Summary of IFB 26-041-LH: LMIG 2026 Projects for Macon-Bibb County
This is an Invitation for Bids (IFB) issued by Macon-Bibb County, Georgia, for roadway repair and resurfacing projects under the Local Maintenance and Improvement Grants (LMIG) 2026 program. The project encompasses multiple residential streets across Macon-Bibb County, totaling approximately 16.34 miles of roadwork. Work items include milling (18,463.2 tons), bituminous tack application (13,427.79 gallons), roadway patching (22,379.64 square yards), installation of 12.5 mm and 9.5 mm Superpave asphalt, manhole and water valve adjustments and risers, traffic signal loop installation, and various striping and marking work including centerlines, edge lines, lane markings, crosswalks, and stop bars. A mandatory pre-bid conference is scheduled for Wednesday, April 1, 2026, at 2:00 p.m., with a question submission deadline of Friday, April 3, 2026, by 3:00 p.m. Sealed bids are due no later than 12:00 noon on Thursday, April 23, 2026, and will be publicly opened at 2:00 p.m. the same day. The contractor must commence work within 10 calendar days of receiving the notice to proceed and must complete all work within 150 calendar days. The contract term includes a one-year warranty on all labor and workmanship from the date of completion.
All bids must be accompanied by a bid bond equal to 5% of the total base bid. The successful bidder must furnish both a Performance Bond and a Payment Bond, each equal to 100% of the contract price, with the surety rated B+ or better by A.M. Best Company and licensed in Georgia. Required insurance includes statutory Worker's Compensation, General Liability of $1,000,000 combined single limit with a $5,000 maximum deductible, and Automobile Liability of $1,000,000 combined single limit with a $5,000 maximum deductible. A 5% retainage will be withheld from each payment until final payment, and liquidated damages of $75 per day will be assessed for project delays beyond the completion date. Minority, Women Owned, and Disadvantaged Business Enterprises are encouraged to participate, and contractors must submit quarterly Subcontractor/Supplier Participation Reports. The County reserves the right to award the contract based on total bid price under Georgia Official Code Section 36-10-2.2, and may reject any and all bids or award to other than the lowest bidder if deemed in the County's best interest.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26_041_LH_ Attachment B Copy of Project Quant.xlsx | XLSX spreadsheet | |
| 26_041_LH Attachment A.pdf | ||
| 26_041_LH_ Addendum_1.pdf | ||
| 26_041_LH Attachment C_ Frequently Asked Ques.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Macon-Bibb County, Georgia
INVITATION FOR BIDS
FOR
LMIG 2026 PROJECTS FOR MACON-BIBB COUNTY
745-02 745-21 745-65 755-35 755-30
BID NUMBER: 26-041-LH
ISSUED: 3/23/2026
BIDS DUE NO LATER THAN 12:00 NOON ON THURSDAY, April 23, 2026
Macon-Bibb County Procurement Department 700 Poplar Street
Suite 308 City Hall
Macon, Georgia 31201
TABLE OF CONTENTS
I. GENERAL
A. INVITATION
B. BID DOCUMENTS
C. PRE-BID
D. BID BOND
E. SEALED BIDS
F. VALIDITY
G. CONTRACT AWARD
H. SURETY
I. PAYMENT CONDITIONS
J. EXCISE TAXES
K. INSURANCE
II. INSTRUCTIONS TO BIDDERS
A. DEFINITIONS
B. RELATED DOCUMENTS
C. BIDDER’S REPRESENTATION
D. DOCUMENT DISCREPANCIES
E. SUBMITTALS
F. RESERVATIONS
G. SURETY AND INSURANCE COMPANIES
III. SPECIAL CONDITIONS
A. GENERAL
B. PERMITS AND LICENSES
C. LAYOUT OF WORK
D. WORK AREA
E. UNDERGROUND UTILITIES
F. TRAFFIC CONTROL
G. EROSION CONTROL
H. VANDALISM
I. MATERIAL DISPOSAL
J. EXTENSION OF TIME
K. LIQUIDATED DAMAGES
L. INSPECTION
IV. EXECUTION
A. GENERAL
B. SPECIFICATIONS
C. SCHEDULE
V. WARRANTY
VI. OPEN RECORDS…………………………………………………………………………………………… … 8
FORMS PROVIDED:
BID FORM
BIDDER QUALIFICATION FORM
FINANCIAL & LEGAL STABILITY STATEMENT
LIST OF SUB-CONTRACTORS
BIDDER MINORITY PARTICIPATION GOAL
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT (E-VERIFY) AFFIDAVIT
ATTACHMENTS:
A – REQUIRED SUBMITTAL DOCUMENTS W/ BID SCHEDULE & BID PRICE FORM
B – QUANTITY WORKSHEET
END OF TABLE OF CONTENTS
LMIG 2026 Projects for Macon-Bibb County
I. GENERAL
A. Invitation
1. Notice is hereby given that the Macon-Bibb County Board of Commissioners will receive sealed bids (1 original and Flash Drive) in the Procurement Department, Suite 308, Macon- Bibb City Hall, 700 Poplar Street, Macon, Georgia 31201, until 12:00 o’clock NOON at the time legally prevailing in Macon, Georgia on Thursday, April 23, 2026, for LMIG 2026 Projects for Macon-Bibb County for the Macon-Bibb County Engineering Department, Macon, Bibb County, Georgia.
2. NO BIDS WILL BE ACCEPTED AFTER THIS DESIGNATED TIME.
3. Bids will be publicly opened in the Macon-Bibb County Procurement Department Conference Room on Thursday April 23, 2026, at 2:00 pm.
4. Minority, Women Owned, and other Disadvantaged Business Enterprises are encouraged to participate in the solicitation process. Additionally, respondents are encouraged to use M/W/DBE subcontractors where possible. Small and other disadvantaged businesses requiring assistance with the competitive process can contact Charise Stephens, Director of Small Business Affairs at (478) 300-2297 or Cstephens2@maconbibb.us .
B. Bid Documents
1. Bid documents may be examined and obtained at the Macon-Bibb County Procurement
Department, Suite 308, Government Center, 700 Poplar Street, Macon, Georgia 31201, by calling (478) 803-0550, or may be viewed and downloaded from one of the links included below:
Georgia Procurement Registry website http://ssl.doas.state.ga.us/PRSapp/PR_custom_index.jsp?agency=61100 Macon-Bibb County Procurement Page www.maconbibb.us/purchasing
C. Pre-Bid A Pre-bid conference is scheduled for 2:00 o’clock p.m., Wednesday, April 1, 2026, in the Board of Commissioners Chambers, located at 700 Poplar Street, Macon, GA 31201.
This pre-bid is not mandatory. Deadline for submission of questions is Friday, April 3, 2026, by 3:00 p.m. standard eastern time. Questions must be submitted via email to Lhardwick@maconbibb.us
D. Bid Bond
1. Bids, in order to be considered, shall be accompanied by a bid bond, payable to the Owner, in amount not less than five percent (5%) of the total base bid.
a) This bid security shall become payable to the Owner only if the bidder, to whom award is made, should fail to execute a contract with the Owner and furnish bond and insurance in accordance with terms of the contract within ten (10) days after notification of award.
E. Sealed Bids
1. Envelopes shall be identified on the outside as
“Bid 26-041-LH – “LMIG-2026 Projects for Macon-Bibb County” And delivered by hand or mailed to:
Macon-Bibb County Procurement Department 700 Poplar Street, Suite 308
Macon, Georgia 31201 mailto:Cstephens2@maconbibb.us http://ssl.doas.state.ga.us/PRSapp/PR_custom_index.jsp?agency=61100 http://www.maconbibb.us/purchasing
F. Validity
1. No bid may be withdrawn for a period of sixty (60) days after time has been called on date of bid opening.
G. Contract Award
1. The contract, if awarded, will be based on Total Bid Price.
2. Guidelines in the award of this contract will be Section 36-10-2.2, Official Code of Georgia Annotated.
3. Upon award of the Contract, a pre-construction meeting will be held to discuss the project and to establish a schedule of work.
H. Surety
1. Whereas the anticipated contracted price exceeds $5,000, the bidder to whom award is made shall submit a Payment Bond and a Performance Bond, both in amount of one hundred percent (100%) of the contract price.
a) Bonding company/Surety shall be:
(1) Rated B+ or better in current Key Rating Guide as issued by A.M. Best Company, Oldwick, NJ.
(2) Licensed to do business in the State of Georgia.
I. Payment Conditions
1. The County Inspector will collect material tickets, measure and inspect work completed to date on said job and report to the Project Manager for payment.
2. A 5 % retainage will be withheld from each payment until final payment is made. The Owner will only pay for items used and actual work performed.
3. Change orders are issued for any variance from contract or plan sheets.
4. Any unauthorized work or material change will not be paid for unless a change order has been issued.
J. Excise Taxes
1. Any material that is to be incorporated into the work of this project may be consigned to Macon-Bibb County in care of the contractor. If the shipping papers show clearly that any such materials is so consigned, the shipment shall be exempt from the tax on transportation of property under the provisions of Section 3478(b) of the Internal Revenue Code, as amended by Public Law 180-78th Congress.
2. The Contractor shall pay all transportation charges.
3. Each bidder shall take this exemption into account in calculating his bid.
K. Insurance
1. Insurance coverage shall be carried with an insurance company licensed to do business in the State of Georgia.
2. Insurance shall be obtained prior to commencement of work and shall remain in force throughout the period of the contract.
3. Macon-Bibb County shall be named as additional insured on the policy.
4. Coverage shall include water damage.
5. Contractor is responsible for any and all deductibles.
6. Required coverage:
a) Worker’s Compensation: Statutory
b) General Liability:
(1) $1,000,000.00 combined single limit for B.I., P.D.
(2) Maximum deductible: $5,000.00
(3) To include:
(a) Premises – Operations
(b) Products & Completed Operations
(c) Broad form Contractual
(d) Independent Contractor and Subcontractor
(e) Underground explosion and collapse
c) Automobile Liability:
(1) $1,000,000.00 combined single limit for B.I. and P.D.
(2) Maximum deductible: $5,000.00
(3) To include:
(a) Owned Automobiles
(b) Hired Automobiles
(c) Non-Owned Automobiles
II. INSTRUCTIONS TO BIDDERS
A. Definitions
1. Wherever the term “Owner”, “County”, or “Macon-Bibb County” occur in these specifications, it shall mean Macon-Bibb County, a political subdivision of the State of Georgia acting through the Macon-Bibb County Board of Commissioners.
2. Wherever the term “Engineer” occurs in these specifications, it shall mean the engineer of the Owner, the County Engineer, or his representative.
3. Wherever the term “work” occurs in these specifications, it shall mean the work as defined herein, including, all labor, materials, equipment, transportation, and supervision necessary to complete the contract.
4. Wherever the term “D.O.T.” occurs in these specifications, it shall mean the Georgia Department of Transportation.
B. Related Documents
1. Quantity Worksheet (Attachment “B”)
2. Bid Form
3. Bidder’s Qualification Form
4. Financial & Legal Stability Statement
5. Bidder MBE Plan Form
6. List of Sub-contractors
7. Bond Forms
8. E-Verify Affidavit
9. Title VI non-discrimination Notice
C. Bidder’s Representation
1. Each bidder, by making his bid, represents that he has:
a) Read and understand the bidding documents; and,
b) Visited the site and became familiar with the local conditions under which the work is to be performed.
(1) Bidders shall examine the areas wherein work of this project is to be carried out and shall take into consideration all conditions that might affect his work.
(a) Failure of the bidder to inspect firsthand the areas affected by work in this project shall not relieve him of the obligation to comply fully with the scope of the work as defined herein.
(b) No consideration will be given any claim based on lack of knowledge of existing conditions, except where the Contract Documents make definite provisions for adjustment of cost or extension of time due to existing conditions that cannot be readily ascertained.
D. Document Discrepancies
1. Should the bidder find discrepancies in, or omissions from the documents, he shall at once notify the Macon-Bibb County Procurement Department.
2. Requests for Interpretations of Drawings and Specifications shall be made in writing to the Macon-Bibb County Procurement Department not later than Friday, April 3, 2026, by 3:00 p.m. email preferred to Lhardwick@maconbibb.us
3. Any subsequent instructions to bidders will be issued in the form of addenda to the specifications and sent to the bidder. All addenda shall be enumerated in the Bid Form.
4. All definitions set forth in the specifications are applicable to this Instruction to Bidders, the Bid Form and the proposed Contract Documents including, but not limited to, drawings, project manual, and any addenda issued prior to receipt of bids.
a) Addenda are written or graphic instruments issued prior to the execution of the Contract that may modify or interpret the bidding documents by deletion, additions, clarifications or corrections.
b) Addenda will become part of the Contract Documents when the Construction Contract is executed.
E. Submittals
1. In order for bids to be considered, the complete bid document package shall be submitted including each of the following completed documents.
a) Bid Form
b) Bidder’s Qualification Form
c) Financial & Legal Stability Statement
d) List of Sub-Contractors
e) Minority Participation Goal
f) Bid Bond in amount of 5% of the total base bid
g) E-Verify Affidavit
h) Debarment Form
F. Reservations
1. The bidder acknowledges that Macon-Bibb County reserves full freedom (in addition to the right to reject any and all bids) in awarding bids to consider all available factors including, but not limited to, price, the provision of needed and unneeded features, usefulness to the using department and prior County experience. In addition, the bidder recognizes the right of the Owner to reject a bid if the bidder failed to furnish any required submittals on the date required by the bidding documents, or if the bid is in any way incomplete or irregular.
Hence the County may award bids to other than the lowest bidder if in the judgment of the Board of Commissioners the interest of the County will be best served by award to another.
G. Surety and Insurance Companies
1. The Contract provides that the surety and insurance companies must be acceptable to the Owner. The bidder shall require the attorney in fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of his power of attorney indicating the monetary limit of such power.
III. SPECIAL CONDITIONS
A. General
1. All work to be performed as part of this specification shall comply with all codes, ordinances and regulations applicable to the contract, including, but not limited to:
a) International Building Code
b) State and Local Building Code
c) Georgia Department of Transportation (D.O.T.)
d) Occupational Safety and Health Administration (OSHA)
e) Other Federal, State, or Local Codes
B. Permits and Licenses
1. Contractor shall obtain all permits and licenses, paying all fees as required, for execution of the Contract. In addition, the Contractor shall arrange for necessary inspections required by the City, County, State and other authorities having jurisdiction, and submit certificates of approval to the Owner or his designated representative.
C. Layout of Work
1. The Contractor shall verify all existing conditions and contiguous work and lay out his work there from, providing for himself all other necessary measurements, lines and levels, and shall assume the responsibility for the correctness of the layout of the work.
D. Work Area
1. The Contractor shall confine his operations to as small an area as possible, using only the areas designated for on-site storage.
2. The Contractor shall protect all surrounding adjoining private and public property, taking every precaution to prevent damage or injury to trees, shrubs, curbs, sidewalks, driveways and fences along or adjacent to the work. Should damage occur, the Contractor shall restore, at his expense, any such property damage or injuries by his operations to a condition equal to that existing before such damage or injury was done, by repairing, rebuilding or otherwise restoring as may be directed by, and to the satisfaction of the Owner.
3. In case of failure on the part of the Contractor to restore such property, or make good such damages or injury, the Owner may, after forty-eight (48) hours written notice, proceed to repair, rebuild, or otherwise restore such property as may be deemed necessary, and the cost thereof shall be deducted from any monies due or which may become due the contractor under this contract.
E. Underground Utilities
1. The Contractor shall verify all underground utilities and their locations prior to commencing any work under this contract. Damage to underground utilities, and costs to repair same, shall be the responsibility of the Contractor.
F. Traffic Control
1. It shall be the responsibility of the Contractor to maintain traffic by utilizing adequate construction signs and flagmen at all times.
2. The Contractor shall furnish, install, maintain and eventually remove all traffic control devises necessary to properly protect and divert traffic. Such barricades and detour signs shall be illuminated at night.
3. All costs associated with traffic control shall be the responsibility of the Contractor.
4. The Contractor shall assume all responsibility for damages resulting from the failure of the signs and/or barricades to properly protect the work from traffic.
G. Erosion Control
1. The Contractor shall control all erosion by incorporating temporary grassing, mulch, baled straw, or silt fencing wherever required.
H. Vandalism
1. The Contractor shall take every precaution not to leave equipment and materials where they can be reached and used for defacing new or existing work at any time.
I. Material Disposal
1. The Contractor shall allow no trash, dirt, stumps, tree trunks, or excess material to accumulate and shall be responsible for removing same from the premises.
a) Such items shall be disposed of off the premises.
b) Burning of material on the site will not be permitted.
c) All costs of removing trash shall be the responsibility of the Contractor.
d) Place and method of disposal shall be the responsibility of the Contractor.
J. Extension of Time
1. In the event the work under this project is delayed by neglect, delay, or default of any other Contractor or the Owner, or by any damage which is the result of an Act of God, or by a general strike of the employees, the Contractor shall have reason to claim for delay and request an extension of time to complete the contract.
K. Liquidated Damages
1. Liquidated damages in the amount of $75 shall be charged to the contractor for each day that the project is delayed beyond the completion date of the contract. These charges are to defray the cost of inspection by Macon-Bibb employees assigned to the project.
L. Inspection
1. The Engineer may appoint inspectors to inspect all materials used and all work performed.
Such inspection may extend to all or any part of the work and to the preparation of manufacture of the materials to be used. The inspectors will not be authorized to revoke, alter, enlarge or relax the provisions of this specification, nor will they be authorized to approve or accept any portion of the completed work or to issue instruction contrary to the plans and specifications. The inspector shall have authority to reject defective material and to suspend work that is being improperly done, subject to the final decision of the Engineer.
2. It is mutually agreed between the parties to the contract that to prevent all disputes and misunderstandings between them in relation to any of the provisions contained in these specifications, or their performance by either of said parties, the Engineer shall serve as the referee to decide all matters of construction of the specifications and of the terms of the contract, and as to all matters arising or growing out of said contract and his decision shall be final and binding upon both parties.
3. The Engineer and his inspectors shall have free access to all parts of the work, and to all material intended for use in the work. The work will be inspected as it progresses, but failure to reject or condemn defective work at the time it is done will in no way prevent its rejection whenever it is discovered before the work is finally accepted and approved, nor will final acceptance and approval constitute waiver by the County of any right of action for defective work or the failure to perform the contract according to its terms.
IV. EXECUTION
A. General
1. It is the intent of this specification to provide for the LMIG-2026 Macon-Bibb Projects, for the Macon-Bibb County Engineering Department, Macon, Georgia.
B. Specifications
1. The Contractor shall provide all services as outlined in this solicitation, See Attachment “B” for Quantity Worksheet, attached hereto and incorporated herein
C. Schedule
1. The contractor shall commence work including applying for all needed railroad permits within 10 calendar days following issuance of notice to proceed, shall execute the work diligently, and shall complete all work requirements within 150 calendar days following the receipt of all necessary railroad permits. This time shall include all clean up, demobilization, and other necessary work to return the project area to its final state.
V. WARRANTY
A. The Contractor shall guarantee all labor and workmanship for minimum of one (1) year(s) from date of completion.
VII. SUBCONTRACTOR REPORTING REQUIREMENTS
A. Contractor shall submit a “Subcontractor/Supplier Participation Report” on this contract quarterly to the
Macon-Bibb County Office of Small Business Affairs which shall include the following:
1. The name of each subcontractor or supplier participating in the contract.
2. A description of the work to be performed, materials, supplies, and services provided by each subcontractor or supplier.
3. Whether each subcontractor or supplier is a minority owned, woman owned, LGBTQIA+ owned, veteran owned, disabled person owned, Certified Disadvantaged Business Entity, non-profit, or local business.
4. Whether each subcontractor is a supplier, subcontractor, or other.
5. The dollar value of each subcontract or supply agreement.
6. The actual payment to date of each subcontractor or supplier participating in the contract
B. The report shall be updated during the applicable quarter by the Contractor whenever any of the approved subcontractors or suppliers have completed the portion of the work they were contracted to perform. Copies of this report should be transmitted promptly to the Macon-Bibb County Office of Small Business Affairs.
C. The County may withhold any payment due to the Contractor on any project for failure to submit the
Subcontractor/Supplier Report within thirty (30) days following the end of the calendar quarter or for the failure to submit updates to the quarterly report within thirty (30) days of any subcontractor or supplier having completed the portion of work they were contracted to perform.
BID FORM
Macon-Bibb County Board of Commissioners Laura Hardwick, Procurement Director Macon-Bibb County, Procurement Dept.
700 Poplar Street, Suite 308 Macon, Georgia 31201
DATE: ___________________________________
Re: LMIG-2026 Projects for Macon-Bibb County
Macon-Bibb County Engineering Department Bibb County, Georgia
1. We have examined the Specifications, related documents and the site of the proposed Work, and are familiar with all the conditions surrounding this project, including the availability of materials and labor, and hereby bid to furnish all materials and labor, and to complete the project in accordance with the Contract Documents, within the time set forth herein, and at the prices stated below. These prices are to cover all expenses incurred in performing the Work required under these Specifications, of which this bid is part.
2. ADDENDUM RECEIPT:
a. We acknowledge our responsibility to ensure that all addenda have been received prior to the submission of a bid.
b. Bidder acknowledges receipt of the following addenda:
Addendum No. Dated _________________________
Addendum No. Dated__________________________
Addendum No. Dated__________________________
3. We agree to commence actual physical work on site, with adequate force and equipment within the timeframe presented in the specifications and to complete fully all work within the stated timeframe following notice to proceed.
4. We agree that this bid may not be revoked or withdrawn after the time set for the opening of bids and shall remain open for acceptance for a period of sixty (60) days following such time.
5. In case of written notification by mail, telegraph, or delivery of the acceptance of this bid within sixty (60) days after the time set for the opening of bids, the undersigned agrees to execute within ten (10) days a Contract for the Work for the below stated compensation and at the same time to furnish and deliver to the Owner a Performance Bond and a Payment Bond, both in an amount equal to one-hundred-percent (100%) of the Contract Sum.
6. Enclosed herewith is a Bid Bond in the amount of five percent (5%) of the total base bid. We agree that the above stated amount is the proper measure of liquidated damages that the Owner will sustain by the failure of the undersigned to execute the Contract and to furnish the Performance Bond and the Payment Bond.
7. If this bid is accepted within sixty (60) days after the date set for the opening of bids and we fail to execute the
Contract within ten (10) days after written notice of such acceptance or if we fail to furnish both a Performance Bond and a Payment Bond, the obligation of the bond will remain in full force and affect and the money payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure; otherwise, the obligation of the bond will be null and void.
8. We hereby certify that we have not, nor have any member of the firm(s) or corporation(s), either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this submitted bid.
9. We understand the total bid price listed below to be inclusive of all materials, labor, equipment, and other provisions necessary to provide the services in accordance with the associated specification.
2026 LMIG – Road List Road Name From To Miles Grace Road Industrial Highway Avondale Mill Rd 0.30
Lokchapee Dr Forest Hill Rd Arbor Climb 0.17 Arbor Climb Lokchapee Landing 0.06 Lokchapee Landing Commanche Dr 0.06 Commanche Dr Commanche Pl 0.10 Commanche Pl Sioux Dr 0.13 Sioux Dr Commanche Dr 0.08 Huntington Pl Alexandria Dr 0.24 Alexandria Dr Alexandria Dr 0.16 Huntington Pl Lokchapee Dr Huntington Ct 0.13 Brandon Way Lokchapee Dr Kells Ct 0.18 Kells Ct Lichelle Ct 0.05 Lichelle Ct cul-de-sac 0.06 Kells Ct Brandon Way cul-de-sac 0.06 Lichelle Ct Brandon Way cul-de-sac 0.05 Commanche Dr Lokchapee Dr Sioux Dr 0.20 Sioux Dr Commanche Pl 0.12 Commanche Pl Lokchapee Dr 0.14 Sioux Dr Lokchapee Dr Commanche Dr 0.15 Commanche Dr cul-de-sac 0.15 Commanche Pl Lokchapee Dr Commanche Dr 0.14 Arbor Climb Lokchapee Dr Lokchapee Ridge 0.10 Lokchapee Ridge Arbor Ct 0.04 Arbor Ct cul-de-sac 0.11 Lokchapee Ridge Arbor Climb cul-de-sac 0.28
Carrick Way Troon W Ravenal Ct 0.12 Ravenal Ct Troon W 0.38 Troon W Carrick Way Carrick Way 0.28 Rutledge Way Troon W Troon W 0.34 Ravenal Ct Carrick Way cul-de-sac 0.06
Ashford Park Zebulon Rd Hanover Place 0.19 Hanover Place Clarendon Ct 0.06 Clarendon Ct Trillium Terrace 0.16 Trillium Terrace Kenilworth Ct 0.11 Kenilworth Ct Mandalay Ct 0.04 Mandalay Ct Foster Road 0.20 Hanover Place Ashford Park cul-de-sac 0.06 Clarendon Ct Ashford Park cul-de-sac 0.12 Trillium Terrace Ashford Park cul-de-sac 0.11 Kenilworth Ct Ashford Park cul-de-sac 0.10 Mandalay Ct Ashford Park cul-de-sac 0.08
Taylor Crest Dr Hartley Bridge Rd Pine Rock Ct 0.10 Pine Rock Ct Becca Ct 0.10 Hudson Way Becca Ct Alicia Ct 0.09 Alicia Ct Trudie Lane 0.09 Trudie Lane Lance Dr 0.18 Lance Dr Trula Dawn Ct 0.13 Trula Dawn Ct Hudson Way cul-de-sac 0.04 Lance Dr Hudson Way Trudie Lane 0.18 Chad Court Hudson Way cul-de-sac 0.07 Alicia Ct Hudson Way cul-de-sac 0.06 Becca Ct Taylorcrest Dr cul-de-sac 0.05 Pine Rock Ct Taylorcrest Dr cul-de-sac 0.11 Oney Dr Taylorcrest Dr Matt Dr 0.09 Trudie Lane Hudson Way Lance Dr 0.11 Lance Dr William Way 0.09 Benton Dr Skipperton Road Alma Drive 0.14 Alma Dr Skipperton Road Alma Drive 0.08 Alma Dr Cutler Ct 0.12 Cutler Ct Benton Dr 0.45 Benton Dr Alma Drive 0.15 Cutler Ct Alma Dr cul-de-sac 0.13
Franklinton Road Riggins Mill Rd Seville Road 0.08 Seville Road Brownston Circle 0.55 Brownston Circle Old Franklinton Rd 0.16 Old Franklinton Rd Old Franklinton Rd 0.39 Old Franklinton Rd Jeffersonville Rd 0.08
Heathwood Dr Heath Road Rosewood Court 0.10 Rosewood Ct Meadow Wood Dr 0.10 Meadow Wood Dr Shadow Wood Ct 0.17 Shadow Wood Ct Richwood Ct 0.15 Richwood Ct Shadeland Place 0.06 Shadeland Place Formosa Walk 0.19 Formosa Walk cul-de-sac 0.08 Formosa Walk Shadeland Place Heathwood Dr 0.07 Shadeland Place Heathwood Dr Formosa Walk 0.18 Formosa Walk cul-de-sac 0.08 Richwood Ct Heathwood Dr cul-de-sac 0.15 Shadow Wood Ct
Heathwood Dr North to cul-de-sac 0.05
Heathwood Dr South to cul-de-sac 0.12 Meadow Wood Dr
Heathwood Dr cul-de-sac 0.06
Rosewood Ct Heathwood Dr cul-de-sac 0.08
Antioch Road Antioch Pl Heard Ave 0.04
Rutherford Ave Raines Ave 0.04 Raines Ave Crisp St 0.20 Crisp St Spikes St 0.02 Spikes St Charles St 0.03 Charles St Pittman St 0.03 Pittman St Colquitt St 0.03 Colquitt St Holloway St 0.03 Cleveland St Blount St Simmons St S 0.08 Simmons St S Bacon St 0.08 Bacon St Houston Ave 0.08 Hanson St Blount St Simmons St S 0.08
Bacon St Houston Ave 0.05
Audubon Dr Riverview Rd Audubon Cir 0.04 Audubon Cir Southshore Ct 0.15 Southshore Ct N Pine Knoll Dr 0.16 N Pine Knoll Dr Tiffin Cir 0.09 Tiffin Cir Clairmont Ave 0.07 Clairmont Ave Rolling Road 0.09 Southshore Ct Audubon Dr start of circle 0.08 Southshore Ct part of circle 0.07 Southshore Ct part of circle 0.06 Tiffin Cir Audubon Dr Tiffin Cir 0.07 Tiffin Cir Tiffin Ct 0.25 Tiffin Ct Tiffin Cir 0.25 Glenrock Ct Glenrock Dr cul-de-sac 0.03 Rolling Rd Audubon Dr Clairmont Pl 0.16 Clairmont Pl Clairmont Ave 0.20 Clairmont Pl Rolling Rd Clairmont Ave 0.09 Sweet Bay Ct Laurel Oak Ct 0.05 Laurel Oak Ct Red Bank Ct 0.06 Red Bank Ct Red Bank Ct 0.01 Red Bank Ct Greystone Ct 0.04 Greystone Ct Stoney Brook Ct 0.05 River Ridge Dr Clifton Dr Hickory Ridge Dr 0.12 Hickory Ridge Dr Rolling Road N 0.07 Rolling Rd N cul-de-sac 0.05 Rolling Rd N River Ridge Dr Clairmont Pl 0.08 Red Oak Dr I-75 Bridge Red Oak Ct 0.12 Red Oak Ct Clairmont Pl 0.03 Clairmont Pl Clairmont Ave 0.08 Red Oak Ct Red Oak Dr cul-de-sac 0.05 Clairmont Ave Red Oak Dr Clairmont Pl 0.24 Clairmont Pl cul-de-sac 0.18 Riverview Rd Audubon Dr Audubon Cir 0.10 Audubon Cir Southshore Dr 0.07 Southshore Dr Avenue of Pines 0.15 Avenue of Pines Inwood Dr 0.32
Inwood Dr N Pierce Ave 0.24 Southshore Dr Riverview Rd Southshore Pl 0.10 Southshore Pl Glenrock Dr 0.08 Inwood Dr Riverview Rd Sheraton Dr 0.06 N Pierce Ave Sheraton Dr 0.16
16.34
2026 LMIG Projects for Macon-Bibb County (Roadway Repair and Resurfacing)
Bid Schedule – 2026 LMIG
The quantities listed are an approximate estimate of the materials required to complete the roadway repair and resurfacing projects, for the Main Streets listed above. The “Total Bid Price” is the bid amount which shall be used to award the 2026 LMIG paving contract to the successful bidder.
Prior to beginning contract paving work on the main streets, the successful bidder shall be required to contact Mike Beard with the Macon Water Authority, at (478) 256-9382, regarding coordination with MWA on locating /marking paved over sanitary manholes. Contact Willie Sidney with the Macon Water Authority, at (478) 256-9400, to locate / mark paved over water valves.
Also, the successful bidder shall contact Monte Tolleson with the Macon Water Authority Storm Water Office, at (478) 738-6520, regarding locating / marking paved over storm manholes.
The 150-day contract period shall proceed upon the successful bidder receiving the “Notice to Proceed” from our Procurement Office.
Item Unit Quantity Unit Price Total Price Milling TONS 18463.2
Bituminous Tack GAL 13,427.79
Roadway Patching SY 22,379.64
12.5 mm Superpave Asphalt
TONS 18463.2
9.5 mm Superpave Asphalt
TONS 0
Install Furnished Sewer Manhole, Storm Manhole Risers
EA 648
Install Furnished Water Valve Risers
EA 259
Manholes (Adjustment) EA 322
Manhole Risers EA 322
Water Valves (Adjustment)
EA 130
Water Valves Risers EA 130
Traffic Signal Loop Install
EA 3
Striping (Center Lines, Edge Lines, Lane Lines)
LF 51,611
Painted Arrows EA 3
Bike Symbols EA 0
Painted Messages EA 1
Speed Bumps EA 1
Painted Crosswalks LF 121
Painted Stop Bars LF 1,017
Painted RR Symbols EA 0
Painted X-Hatching LF 0
Rumble Strips SETS 3
RPMs MILES 1.3
Clipping Grassed Shoulders
MILES 6.15
Total Amount
| LMIG 2026 Projects for Macon-Bibb County |
| I. GENERAL |
| A. Invitation |
| 1. Notice is hereby given that the Macon-Bibb County Board of Commissioners will receive sealed bids (1 original and Flash Drive) in the Procurement Department, Suite 308, Macon-Bibb City Hall, 700 Poplar Street, Macon, Georgia 31201, until 12:00 o’cl... |
| 2. NO BIDS WILL BE ACCEPTED AFTER THIS DESIGNATED TIME. |
| 3. Bids will be publicly opened in the Macon-Bibb County Procurement Department Conference Room on Thursday April 23, 2026, at 2:00 pm. |
| 4. Minority, Women Owned, and other Disadvantaged Business Enterprises are encouraged to participate in the solicitation process. Additionally, respondents are encouraged to use M/W/DBE subcontractors where possible. Small and other disadvantaged busi... |
| B. Bid Documents |
| 1. Bid documents may be examined and obtained at the Macon-Bibb County Procurement Department, Suite 308, Government Center, 700 Poplar Street, Macon, Georgia 31201, by calling (478) 803-0550, or may be viewed and downloaded from one of the links incl... |
| Georgia Procurement Registry website http://ssl.doas.state.ga.us/PRSapp/PR_custom_index.jsp?agency=61100 |
| Macon-Bibb County Procurement Page www.maconbibb.us/purchasing |
| C. Pre-Bid |
| A Pre-bid conference is scheduled for 2:00 o’clock p.m., Wednesday, April 1, 2026, in the Board of Commissioners Chambers, located at 700 Poplar Street, Macon, GA 31201. This pre-bid is not mandatory. Deadline for submission of questions is Friday, A... |
| D. Bid Bond |
| 1. Bids, in order to be considered, shall be accompanied by a bid bond, payable to the Owner, in amount not less than five percent (5%) of the total base bid. |
| a) This bid security shall become payable to the Owner only if the bidder, to whom award is made, should fail to execute a contract with the Owner and furnish bond and insurance in accordance with terms of the contract within ten (10) days after notif... |
| E. Sealed Bids |
| 1. Envelopes shall be identified on the outside as |
| “Bid 26-041-LH – “LMIG-2026 Projects for Macon-Bibb County” |
| And delivered by hand or mailed to: |
| Macon-Bibb County Procurement Department |
| F. Validity |
| 1. No bid may be withdrawn for a period of sixty (60) days after time has been called on date of bid opening. |
| G. Contract Award |
| 1. The contract, if awarded, will be based on Total Bid Price. |
| 2. Guidelines in the award of this contract will be Section 36-10-2.2, Official Code of Georgia Annotated. |
| 3. Upon award of the Contract, a pre-construction meeting will be held to discuss the project and to establish a schedule of work. |
| H. Surety |
| 1. Whereas the anticipated contracted price exceeds $5,000, the bidder to whom award is made shall submit a Payment Bond and a Performance Bond, both in amount of one hundred percent (100%) of the contract price. |
| a) Bonding company/Surety shall be: |
| (1) Rated B+ or better in current Key Rating Guide as issued by A.M. Best Company, Oldwick, NJ. |
| (2) Licensed to do business in the State of Georgia. |
| I. Payment Conditions |
| 1. The County Inspector will collect material tickets, measure and inspect work completed to date on said job and report to the Project Manager for payment. |
| 2. A 5 % retainage will be withheld from each payment until final payment is made. The Owner will only pay for items used and actual work performed. |
| 3. Change orders are issued for any variance from contract or plan sheets. |
| 4. Any unauthorized work or material change will not be paid for unless a change order has been issued. |
| J. Excise Taxes |
| 1. Any material that is to be incorporated into the work of this project may be consigned to Macon-Bibb County in care of the contractor. If the shipping papers show clearly that any such materials is so consigned, the shipment shall be exempt from t... |
| 2. The Contractor shall pay all transportation charges. |
| 3. Each bidder shall take this exemption into account in calculating his bid. |
| K. Insurance |
| 1. Insurance coverage shall be carried with an insurance company licensed to do business in the State of Georgia. |
| 2. Insurance shall be obtained prior to commencement of work and shall remain in force throughout the period of the contract. |
| 3. Macon-Bibb County shall be named as additional insured on the policy. |
| 4. Coverage shall include water damage. |
| 5. Contractor is responsible for any and all deductibles. |
| 6. Required coverage: |
| a) Worker’s Compensation: Statutory |
| b) General Liability: |
| (1) $1,000,000.00 combined single limit for B.I., P.D. |
| (2) Maximum deductible: $5,000.00 |
| (3) To include: |
| (a) Premises – Operations |
| (b) Products & Completed Operations |
| (c) Broad form Contractual |
| (d) Independent Contractor and Subcontractor |
| (e) Underground explosion and collapse |
| c) Automobile Liability: |
| (1) $1,000,000.00 combined single limit for B.I. and P.D. |
| (2) Maximum deductible: $5,000.00 |
| (3) To include: |
| (a) Owned Automobiles |
| (b) Hired Automobiles |
| (c) Non-Owned Automobiles |
| II. INSTRUCTIONS TO BIDDERS |
| A. Definitions |
| 1. Wherever the term “Owner”, “County”, or “Macon-Bibb County” occur in these specifications, it shall mean Macon-Bibb County, a political subdivision of the State of Georgia acting through the Macon-Bibb County Board of Commissioners. |
| 2. Wherever the term “Engineer” occurs in these specifications, it shall mean the engineer of the Owner, the County Engineer, or his representative. |
| 3. Wherever the term “work” occurs in these specifications, it shall mean the work as defined herein, including, all labor, materials, equipment, transportation, and supervision necessary to complete the contract. |
| 4. Wherever the term “D.O.T.” occurs in these specifications, it shall mean the Georgia Department of Transportation. |
| B. Related Documents |
| 1. Quantity Worksheet (Attachment “B”) |
| 2. Bid Form |
| 3. Bidder’s Qualification Form |
| 4. Financial & Legal Stability Statement |
| 5. Bidder MBE Plan Form |
| 6. List of Sub-contractors |
| 7. Bond Forms |
| 8. E-Verify Affidavit |
| 9. Title VI non-discrimination Notice |
| C. Bidder’s Representation |
| 1. Each bidder, by making his bid, represents that he has: |
| a) Read and understand the bidding documents; and, |
| b) Visited the site and became familiar with the local conditions under which the work is to be performed. |
| (1) Bidders shall examine the areas wherein work of this project is to be carried out and shall take into consideration all conditions that might affect his work. |
| (a) Failure of the bidder to inspect firsthand the areas affected by work in this project shall not relieve him of the obligation to comply fully with the scope of the work as defined herein. |
| (b) No consideration will be given any claim based on lack of knowledge of existing conditions, except where the Contract Documents make definite provisions for adjustment of cost or extension of time due to existing conditions that cannot be readily ... |
| D. Document Discrepancies |
| 1. Should the bidder find discrepancies in, or omissions from the documents, he shall at once notify the Macon-Bibb County Procurement Department. |
| 2. Requests for Interpretations of Drawings and Specifications shall be made in writing to the Macon-Bibb County Procurement Department not later than Friday, April 3, 2026, by 3:00 p.m. email preferred to Lhardwick@maconbibb.us |
| 3. Any subsequent instructions to bidders will be issued in the form of addenda to the specifications and sent to the bidder. All addenda shall be enumerated in the Bid Form. |
| 4. All definitions set forth in the specifications are applicable to this Instruction to Bidders, the Bid Form and the proposed Contract Documents including, but not limited to, drawings, project manual, and any addenda issued prior to receipt of bids. |
| a) Addenda are written or graphic instruments issued prior to the execution of the Contract that may modify or interpret the bidding documents by deletion, additions, clarifications or corrections. |
| b) Addenda will become part of the Contract Documents when the Construction Contract is executed. |
| E. Submittals |
| 1. In order for bids to be considered, the complete bid document package shall be submitted including each of the following completed documents. |
| a) Bid Form |
| b) Bidder’s Qualification Form |
| c) Financial & Legal Stability Statement |
| d) List of Sub-Contractors |
| e) Minority Participation Goal |
| f) Bid Bond in amount of 5% of the total base bid |
| g) E-Verify Affidavit |
| h) Debarment Form |
| F. Reservations |
| 1. The bidder acknowledges that Macon-Bibb County reserves full freedom (in addition to the right to reject any and all bids) in awarding bids to consider all available factors including, but not limited to, price, the provision of needed and unneeded... |
| G. Surety and Insurance Companies |
| 1. The Contract provides that the surety and insurance companies must be acceptable to the Owner. The bidder shall require the attorney in fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of h... |
| III. SPECIAL CONDITIONS |
| A. General |
| 1. All work to be performed as part of this specification shall comply with all codes, ordinances and regulations applicable to the contract, including, but not limited to: |
| a) International Building Code |
| b) State and Local Building Code |
| c) Georgia Department of Transportation (D.O.T.) |
| d) Occupational Safety and Health Administration (OSHA) |
| e) Other Federal, State, or Local Codes |
| B. Permits and Licenses |
| 1. Contractor shall obtain all permits and licenses, paying all fees as required, for execution of the Contract. In addition, the Contractor shall arrange for necessary inspections required by the City, County, State and other authorities having juri... |
| C. Layout of Work |
| 1. The Contractor shall verify all existing conditions and contiguous work and lay out his work there from, providing for himself all other necessary measurements, lines and levels, and shall assume the responsibility for the correctness of the layout... |
| D. Work Area |
| 1. The Contractor shall confine his operations to as small an area as possible, using only the areas designated for on-site storage. |
| 2. The Contractor shall protect all surrounding adjoining private and public property, taking every precaution to prevent damage or injury to trees, shrubs, curbs, sidewalks, driveways and fences along or adjacent to the work. Should damage occur, th... |
| 3. In case of failure on the part of the Contractor to restore such property, or make good such damages or injury, the Owner may, after forty-eight (48) hours written notice, proceed to repair, rebuild, or otherwise restore such property as may be dee... |
| E. Underground Utilities |
| 1. The Contractor shall verify all underground utilities and their locations prior to commencing any work under this contract. Damage to underground utilities, and costs to repair same, shall be the responsibility of the Contractor. |
| F. Traffic Control |
| 1. It shall be the responsibility of the Contractor to maintain traffic by utilizing adequate construction signs and flagmen at all times. |
| 2. The Contractor shall furnish, install, maintain and eventually remove all traffic control devises necessary to properly protect and divert traffic. Such barricades and detour signs shall be illuminated at night. |
| 3. All costs associated with traffic control shall be the responsibility of the Contractor. |
| 4. The Contractor shall assume all responsibility for damages resulting from the failure of the signs and/or barricades to properly protect the work from traffic. |
| G. Erosion Control |
| 1. The Contractor shall control all erosion by incorporating temporary grassing, mulch, baled straw, or silt fencing wherever required. |
| H. Vandalism |
| 1. The Contractor shall take every precaution not to leave equipment and materials where they can be reached and used for defacing new or existing work at any time. |
| I. Material Disposal |
| 1. The Contractor shall allow no trash, dirt, stumps, tree trunks, or excess material to accumulate and shall be responsible for removing same from the premises. |
| a) Such items shall be disposed of off the premises. |
| b) Burning of material on the site will not be permitted. |
| c) All costs of removing trash shall be the responsibility of the Contractor. |
| d) Place and method of disposal shall be the responsibility of the Contractor. |
| J. Extension of Time |
| 1. In the event the work under this project is delayed by neglect, delay, or default of any other Contractor or the Owner, or by any damage which is the result of an Act of God, or by a general strike of the employees, the Contractor shall have reason... |
| K. Liquidated Damages |
| 1. Liquidated damages in the amount of $75 shall be charged to the contractor for each day that the project is delayed beyond the completion date of the contract. These charges are to defray the cost of inspection by Macon-Bibb employees assigned to t... |
| L. Inspection |
| 1. The Engineer may appoint inspectors to inspect all materials used and all work performed. Such inspection may extend to all or any part of the work and to the preparation of manufacture of the materials to be used. The inspectors will not be auth... |
| 2. It is mutually agreed between the parties to the contract that to prevent all disputes and misunderstandings between them in relation to any of the provisions contained in these specifications, or their performance by either of said parties, the En... |
| 3. The Engineer and his inspectors shall have free access to all parts of the work, and to all material intended for use in the work. The work will be inspected as it progresses, but failure to reject or condemn defective work at the time it is done ... |
| IV. EXECUTION |
| A. General |
| 1. It is the intent of this specification to provide for the LMIG-2026 Macon-Bibb Projects, for the Macon-Bibb County Engineering Department, Macon, Georgia. |
| B. Specifications |
| 1. The Contractor shall provide all services as outlined in this solicitation, See Attachment “B” for Quantity Worksheet, attached hereto and incorporated herein |
| C. Schedule |
| 1. The contractor shall commence work including applying for all needed railroad permits within 10 calendar days following issuance of notice to proceed, shall execute the work diligently, and shall complete all work requirements within 150 calendar d... |
| V. WARRANTY |
| A. The Contractor shall guarantee all labor and workmanship for minimum of one (1) year(s) from date of completion. |