26-13 Debris Removal fr Streambank.pdf
PDF 1 MB Posted
- Solicitation number
- 26-13
- Issued by
- Brazoria County, Amarillo City, Texas
About this file
This is a Scope of Work document prepared by Brazoria County, Texas, for debris removal services from the streambank and shoreline along Oyster Creek and Bastrop Bayou. The project encompasses cleanup and removal of storm-generated debris deposited as a result of Hurricane Beryl, including trees, logs, brush, tops, blockages, rubbish, and other identified debris from both the waterway and adjacent areas. The contractor will be responsible for clearing obstructions and removing all hurricane-related debris within the specified waterways and their banks. The work scope includes site-specific identification of debris by Brazoria County, with the contractor expected to remove materials to designated locations or disposal sites as directed by the county.
The document establishes the technical requirements and operational parameters for debris removal operations, including contractor qualifications, equipment specifications, safety protocols, and environmental compliance measures. Pricing will be structured according to unit costs for debris removal and disposal, with compensation based on actual quantities removed and properly disposed of. The contract will be awarded to the lowest responsive, responsible bidder meeting all specified requirements. Brazoria County retains the right to modify the scope and quantities of work based on site conditions and post-storm assessments. The project represents disaster recovery efforts following Hurricane Beryl, with funding anticipated through FEMA or other emergency management assistance programs available for hurricane recovery operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
BRAZORIA COUNTY
PURCHASING DEPARTMENT
237 E. LOCUST STREET, SUITE 406
ANGLETON, TEXAS 77515
TEL: 979-864-1825 FAX: 979-864-1034
COMPETITIVE SEALED PROPOSAL COVER SHEET
The COMPETITIVE SEALED PROPOSAL (CSP) and accompanying documents are for your convenience in submitting an offer for the referenced products and/or services for BRAZORIA COUNTY.
“CSP #26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE
ALONG OYSTER CREEK AND BASTROP BAYOU”
TUESDAY, JUNE 2, 2026 at 11:00 A.M. LOCAL TIME
Sealed Hard Copy or Electronic offers shall be received no later than the due date and time above.
*BID OPENING WILL BE AVAILABLE VIA ZOOM. MEETING LINK IS AVAILABLE ON THE PROJECT DETAILS
PAGE IN BONFIRE UNDER “IMPORTANT EVENTS”. BONFIRE LINK:
https://brazoriacounty.bonfirehub.com/portal/?tab=login
IF SUBMITTING AN ELECTRONIC SEALED OFFER:
PREFERRED METHOD IS USING THE “BONFIRE” ELECTRONIC BIDDING PLATFORM.
USE LINK, https://brazoriacounty.bonfirehub.com/portal/?tab=login, CLICK THE HELP BUTTON PROVIDED IN THE BONFIRE WEBSITE AS NEEDED.
IF SUBMITTING A HARD COPY SEALED OFFER:
THE PHYSICAL ADDRESS FOR COURIERS, HAND DELIVERIES AND THE US POSTAL SERVICE IS:
SUSAN SERRANO, CPPO, CPPB
PURCHASING DIRECTOR
BRAZORIA COUNTY COURTHOUSE CAMPUS ADMINISTRATION BUILDING
237 E. LOCUST STREET, SUITE 406
ANGLETON, TEXAS 77515
PLEASE USE THE RETURN LABEL PROVIDED WITH THIS SOLICITATION:
**Please note: US Postal Service mailing address
The U.S. mail may not deliver to the physical address shown above. Respondents who prefer to use the U.S. mail may submit their offers using the U.S. Postal Service mailing address shown above.
However, packages delivered by the U.S. Postal Service to the Brazoria County mailing address are subject to delays that may cause a response to be rejected due to missing a solicitation receipt deadline.
Responses delivered to the mailing address are routed through the County mailroom and may not reach the required location in time for the bid / offer opening.
Respondents using the U.S. mail should take this possible delay into account when using the U.S. mail.
https://brazoriacounty.bonfirehub.com/portal/?tab=login%20
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
BRAZORIA COUNTY is very conscious and extremely appreciative of the time and effort you have expended to submit an offer. We would appreciate it if you would indicate on any “No Offer” response, any requirement of this CSP which may have influenced your decision to “No Offer”. If your response to this CSP is a “No Offer” response, please complete the Statement of No Offer in this CSP package and submit.
Any prospective respondent desiring any explanation or interpretation of the solicitation must make a written request online through
Bonfire electronic platform or email the project facilitator as shown in Section “Questions Due Date (for Clarifications)”, which must be received by the Purchasing Department at least five (5) business days prior to the scheduled time for the offer opening.
Any information given to a prospective respondent concerning this solicitation will be furnished promptly to all other known prospective respondents as a written amendment/addendum to the solicitation. Brazoria County reserves the right to accept or reject any or all bids/offers as it deems in its best interest and to waive any formalities.
It is the Respondent’s responsibility to verify the issuance of Addenda in regard to this Offer. All Addenda shall be submitted to all known respondents and shall be posted on the Bonfire electronic bidding platform at https://brazoriacounty.bonfirehub.com/portal/?tab=login. Brazoria County shall not be responsible for failed internet connections or power interruptions.
All required Offer documents shown on the Table of Contents, including any Addenda Receipt Forms which may have been issued, must be submitted in the Bonfire electronic bidding platform or a sealed envelope included in a hard copy submittal, marked with the bidder’s company name, the Offer name, number and due date.
SUSAN SERRANO, CPPO, CPPB
Purchasing Director
Brazoria County Courthouse Campus Administration Building
237 E. Locust Street, Suite 406
Angleton, Texas 77515
Published Dates: THURSDAY, APRIL 30, 2026
THURSDAY, MAY 6, 2026
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
CONTRACT SHEET
THE STATE OF TEXAS
COUNTY OF BRAZORIA
This memorandum of agreement made and entered into on the _____ day of __________, 2026, by and between Brazoria County in the
State of Texas (hereinafter designated County), acting herein by County Judge L.M. “Matt” Sebesta, Jr., by virtue of an order of Brazoria
County Commissioners’ Court, and __________________________________________ (hereinafter designated Vendor/Contractor).
(company name)
WITNESSETH:
The Vendor and the County agree that the Instructions to Respondents, Specifications/Statement of Work, Standard Terms & Conditions, and all other requirements herein for CSP #26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND
SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU as stated in the Competitive Sealed Proposal Table of Contents hereto attached and made a part hereof, together with the bond (when required), vendor’s response and negotiated pricing, shall constitute the full agreement and Contract between parties and for furnishing the items set out and described; the County agrees to pay the prices stipulated in the accepted offer.
The order of precedence shall be:
• Brazoria County CSP #26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE
ALONG OYSTER CREEK AND BASTROP BAYOU
• Vendor’s submittal to the above listed CSP and the final accepted pricing
It is further agreed that this Contract shall not become binding or effective until signed by the parties hereto and a purchase order authorizing the items desired has been issued.
Executed at Angleton, Texas this __________day of _______________________2026.
By:__________________________________________
County Judge Signature
Printed Name
Signature of Vendor
Printed Name and Title
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
COMPETITIVE SEALED PROPOSAL
TABLE OF CONTENTS
CSP #26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER
CREEK AND BASTROP BAYOU
All documents included in CSP# 26-13, represent components which comprise this bid/offer package and subsequent awarded executed contract. The documents shown in Exhibit A and Exhibit B are required to be submitted in your bid/offer package. It is the respondent's responsibility to be thoroughly familiar with all requirements and specifications. Be sure you understand the requirements before you return your bid/offer packet.
“Exhibit A - Required Forms” and “Exhibit B – Other Requirements” are to be uploaded into the Bonfire electronic procurement portal system or included with your hard copy submittal.
EXHIBIT A – THE FOLLOWING FORMS ARE TO BE COMPLETED AND SUBMITTED WITH
YOUR CSP RESPONSE:
• RESPONDENT CERTIFICATION FORM
• BIDDER/RESPONDENT’S AFFIRMATION & SDNs/BLOCKED PERSONS AFFIRMATION
• WORKERS COMPENSATION REQUIREMENTS
• CERTIFICATION REGARDING LOBBYING FORM
• EXCEPTIONS TO STANDARD TERMS & CONDITIONS & SPECIAL REQUIREMENTS (if applicable) (If vendor has any exceptions to the CSP terms & conditions or special requirements, they must be included with the CSP submittal in order to be considered)
• NON COLLUSION AFFIDAVIT
• BID BOND
• CONFLICT OF INTEREST QUESTIONNAIRE – FORM CIQ (if applicable)
• CONTRACTOR ACKNOWLEDGMENT OF STORMWATER MANAGEMENT PROGRAM
• TEXAS GOVERNMENT CODE 552, SUBCHAPTER J ACKNOWLEDGEMENT FORM
• PROHIBITED TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES AND EQUIPMENT
CERTIFICATION FORM
• AUTHORIZED NEGOTIATOR
• VENDOR DATA SHEET & W-9 FORM
EXHIBIT B – VENDOR’S RESPONSE
• BID TABLE WITH PRICING
• VENDOR RESPONSE TO EVALUATION CRITERIA
• SIGNED ADDENDA (IF APPLICABLE)
Attachments to the CSP:
• Exhibit A – Required Forms
• Exhibit B – Vendor Response
• Attachment A – Bid Table
• Attachment B –Plans
• Attachment C – Specifications
• Attachment D – Project Manual
• Attachment E - NRCS Supplement to OSHA Parts 1910 and 1926-Appendix F
• Attachment F – USDA NRCS Supplemental Terms
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
SPECIFICATIONS / SCOPE OF WORK
The following requirements and specifications shall be in addition to the other requirements contained herein and shall supersede the other requirements where applicable.
1.0 SCOPE
The specifications and scope of work can be found in Bonfire and labeled as Attachment C Plans and Attachment D Project
Manual.
2.0 MAINTENANCE WARRANTY
The contractor warrants to the Owner “County” that all materials and workmanship used in the construction of the Project will be free from defects in materials and workmanship for a period of one (1) year from the date of substantial completion of the
Project. If any defect in materials or workmanship occurs during the warranty period, the Contractor shall promptly repair or replace the defective materials or workmanship at its own expense.
This warranty shall not apply to defects caused by: acts of God or other force majeure events, or any other cause, beyond the reasonable control of the Contractor.
The owner shall notify the Contractor in writing if any defects in materials or workmanship within a reasonable time after discovery of such defects. If the Contractor fails to repair or replace the defective materials or workmanship within a reasonable time after receipt of notice from the Owner, the Owner may have the defective materials or workmanship repaired or replaced at the Contractors expense.
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
INSTRUCTIONS TO RESPONDENTS
The following requirements and specifications shall be in addition to the other requirements contained herein and shall supersede the other requirements where applicable.
1.0 THE CONTRACT:
The Contract consists of all documents included in this Competitive Sealed Proposal Number 26-13, as well as addenda issued prior to execution of the Contract and modifications issued after execution of the Contract. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. The Contract may only be amended or modified under the terms of this Contract. Brazoria County may make partial or complete awards to one or more vendors (if applicable) whichever is in the best interest of the County
2.0 PROJECT DESCRIPTION
In accordance with Texas Government Code 2269, Brazoria County is seeking proposals for the cleanup and removal of storm-generated debris from the streambank and shoreline along Oyster Creek and Bastrop Bayou. Debris removal includes but not limited to, trees, logs, brush, tops, blockages, rubbish, and other debris identified by Brazoria County that was deposited in and adjacent to Oyster Creek and Bastrop Bayou as a result of Hurricane Beryl.
Estimated Budget: $3.5 million dollars
Estimated Completion Time: 120 Calendar Days
3.0 ESTIMATED PROJECT TIMELINE (dates may be subject to change)
Step One –
Publicly advertised (1st Notice) April 30, 2026
Publicly advertised (2nd Notice) May 6, 2026
Deadline for Questions (Clarifications) Submitted May 18, 2026
Deadline for Addendum to be posted in Bonfire May 22, 2026
Response Open/Due date by 11:00 a.m. C.S.T. June 2, 2026
Step Two – Interviews (if requested by evaluation committee)
Negotiations (if requested by the evaluation committee)
Award - Contract approval by Commissioner’s Court June 2026
4.0 PRE-OFFER MEETING
A pre-offer meeting will be held on Thursday, May 14, 2026 at 10:00 a.m. in the West Annex building, 2nd floor conference room, 451 N. Velasco Street, Suite 249, Angleton, TX 77515. Attendance is not mandatory in order to submit an offer;
however, it is highly recommended. Interested parties are encouraged to download all of the proposal documents prior to attending the meeting.
5.0 PROPOSAL REQUIREMENTS
The proposal includes instructions to respondents, specifications and contract documents. It is the responsibility of each
Respondent before submitting a proposal to examine the contract documents thoroughly.
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
CSP SUBMISSIONS MAY BE PROVIDED IN ONE OF TWO WAYS, AS EXPLAINED BELOW:
If submitting an CSP Electronic Document Submission (using the Bonfire electronic platform)
Respondent shall fill out and upload the “Exhibit A Required Forms” and “Exhibit B Additional Requirements” into the Bonfire electronic platform. An authorized representative of the company MUST sign all required forms. See “Exhibit A Required
Forms” for instructions on signing electronically.
If submitting an CSP Hard Copy Document Submission
One (1) original hard copy shall be submitted, which will consist of “Exhibit A Required Forms” and “Exhibit B Additional
Requirements”.
The hard copy submission shall be sealed in an envelope or box for delivery to the Brazoria County Purchasing Director per instructions herein. All documents included in the response and the outside of the envelope and/or box must be labeled with the vendor name and the CSP number. A Return Label is also provided in this solicitation.
6.0 CONTRACT AWARD / EVALUATION PROCESS
Brazoria County Purchasing Department shall receive, publicly open, and read aloud the names of the offerors and any monetary proposals made by the offerors.
Brazoria County shall select the offeror that submits the proposal that offers the best value for the County based on:
(1) the selection criteria in the request for proposal and the weighted value for those criteria in the request for proposal; and
(2) its ranking evaluation.
Brazoria County shall first attempt to negotiate a contract with the selected offeror. The governmental entity and its architect or engineer may discuss with the selected offeror options for a scope or time modification and any price change associated with the modification. If Brazoria County is unable to negotiate a satisfactory contract with the selected offeror, the County shall, formally and in writing, end negotiations with that offeror and proceed to the next offeror in the order of the selection ranking until a contract is reached or all proposals are rejected.
An evaluation committee will examine all responses to this Proposal. Responses that do not conform to the instructions given or that do not address all the questions and services specified may be eliminated from consideration. Brazoria County, however, reserves the right to accept such a response if it is determined to be in the County’s best interest to do so.
Brazoria County may seek clarifications from respondents during the evaluation process. Respondents may NOT initiate discussions with Brazoria County during the evaluation process. Brazoria County expects to receive clarifications from respondent personnel authorized to enter into contractual obligations.
Brazoria County reserves the right to reject any and all proposals and is not obligated to award a contract pursuant to this
Competitive Sealed Proposal.
6.1 Financial Statements
If your company is deemed the highest ranked, you will be requested to submit your current and prior 2 years of financial statements for review to ensure that your company has the financial capacity to perform and to continue to perform its obligations under the contract if your company is awarded the contract.
As part of the solicitation review, to deem your submission as responsive for the committee to evaluate, the County will require the submission of financial statements in order to minimize potential issues from contracting with a vendor that is financially unstable.
If your company enters into formal negotiations, failure to provide financial statements when requested will deem your submission as non-responsive and the County will discontinue negotiations.
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
7.0 EVALUATION CRITERIA
The criteria used to evaluate the proposals shall be:
Price -Price submitted in offer
40 points
Qualifications- Provided qualifications and experience your company has with similar projects. (see
Exhibit B – Vendor Response: Section 1-Contractor’s Experience and Qualifications, Section 2 –
Projects and Section 9- Project Schedule) and Section 4 Contractor References).
15 points
Construction Duration & Sequencing –Is the contractor able to complete the project within the timeline of the grant deadline as reflected in Section 2.0 on page 6/52 (Include Project Schedule-Exhibit B
Section 9)
25 points
Proposed Personnel – Provide resumes of key personnel and list any litigations or claims against your company. (see Exhibit B Vendor Response: Section3-Contractor Key Personnel, Section 6 Vendor
Litigation, Claims and Reputation & Compliance and Section 8 Subcontractor List)
10 points
Work Schedule and Record – Provide list of your company current work schedule. (see Exhibit B -
Vendor Response: Section 5-Contractors Current Work Schedule/Record)
10 points
Bonus Scoring (15 point scale)
7.1 Bonus Points-Interview (If requested by evaluation committee)
Your score may be adjusted up to a maximum of 15 points-total overall possible evaluation points=15
7.1.1 Response to Questions & Answers (0-10 points)
7.1.2 Interview preparedness & adherence to interview (0-5 points)
8.0 PROJECT MANAGER
Wael Tabara, Brazoria County Engineering
9.0 REQUEST FOR CLARIFICATIONS
Any prospective respondent desiring any explanation or interpretation of the proposal must make a written request which must be received by the Purchasing Department on or before Monday, May 18, 2026 by 11:00 a.m. C.S.T. The request must be emailed to bidclarifications@brazoriacountytx.gov. Emails must include the project name and number in the subject field.
All responses to questions or clarification requests will be answered in the form of an addendum after the question deadline and no later than 5 business days prior to the opening/closing date of the solicitation.
10.0 AWARD LETTER / NOTICE TO PROCEED AND PRE-CONSTRUCTION MEETING
After the award has been made in Commissioners Court, an award letter will be sent to the vendor with information on how to submit any required documentation needed to finalize the award. Once all required bonds, insurance forms and other applicable forms have been submitted to the Purchasing Department, the Project Manager will contact the awarded Vendor and set up the pre-construction meeting in order to schedule the mobilization start date of the project.
11.0 DISCLOSURE OF CERTAIN RELATIONSHIP
Texas Local Government Code chapter 176 requires that any vendor or person who enters or seeks to enter into a contract with a local governmental entity (including any agent of such person or vendor) disclose in the Questionnaire Form CIQ the vendor or person’s employment, affiliation, business relationship, family relationship or provision of gifts that might cause a conflict of interest with a local governmental entity.
mailto:bidclarifications@brazoriacountytx.gov
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
By law, this questionnaire must be completed and filed with the records administrator of Brazoria County no later than the seventh business day after the date the person engages or communicates with Brazoria County or becomes aware of facts that require the completion of the questionnaire pursuant to Texas Local Government Code section 176.006.
A person commits an offense if the person knowingly violations Texas Local Government Code section 176.006. An offense under this section is a Class C misdemeanor.
A copy of House Bill 23 which amended the Texas Local Government Code Chapter 176 is available at: http://www.capitol.state.tx.us/tlodocs/84R/billtext/html/HB00023F.HTM
Texas Local Government Code Chapter 176 can be found here: http://www.statutes.legis.state.tx.us/Docs/LG/htm/LG.176.htm
Questionnaire Form CIQ is included in this bid/offer.
By submitting a response to this request, the vendor or person represents compliance with the requirements of Texas Local
Government Code chapter 176. If required, completed forms should be sent with your proposal, as well as to:
Brazoria County Courthouse
County Clerk’s Office
111 E. Locust Street, Suite 200
Angleton, TX 77515
12.0 CERTIFICATE OF INTERESTED PARTIES
Effective January 1, 2016, all contracts and contract amendments, extensions, or renewals executed by the Commissioners
Court will require the completion of Form 1295 “Certificate of Interested Parties” pursuant to Government Code §
2252.908. Form 1295 must be completed by awarded vendor at time of signed contract submission.
Form 1295 and definitions are included in this bid/offer for your information.
All responding vendors may access a video from the Texas Ethics Commission which explains the process on how to submit Form 1295. The video link is available on the Brazoria County Purchasing website at http://brazoriacountytx.gov/departments/purchasing/doing-business.
13.0 BACKGROUND CHECKS AND NON-DISCLOSURE AGREEMENTS:
It is the policy of the County that contractor employees and subcontractors that will complete work in sensitive areas on
Brazoria County property be subject to a criminal background check. The County reserves the right to determine a sensitive area and the appropriateness of a criminal background check for any contractor employee or subcontractor.
Non-Disclosure Agreements (NDA) may also be required by Brazoria County. NDAs will be provided to contractor employees and any subcontractors by the Purchasing Department and must be signed and returned in a time frame determined by
Purchasing Department.
14.0 DISADVANTAGE BUSINESSES
Disadvantaged businesses, particularly the State of Texas Comptroller’s Office VetHUB Program, are encouraged to participate in the bid/RFP processes. Although Brazoria County does not certify HUB vendors, Brazoria County recognizes the certifications of other governmental entities. If you are certified by a government entity, please upload the certificate with your response electronically in the Bonfire electronic platform or include a hard copy of your certificate in your submittal.
Per Code of Federal Regulations, Title 2, § 200.321, “Contracting with small and minority businesses, women's business enterprises, and labor surplus area firms”, if awarded vendor is a prime contractor and subcontractors are to be let by prime contractor, the following affirmative steps are required of the prime contractor:
(1) Placing qualified small and minority businesses and women's business enterprises on solicitation lists;
(2) Assuring that small and minority businesses, and women's business enterprises are solicited whenever they are potential sources;
(3) Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by small and minority businesses, and women's business enterprises;
http://www.capitol.state.tx.us/tlodocs/84R/billtext/html/HB00023F.HTM http://www.statutes.legis.state.tx.us/Docs/LG/htm/LG.176.htm http://brazoriacountytx.gov/departments/purchasing/doing-business
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
(4) Establishing delivery schedules, where the requirement permits, which encourage participation by small and minority businesses, and women's business enterprises;
(5) Using the services and assistance, as appropriate, of such organizations as the Small Business Administration and the
Minority Business Development Agency of the Department of Commerce.
Brazoria County must take all necessary affirmative steps to assure that minority businesses, women's business enterprises, and labor surplus area firms are used when possible.
15.0 SYSTEM FOR AWARD MANAGEMENT (SAM)
The System for Award Management (SAM) is the official registration required prior to bidding on a contract with any federal government agency, including local governments who receive federal funds.
Prior to award, Brazoria County will check www.sam.gov, the System for Award Management (SAM), to ensure that the proposed vendor has not been debarred. Vendor shall provide their Unique Entity ID number to Brazoria County in order to check www.sam.gov for debarment.
If you do not have a Unique Entity ID number, you can request a number for free by visiting https://sam.gov/content/entity-registration. For additional information about the change from DUNS to Unique Entity ID visit https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-id-is-here.
Brazoria County is unable to conduct business with vendors who have been debarred.
If the procurement is using federal funds, the awarded vendor is required to hold an active status on the SAM.gov website, applicable, https://sam.gov/content/home, and with the Texas Comptroller Taxable Entity website https://mycpa.cpa.state.tx.us/coa/ .
If the procurement is using County funds, and your company is not registered on the SAM.gov website, the County is asking that your company obtain a registration. If your company has a current Unique Entity Identifier number on the SAM.gov website, the County is requesting that your company obtain a registration.
16.0 CONTRACT TERM
Award of Contract shall begin upon execution by the County Judge and shall continue until completion of the project as stated on the Offer Sheet contained herein.
Brazoria County retains the option to solicit new proposals at any time if in its best interest.
17.0 PREVAILING WAGE RATES
Chapter 2258 of the Texas Government Code requires state agencies, cities, counties, independent school districts, and all other political subdivisions that engage in public work projects using public funds to include prevailing wage rate in the project competitive sealed proposal documents and Contract.
Current prevailing wage rates are incorporated in the Contract documents.
18.0 CHANGE ORDERS
Due to budget constraints, change orders will be limited to those revisions that are due to unforeseen conditions and are approved by Brazoria County. Vendors are advised to fully understand the scope of work and to review the specifications and drawings in order to submit any requests for clarifications prior to the proposal opening.
In the event a change order is required and approved by Brazoria County, said changes shall be incorporated into this Contract in the form of a change order. All change orders shall be subject to the review and approval of Brazoria County Commissioner’s Court, or the Court’s designee, and shall be in accordance with the Local Government Code.
http://www.sam.gov/ http://www.sam.gov/ https://sam.gov/content/entity-registration https://sam.gov/content/entity-registration https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-id-is-here https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-id-is-here https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-id-is-here
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
Any discrepancies which may be discovered between actual conditions and those represented by the specifications or drawings shall be reported at once to the Brazoria County Project Manager and work shall not proceed except at the Vendor's risk, until written instructions have been received by him from the Brazoria County Project Manager.
19.0 FINAL INSPECTION
When the work included in this Contract is substantially completed, the Vendor shall notify the Project Manager in writing that the work will be ready for final inspection on a definite date which shall be stated in the notice. The Project Manager will make the arrangements necessary to have final inspection commenced on the date stated in the notice, or as soon thereafter as is practicable.
Per Brazoria County, substantial completion is defined as a designated portion of a construction project that is sufficiently complete in accordance with the contract for the owner to occupy and / or utilize it for its intended use, without undue interference.
20.0 PAYMENTS TO VENDOR:
20.1 Retainage
The Vendor shall prepare his invoice or application for payment for partial payment(s) as of the last day of the month and submit the invoice or pay application to the Project Architect and /or Brazoria County Project Manager for his approval. The amount of the payment due the Vendor shall have five percent (5%) deducted to be retained until final payment.
20.2 Final Payment
After final inspection and acceptance by Brazoria County of all work under the Contract, the Vendor shall prepare his invoice or application for payment for final payment which shall be based upon the careful inspection of each item of work at the applicable unit prices stipulated in the Contract. The total amount of the final payment due the Vendor under this Contract shall be the amount computed as described above less all previous payments.
21.0 INSURANCE REQUIREMENTS
Vendor shall furnish certificates of insurance to County evidencing compliance with the insurance requirements hereof for the duration of the project. Certificates shall indicate name of Vendor, name of insurance company, policy number, term of coverage and limits of coverage.
Insurance shall be placed with insurers having an A.M. Best’s rating of no less than A. Such insurance must be issued by a casualty company authorized to do business in the State of Texas, and in standard form approved by the Board of Insurance
Commissioners of the State of Texas, with coverage provisions insuring the public from loss or damage that may arise to any person or property by reason of services rendered by Vendor.
Insurance required herein shall be maintained in full force and effect during the life of this contract and shall be issued on an occurrence basis. Vendor shall require that any and all subcontractors that are not protected under the Vendor’s own insurance policies take and maintain insurance of the same nature and in the same amounts as required of Vendor and provide written proof of such insurance to Vendor. Proof of renewed/replacement coverage shall be provided upon expiration, termination, or cancellation of any policy. Vendor shall not allow any subcontractor to commence work on the subcontract until such insurance required for the subcontractor has been obtained and approved.
In the event that the insurance is renewed during the duration of the contract, Vendor shall furnish certificate of insurance to the County evidencing renewal of policy within 30 days of renewal. Vendor shall provide County with at least 30 days prior written notice of any reduction in the limit of liability by endorsement of the policy, cancellation or non-renewal of the insurance coverage required under this Agreement.
Certificates of Insurance, fully executed by a licensed representative of the insurance company written or countersigned by an authorized Texas state agency, shall be filed with the County Purchasing Agent within ten (10) business days of issuance of notification from the County Purchasing Agent to Bidder that the contract is being activated as written proof of such insurance and further provided that Bidder shall not commence work under this contract until it has obtained all insurance required herein and provided written proof as required herein.
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
WAIVER OF SUBROGATION:
All policies of insurance shall waive all rights of subrogation against Brazoria County, its officers, employees and agents.
ADDITIONALLY INSURED:
Further, on vendor’s certificate of insurance supplied to Brazoria County, Brazoria County shall be listed as additionally insured with the exception of workers compensation insurance. The certificate holder shall be as follows:
Brazoria County
237 E. Locust Street, Suite 401
Angleton, TX 77515
POLLUTION LIABILITY
The Vendor shall carry in full force during the term of the Contract, and any extensions thereof, pollution liability insurance not less than the value of this Contract.
22.0 INCLEMENT WEATHER:
In case of inclement weather or any other unforeseen event causing the County to close for business on the date of a proposal submission deadline, the closing will automatically be postponed until the next business day the County is open and at the time shown on the Cover Sheet.
If inclement weather conditions or any other unforeseen event causes delays in carrier service operations, the County may issue an addendum to all known vendors interested in the project to extend the deadline. It will be the responsibility of the vendor to notify the County of their interest in the project if these conditions are impacting their ability to turn in a submission within the stated deadline. The County reserves the right to make the final judgment call to extend any deadline.
23.0 LIQUIDATED DAMAGES, TERMINATION AND DELAYS
23.1 If the Vendor shall fail to fully complete the work within the time specified on the Bid Table (subject however to extensions of time duly granted in the manner and for the causes specified in the herein) the Vendor shall be charged by Brazoria
County as liquidated and ascertained damages the sum of one thousand one hundred and seven ($1107.00) dollars for each working day that the work remains incomplete beyond the time herein fixed for the completion, it being hereby expressly and mutually agreed that from the nature of the case it would be impracticable and extremely difficult to fix the actual damage which would or will be suffered in the event that the Vendor should fail to fully complete the work within the time specified, and it being further agreed that said charge herein provided for is reasonable and proper in the premises. The amount so charged may be deducted by Brazoria County from any moneys which might otherwise be or become payable to the Vendor.
23.2 Excusable Delays.
The right of the Vendor to proceed shall not be terminated nor shall the Vendor be charged with liquidated or ascertained damages for any delays in the completion of the work due to:
• Controls or restrictions upon or requisitioning of materials, equipment, tools, or labor by reason of war, national defense, or any other national emergency; or
• Causes not reasonably foreseeable by the parties to this Contract at the time of the execution of the Contract which are beyond the control and without the fault or negligence of the Vendor, including, but not limited to, acts of
God or of the public enemy, fires, floods, epidemics, quarantine, restrictions, strikes, freight embargoes, and weather of unusual severity such as hurricanes, tornadoes, cyclones and other extreme weather conditions.
Provided, however, the Vendor shall promptly notify Brazoria County Project Manager within ten (10) days in writing of the cause of any delay. Upon receipt of such notification, the Brazoria County Project Manager shall ascertain the facts and the cause and extent of delay. If, upon the basis of the facts and the terms of this Contract, the delay is determined by the Brazoria County Project Manager to be excusable, Brazoria County shall extend the time for completing the work for a period of time commensurate with the period of excusable delay. Any delay by the Vendor in not notifying the Brazoria County Project Manager shall not be excused.
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
24.0 FEDERAL REQUIREMENTS
24.1 Remedies
“If the bidder/vendor fails to comply with the terms and conditions of this Agreement, Brazoria County may take one or more of the following actions, as appropriate to the circumstance:
(a) Temporarily withhold payments pending the bidder/vendor commencing in good-faith corrective action to cure the deficiency;
(b) Permanently withhold payments; and/or
(c) Take any and all other remedies that may be legally available.
24.2 Access to Records and Record Retention
“Retention of Records. The contractor agrees to maintain all books, records, accounts and reports required under this contract for a period of not less than three years after the date of termination or expiration of this contract, except in the event of litigation or settlement of claims arising from the performance of this contract, in which case contractor agrees to maintain same until the FEMA or applicable Federal Administrator, Brazoria County, the Comptroller General of the United States, or any of their duly authorized representatives, have disposed of all such litigation, appeals, claims or exceptions related to the litigation or settlement of claims.”
Access to Records. The following access to records requirements apply to this contract:
1) The contractor agrees to provide Brazoria County, any State or Federal Agency, the Comptroller General of the United
States, or any of their authorized representatives access to any books, documents, papers, and records of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts and transcriptions.
1) The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed.
2) The contractor agrees to provide any State or Federal Agency, Brazoria County, the Comptroller General of the United
States, or any of their authorized representatives or their authorized representatives access to construction or other work sites pertaining to the work being completed under this contract.
24.3 Debarment and Suspension
“Suspension and Debarment
(1) The contractor is required to verify that none of the contractor, its principals (defined at 2 C.F.R. § 180.995), or its affiliates
(defined at 2 C.F.R. § 180.905) are excluded (defined at 2 C.F.R. § 180.940) or disqualified (defined at 2 C.F.R. § 180.935).
(2) The contractor must comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C and must include a requirement to comply with these regulations in any lower tier covered transaction it enters into. (3) This certification is a material representation of fact relied upon by Brazoria County. If it is later determined that the contractor did not comply with
2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C, in addition to remedies available to Texas Department of
Emergency Management and Brazoria County, the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment.
(4) The bidder or proposer agrees to comply with the requirements of 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart
C while this offer is valid and throughout the period of any contract that may arise from this offer. The bidder or proposer further agrees to include a provision requiring such compliance in its lower tier covered transactions.”
24.4 Procurement of Recovered Materials (Solid Waste Disposal Act) (2 CFR 200.323):
Application:
A non-Federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with section
6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section
6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded
$10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.
[78 FR 78608, Dec. 26, 2013, as amended at 79 FR 75885, Dec. 19, 2014]
1) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
(i) Competitively within a timeframe providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, http://www3.epa.gov/epawaste/conserve/tools/cpg/index.htm
The list of EPA-designate items is available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program
24.5 Domestic Preferences for Procurements (2 CFR 200.322)
(a) As appropriate and to the extent consistent with law, the non-Federal entity should, to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the
United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award.
(b) For purposes of this section:
(1) “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.
(2) “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.
24.6 DHS Seal, Logo and Flags
"The contractor shall not use the DHS seal(s), logos, crests, or reproductions of flags or likenesses of DHS agency officials without specific FEMA or Federal Administrator preapproval."
24.7 Compliance with Federal Law, Regulations, and Executive Orders
"This is an acknowledgement that FEMA (or applicable Federal Administrator) financial assistance will be used to fund the contract only. The contractor will comply will all applicable federal law, regulations, executive orders, FEMA (or applicable
Federal Administrator) , policies, procedures, and directives."
24.8 No Obligation by Federal Government
"The Federal Government is not a party to this contract and is not subject to any obligations or liabilities to the non-Federal entity, contractor, or any other party pertaining to any matter resulting from the contract."
24.9 Program Fraud and False or Fraudulent Statements or Related Acts
"The contractor acknowledges that 31 U.S.C. Chap. 38 (Administrative Remedies for False Claims and Statements) applies to the contractor's actions pertaining to this contract."
24.10 Termination for Cause and Convenience
Termination with Cause:
“Upon written notice to the Contractor of a defect or breach of this Agreement, Contractor has five (5) business days to cure any defect(s) or breach(es) cited in said notice. If Contractor fails to cure the defect(s) or breach(es) within the five (5) business days allowed, Brazoria County may terminate this Agreement. Nevertheless, Brazoria County reserves the right to provide written notice to the Contractor that this Agreement shall continue if Contractor has in good-faith commenced efforts to cure said defect(s) or breach(es) and Contractor agrees, in writing, to continue to act without undue delay to cure said defect(s) or breach(es).
https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU
Termination Without Cause:
This contract may be terminated by either the County or the Contractor at any time, without cause, by providing the other Party at least thirty (30) calendar days’ prior written notice.
24.11 Clean Air Act
(1) The contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. § 7401 et seq.
(2) The contractor agrees to report each violation to Brazoria County and understands and agrees that Brazoria County will, in turn, report each violation as required to assure notification to the applicable federal program Administrator, and the appropriate
Environmental Protection Agency Regional Office.
(3) The contractor agrees to include these requirements in each subcontract exceeding $100,000 financed in whole or in part with Federal assistance provided by the applicable federal program Administrator
24.12 Federal Water Pollution Control Act
(1) The contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Federal Water
Pollution Control Act, as amended, 33 U.S.C. 1251 et seq.
(2) The contractor agrees to report each violation to Brazoria County and understands and agrees that Brazoria County will, in turn, report each violation as required to assure notification to Brazoria County and the appropriate Environmental Protection
Agency Regional Office.
(3) The contractor agrees to include these requirements in each subcontract exceeding $100,000 financed in whole or in part with Federal assistance provided by the applicable federal program Administrator.”
24.13 Byrd Anti-Lobbying Amendment
Contractors who apply or bid for an award of $100,000 or more shall file the required certification. Each tier certifies to the tier above that it will not and has not used federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer of employee of Congress, or an employee of a member of Congress in connection with obtaining and Federal contract, grant, or any other award covered by
31 U.S.C. 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the recipient.
24.14 Energy Efficiency
The Contractor shall comply with the mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (42 U.S.C. 6201)
24.15 Equal Opportunity:
Standard. Except as otherwise provided under 41 C.F.R. Part 60, all contracts that meet the definition of “federally assisted construction contract” in 41 C.F.R. § 60- 1.3 must include the equal opportunity clause provided under 41 C.F.R. § 60- 1.4(b), in accordance with Executive Order 11246, Equal Employment Opportunity (30 Fed. Reg. 12319, 12935, 3 C.F.R. Part, 1964-
1965 Comp., p. 339), as amended by Executive Order 11375, Amending Executive Order 11246 Relating to Equal Employment
Opportunity, and implementing regulations at 41
C.F.R. Part 60 (Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor). See
2 C.F.R. Part 200, Appendix II, ¶ C.
b. Key Definitions.
1) Federally Assisted Construction Contract. The regulation at 41 C.F.R.
§ 60-1.3 defines a “federally assisted construction contract” as any agreement or modification thereof between any applicant and a person for construction work which is paid for in whole or in part with funds obtained from the Government or borrowed on the credit of the Government pursuant to any Federal program involving a grant, contract, loan, insurance, or guarantee, or undertaken pursuant to any Federal program involving such grant, contract, loan, insurance, or guarantee, or any application or
CSP# 26-13 DSR 48-14-24-5118-002 DEBRIS REMOVAL FROM STREAMBANK AND SHORELINE ALONG OYSTER CREEK AND BASTROP BAYOU modification thereof approved by the Government for a grant, contract, loan, insurance, or guarantee under which the applicant itself participates in the construction work.
(2) Construction Work. The regulation at 41 C.F.R. § 60-1.3 defines “construction work” as the construction, rehabilitation, alteration, conversion, extension, demolition or repair of buildings, highways, or other changes or improvements to real property, including facilities providing utility services. The term also includes the supervision, inspection, and other onsite functions incidental to the actual construction
§ 60–1.4 Equal opportunity clause.
Government contracts. Except as otherwise provided, each contracting agency shall include the following equal opportunity clause contained in section 202 of the order in each of its Government contracts (and modifications thereof if not included in the original contract):
1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .