This document is a construction specification and drawing set for concrete mounting pads at Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC) in Rock Island, Illinois. The project involves installation of new concrete mounting pads in Building 220 (B220) and its annex, organized into eight distinct work areas.
The scope of work includes demolition of existing concrete floors (4-8 inches thick) in Areas 1-5 and Area 8, installation of new 5000-PSI concrete mounting pads ranging from 24 inches thick in most areas to 16 inches thick in Area 8's confined basement tunnel space, and concrete repair and finishing work in Area 6 (approximately 4,500 square feet of existing concrete). Area 7 involves complete concrete removal, installation of tie-back supports with #8 rebar reinforcement spaced every 10 feet, and installation of new 4000-PSI concrete. All new concrete requires double-tied layers of #5 rebar mesh positioned 6 inches from top and bottom surfaces, with 3/4-inch expansion joint material (BASF Sonolastic SL-1 or equivalent) and ground rod installations. Contractor responsibilities include dust control using water during demolition, coordination of concrete delivery with truck mixers (maximum 1.5-hour haul time), provision of spotters for equipment movement, barricading of work areas, and complete worksite cleanup. Area 8 work requires confined space permits and specific safety protocols for the basement tunnel access hatch (23 inches tall by 24 inches wide). The contractor must comply with Rock Island Arsenal security requirements including AT Level I awareness training, background checks, RAMP security program participation, and iWATCH briefing for all personnel. Construction scheduling specifies demolition and jack-hammering on second shift (2:30 PM-11:00 PM) with framing, rebar tying, and pouring during day shift.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-4-10 B220 Concrete Work SOW (26-04-16).pdf | ||
| Contractor Questions W519TC26RA025 B220 Government Answers.xlsx | XLSX spreadsheet | |
| B08 W519TC26RA025 0001 SF30.pdf | ||
| 26-4-10 Quality Assurance Surveillance Plan.xls | XLS spreadsheet | |
| W519TC26RA025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL LOCATIONS
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
25-JUN-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
DMG CONCRETE MOUNTING PADS
SHEET 1 OF 10B. McCLURE B. NILES
NONE
10CONSTRUCTION PLAN AREA 8
DEMOLITION PLAN AREA 8
8LOCATION/LAYOUT PLAN AREA 8
7CONSTRUCTION PLAN AREAS 7
6CONSTRUCTION PLAN AREAS 1-5
5DEMOLITION PLAN AREAS 1-5
4LOCATION/LAYOUT PLAN AREAS 1-7
3CONTRACTOR SECURITY NOTES
2GENERAL NOTES
1GENERAL LOCATIONS
INDEX
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
X
X
X
X
X
X
X
X X
X
X X
X
X
X
X
M I S S
I P P
I R
I V E R
LOCATIONS ON ROCK ISLAND ARSENAL
X
X
X
X
X
X
X X
X X
X
X X
X
X X X X X X X X X X X
X X
X
X
X
X X X
X
X
X
X
X X
X
X
X
X
X
X X
X
X X
X
X
21 29
30-G
70-G
2-G 3-G
4-G
6-G
50 52
62 64
102 104
157120144
301-G
314 312
220210
332333
204203
R O
C K
IS
L
A N
D
U .S . G
O V
E R
N M
E N
T
B R I D
G E
PARKING
RODMAN
D A V E N P
O R T
G
IL
L E
S P
IE
KINGSBURY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
TERRACE
PARKING PARKING PARKING
HEDGE
LANE
SOUTH AVENUE
NORTHAVENUE
PARKING
PARKING
PARKING
PARKING
E A
S T
RODMAN
DRIVE
BECK
SYLVAN
AV
EN
U E
KING
DRIVE
SHED
B L U
N T
R O
A D
PROSPECT
DRIV
E
D R
IV
E
C E
M E T E R
Y
D R
IV
E
DYKE
ROAD
R O
D M
AN
BLUNT
PARKING
PARKING
PARKING
PARKING
PARKING
79 83
S Y
V N
R
IV
E
AVE
BAUMBECK AVENUE
216212
LO
C
K
AND
DAM
NO
. 1
BETTENDORF
DAVENPORT
MOLINE
ROCK ISLAND
C A N A L
M
O
L
I N
E
S L O U G H
E. RIVER DR. GRANT ST.
2ND ST.
4TH ST.
3RD ST.
STATE ST.
PC
X
XX
X
X
X
X
X
X X
X X
X
X
X X
X X
X
X
X
X
X
X X
X
BLDG 220 MACHINE MOUNTING PADS
Elevator #3
AC
WINDOW
W
IN
D O
W
BREAKER
BOX DISCONNECT
WINDOW
AC
P R
I N
T E
R
F A
X
Elevator #4
B A B
B A B
B A C
B N
N 1 N
2K I T
S P
I L
L
B H
P2 P3
O2 O3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 b a c
RAMP
ROLL - UP
AC
COMMUNICATION
AIR
ELEC
STEAM
TUNNEL
WALL
WALL
S T
E A
M L
I N
E S
T E
A M
L I N
E S
T E
A M
L I N
E
DRAIN
FLR
IN
T
A K
E
A I R
R E
T U
R N
AC
L I E
B E
R T
D R
A
IN
R O
F
S T
E A
M S
T E
A M
S T
E A
M
OPEN WELL
SYSTEM
FIRE SPRINKLER
TUNNEL
R O
F
D R
A
IN
bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle bradley.niles Polygon bradley.niles Polygon
GENERAL NOTES
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
25-JUN-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
DMG CONCRETE MOUNTING PADS
SHEET 2 OF 10B. McCLURE B. NILES
NONE
MANUAL PROCESSES.
ACCESS WITH COMMERCIAL CONCRETE PUMPING OR POWER DOLLY OR
10. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK SITE
OR TRUCK AGITATORS HALL BE ACCORDING TO THE FOLLOWING:
THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
DISCHARGING.
WITHOUT THE ADDITION OF WATER OR WATER AND CEMENT PRIOR TO
WORKABLE CONDITION, SATISFACTORY FOR PLACEMETN IN THE WORK
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND
9. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATIORS
SATURDAYS. FRAMING, TYING REBAR AND POURING WILL BE DAY SHIFT.
ON 2ND SHIFT STARTING FROM 2:30 TO 11:00 AT NIGHT OR
8. DEMOLITION/JACK HAMMERING/REMOVAL WILL BE PERFORMED
SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.
RIGID FOAM INSULATION FOR VIBRATION ISOLATION. JOINT SEALANT
CLEAN UP IS COMPLETE, LINE MOUNTING PADS AND CAPS WITH 3/4"
7. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL. AFTER
SHALL BE A MINIMUM OF 5000-PSI.
6. NEW CONCRETE FOR MACHINE MOUNTING PADS AND CAPS
CONVERTER ON ALL DIESEL ENGINES.
USED ARE GAS ENGINES. CONTRACTOR SHALL HAVE CATALYTIC
5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE IF EQUIPMENT
REGULATIONS.
CONCRETE AND REBAR FROM RIA IN ACCORDANCE WITH LOCAL
BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD BLOCKS,
4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH AS
OR THE UNDERLYING SOIL CAUSED BY THE CONSTRUCTION.
3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO FLOOR
PRESENT MUST BE CUT OFF EVEN WITH SAW CUTS.
2. WHEN SAW CUTTING AROUND THE WORK AREA, REBAR
DUST DURING ENTIRE DEMOLITION AND CONSTRUCTION.
1. THE CONTRACTOR WILL USE WATER TO ELIMINATE DUST
OF DISCHARGE deg-F (deg-C)
CONCRETE TEMPERATURE AT POINT
HAUL TIME
HOURS MINUTE
50-64 (10-17.5)
65-90 (18-32) - WITHOUT RETARDER
1 30
1 3065-90 (18-32) - WITH RETARDER
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
SYSTEM.
CONTAINED WITH CONTAINMENT BALES TO AVOID RUNOFF INTO STORMWATER
APPROVED WITH THE COR PRIOR TO PLACING. AREA MUST BE
21. ANY DIRT, ROCKS OR DEBRIS TO BE PLACED OUTSIDE MUST BE
RIA REPRESENTATIVES IMMEDIATELY.
SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF
20. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND
OTHER EMBEDDED ITEMS AND INTO FORMS.
SO THAT CONCRTE IS WORKED AROUND REINFORCING AND
VIBRATING EQUIPMENT WITH HAND RODDING AND TAMPING
19. CONSOLIDATE PLACED CONCRETE USING MECHANICAL
PERFORMED BY COMPETENT, EXPERIENCED, QUALIFIED WORKMEN.
(AISC) STANDARDS AND SPECIFICATIONS. ALL WORK SHALL BE
COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL CONSTRUCTION
18. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL SHALL
OF THE EXISTING CONCRETE.
DOWELS WILL BE DRILLED A MINIMUM OF 6" INTO THE VERTICAL FACE
BOTTOM SURFACE AND HAVE A MINIMUM OF 2 RODS IN EACH DIRECTION.
SPACING. REBAR SHOULD BE A MINIMUM OF 4" AWAY FROM TOP OR
17. DOUBLE TIED LAYERS OF #5 REBAR MESH (5/8"). 12" X-W
COMPLETION OF THE PROJECT.
16. CONTRACTOR SHALL CLEAN UP THE WORKSITE AFTER
SITE UNDER CONSTRUCTION.
15. CONTRACTOR SHALL PROVIDE BARRICADES AROUND JOB
PEDESTRIAN INTERACTIONS.
WITHIN THE BUILDING TO ENSURE SAFE TRAFFIC AND
EQUIPMENT/TRUCKS GOING IN/OUT OF THE BUILDING AND
14. CONTRACTOR WILL PROVIDE SPOTTER/GROUND MAN FOR
AND LEFT EXPOSED FLUSH WITH PAD SURFACE.
INTO A 5-IN DIA X 6-IN DEEP RECESS IN THE MOUNTING PAD
13. CONTRACTOR WILL PROVIDED ONE GROUND ROD DRIVEN
UTILIZE PROPER PPE.
SAFETY RULES OF THE TRAD AND ENSURE ALL PERSONNEL
12. CONTRACTOR WILL FOLLOW AND APPLY ALL STANDARD
REPRESENTATIVE FOR GATE PASS AND FUNCTIONALITY.
11. CONTRACTOR WILL COORDINATE WITH CONTRACTING OFFICER
The RAMP program is discussed in the RIA-JMTC AT training.
Department.
Contractors will comply with any instructions given by the Rock Island Arsenal Police installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc.).
Contractor personnel working on Rock Island Arsenal are subject to participation in change.
The COR will keep the contractors informed on the current FPCON or any possible FPCON
The FPCON descriptions will be provided in the RIA-JMTC AT training.
threat. Services will resume when FPCON level is reduced to level Bravo or lower.
During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher iWATCH program. The iWATCH training will be provided in the RIA-JMTC AT training.
The Contractor and all associated subcontractors shall brief all employees on the local support of any future contract.
Contractors who routinely fail to return these items will not be issued them in placed in a drop box at a RIA-JMTC access point.
within 24 hours of no longer being needed. Items will returned to the COR or
RIA-JMTC electronic keys and access passes are accountable items and will be returned contractor5#32s employment.
IF00015 IF00015 at the end of the contract or the last day of an individual
Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause
Contractor will acquire and need to return all issued U.S. Government Common Access thru the RIA Directorate of Emergency Services.
will provide guidance to complete the Access Control Records Check request Form security policies and procedures (provided by government representative). The COR
(Army Directive 2014-05/AR 190-13), applicable installation, facility access and local identification Index (NCIC-III) and Terrorist Screening Database (TSDB) standards and procedures using the National Crime Information Center interstate
Contractor and all associated subcontractor employees shall comply with adjudication training will be provided in the RIA-JMTC AT training.
all employees on the local iWATCH program. The iWATCH
The Contractor and all associated subcontractors shall brief be issued them in support of any future contract.
Contractors who routinely fail to return these items will not box at a RIA-JMTC access point.
needed. Items will returned to the COR or placed in a drop items and will be returned within 24 hours of no longer being
RIA-JMTC electronic keys and access passes are accountable individual contractor�s employment.
IF00015 at the end of the contract or the last day of an access passes. Use FAR 52.204-9 or PADDS Clause IF00015 Government Common Access Cards, installation badges, and/or Contractor will acquire and need to return all issued U.S.
Form thru the RIA Directorate of Emergency Services.
guidance to complete the Access Control Records Check request (provided by government representative). The COR will provide facility access and local security policies and procedures Directive 2014-05/AR 190-13), applicable installation, Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army National Crime Information Center interstate identification comply with adjudication standards and procedures using the Contractor and all associated subcontractor employees shall require changes in contractor security matters or processes.
individual facility or installation change, the Government may contract, should the Force Protection Condition (FPCON) at any changes otherwise authorized by the change clause of this directed by DoD, HQDA, and/or local policy. In addition to the Personal Identity Verification of Contractor Personnel) as identity verification requirements (FAR clause 52.204-9, The contractor workforce must comply with all personal the installation Director of Emergency Services.
to meet installation access requirements to be accomplished by shall provide all information required for background checks The contractor and all associated subcontractors employees access pass being issued.
Operations Center prior to a RIA-JMTC electronic keys and contractor employee and subcontractor employee to the RIA-JMTC The contractor shall sign a Memorandum of Record for each completed.
Level I awareness training and assuring the training is training. The COR will be provided a copy of the RIA-JMTC AT controlled access areas shall complete AT Level I awareness requiring access to Army installations, facilities, or All contractor employees,including subcontractor employees, SECURITY NOTES
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
25-JUN-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
DMG CONCRETE MOUNTING PADS
SHEET 3 OF 10B. McCLURE B. NILES
NONE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
AREAS 1 thru 7
B220 ANNEX LAYOUT
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
25-JUN-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
DMG CONCRETE MOUNTING PADS
SHEET 4 OF 10B. McCLURE B. NILES
NONE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
wall.
marked in red on the west drawing with the grate lines on the cooresponding
Tunnel is shown in dashed area of the tunnel. The avoid high impact over the lifted out of location to will need to be cut and exisitng concrete. The slab during removal of the area, caution will be used existing concrete. In this surface grade of the west roughly 8 ft below the a tunnel that runs east and there is an access grate to and 6 on the west wall, Located between column 5 slope.
grades at less than a 1%
/sloped to meet the two the grade will be blended meets existing concrete, In areas where the new slab current existing slabs.
be based level with the
Elevation of the slabs will
NOTES:
N
RAMP
STEAM
TUNNEL
WALL
WALL
S T
E A
M L
I N
E S
T E
A M
L I N
E S
T E
A M
L I N
E
DRAIN
FLR
TUNNEL
EXISTING
E X
I S
T I N
G E
X I S
T I N
G E
X I S
T I N
G E
X I S
T I N
G
E X
I S
T I N
G
E X
I S
T I N
G
E X
I S
T I N
G
E X
I S
T I N
G
E X
I S
T I N
G f t i n f t i n f t i n f t i n f t i n f t i n
5ft 1in
43ft 10in f t i n
24ft pages.
described on the following and install new concrete as install tie-back supports will complete excavation, removed. The Contractor
Area 7 has had the concrete surface.
hardening the newly exposed
200-grit finish including and polish the concrete to the Contractor shall grind concrete in this area. Then repair cracks and damaged sq-ft. The Contractor shall
It is approximately 4,500-
Area 6 is existing concrete.
pages.
described on the following concrete mounting pads
Areas 1 thru 5 are new
NOTES:
24ft-5in removed.Estimated 24-in thick.
Existing mounting pad to be ..
4ft 6in f t i n
CURRENT VIEW CUT LINE VIEW
1" EXPANSION JOINT
4"-8" EXISTING CONCRETE 4"-8" EXISTING CONCRETE
NEW MOUNTING PAD
DEMO AS NEEDED TO INSTALL
DISTURBED.
THICK. BUILDING COLUMNS AND FOOTINGS WILL BE AVOIDED AND NOT
EXISTING CONCRETE FLOORS THAT ARE BETWEEN 4" AND 8"
NOTE: LATHE MOUNTING PADS WILL REQUIRE REMOVAL OF
AREAS 1 thru 5
B220 ANNEX ELEVATION/DEMOLITION PLAN
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
25-JUN-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
CONCRETE MOUNTING PADS
SHEET 5 OF 10B. McCLURE B. NILES
NONE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
AREAS 1 thru 5
B220 ANNEX ELEVATION/CONSTRUCTION PLAN
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
25-JUN-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
CONCRETE MOUNTING PADS
SHEET 6 OF 10B. McCLURE B. NILES
NONE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
4"-8" EXISTING CONCRETE
#5 REBAR MESH 6" FROM TOP AND BOTTOM SURFACES.
CA6
3/4" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT
ELEVATION.
THE FINAL 12" CAN BE SLOPED TO MEET THE EXISTING
OVER 10'. IF THIS CANNOT MEET EXISTING CONCRETE
MUST MAINTAIN NO GREATER THAN 1/4" DEVIATION
ALWAYS BE THE SAME ELEVATION. MOUNTING PADS
AREA SURROUNDING MOUNTING PADS WILL NOT
NOTE:
5000 PSI CONCRETE
12 IN
24 IN
AREA 7
B220 ANNEX ELEVATION/CONSTRUCTION PLAN
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
30-DEC-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
CONCRETE MOUNTING PADS
SHEET 7 OF 10B. McCLURE B. NILES
NONE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
SHALL BE INSTALLED APPROXIMATELY EVERY 10-FT ALONG WALL.
WITH #8 REBAR (MATCH EXISTING FURTHER ALONG WALL). THESE
TIE BACKS SHALL BE 12-IN X 12-IN X 1/2-IN STEEL PLATE
NOTE:
i n i n
EXISTING
CA6
EXISTING
4000 PSI CONCRETE
3/4" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT
4000 PSI CONCRETE
CA6
i n i n
TIE BACK
EXISTING CONCRETE WALL
AREA 8
B220 LAYOUT
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
30-DEC-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
DMG CONCRETE MOUNTING PADS
SHEET 8 OF 10B. McCLURE B. NILES
NONE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
AC
COMMUNICATION
Elevator #2Elevator #3
B
M
40ft f t i n
N16 N17 N18 N19
N20 N21
M18 M19
B220 ELEVATION/DEMOLITION PLAN
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
30-DEC-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
CONCRETE MOUNTING PADS
SHEET 9 OF 10B. McCLURE B. NILES
NONE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
M
6N
REQUIRED PRIOR TO ENTRY.
COMMON TUNNEL FLOOR. CONFINED SPACE PERMIT
23-IN TALL x 24 IN WIDE AND IS 56-IN FROM
4. REFERENCE: BASEMENT ACCESS HATCH IS ONLY
PIECES FALL INTO TUNNEL.
3. LIFT PIECES OUT OF TUNNEL AREA. DO NOT LET
INTO THE TOP OF THE TUNNEL WALLS.
2. SAW CUT FLOOR TO BE REMOVED. DO NOT CUT
1. PIERCE AND SUPPORT BEFORE SAW CUTTING.
NOTE:
6 ft 3 in i n
1 ft 1 ft a t
H A
T C
H f t a t
W O
R K
A R
E A f t i n
BUILDING COLUMN
BUILDING COLUMN
BASEMENT ACCESS HATCH
WITH SLOPING FLOOR
BASEMENT TUNNEL
CONFINED SPACE
7 ft 3 in
6 in TYP
COMMON TUNNEL
Rectangle
B220 ELEVATION/CONSTRUCTION PLAN
CONCRETE MOUNTING PADS
PLANT ENGINEERING
ROCK ISLAND ARSENAL JMTC
30-DEC-25
DRAWN
SCALE DATE
APPROVED
NO.
DRAWING
TARA-LGC
PLANT ENGINEERING DIVISION
ROCK ISLAND ARSENAL
CONCRETE MOUNTING PADS
SHEET 10 of 10B. McCLURE B. NILES
NONE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
6 in TYP
7 ft 3 in i n i n
4. UNDERSIDE FORMS MAY REMAIN AFTER COMPLETION.
TO MATCH EXISTING CONCRETE FLOOR.
3. POUR 4500-PSI CONCRETE. TROWEL AND SMOOTH FINISH
COVERAGE TOP & BOTTOM.
PLACE AND TIE (2) MATS @ 12-IN CENTER WITH MIN OF 3-IN
2. DOWEL #5 EPOXY COATED REBAR INTO EXISTING WALLS.
1. FORM UNDERSIDE TO CREATE NEW 16" THICK CONCRETE LID.
NOTE:
Polygon