This Frequently Asked Questions document supports the Paving the Way Project 5 bid solicitation issued by the Macon-Bibb County Board of Commissioners in Georgia. The project involves asphalt milling and paving operations on multiple road segments, with work authorized during standard business hours of 8 a.m. to 5 p.m., Monday through Friday, or as daylight permits, with special requests for night work subject to approval. Key project specifications include full-depth milling from curb lip to curb lip or road edge to road edge, patching to a maximum depth of four inches to remove cracking, and asphalt placement of 12.55mm (1.50 inches) for patching and either 1.25 inches or 1.5 inches for topping depending on the road segment. The document clarifies that milled surfaces must be repaved within one day of milling, advance warning signs may be placed on tripods or post-mounted, shoulder clipping material must be removed from the site, and both manhole and water valve adjustments and risers should be bid as separate line items pending field determination. Asphalt compaction testing is not required, and a shuttle buggy is permitted but not mandated for placing 12.5mm asphalt. Driveway paving is excluded from the scope, though milling and paving at side road intersections must extend through the side road end of the curb radius. The pre-bid conference was scheduled for February 4, 2026, with the question submission deadline of February 6, 2026, and sealed bids due by noon on February 26, 2026, with public opening at 2 p.m. that same day. The document specifies that Type 1 9.5mm asphalt will be used and that patching mix must match the paving mix being placed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26_034_LH Attachment B.pdf | ||
| 26_034_LH PavingThe Way Project_5 IFB.pdf | ||
| 26_034_LH Attachment A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Frequently Asked Questions
1. What will be the allowed work hours on this project?
Answer: 8-5, Monday – Friday, or as daylight permits. Special requests for night work
(like on downtown streets) may be approved by request.
2. Will the contractor be required to post mount the advanced warning signs or can these signs be placed on tripod stands?
Answer: Advance warning signs may be placed on a tripod or post mounted.
3. How long will a milled surface be allowed to remain without the finished asphalt layer?
Answer: Final repaving to be completed within one day of the milling work.
4. Will the contractor be required to mill and pave into side roads?
Answer: Mill and pave, at the side road intersection, through the side road end of the curb radius.
5. Will the contractor be required to mill and pave into driveways?
Answer: No driveway paving is included.
6. Will any asphalt compaction test be required on this project?
Answer: You are not required to submit compaction tests to Macon – Bibb County.
7. The Milling will be Full Width Milling at the depth of the asphalt being placed – Is this correct?
Answer: Milling to be full depth, lip of curb to lip of curb, or road edge to road edge on roads without curb and gutter.
8. What will the depth of the Patching be?
Answer: Milling for patching to be to a depth to remove cracking as needed, maximum four inches deep.
9. Will the patch areas be marked 7.5’ or wider so a milling machine can be used in this operation?
Answer: Patching width to be at least one lane width. Contractor to patch areas needed, per his judgement.
10. Will 19mm be used for the Patching operation?
All mix placed shall be 12.55 mm asphalt (1.50” asphalt)
11. Looks like the depth of the 12.5mm asphalt will be 1.5” – is this correct?
Answer: That is correct.
12. Looks like the depth of the 9.5mm asphalt will be 1.25” – is this correct?
Answer: That is correct.
13. What type 9.5mm will be used for this project – Type 1 or Type 2?
Answer: Type 1.
14. For the pay item Clip Grass Shoulders will the clipped material be left on the shoulder or will the contractor be required to remove the material?
Answer: Contractor to remove all clipped material from the site.
15. Will a MTV (Shuttle Buggy) be required when placing the 12.5mm?
Answer: A shuttle buggy is allowed but not required.
16. Will the contractor be required to perform any shoulder building, grassing, place barrels or install any Low/Soft Shoulder Signs on the shoulders without curb and gutter?
Answer: The contractor is only required to clip and remove shoulder material from the site.
17. What mix type will be used for the Patching line item?
Answer: Patching mix to match the paving mix.
18. What thickness will the asphalt topping be placed?
Answer: 1.25” on all roads except for Fulton Mill Road (1.5”).
19. Manholes and water valves are list twice on the bid sheet, do you want us to bid both items?
Answer: Bid both manhole and water valve adjustment and manhole and water valve riser. It will be determined in the field if an adjustment is needed and which method will be used.