This is a Frequently Asked Questions document issued by Macon-Bibb County on March 20, 2026, regarding a milling and paving project. The project involves milling existing asphalt surfaces, patching damaged areas to a maximum depth of four inches, and applying a 12.55mm (1.50-inch) asphalt overlay. Work on the project is limited to 8:00 AM to 5:00 PM, Monday through Friday, or as daylight permits, with special requests for night work on downtown streets subject to approval. Contractors are required to mill and pave through side road curb radii but are not required to pave driveways. Milled surfaces must be repaved within one day of milling completion. Patching areas must be at least one lane width, and contractors must use discretion in determining which areas require patching. Shoulder clipping work requires removal of all clipped material from the site. The county does not require submission of asphalt compaction tests and allows contractors discretion regarding the use of shuttle buggies during placement of the 12.5mm asphalt.
Advanced warning signs may be placed on tripod stands or post-mounted at the contractor's discretion. Patching mix must match the paving mix specifications. The bid sheet lists manholes and water valves twice, requiring contractors to bid both adjustment and riser items, with the specific method to be determined during field work. No shoulder building, grassing, barrel placement, or low/soft shoulder signage is required on shoulders without curb and gutter, beyond the clipping and removal of shoulder material.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26_048_LH Pre Bid Sign In Sheet.pdf | ||
| 26_048_LH 2026 LRA Paving_IFB.pdf | ||
| 26_048_ Attachment B Project Quantity Sheet f.xlsx | XLSX spreadsheet | |
| 26_048_LH Attachment A.pdf | ||
| 26_048_LH_ Addendum_Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Frequently Asked Questions Modified 3/20/26
1. What will be the allowed work hours on this project?
Answer: 8-5, Monday – Friday, or as daylight permits. Special requests for night work
(like on downtown streets) may be approved by request.
2. Will the contractor be required to post mount the advanced warning signs or can these signs be placed on tripod stands?
Answer: Advance warning signs may be placed on a tripod or post mounted.
3. How long will a milled surface be allowed to remain without the finished asphalt layer?
Answer: Final repaving to be completed within one day of the milling work.
4. Will the contractor be required to mill and pave into side roads?
Answer: Mill and pave, at the side road intersection, through the side road end of the curb radius.
5. Will the contractor be required to mill and pave into driveways?
Answer: No driveway paving is included.
6. Will any asphalt compaction test be required on this project?
Answer: You are not required to submit compaction tests to Macon – Bibb County.
7. What will the depth of the Patching be?
Answer: Milling for patching to be to a depth to remove cracking as needed, maximum four inches deep.
8. Will the patch areas be marked 7.5’ or wider so a milling machine can be used in this operation?
Answer: Patching width to be at least one lane width. Contractor to patch areas needed, per his judgement.
9. Will 19mm be used for the Patching operation?
All mix placed shall be 12.55 mm asphalt (1.50” asphalt)
10. Looks like the depth of the 12.5mm asphalt will be 1.5” – is this correct?
Answer: That is correct.
11. For the pay item Clip Grass Shoulders will the clipped material be left on the shoulder or will the contractor be required to remove the material?
Answer: Contractor to remove all clipped material from the site.
12. Will a MTV (Shuttle Buggy) be required when placing the 12.5mm?
Answer: A shuttle buggy is allowed but not required.
13. Will the contractor be required to perform any shoulder building, grassing, place barrels or install any Low/Soft Shoulder Signs on the shoulders without curb and gutter?
Answer: The contractor is only required to clip and remove shoulder material from the site.
14. What mix type will be used for the Patching line item?
Answer: Patching mix to match the paving mix.
15. Manholes and water valves are list twice on the bid sheet, do you want us to bid both items?
Answer: Bid both manhole and water valve adjustment and manhole and water valve riser. It will be determined in the field if an adjustment is needed and which method will be used.