26-4-10 Quality Assurance Surveillance Plan.xls
XLS spreadsheet 42 KB Posted
- Attached to
- Concrete Pads B220
- Solicitation number
- W519TC26RA025
About this file
This is a Quality Assurance Surveillance Plan (QASP) for concrete work at Rock Island Arsenal, specifically for the construction of a concrete mounting pad under contract reference TARA-LGC-26-4-10, dated December 30, 2025.
The QASP establishes surveillance requirements across five key task areas with defined performance standards and acceptable quality levels. Security protocols require 100% visual verification that all site personnel receive and maintain safety information, with daily roster maintenance at 90% accuracy to track workforce presence. The contractor must submit a project timeline within one week of contract award showing the completion plan, subject to 100% visual and written verification. Site inspections occur daily at 90% compliance to ensure work proceeds safely and according to the contracted scope of work and timeline. Materials inspections are conducted on a random basis with 100% visual and measurement standards to verify compliance with contracted scope and industry standards, including testing of concrete properties such as slump and temperature. A final inspection at 100% compliance occurs once upon completion to verify all work meets the contracted scope of work specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-4-10 B220 Concrete Work SOW (26-04-16).pdf | ||
| Contractor Questions W519TC26RA025 B220 Government Answers.xlsx | XLSX spreadsheet | |
| B08 W519TC26RA025 0001 SF30.pdf | ||
| 26-4-10 B220 Concrete Work SOW (25-12-30).pdf | ||
| W519TC26RA025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP
| Task | Contract Reference | Frequency | Performance Standard | Acceptable Quality Level | Surveilance Method | Surveilance Date(s) | Performance Level | Notes |
| Site Conference | Sheet 1 - Security Notes | Once | Each individual working at the site must receive this information for safety and accountability purposes. May be updated if additional personnel come to the work site. May be performed as part of the badging process. | 100% | Visual/Roster | |||
| Work Roster | Sheet 1 - Security Notes | Daily | Must be maintained for safety and security purposes. Must show who is at the work-site at any given time. | 90% | Written Roster | |||
| Project Timeline | Dictated by contract | Once | To be provided within 1-week of award of the contract. Must show plan for completion prior to the date stated in the contract. May be adjusted during performance provided within project completion date. | 100% | Visual/Written | |||
| Site Inspection | Sheet 1 - Security Notes | Daily | Observe work is being performed safely and in accordance with the contractor provided timeline and IAW the contracted Scope of Work | 90% | Visual | |||
| Materials Inspections | Sheet 1 - Notes 1-17 | Random | Materials provided by the contractor may be inspected to ensure that they meet the contracted Scope of Work and minimum industry and design standards. (e.g. slump or temperature tests of incoming concrete) | 100% | Visual/ Measurement | |||
| Final Inspection | Sheet 1 - Notes 1-17 | Once | Verify that all work is completed IAW the contracted Scope of Work | 100% | Visual |
&LRock Island Arsenal Quality Assurance Surveillance Plan&CConcrete Work (Concrete Mounting Pad)&RTARA-LGC-26-4-10 DATE: 30-Dec-25