26-32_Utility_Services_Admin_Bldg_Renovations.pdf
PDF 15 MB Posted
- Attached to
- Master Lift Station Motor Control Center
- Solicitation number
- 26-32
- Issued by
- Bay County, Florida
About this file
ITB 26-32: Bay County Utilities Administration Building Renovation
This Invitation to Bid is issued by the Bay County Board of County Commissioners Purchasing Department in Panama City, Florida, for comprehensive interior renovation of the Utility Services Administrative Building located at 3410 Transmitter Road, Panama City, Florida. The project encompasses interior office space renovation across approximately 3,983 square feet and includes demolition of existing walls, construction of six new offices, creation of a new reception area with security features (UL 752 Level 1 acrylic with Kevlar panels), kitchen/break room reconfiguration, restroom upgrades with new tile installation, flooring replacements (carpet tile and LVT), electrical and fiber conduit installations to modular units, LED lighting with brightness controls, and acoustical ceiling tile installation. A mandatory pre-bid meeting is scheduled for 11:00 AM CDT on Tuesday, April 14, 2026, at the Purchasing Department office, with attendance required for bid eligibility. Sealed bids or electronic submissions via OpenGov Procurement are due by 2:30 PM CDT on Tuesday, May 5, 2026, with public opening immediately following the deadline. The successful contractor must complete all work within 120 calendar days from the Notice to Proceed, with liquidated damages assessed at $250.00 per calendar day for delays. The Board of County Commissioners is scheduled to meet for the recommended award on Tuesday, May 19, 2026.
Contractors must be Florida-licensed Building Contractors or General Contractors with all subcontractors holding required Florida trade licenses. A 5% bid bond is required with each submission. Contract pricing is awarded on a lump sum basis to the lowest responsive, responsible bidder, with payment made monthly based on progress, subject to 5% retainage at the County's discretion. Final payment is due within 30 days of project completion and substantial occupancy, with retainage applied to incomplete items at 150% of estimated completion costs. Contractors must provide comprehensive insurance coverage per Bay County requirements, a Public Construction Bond per Florida Statute Section 255.05, and comply with all federal, state, and local laws including E-Verify requirements for employment verification. The project includes a one-year workmanship warranty commencing at final payment, and the County reserves the right to reject any or all bids and waive minor informalities. All workers must speak and understand English, and a responsible on-site superintendent must be maintained throughout construction with 24/7 emergency contact availability required.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAY COUNTY BOARD OF COUNTY COMMISSIONERS
PURCHASING DEPARTMENT
840 WEST 11th STREET
SUITE 2500
PANAMA CITY, FLORIDA 32401
INVITATION TO BID
UTILITY SERVICES ADMINISTRATIVE BUILDING RENOVATION
THIS BID MAY BE SUBMITTED ELECTRONICALLY THROUGH OPENGOV
PROCUREMENT
THOSE BIDDERS WISHING TO SUBMIT A PAPER BID MAY CONTACT THE
PURCHASING DEPARTMENT
ITB No. 26-32
26-32 for Utilities Administration Building Renovation Page 1 of 81 https://procurement.opengov.com/signup https://procurement.opengov.com/signup mailto:PURCHASING@BAYCOUNTYFL.GOV
TABLE OF CONTENTS
INSTRUCTIONS TO BIDDERS
INTRODUCTION
QUALIFICATIONS
MANDATORY PRE-BID MEETING
BID DEADLINE/DELIVERY
BID DOCUMENTS
POINT OF CONTACT
QUESTIONS
ADDENDA
BID FORM
BONDS
COMPLETE BID AMOUNTS; EXAMINATIONS OF SPECs; WORK SITES
WITHDRAWAL OF BIDS
CANCELLATION
BASIS OF AWARD
RIGHT TO REJECT
EXECUTION OF AGREEMENT
LICENSING
GENERAL TERMS
PUBLIC RECORDS
EXEMPTION OF MEETINGS/PRESENTATIONS
REPRESENTATIONS
WARRANTY
SUBCONTRACTORS
SCRUTINIZED COMPANIES
DIRECT PURCHASE
BID PROTEST
ANTICIPATED SCHEDULE
BID CHECKLIST
ATTACHMENT 1 REQUIRED FORMS
ATTACHMENT 2 SAMPLE CONTRACT 26-32
UTILITIES ADMINISTRATION BUILDING RENOVATIONS
EXHIBIT 1 GENERAL TERMS AND CONDITIONS
EXHIBIT 2 SCOPE OF WORK
EXHIBIT 3 VBA DRAWINGS
EXHIBIT 4 VENDOR’S RESPONSE TO ITB 26-32
EXHIBIT 5 BAY COUNTY INSURANCE REQUIREMENTS
EXHIBIT 6 PUBLIC CONSTRUCTION BOND
EXHIBIT 7 OWNER DIRECT PURCHASE PURCHASE INSTRUCTIONS
26-32 for Utilities Administration Building Renovation Page 2 of 81
INSTRUCTIONS TO BIDDERS
Some of the instructions below may not apply to all projects.
The scope of work/specifications shall control any conflicting provisions
INTRODUCTION
The Bay County Board of County Commissioners (County) seeks bids from qualified vendors to provide all necessary labor, supervision, equipment, and supplies to renovate the interior office space at the Bay County Utility Services Administrative Building which is located at 3410 Transmitter Rd. Panama City, Florida, 32404.
QUALIFICATIONS
Vendors shall be Florida licensed Building Contractor or General Contractor. Sub- Contractors shall be Florida licensed in their trade. Vendors shall identify subcontractors that are providing services requiring a license under Florida law. Bids may be deemed nonresponsive if not accompanied by proof of any required State of Florida license.
MANDATORY PRE-BID MEETING
A MANDATORY Pre-Bid Meeting will be held at 11:00 am (CDT), Tuesday, April 14, 2026 in the Board of County Commissioners Purchasing Department, at 840 W. 11th Street, Suite 2500, Panama City, Florida 32401.
Note: Respondents shall attend the pre-bid meeting. Any respondent who fails to attend will be deemed non-responsive and automatically disqualified from further consideration.
The purpose of this meeting is to familiarize respondents with the project and answer questions. All respondents must be present and signed in prior to the start of the Mandatory Pre-Bid Meeting. The convener of the meeting will collect the sign in sheet(s) and the meeting will “Officially” start. Anyone not signed in at the “Official” start of the meeting will be considered late and will not be allowed to propose on the project. Please allow 10 to 15 minutes to sign in prior to the start of the Mandatory Pre-Bid Meeting.
In the event that any discussions or questions at the pre-bid meeting or afterward require additional clarification the COUNTY will issue a written summary of questions and answers as an addendum to this Invitation to Bid.
BID DEADLINE/DELIVERY
ELECTRONIC OR SEALED PAPER BIDS for ITB NO: 26-32 Utilities Administration Building Renovation will be received by the BOARD OF COUNTY COMMISSIONERS OF BAY COUNTY, FLORIDA up until 2:30 pm (CDT) Tuesday, May 5, 2026. Bids will be publicly opened immediately following the deadline. ANY BID RECEIVED AFTER THE
SPECIFIED TIME WILL NOT BE CONSIDERED.
Bids for this solicitation may be submitted either electronically via OPENGOV PROCUREMENT or by paper, sealed and delivered to the Board of County Commissioners Purchasing Department, at 840 W. 11th Street, Suite 2500, Panama City, Florida 32401.
26-32 for Utilities Administration Building Renovation Page 3 of 81
Bidders electing to submit paper bids should submit one (1) original bid package.
Bids shall be enclosed in a sealed envelope bearing the title of the work, the name of the bidder, and the date for opening. It is the sole responsibility of the bidder to ensure that the bid is received on time.
Each bid shall be valid to Bay County for a period of ninety (90) days after the bid opening.
The County will check the bids and notify the selected bidder at the earliest opportunity.
Special Accommodation: Any person requiring a special accommodation at a Pre-Bid Conference or Bid opening because of a disability should call the Purchasing Department at (850) 248-8270 at least five (5) workdays prior to the Pre-Bid Conference or Bid opening. For Hearing Impaired, Dial 1-800-955-8771 (TOO), and 1-800-955-8770 (Voice).
BID DOCUMENTS
Electronic versions of the solicitation documents are available via OpenGov Procurement https://procurement.opengov.com/portal/baycountyfl
Bid documents, plans, blueprints, or other materials may also be obtained by contacting the Bay County Purchasing Department, purchasing@baycountyfl.gov, 840 West 11th Street, Suite 2500, Panama City, FL 32401, (850) 248-8270.
For those projects with separate plans, blueprints, or other materials that cannot be accessed through the internet, the Purchasing Department will make a good faith effort to ensure that all registered bidders (those who have been registered as receiving a bid package) receive the documents.
POINT OF CONTACT
The County Purchasing Department will be the only point of contact for this ITB. Under no circumstances may a bidder contact any County Commissioner, County Administrator, or County employee concerning this ITB until after award. Any such contact may result in disqualification as per Bay County Code Section 2-124.
QUESTIONS
Bidders shall submit all questions, in writing, to the Purchasing Department via email Purchasing@baycountyfl.gov. All questions shall be submitted no later than 5:00 pm (CDT) on Friday, April 24, 2026.
ADDENDA
If any addenda are issued after the initial specifications are released, the County will post the addenda on the County website or OpenGov. It is the responsibility of the bidder prior to submission of any bid to check the above website or contact the Purchasing Department to verify any addenda issued. The receipt of all addenda must be acknowledged on the addenda response sheet.
26-32 for Utilities Administration Building Renovation Page 4 of 81 https://www.baycountyfl.gov/Bids.aspx https://procurement.opengov.com/portal/baycountyfl mailto:purchasing@baycountyfl.gov mailto:Purchasing@baycountyfl.gov
BID FORM
To receive consideration, all bids shall be made on the forms provided, properly executed and with all items filled out. Do not change the wording of the Bid Form and do not add words to the wording of the Bid Form. No conditions, limitations or provisions will be attached or added to the Bid Form or other bid documents by the bidder.
No bidder shall be permitted to correct a bid mistake after bid opening that would cause such bidder to have the low bid, except for the correction of errors in extension of unit prices in the bids. In such cases, the unit price bid shall not be changed and shall prevail.
BONDS
A Bid Bond, in the amount of 5% of the proposed base bid contract amount, shall accompany each bid. A scanned copy may be submitted with the e-bid. The successful bidder’s security will be retained until the contract has been signed and the bidder has furnished the required Public Construction Bond. The County reserves the right to retain the security of the next bidder until the selected bidder enters into contract or until 90 days after bid opening, whichever is shorter. All other bid security will be returned as soon as practicable.
COMPLETE BID AMOUNTS; EXAMINATIONS OF SPECIFICATIONS; WORK SITES
Bids shall be on the basis of unit price and shall be compensation in full for the complete work. The unit prices shall include all charges for completing the work and include layout, insurance, taxes, field office and supervision, overhead and profit, permits, impact fees, bonds, and miscellaneous items needed to complete the bid. All prospective firms may visit the site and become familiar with the existing conditions. No allowance will be made to any bidder because of a claimed lack of examination or knowledge. The submission of a bid shall be construed as conclusive evidence that the bidder has made such examination.
WITHDRAWAL OF BIDS
Any bidder may withdraw his bid, either personally or by written request, at any time prior to the scheduled time for opening bids. No bidder may withdraw his bid for a period of 90 days after the date for opening and all bids shall be subject to acceptance by the County during this period.
CANCELLATION
The County may cancel this ITB, or reject in whole or in part, when it is in the best interests of the County, as determined by the Board of County Commissioners. Notice of cancellation shall be posted on OpenGov and the County website. The notice shall identify the solicitation, and, where appropriate, explain that an opportunity will be given to compete on any re-solicitation or any future procurement of similar items.
BASIS OF AWARD
The contract will be awarded to the lowest, responsive, responsible bidder who has proposed the lowest qualified Lump Sum Price and is deemed qualified by Bay County, 26-32 for Utilities Administration Building Renovation Page 5 of 81 subject to the County’s right to reject any or all bids and to waive informality and irregularity in the proposals and proposing.
RIGHT TO REJECT
In accordance with section 2-113 of the Bay County Code, the County reserves the right to:
a. reject any or all submittals received;
b. select and award any portion of any or all submittal items;
c. waive minor informalities and irregularities in the bidder’s submittal.
A bid may be rejected if it is non-responsive or does not conform to the requirements and instructions in this ITB. A bid may be non-responsive by reasons, including, but not limited to, failure to utilize or complete prescribed forms, conditional bids, incomplete bids, indefinite or ambiguous bids, failure to meet deadlines and improper and/or undated signatures. Other conditions which may cause rejection of bids include evidence of collusion, obvious lack of experience or expertise to perform the required work, submission of more than one bid for the same work from an individual, bidder or corporation under the same or a different name, and/or failure to perform or meet financial obligations on previous contracts. Bids may be rejected if not delivered on or before the date and time specified as the due date for submission of the bid.
EXECUTION OF AGREEMENT
The successful bidder shall, within 10 days after receipt of the Notice of Award and the contract forms or documents, sign and deliver to the County Chief Procurement Officer all required contract documents in form and substance approved by the County. The vendor shall also deliver any required bonds and certificates of insurance as required. All bonds and certificates of insurance shall be approved by the Bay County Risk Management Office before the successful bidder may proceed with the work.
Neither the Notice of Award nor the execution of the required contract documents by the Vendor create any rights in the bidder. The bidder has no rights with respect to the award of the contract until a fully executed contract is signed by all required parties and all insurance policies and other required deliverables are provided and approved by the County.
LICENSING
Bidder shall be properly licensed for the appropriate work specified in this Invitation to Bid. All bidders are requested to submit any required license(s) with their bids. License(s) must be effective as of the bid opening date and must be maintained throughout the contract period. Failure to be properly licensed as stated above will result in the rejection of the bid as nonresponsive.
GENERAL TERMS
Companies that are required to register with the State of Florida Division of Corporations as a domestic or foreign business entity should provide evidence of their registration.
26-32 for Utilities Administration Building Renovation Page 6 of 81
PUBLIC RECORDS
In accordance with Chapter 119 of the Florida Statutes (Public Records Law) and except as may be provided by other applicable State or Federal Law, all bidders should be aware that bids, responses, and proposals are in the public domain. Bidders must identify specifically any information contained in their response which they consider confidential and/or proprietary and which they believe to be exempt from disclosure, citing specifically the applicable exempting law.
Sealed bids, proposals, or replies received by an agency pursuant to a competitive solicitation are exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution until such time as the agency provides notice of an intended decision or until 30 days after opening the bids, proposals, or final replies, whichever is earlier.
EXEMPTION OF MEETINGS/PRESENTATIONS
Pursuant to Florida Statute section 286.0113(2), any portion of a meeting at which a negotiation with a vendor is conducted pursuant to a competitive solicitation, at which a vendor makes an oral presentation as part of a competitive solicitation, or at which a vendor answers questions as part of a competitive solicitation is exempt from public meeting requirements. However, the County must make a complete recording of any portion of an exempt meeting and no portion of the exempt meeting may be held off the record. The recording of, and any records presented at, the exempt meeting are exempt from the public records law of section 119.07(1), Fla. Stat. (2015) and section 24(a), Art.
I of the State Constitution, until such time as the agency provides notice of an intended decision or until 30 days after opening the bids, submittals, or final replies, whichever occurs earlier. If the County rejects all bids, submittals, or replies and concurrently provides notice of its intent to reissue a competitive solicitation, the recording and any records presented at the exempt meeting remain exempt from section 119.07(1), Fla.
Stat. (2015) and section 24(a), Art. I of the State Constitution until such time as the agency provides notice of an intended decision concerning the reissued competitive solicitation or until the agency withdraws the reissued competitive solicitation. A recording and any records presented at an exempt meeting are not exempt for longer than 12 months after the initial agency notice rejecting all bids, submittals, or replies.
REPRESENTATIONS
The contract documents contain the provisions required for the project. Information obtained from an office, Director, or employee of the County or any other person shall not affect the risks or obligations assumed by the bidder or relieve the bidder from fulfilling any of the conditions of the contract.
WARRANTY
All goods and services furnished by bidder, relating to and pursuant to this ITB, will be warranted to meet or exceed the specifications contained herein. In the event of breach, the bidder will take all necessary action, at bidder’s expense, to correct such breach in the most expeditious manner possible.
26-32 for Utilities Administration Building Renovation Page 7 of 81
SUBCONTRACTORS
The successful bidder will be the prime service provider and shall be responsible for all work performed and contract deliverables. Proposed use of subcontracts should be included in the bidder’s response. Requests for use of subcontractors received subsequent to the solicitation process are subject to review and approval by the County.
The County reserves the right to request and review information in conjunction with its determination regarding a subcontract request. All subcontractors are subject to the same requirements of this solicitation as the successful bidder.
SCRUTINIZED COMPANIES
Respondent must certify that the company is not participating in a boycott of Israel.
Respondent must also certify that Contractor is not on the Scrutinized Companies that Boycott Israel list, not on the Scrutinized Companies with Activities in Sudan List, and not on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or has been engaged in business operations in Cuba or Syria. Subject to limited exceptions provided in state law, the County will not contract for the provision of goods or services with any scrutinized company referred to above.
Respondent must submit the certification that is attached to this solicitation. Submitting a false certification shall be deemed a material breach of contract. The County shall provide notice, in writing, to the Contractor of the County's determination concerning the false certification. The Contractor shall have five (5) days from receipt of notice to refute the false certification allegation. If such false certification is discovered during the active contract term, the Contractor shall have ninety (90) days following receipt of the notice to respond in writing and demonstrate that the determination of false certification was made in error. If the Contractor does not demonstrate that the County's determination of false certification was made in error then the County shall have the right to terminate the contract and seek civil remedies pursuant to Section 287.135, Florida Statutes, as amended from time to time.
PROHIBITION AGAINST CONSIDERING SOCIAL, POLITICAL, OR IDEOLOGICAL
INTEREST IN GOVERNMENT CONTRACTING
Bidders are hereby notified of the provisions of section 287.05701, Florida Statutes, as amended, that the County will not request documentation of or consider a Bidder's social, political, or ideological interests when determining if the Bidder is a responsible Bidder. Bidders are further notified that the County’s governing body may not give preference to a Bidder based on the Bidder's social, political, or ideological interests.
DIRECT PURCHASE
The County has determined that this project may be subject to certain sales tax exemptions pursuant to section 212.08(6), Fla. Stat. (2010). The Owner Direct Purchase Supplementary Conditions, EXHIBIT 6, is intended to inform the Vendor of the requirements of the statute and the County’s procedures. The Awarded Vendor(s) will compile a list of all purchases for this project that have an estimated cost over $5,000.00.
26-32 for Utilities Administration Building Renovation Page 8 of 81
After review of bid submittals, the County will determine if it is in the best interest of the County to utilize owner direct purchase.
BID PROTEST
A notice of protest must be submitted in accordance with section 2-114 of the Bay County Code, as amended from time to time. If a party intends to initiate such an action, it must electronically notify the Chief Procurement Officer and the County Attorney no later than one business day after notice of the awarding authority’s decision.
ANTICIPATED SCHEDULE
This schedule may be altered solely at the County’s discretion:
ITB Advertisement Monday, March 30, 2026 Pre-Bid Meeting Tuesday, April 14, 2026 Questions Due Date Friday, April 24, 2026 Bid Deadline Tuesday, May 5, 2026 Board Meeting for recommended award Tuesday, May 19, 2026
26-32 for Utilities Administration Building Renovation Page 9 of 81
BID CHECKLIST
The checklist is provided as a courtesy and may not be all inclusive of items required within this invitation to bids.
The following bid forms may be submitted electronically through OpenGov. Bidders submitting paper bids may download all documents from the Purchasing Department’s Opengov Procurement page: https://procurement.opengov.com/portal/baycountyfl
ADDENDUM ACKNOWLEDGEMENT
AFFIDAVIT OF COMPLIANCE WITH SECTION 287.138, FLORIDA STATUTES,
CONTRACTING WITH FOREIGN ENTITIES OF CONCERN
AFFIDAVIT OF COMPLIANCE WITH SECTION 787.06, FLORIDA STATUTES,
HUMAN TRAFFICKING ATTESTATION
ANTI-COLLUSION CLAUSE
CERTIFICATION REGARDING SCRUTINIZED COMPANIES LIST
CONFLICT OF INTEREST DISCLOSURE FORM
DRUG FREE WORKPLACE
SUB-CONTRACTORS
BID BOND
DIRECT PURCHASE LIST OF MATERIALS/EQUIPMENT
LICENSE AND CERTIFICATION AS REQUIRED
26-32 for Utilities Administration Building Renovation Page 10 of 81 https://procurement.opengov.com/portal/baycountyfl
ATTACHMENT 1
REQUIRED FORMS
26-32 for Utilities Administration Building Renovation Page 11 of 81
ITB NO: 26-32
This proposal of , hereinafter called “BIDDER,” organized and existing under the laws of the State of doing business as (Insert “a corporation”, “a partnership” or “an individual” as applicable), is hereby submitted to the Board of County Commissioners, Bay County, hereinafter called “OWNER.”
In compliance with the Advertisement for Bids, BIDDER hereby proposes to perform all work, as detailed in this bid.
By submission of this BID, each Bidder certifies, and in the case of a joint BID each party thereto certifies as to its own organization, that this BID has been arrived at independently, without consultation, communication or agreement as to any matter relating to this BID with any other BIDDER or with any other competitor.
Vendor agrees to perform the entire work as indicated on the drawings and in compliance with the Contract Documents and Specifications, complete in every detail.
The Lump Sum Price is:
(Words)
Submitted By:
Name of Firm/Vendor Submitting This Bid
Bid Prepared By:
Name of Individual Who Prepared This Bid
Contact Email:
Address:
Phone:
Contractor’s License No. (if applicable)
Signature of Authorized Representative of Firm/Vendor Date
SEAL: (If bid is by Corporation)
26-32 for Utilities Administration Building Renovation Page 12 of 81
ADDENDUM ACKNOWLEDGEMENT
I acknowledge receipt of the following addenda:
ADDENDUM NO. DATED
ADDENDUM NO. DATED
Name of Firm:
Authorized Signature:
Printed Name:
Title:
Date:
It is the responsibility of the firm to ensure that they have received addendums if issued.
Call (850) 248-8270 or email Purchasing@baycountyfl.gov prior to submitting your bid to ensure that you have received addendums.
26-32 for Utilities Administration Building Renovation Page 13 of 81 mailto:Purchasing@baycountyfl.gov
AFFIDAVIT OF COMPLIANCE WITH SECTION 287.138, FLORIDA STATUTES,
CONTRACTING WITH FOREIGN ENTITIES OF CONCERN
Before me, the undersigned authority, personally appeared (Name of Affiant)
_______________ ____________________, who, after being first duly sworn, deposes and says of his or her personal knowledge the following:
1. Affiant is the (Title) ___________________________ of (Business Name)
_________________________________ which does business in the State of Florida, hereinafter called the “Nongovernmental Entity.”
2. Nongovernmental Entity, pursuant to § 287.138, Florida Statues, certifies that (1)
Nongovernmental Entity is not owned by a government of a foreign country of concern; (2) a government of a foreign country of concern does not have a “controlling interest” in Nongovernmental Entity, as defined by Section 287.138(1)(a), Florida Statutes; and (3) Nongovernmental Entity is not organized under the law of nor has its principal place of business in a foreign country of concern. For the purposes of this affidavit, foreign country of concern means the People’s Republic of China, the Russian Federation, the Islamic Republic of Iran, the Democratic People’s Republic of Korea, the Republic of Cuba, the Venezuelan regime of Nicolás Maduro, or the Syrian Arab Republic, including any agency of or any other entity of significant control of such foreign country of concern, as defined in § 287.138(1)(c), Florida Statutes.
3. This Affidavit is executed by the Nongovernmental Entity accordance with § 287.138, Florida Statutes, for the purposes of preventing Bay County, Florida, from entering contracts with foreign entities of concern which would provide Nongovernmental Entity access to an individual’s personal identifying information.
Signed and Delivered on this _____ day of __________, 2026.
Signature of Affiant Printed Name of Affiant
STATE OF__________________
COUNTY OF________________________
Sworn to (or affirmed) and subscribed before me by means of □ physical presence or □ online notarization, this ______ day of _____________, 2026, by ___________________________.
Personally Known OR Produced Identification Type of Identification Produced________ __ ____________________________ (Notary Signature)
(SEAL)
26-32 for Utilities Administration Building Renovation Page 14 of 81
AFFIDAVIT OF COMPLIANCE WITH SECTION 787.06, FLORIDA STATUTES,
HUMAN TRAFFICKING ATTESTATION
Before me, the undersigned authority, personally appeared (Name of Affiant) _________________________________, who, after being first duly sworn, deposes and says of his or her personal knowledge the following:
1. Affiant is the (Title) ______________________________ of (Business Name) __________________________________ which does business in the State of Florida, hereinafter called the “Nongovernmental Entity.”
2. Nongovernmental Entity, pursuant to § 787.06(13), Florida Statues, certifies that 1) neither Nongovernmental Entity nor any of its subsidiaries or affiliates uses coercion for labor or services, as terms are defined in § 787.06, Fla. Stat., as may be amended from time to time; (2) Nongovernmental Entity will immediately notify Bay County, Florida, if, at any time in the future, Nongovernmental Entity does use coercion for labor or services, and understands that pursuant to such notification no contracts may be executed, renewed, or extended between the parties; and (3) Nongovernmental Entity has read the foregoing attestation, confirms the facts stated in it are true, ad are made for the benefit of, and reliance by, Bay County, Florida.
Signed and Delivered on this _____ day of __________, 2026.
Signature of Affiant Printed Name of Affiant
STATE OF ___________
COUNTY OF ______________
Sworn to (or affirmed) and subscribed before me by means of □ physical presence or □ online notarization, this ____ day of _____________, 2026, by ___________________.
Personally Known OR Produced Identification
Type of Identification Produced______ _______________________________ (Notary Signature)
(SEAL)
26-32 for Utilities Administration Building Renovation Page 15 of 81
ANTI-COLLUSION CLAUSE
Firm certifies that their response is made without prior understanding, agreement or connection with any Corporation, Firm or person submitting a response for the same services and is in all respects fair and without collusion or fraud.
Printed Name:
26-32 for Utilities Administration Building Renovation Page 16 of 81
CERTIFICATION REGARDING SCRUTINIZED COMPANIES LIST
Respondent Vendor Name:
Vendor FEIN:
Vendor's Authorized Representative Name and Title:
Address:
City: State: ZIP:
Phone Number:
Email Address:
Section 287.135, Florida Statutes prohibits agencies from contracting with companies, for goods or services over $1,000,000, that are participating in a boycott of Israel, are on the Scrutinized Companies that Boycott Israel list, the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or has been engaged in business operations in Cuba or Syria.
Both lists are created pursuant to Section 215.473, Florida Statutes.
As the person authorized to sign on behalf of Respondent, I hereby certify that the company identified above in the sector entitled "Respondent Vendor Name" is not participating in a boycott of Israel, is not listed on the Scrutinized Companies that Boycott Israel List, the Scrutinized Companies with Activities in Sudan List, or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List and has not been engaged in business operations in Cuba or Syria. I understand that pursuant to Section 287.135, Florida Statutes, the submission of false certification may subject company to civil penalties, attorney's fees, and/or costs.
Certified By:
AUTHORIZED SIGNATURE
Print Name and Title:
26-32 for Utilities Administration Building Renovation Page 17 of 81
CONFLICT OF INTEREST DISCLOSURE FORM
For purposes of determining any possible conflict of interest, all firms, must disclose if any Bay County Board of County Commissioner(s), employee(s), elected officials(s), or any of its agencies is also an owner, corporate officer, agency, employee, etc., of their firm.
Indicate either “yes” (a county employee, elected official, or agency is also associated with your firm), or “no”. If yes, give person(s) name(s) and position(s) with your firm.
YES NO
NAME(S) POSITION(S)
Printed Name:
26-32 for Utilities Administration Building Renovation Page 18 of 81
DRUG FREE WORKPLACE
To have a drug-free workplace program, a business shall:
1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
3. Give each employee engaged in providing the commodities or contractual services that are under Proposal a copy of the statement specified in subsection (1).
4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under Proposal, the employees will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction.
5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by an employee who is so convicted.
6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.
As the person authorized to sign the statement, I certify the following:
(Check one and sign in the space provided.)
This firm complies fully with the above requirements.
This firm does not have a drug free work place program at this time.
Printed Name:
26-32 for Utilities Administration Building Renovation Page 19 of 81
SUB-CONTRACTORS
As the bidder, I submit a listing of the Sub-Contractors which I shall use to accomplish the Work. Sub-Contractors are listed by name, address, amount of work and item of work. If none, please state so.
Subcontractor Name and Address:
Work to be performed and $ amount:
Printed Name:
Title:
Date:
*Complete additional forms if needed to list all subcontractors
26-32 for Utilities Administration Building Renovation Page 20 of 81
BID BOND
BY THIS BOND, We, as Principal and , a corporation, as Surety, are bound to the Board of County Commissioners, Bay County, Florida, as County, in the sum of $ for the payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally. THE CONDITION of this bond is such that
1. The Principal has submitted to the County a certain Bid dated
2. If said Bid shall be rejected, or, if said Bid shall be accepted and the Principal shall execute and deliver a Contract, and furnish bonds for the faithful performances of work and for the payment of all persons performing labor and furnishing materials in connection therewith, and shall fulfill all other aspects created by the acceptance of said Bid, then this obligation shall be void. Otherwise, this bond shall remain in full force and effect with it being expressly understood and agreed that the liability of the Surety and for any and all claims hereunder shall, in no event, exceed the amount of this obligation.
This Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and this bond shall, in no way, be impaired or affected by any extension of time within which the County may accept such Bid; and Surety hereby waives notice of any such extension.
Signed, sealed and delivered in three (3) counterparts on
CORPORATE PRINCIPAL
By: Attest:
Its: Seal:
Acknowledged and subscribed on , before the undersigned authority by , as the of the Corporation named as Principal and with due authorization of the Corporation.
Notary Public
SURETY
By: Attest:
Seal:
Countersigned:
By:
Attorney-in-Fact, State of Florida
26-32 for Utilities Administration Building Renovation Page 21 of 81
ATTACHMENT 2
SAMPLE CONTRACT 26-32
UTILITIES ADMINISTRATION BUILDING RENOVATIONS
This Contract, dated is between the Bay County Board of County Commissioners, located at 840 West 11th Street, Panama City, FL 32401 ("County"), and Vendor Name, located at Vendor Address, City, State, Zip ("Vendor”).
1. Scope of Work The County desires to hire Vendor to provide all necessary labor, supervision, equipment, and supplies to provide all necessary labor, supervision, equipment, and supplies to renovate the interior office space at the Bay County Utility Services Administrative Building which is located at 3410 Transmitter Rd.
Panama City, Florida, 32404.
The Vendor will perform those services in accordance with Exhibit 1 General Terms and Conditions, Exhibit 2 Scope of Work and Exhibit 3 VBA Drawings. The Vendor hereby agrees to provide the following services to the County according to Invitation to Bid (ITB) 26-32 said documents being incorporated into this agreement as if fully set out herein, and the Vendor’s response thereto, said documents being attached as Exhibit 4, to the extent they are not inconsistent with this Agreement.
The County has determined that this project may be subject to certain sales tax exemptions pursuant to section 212.08(6), Fla. Stat., the Vendor hereby agrees to provide services in accordance with Exhibit 7 for Direct Purchase (if applicable).
2. Term
This Contract shall commence upon the date of receipt of the “Notice to Proceed” and work shall be completed in 120 calendar days. Should the Vendor fail to complete the work by the specified date, the County shall deduct from the Contract Sum the amount of $250.00 per calendar day as liquidated damages for every day subsequent to the specified date until the work is fully completed and receipted by the County as being completed. For purposes of time calculation, day one of the project is the calendar day after the date of the Notice to Proceed.
3. Contract Price
The County shall pay the Vendor for services provided in accordance with the Florida Prompt Payment Act of the Florida Statutes, Chapter 218.70, upon receipt of the Vendor’s invoice and written approval of same by the County’s Designated Representative indicating that services have been rendered in conformity with this Agreement. The Vendor shall submit an invoice for payment to Utilities Services Department on a monthly basis for those specific services, as described in this Agreement, ITB 26-32 and the Vendor’s proposal cost of
26-32 for Utilities Administration Building Renovation Page 22 of 81
$_______________, that were satisfactorily completed during that invoicing period.
4. Payments
Notwithstanding anything to the contrary herein, the County shall pay the Vendor for services performed under this Contract in accordance with the Local Government Prompt Payment Act (F.S. §218.70, et seq.) Pay requests shall be sworn statements based upon the progress made and submitted to the County Utility Services Department on a monthly basis. Payment by the County to the Vendor of the statement amount shall be made within twenty (20) days after the date on which the payment request or invoice is stamped as received. Five percent (5%) retainage shall be held at the discretion of the County.
Final Payment - Final payment constituting the unpaid balance of the cost of the Project and the Vendor's fee, shall be due and payable within 30 days after the Project is delivered to the County, finished and ready for beneficial occupancy, or when the County occupies the Project, whichever event first occurs provided that the Project be then substantially completed and this agreement substantially performed. However, if there should remain work to be completed, the Vendor and the County shall list those items prior to receiving final payment and the County may retain a sum equal to 150% of the estimated cost of completing any unfinished work and the applicable portion of the Vendor's retainage, provided that said unfinished items are listed separately and estimated cost of completing any unfinished items are likewise listed separately. Thereafter, County shall pay to Vendor, monthly, the amount retained from each incomplete item after each of said items is completed.
Payments to Subcontractors - The Vendor shall promptly, but not later than
10 days after receipt of payment from the County, pay all the amount due subcontractors. If there should remain items to be completed, the Vendor and County shall list those items required for completion and the Vendor shall require the retainage of a sum equal to 200% of the estimated cost of completing any unfinished items, provided that said unfinished items are listed separately and the estimated cost of completing any unfinished items likewise listed separately.
Thereafter, The Vendor shall pay to the subcontractors, monthly; the amount retained for each incomplete item after each of said items is completed. Before issuance of final payment without any retainage, the subcontractor shall submit satisfactory evidence that all payrolls, material bills and other indebtedness connected with the Project have been paid or otherwise satisfied, warranty information is complete, as-built markups have been submitted and instruction for the County's operating and maintenance personnel is complete. Final payment may be made to certain select subcontractors who work is satisfactorily completed prior to the total completion of the Project but only upon approval of the County.
Delayed Payments by County - If the County shall fail to pay the Vendor within 20 days after the receipt of an approved payment request from the Vendor, 26-32 for Utilities Administration Building Renovation Page 23 of 81 then the Vendor may, upon fourteen (14) additional days advance written notice to the County and the Engineer stop the Project until payment of the amount owing has been received, provided that the payment request has been submitted in sufficient detail to comply with the guidelines of the Office of the Clerk of the Circuit Court for Bay County. In the event that there is a dispute in the amount of the pay request, then only the disputed amount shall be held until resolved and the undisputed amount shall be paid within the time limits as stated within this paragraph. If undisputed amounts are timely paid, then the Vendor shall not stop the Project in any fashion and the progress of the project shall not be interrupted.
Both parties agree that best efforts be made to resolve the disputed amount.
5. Independent Contractor The Vendor shall at all times, relevant to this contract, be an independent contractor and in no event shall the Vendor, nor any employees or sub-contractors under it, be considered to be employees of Bay County.
6. Vendor’s Personnel Vendor has the exclusive right to hire and terminate its employees and may transfer or reassign any of its employees to other work of the Vendor. The direction of the work of Vendor's employees shall be under the exclusive control of Vendor.
If the County objects to the presence or performance of any employee of Vendor, Vendor shall remove such employee from County premises.
7. Cooperation
Vendor agrees to perform each phase of the work at the scheduled time and in the scheduled sequence. Vendor will cooperate with the Utility Services Director or their designee as requested and specifically to allow the County to inspect the performance of work of this Contract.
8. Materials, Supplies, Etc.
Vendor shall furnish and supply all tools, materials, consumable supplies and equipment, safety devices and equipment, and any special clothing that are required to perform the work of this Contract and consistent with the requirements of the ITB.
9. Records / Audits
The County is a public agency subject to Chapter 119, Florida Statutes.
The Vendor shall comply with Florida’s Public Records Law. Specifically, the Vendor shall:
Keep and maintain public records required by the County in order to perform the service;
Upon request from the County’s custodian of public records, provide the County with a copy of the requested records or allow the records to be inspected
26-32 for Utilities Administration Building Renovation Page 24 of 81 or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, F.S. or as otherwise provided by law.
Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Vendor does not transfer the records to the County.
Upon completion of the contract, transfer, at no cost to the County, all public records in possession of the Vendor, or keep and maintain public records required by the County to perform the service. If the Vendor transfers all public records to the County upon completion of the contract, the Vendor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Vendor keeps and maintains public records upon completion of the contract, the Vendor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the County, upon request from the County’s custodian of public records in a format that is compatible with the information technology systems of the County.
The Vendor shall maintain books, records and documents directly pertinent to performance under this Contract in accordance with generally accepted accounting principles consistently applied. The County, the State of Florida, or their authorized representatives shall have access to such records for audit purposes during the term of this Contract and for five (5) years following Contract completion.
10. Public Records Custodian
If the Vendor has questions regarding the application of Chapter 119, Florida Statutes, to the Vendor’s duty to provide public records relating to this contract contact the Custodian of Public Records, at (850) 248-8145, publicrecords@baycountyfl.gov or 840 W. 11th Street, Panama City, Florida 32401.
11. Inspector General
The parties agree to comply with s.20.055(5), Florida Statutes, and to incorporate in all subcontracts the obligation to comply with s. 20.055(5), Florida Statutes. “(5) It is the duty of every state officer, employee, agency, special district, board, commission, contractor, and subcontractor to cooperate with the inspector general in any investigation, audit, inspection, review, or hearing pursuant to this section.”
12. County Representative The County Facilities Management Division Manager or a designee has authority to designate the work to be done by Vendor, to inspect such work, and to resolve questions which arise between the parties. The Vendor or the Vendor’s designee will deal with the County's representative on matters relating to the performance of the work. The County shall have the authority to stop the work
26-32 for Utilities Administration Building Renovation Page 25 of 81 mailto:publicrecords@baycountyfl.gov whenever it deems such action necessary to secure the safe and proper performance of the work assignment.
13. Laws, Rules and Regulations General Laws: Vendor shall give all notices required of it by law and shall comply with all Federal, State and local laws, ordinances, rules and regulations governing Vendor’s performance of this Contract and the preservation of public health and safety. Upon request by the County, Vendor shall provide proof of such compliance to the County.
Illegal Alien Labor: Vendor shall comply with all provisions state and federal law regarding the hiring and continued employment of aliens not authorized to work in the United States. Vendor shall not knowingly employ or contract with an illegal alien to perform work under this contract or enter into a contract with a subcontractor that fails to certify to the Vendor that the subcontractor is in compliance with such laws. Vendor agrees that it shall confirm the employment eligibility of all employees through participation in E-Verify and will require the same of any subcontractors. Vendor shall pay all cost incurred to initiate and sustain the verification programs.
14. E- Verify.
As a condition precedent to entering into this agreement, and in compliance with Section 448.095, Fla. Stat., Vendor and its subcontractors shall, register with and use the E-Verify system to verify work authorization status of all employees.
Vendor shall require each of its subcontractors to provide Vendor with an affidavit stating that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien. Vendor shall maintain a copy of the subcontractor’s affidavit as part of and pursuant to the records retention requirements of this agreement.
The County, Vendor, or any subcontractor who has a good faith belief that a person or entity with which it is contracting has knowingly violated Section 448.09(1), Fla. Stat. or the provisions of this section shall terminate the contract with the person or entity.
The County, upon good faith belief that a subcontractor knowingly violated the provisions of this section, but Vendor otherwise complied, shall promptly notify Vendor and Vendor shall immediately terminate the contract with the subcontractor.
A contract terminated under the provisions of this section is not a breach of contract and may not be considered such. Any contract termination under the provisions of this section may be challenged pursuant to Section 448.095(2)(d), Fla. Stat. Vendor acknowledges that upon termination of this agreement by the County for a violation of this section by Vendor, Vendor may not be awarded a
26-32 for Utilities Administration Building Renovation Page 26 of 81 public contract for at least one (1) year. Vendor further acknowledges that Vendor is liable for any additional costs incurred by the County as a result of termination of any contract for a violation of this section.
Subcontracts. Vendor or subcontractor shall insert in any subcontracts the clauses set forth in this section, including this subsection, requiring the subcontractors to include these clauses in any lower tier subcontracts. Vendor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in this section.
15. Public Entity Crimes Statement
A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a vendor, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list. By submission of a proposal in response to this document, the vendor certifies compliance with the above requirements as stated in Section 287.133, Florida Statutes.
16. Scrutinized Companies
Vendor must certify that the company is not participating in a boycott of Israel.
Vendor must also certify that Vendor is not on the Scrutinized Companies that Boycott Israel list, not on the Scrutinized Companies with Activities in Sudan List, and not on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or has been engaged in business operations in Cuba or Syria.
Subject to limited exceptions provided in state law, the County will not contract for the provision of goods or services with any scrutinized company referred to above.
Vendor must submit the certification attached to this contract. Submitting a false certification shall be deemed a material breach of contract. The County shall provide notice, in writing, to the Vendor of the County's determination concerning the false certification. The Vendor shall have five (5) days from receipt of notice to refute the false certification allegation. If such false certification is discovered during the active contract term, the Vendor shall have ninety (90) days following receipt of the notice to respond in writing and demonstrate that the determination of false certification was made in error. If the Vendor does not demonstrate that the County's determination of false certification was made in error then the County shall have the right to terminate the contract and seek civil remedies pursuant to Section 287.135, Florida Statutes, as amended from time to time.
26-32 for Utilities Administration Building Renovation Page 27 of 81
17. Antitrust Violations; Denial or Revocation Pursuant to § 287.137, Florida Statutes, as may be amended, a person or an affiliate who has been placed on the antitrust violator vendor list (electronically published and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .