate+Dr,+Naples,+FL+34103/@26.2112378,-81.8144779,17z/data=!3m1!4b1!4m6!3m5!1s0x88db1e48736e59e9:0x8a13140f5668b26b!8m2!3d26.211233!4d-81.811903!16s%2Fg%2F11c21cs6zg?entry=ttu

1.2.2 MEP Work along Timber Boardwalk

1.2.2.1 Remove and dispose of all existing straps, clamps, supports, and hardware

1.2.2.2 Install new trapeze and clevis style hangers as shown on the Construction Drawings. All hardware and supports shall be 316 Stainless Steel.

1.2.2.3 Re-support all free-air cabling and route in new conduit.

1.2.2.4 Maintain temporary support of utilities during Construction to prevent disruption of service.

1.3 Bid Alternate No. 1: Bid Alternate No. 1 work generally consists of selective repair and/or replacement of hardware, tie-downs, and handrails:

1.3.1 Replace corroded and/or missing hardware (through bolts, nuts, washers, etc.) at locations identified on the Construction Drawings.

1.3.2 Install new hurricane ties at locations identified on the Construction Drawings.

1.3.3 Repair loose and/or damaged handrail posts at locations identified on the Construction

Drawings. Repairs consist of replacing damaged timber members and/or replacing corroded and/or missing hardware and connections.

1.4 Bid Alternate No. 2: Bid Alternate 2 work consists of furnishing all labor and materials necessary to replace all lumber members across the full length of the boardwalk, excluding piles and bents 62-68 spanning the waterway. The work will include, but not be limited to, removal and replacement of:

1.4.1 Pile Caps

1.4.2 Stringers

1.4.3 Deck Boards*

1.4.4 Handrails

1.4.5 Bracing, blocking, and all hardware, hurricane ties, and other ancillary materials and connections.

1.4.6 *To the greatest extent possible, the Contractor shall remove, salvage, and reuse the existing Ipe Deck Boards. For Bid Purposes, the Contractor shall assume that approximately 5,000 SF of new Ipe deck boards will be required. A bid item for new Ipe deck boards is included in the Bid Form.

1.4.7 See Construction Drawings for estimated quantities. The quantities listed on the Construction

Drawings are approximate assuming typical dimensions, however, dimensions will vary from typical. The Contractor shall be responsible for determining the amount material, labor and coordination needed for full replacement. A site visit prior to bidding is strongly recommended.

1.5 Construction Schedule and Staffing Requirements

1.5.1 This project will include the temporary closure of one of the County’s most popular beach access parks and will be coordinated to coincide with a planned shutdown and renovation of the adjacent Naples Grande Hotel which operates Clam Pass Park as a concession vendor.

1.5.2 To meet the required completion date, the Contractor shall, as necessary, deploy multiple crews working concurrently starting in different locations along the boardwalk.

1.5.3 The contractor shall schedule work during weekends, evenings, and outside standard working hours as necessary and within regulatory requirements to maintain progress and ensure timely completion.

1.5.4 Provide adequate labor, equipment, materials, and supervision to meet the contractual deadline for completion.

1.5.5 The contractor shall only disassemble and remove sections of the boardwalk to accommodate the ongoing work to ensure that if the project were to be halted, the contractor is able to work to a stopping point and turn over the facility for use within 25 calendar days of notification.

Notification to halt the project and work to a stopping point and turn over the facility shall establish a deadline relative to liquidated damages on the project tied to 25 calendar days from said notification.