26-3-10 Evaluation Criteria.pdf
PDF 131 KB Posted
- Attached to
- Generator and Slurry Tank Mod
- Solicitation number
- W519TC25QA020
About this file
This document is an Evaluation Criteria document for a Slurry Tank Modification project at Rock Island Arsenal, dated 5-May-2025, with Project Number 26-3-10. The document outlines two primary evaluation criteria for potential contractors: Experience and Technical Requirements.
For the Experience criteria, contractors must demonstrate at least 3 years of business history supplying similar equipment to U.S. Government or commercial industries, and provide published equipment data and two reference examples. The Technical criteria require contractors to submit a comprehensive package including a detailed compliance statement (with explicit "COMPLY" or "NON-COMPLY" annotations), full equipment identification (including manufacturer, model number, and all options), and a minimum one-year parts and labor warranty beginning upon final acceptance. Failure to provide complete documentation may result in the contractor being considered unresponsive and eliminated from further consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08 KTR Questions and Government Answers v2.xlsx | XLSX spreadsheet | |
| B08 KTR Questions and Government Answers.xlsx | XLSX spreadsheet | |
| W519TC25QA020 0001.pdf | ||
| RIPD E4000-26-3-10 Slurry Tank Mod.pdf | ||
| B08 26-3-10 CDRL.docx | DOCX document | |
| Solicitation - W519TC25QA020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROCK ISLAND ARSENAL DATE: 5-May-2025
PROJECT: 26-3-10
EVALUATION CRITERIA
SLURRY TANK MOD.
1. EXPERIENCE
In the regular course of its business for a period of at least 3-yrs preceding this solicitation, the manufacturer of this equipment shall have previously supplied or offered for sale this type of equipment to industry for other than its own use. Both of the following shall be provided as evidence:
1.1.1 PUBLISHED DATA: Each contractor shall provide a brochure, catalog, or published data describing the equipment offered.
1.1.2 REFERENCES: The contractor shall provide at minimum, two examples of previous instances where the equipment was sold to U.S Government or U.S Commercial Industries.
2. TECHNICAL
Each contractor shall submit a package containing the following information. Failure to provide all the data required with the package may result in a contractor being considered unresponsive and eliminated from further consideration.
2.1 Compliance Statement
Each contractor shall provide a statement of compliance. It shall be a copy of the purchase description. At the end of each and every paragraph the vendor shall type or write exactly either “COMPLY” or “NON-COMPLY”.
Other formats will not be considered acceptable. If “NON-COMPLY” is written, a brief description of the non-compliance is required.
2.2 Equipment Identification
Each contractor shall identify the manufacture and model number of the equipment being offered. The contractor shall also identify all the options by number that are offered in order to meet this purchase description. The contractor shall also identify items that are not normally numbered for ordering such as installation, freight, and training.
2.3 Warranty
The proposal must include a minimum warranty of one-year parts and labor and will begin upon final acceptance.
| 1. Experience |
| 2. TECHNICAL |
| 2.1 Compliance Statement |
| 2.2 Equipment Identification |
| 2.3 Warranty |
File details come from the government source that posted it. Updated .