26-24031-Centrifuge Base - Addendum No. 2.pdf
PDF 253 KB Posted
- Attached to
- OLCC Conveyance System Upgrade
- Solicitation number
- S-84500-00015388
- Issued by
- Multnomah County, Oregon
About this file
This is an Addendum No. 2 issued by the City of Newport Public Works Department for the Newport Wastewater Treatment Plant Centrifuge Replacement Project (Project No. 26-24031) in Newport, Oregon, located in Lincoln County. The addendum, dated November 24th, 2025, provides clarifications and responses to bidder questions submitted during the open bidding period and does not modify the project drawings, specifications, bid items, or scope of work. Bids are due November 26, 2025, at 2:00 PM Pacific Time, with public bid opening and reading occurring immediately following the closing time at the City of Newport Engineering Department. The City anticipates administrative processing will take several days before issuance of the Notice of Intent to Award, with bidders advised to follow up approximately seven calendar days after the bid opening.
The City of Newport does not have a first-principles engineer's cost estimate and is not providing a construction cost estimate or cost range for this project; bidders must rely on the Invitation to Bid, drawings, specifications, and site conditions when preparing their bids. The City does not publish plan holder lists or non-mandatory site-visit attendee lists during the active bidding window. Regarding bid bonds, the City does not have a separate bid bond form but permits bidders to use their surety's standard bid bond form provided it meets the requirements of the Invitation to Bid and ORS 279C. All necessary project information is contained within the solicitation documents and addenda, with this addendum forming part of the Contract Documents for the Invitation to Bid issued November 17, 2025, and requiring bidders to acknowledge receipt on the Bid Form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ContractForServices - Pivot - Websocket.docx | DOCX document | |
| RFQ Pivot Modification Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: ___November 24th, 2025____________ Addenda No. 2
TO: PLAN HOLDERS
PREPARED BY: ___ Larry Hutchinson ______________
SUBJECT: City of Newport
NEWPORT WASTEWATER TREATMENT PLANT CENTRIFUGE
REPLACEMENT PROJECT
CITY OF NEWPORT PROJECT No. 26-24031
Newport, Oregon Lincoln County
The following changes are made to the project Bid Documents:
This Addendum forms a part of the Contract Documents for the Invitation to Bid issued November 17, 2025, and modifies the work described therein. All other provisions of the ITB remain unchanged. Bidders must acknowledge receipt of this Addendum on the Bid Form.
1 PURPOSE OF ADDENDUM
This Addendum provides written responses to bidder questions received by the City for the Newport WWTP Centrifuge Replacement Project Invitation to Bid. These questions were submitted during the open bidding period and are being issued by addendum so that all plan holders receive the same information.
This Addendum does not modify the project drawings, specifications, bid items, or scope of work. Except for the clarifications included in the Question-and-Answer section below, all provisions of the original Invitation to Bid and Addendum No. 1 remain in full force and effect.
The City of Newport Public Works 169 S.W. Coast Highway Newport, OR 97365 phone: 541.574.3366 fax: 541.265.3301 www.newportoregon.gov
Coast Guard City, U.S.A. Home Port of NOAA Pacific Fleet
2. BIDDER QUESTIONS & ANSWERS
Question 1:
“Confirm that the bid date and time listed above are unchanged.”
Response:
The bid date and time remain unchanged. Bids are due November 26, 2025 at 2:00 PM Pacific Time, and will be publicly opened and read aloud immediately following the closing time at the City of Newport Engineering Department.
Question 2:
“Construction cost estimate or a construction cost range for the project.”
Response:
For this project, the City does not have a first-principles engineer’s cost estimate. As a result, we are not providing a construction cost estimate or cost range. Bidders should rely on the Invitation to Bid, drawings, specifications, and site conditions when preparing their bids.
Question 3:
“Planholders list/bidders list and/or Non-Mandatory pre-bid attendance list.”
Response:
The City does not publish plan holder lists or non-mandatory site-visit attendee lists during the active bidding window. All necessary information is provided in the solicitation documents and addenda.
Question 4:
“Have you issued an additional addendum after Addendum No. 1? If so, please attach them to this response.”
Response:
No additional addenda have been issued beyond Addendum No. 1. The City will issue an Addendum No. 2(this addendum), which will include this Q&A to date.
Question 5:
“When is the best time to follow up for bid results?”
Response:
Because the bid opening occurs near a major holiday period, the City anticipates up to a few days of administrative processing prior to issuance of the Notice of Intent to Award (NITA). A good time for bidders to follow up on bid results is approximately seven (7) calendar days after bid opening. Bid results will also be read aloud immediately at the public bid opening.
Question 6:
“Does the City have a bid bond form, or should we use our surety’s standard form?”
Response:
The City does not have a separate bid bond form for this project. Bidders may use their surety’s standard bid bond form, provided it meets the requirements of the Invitation to Bid and ORS 279C.
**END OF ADDENDUM**