This is an Environmental, Health and Safety (EHS) Contractor Requirements document issued by Collier County, Florida for all construction projects under the county's management. The document establishes mandatory compliance standards that all contractors must follow when performing work on Collier County property. Contractors are required to understand and comply with applicable federal, state, and local regulations including OSHA, DOT, EPA, DHS, ANSI, FDEP, and NFPA standards, as well as Collier County's own EHS Standard Operating Procedures and Job Safety Analysis requirements. Key requirements include wearing county-provided vendor badges, obtaining powered industrial vehicle certifications, proper handling of hazardous materials and flammable liquids, daily incident and accident reporting, weekly internal safety inspections, fall protection protocols for work above six feet, electrical safety compliance, personal protective equipment usage, and proper maintenance of equipment and work areas. The document specifies required site-specific EHS plans including safety plans, security plans, hurricane plans, pandemic safety plans, respirable crystalline silica plans, confined space entry plans, asbestos management plans, mold remediation plans, and environmental protection plans where applicable.

Additional contractor obligations include compliance with Florida Department of Transportation (FDOT) and Manual on Uniform Traffic Control Devices (MUTCD) requirements when working within rights-of-way, such as wearing ANSI/ISEA 107-2010 compliant Class 2 or 3 high-visibility safety garments and implementing appropriate work zone traffic control plans. Contractors must incorporate risk management into all pre-activity, activity, and post-activity construction meetings and are responsible for adequately safeguarding construction sites to prevent public access to hazardous areas, including proper protection and signage for damaged sidewalks, excavations, and other identified hazards. All work must meet or exceed the standards set forth in Collier County Vertical Construction Standards and Collier County IT Construction Standards unless specifically exempted in writing by the Facilities Management Division Director and Risk Management Director.

View the file

Other files for this state and local contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental, Health and Safety

Contractor Requirements for all BCC Construction Projects

1. Contractors will be required to understand and comply with all applicable laws and regulations of any governmental entity (OSHA, DOT, EPA, DHS, ANSI, FDEP. NFPA, etc.) and

Collier County CMA’s, EHS Standard Operating Procedures (SOP’s) or Job Safety Analysis

(JSA’s) that that pertain to environmental, health and safety standards and/or work practices applicable to the activities they perform for Collier County. These include but are not limited to:

• Must wear a BCC provided Vendor Badge at all times while on BCC property.

• Powered Industrial Vehicle Certifications (Heavy Equipment, Cranes, etc.)

• Storage, handling, and use of flammable liquids and hazardous materials, including fuels and compressed gas cylinders.

• Daily reporting of any incidents/accidents or any OSHA safety inspections of equipment and worksites.

• Weekly reporting of at least one internal safety inspection of equipment and worksite.

• Use of Personal Fall Protection Devices while working at heights above 6 feet.

• Following Electrical Safety Practices, Arc Flash and Lockout/Tagout procedures.

• Proper use of Personal Protective Equipment. (PPE)

• Proper maintenance and use of ladders and other equipment.

• Guarding of wall and floor openings, open trenches, and excavations.

• Environmental Requirements (Permitting, Tanks, etc.)

2. Required Site EHS Plans for:

• Site Specific Safety Plan

• Site Specific Security Plan

• Site Specific Hurricane Plan

• Site Specific Pandemic Safety Plan (COVID-19) (If Applicable)

• Site Specific Respirable Crystalline Silica Plan (If Applicable)

• Site Specific Confined Space Entry Plan (If Applicable)

• Site Specific Asbestos Management Plan (If Applicable)

• Site Specific Mold Testing and Remediation Management Plan (If Applicable)

• Site Specific Environmental Protection Plan (Spill Cleanup, SPCC, etc.) (If

Applicable)

3. When working within a right-of-way (i.e. roads, sidewalks, bike paths, etc) – All applicable

FDOT and/or MUTCD requirements are to be followed at all times. Specifics include but are not limited to:

• ANSI/ISEA 107-2010 Compliant Class 2 or 3 Hi-Visibility Safety Garments.

• Applicable work zone signage, cones, barricades or barrels, arrow panels, flagging personnel and Stop/Slow Paddles, where necessary, required by law or the BCC.

• An applicable work zone (Maintenance of traffic) plan based on FDOT and/or

MUTCD designs on site.

4. Risk Management is included in all Pre-Activity/Construction, Activity/Construction and

Post Activity/Construction Meetings.

5. Safeguarding construction sites – Protecting the jobsite and preventing or inhibiting public access after activities are finished for the day is equally important. Therefore, all hazardous locations within construction sites and rights-of-ways are to be adequately protected.

Specifics include but are not limited to:

• Damaged, blocked, or missing sections of sidewalks, bike paths or other pedestrian access zones shall be protected with orange barricade fencing, barricades with yellow or red tape (depending on the hazard) or an equivalent means of protection. Sidewalks must also be posted as being closed on both sides with a white sign with black letters.

• Excavations must be protected in a similar manner as listed above if they must be left open overnight, during weekend hours, etc.

• All other hazards shall be evaluated by the contractor to ensure there are no dangerous conditions remaining that could be inadvertently encountered by collier county employees and/or the public while the construction site is not active (i.e., when no construction work is taking place).

6. Contractor must agree that all work must meet or exceed the standards set forth in the

Collier County Vertical Construction Standards and Collier County IT Construction Standards

(if applicable) unless specifically exempted in writing by Facilities Management Division

Director and Risk Management Director.