26_083_01_Specifications_and_Supplemental_Requirements_-_Final.pdf

PDF 222 KB Posted

Attached to
On Call Storm Drain Maintenance
Solicitation number
2026-ITB-356
Issued by
New Haven County, Connecticut

About this file

This specifications and supplemental requirements document pertains to Project 26-083-01 Storm Drainage Maintenance for the City of New Haven, Connecticut, for the 2026-2027 contract period. The contract is an on-call service agreement requiring the contractor to perform routine catch basin cleaning, priority catch basin cleaning with three-working-day completion requirements, and pipe jetting services throughout the City. The work encompasses cleaning approximately 3,000 catch basins annually, with initial focus on basins not cleaned within the preceding 15 months, concentrated in the downtown area and dispersed throughout the City. The contractor must clean all basins once before any basin receives a second cleaning, following a systematic approach from upstream to downstream in drainage networks. The contract term is one year with options for two successive one-year renewals. No formal bid due date or award date is specified in this supplemental requirements document.

The contract utilizes a unit-price payment structure with separate line items for catch basin cleaning, priority catch basin cleaning, pipe jetting (categorized by pipe diameter ranges), and closed-circuit television (CCTV) inspection services. Time-and-materials billing is available for unique or unpredictable work explicitly agreed upon in writing prior to commencement. The contractor bears full responsibility for obtaining all necessary permits, providing traffic control and uniformed officers (pass-through costs), securing dewatering and staging areas, arranging disposal of solid and liquid wastes, obtaining water from commercial sources, and providing all equipment including vactor trucks, jetting equipment, and CCTV apparatus. The contractor must submit detailed equipment specifications, method statements, disposal location information, and staging area documentation with their bid. Record-keeping and invoicing are conducted through the City-provided ArcGIS Field Maps application, with monthly invoice submissions required and payment contingent upon documented records.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 26-083-01

Storm Drainage Maintenance

2026 - 2027

Supplemental Information and Requirements

1. Use of City Facilities

City facilities are not available for this Contract.

2. Water

The contractor shall obtain water from commercial sources. The city cannot provide water for this contract.

3. Work Area

The routine work shall be undertaken in any area of the City as instructed from time to time by the Engineering Department.

The first set of basins to be cleaned are those that have not been cleaned within the last 15 months. These basins are located throughout the City, with a higher density in the downtown area. The location of these basins are shown in Attachment 1. It is required that all basins are cleaned once before a basin is cleaned for the second time, unless specifically instructed to by the City Engineer. Consistent with this, all basins must be cleaned for a second time before they can be cleaned for a third time, and so on.

Contractors shall familiarize themselves with all areas of the City to ascertain conditions prior to submitting their bids.

4. Priority Catch Basin Cleaning

At times, the City needs particular catch basins cleaned within a short time period, namely three (3) working days. The "Priority Catch Basin Cleaning" item exists to cover any additional costs associated with scheduling the cleaning of singular, assigned catch basins.

These catch basins may be located in all areas of the City. Priority Catch Basin assignments are to be completed within three (3) working days of assignment.

5. Pipe Jetting

The City shall advise the Contractor from time to time of locations where pipes are clogged and in need of cleaning. The Contractor shall undertake the cleaning within fourteen (14) calendar days of being advised of these locations. Pipe jetting locations are most likely to be of catch basin lateral pipes and so should assume shorter lengths of pipe to be cleaned at each assigned locations

(typically 10-30 feet). As far as is possible, several locations will be instructed at one time. However, isolated sections of pipe may require cleaning from time to time.

6. Supplemental information to be submitted with the bid

The contractor shall submit the following information with their bid:

(i) The location of their staging area for dewatering and storing catch basin wastes. This shall include pro-forma documentation from the owner of the site indicating their willingness to enter into a rental agreement with the Contractor if the site is not already owned by the Contractor.

(ii) The location of the final disposal point for the solid wastes from the catch basins.

(iii) The location for the disposal of liquid wastes from the catch basins. It must be noted that decanting in to sanitary sewers is prohibited.

(iii) A list of all equipment to be used on this project, primarily, but not limited to, vactor trucks, jetting trucks, and CCTV equipment. Vehicle registration numbers together with manufacturer's literature and specifications shall be provided.

(iv) Full technical details on the equipment they will provide for the project, together with a method statement on its operation.

7. Contract Length

This contract is for one year, with the option for two one-year renewals each year after.

8. Permits and Traffic Control

The Contractor will be responsible for all permits necessary to complete the work. A City

Obstruction permit will need to be obtained for this work. In addition, it is the Contractor's responsibility to provide Trafficperson in instances where they are necessary for the safe implementation of the work. The Contractor shall also use other methods of traffic protection as described in the Section 32.04 of the Specifications as appropriate. Payment for the uniformed trafficperson is a pass-through cost covered by an Allowance as shown in the bid table.

9. Record Keeping and Invoicing

To document maintenance activities, the ArcGIS Field Maps application will be used. The

City will provide the Contractor with access to the ArcGIS Field Maps app for use of documenting maintenance activities. The ArcGIS Field Maps app is free to download and will be no cost for the Contractor to use. The app can be downloaded and used on any smartphone or handheld device (ipad, laptop, etc). The app allows for uploading of photos, notes on condition of catch basins, and keeps track of dates when maintenance work was conducted and will be used for invoicing purposes. Invoicing is to be submitted monthly.

Each operator will need to create their own account. There is no cost for multiple accounts.

When logging catch basin cleanings, the Contractor is required to upload at least three pictures to the ArcGIS Field Maps app for documentation. These pictures will include a before cleaning, a during cleaning, and a post-cleaning image showcasing the basin appropriately cleaned. The Contractor is also required to upload the condition of the basin, the type of cleaning being performed, the sediment depth, the jet length when applicable, and any relevant notes. If there are any issues in completing any of these steps, the Contractor must immediately inform the City Engineer in an effort to resolve the issue and utilize an alternative tracking method (i.e. paper maps, etc) until resolved

SECTION 32.01

CATCH BASIN CLEANING

32.01.1 Description

This item of work shall consist of the cleaning of catch basins and other miscellaneous drainage structures with sumps. It shall consist of the complete removal and disposal of all debris, silt, leaves, and all other materials (including but not limited to bricks, catch basin grates, and other heavy objects) from within the structure, such that it is clean and free flowing upon completion of the work.

32.01.2 Implementation

a. Methods

The Contractor shall use vactor trucks to remove all the material from within the structure.

Different methodologies may be required from location to location dependent on the type, depth and diameter of the structure, and the material which is within it. Catch basin grates and manhole covers shall also be thoroughly cleaned at the time debris is removed from the drainage structure.

b. Disposal

All materials shall be removed from the site of operations and disposed of by the Contractor in a landfill in accordance with all applicable Federal, State and Local regulations in force at the time the work is undertaken. Any spillage onto adjacent surfaces, including but not limited to pavements and sidewalks, shall be cleared away and disposed of in the same manner as the other materials removed from the drainage structures. These surfaces shall then be hosed down with clean water.

The Contractor shall be responsible for obtaining all permits for the disposal of materials collected from storm water structures and shall advise the City of New Haven of the final disposal location.

The City's transfer station is not available as either a staging or dewatering area. It is entirely the

Contractor's responsibility to locate and rent suitable space for these activities and obtain any and all necessary permits. Alternatively, the Contractor shall transport all removed materials in their vactor trucks directly to the disposal point, which shall be currently authorized by the relevant

State and Federal laws and regulations.

c. Safety

The work is to be undertaken in accordance with all Federal, State and Local regulations.

Particular attention is to be given to the provision and use of protective clothing, and also to

OSHA regulations regarding work in confined spaces, should these be warranted by field conditions.

The Contractor shall also take full responsibility for traffic and pedestrian safety in the vicinity of the work, and provide all barriers, signing, lighting, flagmen, traffic policemen and other safety devices that may be required from time to time as the work progresses. The Contractor shall also be responsible for obtaining all permits that may be necessary for these activities.

The Contractor shall obey any instructions gjven by the City's Police Force, Department of

Transportation, Traffic and Parking, or other City Department having jurisdiction over the areas in which the work is being undertaken. In general, the Contractor should adhere to a traffic plan appropriate for the roadway conditions and type of work being performed.

Typical plans for this work are available from the City and CTDOT resources

(https://portal.ct.gov/dot/traffic-engineering/traffic-special-provisions) and a police officer must work with cleaning crews to provide additional site traffic controls where necessary.

d. Structure Types

Although the majority of structures to be cleaned will be catch basins, the Contractor shall clean all structures required by the City regardless of their type, depth, diameter, and configuration. The following list of drawings is provided for information only, as these indicate the City of New Haven standard designs. Other non-standard structures may also be encountered as the work progresses.

Attention is drawn to the fact that some catch basins are fitted with hoods over their outlet pipes. Drawings indicating the City's storm water sewer system will be provided as locations are assigned and are available at the City Engineer's Office, Room 503,200 Orange Street, New Haven. CT. 06510. City Standard Details for storm water infrastructure can be found on the Engineering Department's section of the City of New Haven website https://www.newhavenct.gov/government/departments-divisions/engineering/construction-standards

STD-NH-06

STD- NH-07

STD- NH-07A

STD- NH-08

STD- NH-08A

STD- NH- 08B

STD- NH- 08C

STD-NH-08D

STD- NH-08E

STD- NH-09

STD- NH - IO

STD- NH - l l

STD- NH- 12

STD-NH-15

STD- NH- 16

STD- NH- 17

Catch Basin Frame and Grate

Standard Manhole Frame

Standard Manhole Cover

Standard Catch Basins Type C and CL

Type C Catch Basin

Type CL Catch Basin

Type CL Drop Inlet

Type CL Catch Basin Double Grate - Type 11

Catch Basin Details

Catch Basin Hood and Appurtenances

Standard Catch Basin Manhole

Shallow Catch Basin Manhole

Standard Storm Manhole

Manhole Steps

Precast Manhole Elements

Eccentric Manhole Entrance Tee https://portal.ct.gov/dot/traffic-engineering/traffic-special-provisions https://www.newhavenct.gov/government/departments-divisions/engineering/construction-standards https://www.newhavenct.gov/government/departments-divisions/engineering/construction-standards

32-02-1 Revision 1 7/07

The Contractor shall inform the City Engineer of any damaged structures prior to cleaning them. In the event of damage occurring during operations the Contractor shall make good at their sole expense to the standards indicated in these drawings, the City's standard specifications, and Connecticut

Department of Transportation.

e. Cleaning Location Assignments

Prior to the start of work, the City will instruct the Contractor on how to property utilize the ArcGIS

Field Maps app for assigning locations and tracking cleanings. Work will be required throughout the

City. The initial locations to be assigned are shown in a map in Attachment 1.

At times, the City needs particular catch basins cleaned within a short time period, namely three (3) working days. The "Priority Catch Basin Cleaning" item exists to cover any additional costs associated with scheduling the cleaning of singular, assigned catch basins. These catch basins may be located in all areas of the City. Priority Catch Basin assignments are to be completed within three (3) working days of assignment.

f. Schedule

The Contractor shall keep the City up to date and informed of the intended work areas expected to be completed in the near future. It is expected that about 3,000 catch basins will be cleaned in a given year.

g. Order of Work

As far as is practicable, the Contractor shall commence work at the upstream ends of drainage networks, and progressively work downstream in the direction of flow.

The City shall provide a plan showing street sweeping days when parking bans are in effect if required by the Contractor. In the event that parked vehicles prevent work at certain locations, the Contractor shall return to complete their work during these parking bans. The Contractor may also be required to submit a parking ban requests to the City of New Haven’s Department of Transportation, Traffic, and

Parking, as necessary to prevent parked cars from obstructing catch basins, in order to complete work in certain areas. Parking ban requests must be submitted to the Department of Transportation, Traffic, and

Parking between the hours of 9:00AM and 12:00PM the day before the ban is being requested.

h. Noise

Noise levels shall not exceed those permitted by the City's ordinances.

i. Record Keeping and Invoicing

To document maintenance activities, the ArcGIS Field Maps application will be used. The City will provide the Contractor with access to the ArcGIS Field Maps application. The ArcGIS Field Maps application is free to download at no cost to the Contractor. The ArcGIS Field Maps application can be downloaded and used on any smartphone or handheld device (ipad, laptop, etc). The Contractor will be responsible for providing the device as the City will not supply the device for use. The City will provide the Contractor with an account to log into the application at no cost to the Contractor. Each operator will need to create their own account. There is no cost for multiple accounts. The application keeps track of dates when maintenance work was conducted, allows for uploading photos and other notes on condition of structure, amount of debris removed, etc. The Contractor will be required to attend one training with City staff to ensure ability to use the ArcGIS Field Maps application.

This application will be used for invoicing purposes. Contractor will need to submit a list of catch basins that have been cleaned and this work will be verified by the City using data collected by the

ArcGIS Field Maps app. If record is not found in the GIS application, then payment will not made for that location unless another form of record keeping can be provided at that location. Invoicing is to be submitted monthly.

j. Other Notifications.

The Contractor shall notify the City immediately of any locations where there is, or is suspected to be, sewage or any other hazardous material in/or entering the storm drains.

k. Maintenance of Flow

The Contractor shall ensure that any water flowing through the structure shall not be obstructed by the cleaning operation.

32.01.3 _Method of Measurement

Measurement shall be per item cleaned, as indicated as follows: Catch Basin

Cleaning Each

Priority Catch Basin Cleaning Each

32.01.4 Basis of Payment

Payment will be made at the unit prices for all cleaned structures. The rate shall apply to all structures regardless of type, configuration, diameter, depth, or location. The payment shall cover all costs associated with the cleaning as described in these specifications and elsewhere in the contract documents, together with any and all other incidental labor, materials, equipment and other necessary items not specifically described herein. It shall include all costs related to the disposal of materials removed from the structures, the cost of maintenance and protection of traffic (outside of uniformed police officer costs), and record keeping.

The City shall not make payment for completed work until the records required by Section 32.0 l.2(i) are provided by the Contractor.

SECTION 32.02

PIPE JETTING

32.02.1 _Description

This item of work shall consist of the cleaning of clogged storm drainage pipes using high pressure water jetting. It shall also consist of the complete removal and disposal of all debris, silt, leaves, and all other materials (including but not limited to bricks and heavy objects) from within the pipeline, such that it is clean and free flowing upon completion of the work.

32.02.2 Implementation

a. Methods

The Contractor shall use jetting equipment that can operate at various pressures and flow rates, and which is self-propelled within the pipe. The Contractor is responsible for supplying water. The jetting shall take place from the downstream end of the clogged pipe. All material removed from the pipe shall then be vacuumed from the upstream drainage structure and disposed of at an appropriate location. If high pressure jetting cannot remove the material clogging the pipe, then the contractor shall use other mechanical methods to remove it and inform the City of the blockage.

b. Additives

The Contractor shall not use any additives with the cleaning water.

c. Pressure Limits

The jet shall not exert a water pressure greater than 1,000 psi perpendicular to the pipe's axis without the

City's prior permission.

d. Disposal

All materials shall be removed from the site of operations and disposed of by the Contractor in accordance with all applicable Federal, State and Local regulations in force at the time the work is undertaken. Any spillage onto adjacent surfaces, including but not limited to pavements and sidewalks, shall be cleared away and disposed of in the same manner as the other materials removed from the jetted pipes. These surfaces shall then be hosed down with clean water. The Contractor shall be responsible for obtaining all permits for the disposal of materials removed from the pipes, and shall advise the City of

New Haven of the disposal locations.

e. Safety

The work is to be undertaken in accordance with all Federal, State and Local regulations. Particular attention is to be given to the provision and use of protective clothing, and also to OSHA regulations regarding work in confined spaces, should these be warranted by field conditions. The Contractor shall also ensure that high pressure jetting water cannot exit the pipe at any drainage structures upstream of the cleaning.

The Contractor shall take full responsibility for traffic and pedestrian safety in the vicinity of the work, and provide all barriers, signing, lighting, flagmen, traffic policemen and other safety devices that may be required from time to time as the work progresses. The Contractor shall also be responsible for obtaining all permits that may be necessary for these activities. The Contractor shall obey any instructions given by the City's Police Force, Department of Transportation, Traffic, and Parking, or other responsible Department having jurisdiction over the areas in which the work is being undertaken.

d. Pipe Sizes

Pipes of sizes from 9 inches up to 36 inches may need to be cleaned from time to time. Drawings indicating the City's storm water sewer system will be provided as locations are assigned. Pipe jetting is likely to be of catch basin lateral pipes.

e. Damage

The Contractor shall inform the City Engineer of any damaged pipes prior to cleaning them.

In the event of damage occurring during operations, the Contractor shall undertake repairs, at their sole expense, to the standards indicated in the City's standard specifications and drawings, or those indicated in Connecticut Department of Transportation Form 819 (or latest revision) where appropriate.

f. Cleaning Locations

The City shall advise the Contractor from time to time of locations where pipes are clogged and in need of cleaning. The Contractor shall undertake the cleaning within fourteen (14) calendar days of being advised of these locations. Pipe jetting locations are most likely to be of catch basin lateral pipes and so should assume shorter lengths of pipe to be cleaned at each assigned locations (typically 10-30 feet). As far as is possible, several locations will be instructed at one time. However, isolated sections of pipe may require cleaning from time to time.

The Contractor shall also inform the City of locations they discover the need for jetting during their catch basin cleaning operations.

g. Schedule

The work shall be undertaken as required. Occasionally, pipes may need to be cleaned overnight.

The Contractor shall keep the City informed on a daily basis of the intended work areas for the following day.

h. Record Keeping

The Contractor shall keep records of all lengths of pipe that are cleaned. These records shall be provided to the City Engineer as soon after completion of the cleaning as is practicable at least monthly.

h. Maintenance of Flow

The Contractor shall ensure that any water flowing through the pipe shall not be obstructed by the jetting operation.

32.02.3 Method of Measurement

Measurement shall be per linear foot of pipe cleaned, as indicated as follows:

Jet cleaning pipes up to and including 15 inches in diameter Lin Ft

Jet cleaning pipes 15 to 30 inches in diameter

Jet cleaning pipes over 30 inches in diameter

Lin Ft

Lin Ft

In the case of non-circular pipes, the dimensions indicated above as diameters shall apply to the smallest dimension of the structure. The length of pipe cleaned shall be measured by the jetting device and shall be the actual length that is jetted to clear away debris.

32.01.4 Basis of Payment

Payment will be made at the unit prices for all lengths of pipe that are cleaned. The rate shall apply to all pipes regardless of type, configuration, depth, or location. The payment shall cover all costs associated with the cleaning as described in these specifications, together with any and all other incidental labor, water and other materials, equipment and other necessary items not specifically described herein. No additional payment will be made for work undertaken at night.

SECTION 32.03

CLOSED CIRCUIT TELEVISION INSPECTION

OF

STORM SEWERS

32.03.1 Description

This item of work shall consist of the inspection of storm sewers and laterals using closed circuit television to determine the type and location of defects or damage, or to locate blockages. It may be required as a stand-alone inspection, or it may be required in conjunction with the pipe jetting work as specified in Section 32.02

32.03.2 Equipment

The contractor shall use purpose-built equipment to undertake all inspections. It shall consist of a color camera mounted on a self-propelled unit located within the storm sewer, and connected by cable to a remote monitoring unit located above ground in the vicinity of the sewer being inspected.

The monitor shall be located approximately four (4) feet above ground level to allow ease of viewing, Alternatively, a custom built vehicle containing the monitoring system may be provided.

The inspection shall also be recorded in a format acceptable to the City for review after the inspection has been undertaken, and a copy shall be provided to the City within five (5) calendar days of the completion of the inspection.

The video inspection film shall include distance counter information. The equipment provided shall be capable of accessing at 700 linear feet of storm sewer from one entry point. In addition to inspecting circular pipes, the equipment shall also be capable of inspecting box sections and arched structures. Specific performance criteria for the equipment and deliverables shall be as follows:-

(1) The television inspection equipment shall have an accurate footage counter that displays on the remote monitor the exact distance of the camera from the center line of the starting manhole.

The camera shall be of the remotely operated pan and tilt type. The rotating camera and light head configuration shall provide 240 degrees of pan and tilt angle measuring centerline to centerline and a 70 degree lens viewing angle. It shall have a focusing range from 6 inches to infinity, and have a 10 times zoom capability.

(2) The camera shall be color and shall provide a minimum of 460 lines of horizontal resolution and 400 lines of vertical resolution. The image pick-up device shall contain in excess of 400,000 picture elements (pixels). Geometrical distortion of the image shall not exceed one percent.

(3) The color camera shall be equipped with the necessary circuitry to allow for the remote adjustment of the optical focus and iris from the power control unit at the remote monitoring unit.

(4) The camera shall be provided with height adjustment capabilities such that it is always located on the center line of the pipe being inspected, or higher if required by flow within the pipe.

(5) The lighting system shall be such that all features of the pipe can be clearly seen on the remote monitoring system, and also on the electronic format transferred to the City. If required, reflectors shall be provided for larger diameter pipes to enhance their illumination.

(6) The Contractor shall provide the CCTV footage to the City in a digital format that is previously agreed upon and approved by the City.

32.03.3. Substitutions

The Contractor may offer substitutions to the equipment specified in parts a. (1) through (6) above provided the end product is acceptable to the City.

32.03.4._Labor

The Contractor shall only use personnel who are skilled in the use of the equipment provided, and they shall have worked on at least three previous projects of a similar nature.

32.03.5. Submittals

The contractor shall submit full technical details on the equipment they will provide for the project, together with a method statement on its operation, and the resumes of the staff who will undertake the work. This submittal shall also include sample digital video and still photographs from previous projects to indicate the standards that are achieved with the equipment proposed.

This information shall be provided with the contractor's bid.

32.03.6. _Implementation

a. Safety

The work is to be undertaken in accordance with all Federal, State and Local regulations.

Particular attention is to be given to the provision and use of protective clothing, and also to

OSHA regulations regarding work in confined spaces, should these be warranted by field conditions.

The Contractor shall also take full responsibility for traffic and pedestrian safety in the vicinity of the work, and provide all barriers, signing, lighting, flagmen, traffic policemen, and other safety devices that may be required from time to time as the work progresses. The Contractor shall also be responsible for obtaining all permits that may be necessary for these activities.

The Contractor shall obey any instructions given by the City's Police Force, City Department of

Transportation, Traffic, and Parking, or other responsible Department having jurisdiction over the areas in which the work is being undertaken.

b. Order of Work

The filming shall be undertaken from the upstream manhole or other drainage structure, and shall proceed in the direction of flow. In the event that filming cannot be completed on an entire length of pipe for any reason, the contractor shall remove the equipment to the downstream manhole or drainage structure, and film in an upstream direction as far as is possible. This shall be at no extra cost to the contract.

c. Entry and Exit Structures

The contractor shall place their equipment in, and remove it from, a number of different drainage structures, not limited to manholes, to undertake this work. The words 'manhole' and 'drainage structure' shall be used inter-changeably within this Section (32.03). Prior to undertaking the work the contractor shall inspect the locations to be filmed, and vary the size of their equipment as necessary to undertake the required inspection.

d. Ingress

Pipes shall not be inspected and televised if there is flow in them exceeding the depths in the following table. The inspection shall be postponed until the flow is below the limits indicated.

Pipe diameter

6 to 10 in

12 to 24 in

24 in or more

Depth of flow as a percentage of diameter

e. Speed of traverse

The CCTV camera shall travel along the pipe at a speed that is slow enough for all defects to be detected, and in no case at more than 6 inches per second. At points of interest the camera shall be stopped and manipulated to film details as instructed in the field by the City. If necessary, the camera shall reverse to re-inspect areas previously passed.

32.03.7. Records

The contractor shall keep the following records of the work performed, and provide them to the

City within five (5) calendar days of the completion of the inspection. They shall be provided on a flash drive, which shall also contain software to allow the footage or stills to be viewed on the

City's computers. The City reserves the right to keep a copy of the inspection video for their own record keeping and for engineering purposes as they see fit in the future.

l. A unique number for each length of pipe inspected (06.01, 06.02, 06.03 etc)

2. Date and time (beginning and end) of inspection.

3. Entry Manhole - Indicate street name and number of adjacent house

4. Exit Manhole - Indicate street name and number of adjacent house

5. Pipe diameter (or other details of conduit if not circular)

6. Pipe Material

7. Total length of pipe inspected

8. Direction of camera travel

9. Direction of flow

10. Depth of flow {if any)

11. Defect location (in feet from entry point)

12. Type of defect (structural defects; missing pieces of pipe; longitudinal or circumferential cracking; joint deterioration including open joints and offset joints; distortions such as ovality;

leakage or evidence thereto; erosion or corrosion damage; break-in connections; protruding connections; mineral deposits; roots; previous repairs; grease, fats, oil or other organic build ups;

and other abnormalities.

32.03.8 Method of Measurement

See Section 32.05

32.03.9 Basis of Payment

See Section 32.05

SECTION 32.04

TRAFFICPERSON

32.04. l Description

The Contractor shall make all arrangement necessary for the provision of Uniformed Officer when required to ensure safe operations, or when instructed to by the City Engineer. The

Contractor will be required to request the presence of uniformed officer to the appropriate agency no later than 4:00PM the day before they will be needed or as per guidelines of the

New Haven Police Department as changed from time to time.

32.04.2 Implementation

The Contractor shall strictly obey all instructions given by the trafficperson assigned.

32.04.3 Method of Measurement

Trafficperson costs are to be pass-through cost to the City at the Actual rate paid for. Invoices from the New Haven Police Department to be attached to submitted invoice for reimbursement at actual cost (no mark-up).

SECTION 32.05

WORK ON A TIME AND MATERIALS BASIS

32.05.01 Description

This section covers work that is explicitly agreed upon in writing by the City and the Contractor as work on a time and material basis ahead of commencing the work. This is meant to cover activities of particularly unique or unpredictable nature and/or requires more effort than a typical cleaning or jetting. This section is not meant to be used in lieu of unit price items, in particular the cleaning of catch basins and the jetting of laterals, for which there are other specification sections and bases of payment and is only to be used as agreed upon by the City and Contractor prior to the commencement of work.

The Contractor must inform the City Engineer at least (1) day prior to the scheduled work, as well as

(1) hour prior to the scheduled work to verify a City representative will be present. The Contractor may not conclude their work until a City representative is present to verify the work completed, or if instructed by the City Engineer. All other work in the Contract shall be at unit rates submitted with the bid.

32.05.04 Method of Measurement

Hourly rate should reflect the time that the equipment and crew are on-site. No more than 30 mins of travel time before or after the time on site can be included for disposal travel, etc. A four hour minimum will be assumed for any given day’s work although this will include multiple cleaning locations.

Combined Vactor and Jetting Truck Hour

CCTV Equipment Hour

Disposal Costs Ton

32.05.05 Basis of Payment

The combined vactor and jetting truck rate shall include all the work described in section 32.01.4 and

32.02.04 of these specifications, except the disposal costs for solids removed.

In the event that the contractor uses separate vactor and jetting vehicles, then rate in the contract for the combined vactor and jetting truck shall be used.

The CCTV equipment item shall include all the requirements of Section 32.03 of these specifications.

The Disposal Costs item shall cover all costs associated with transportation and disposal off-site off all solid materials removed from drainage structures and pipes. Any liquids that are non-hazardous shall included in the Combined Vactor and Jetting Truck rate.