This is a Bid Attachment document for the Macon-Bibb County Board of Commissioners in Georgia regarding the Paving the Way Project 5. Sealed bids must be submitted to the Procurement Department, Suite 308, Macon-Bibb City Hall, 700 Poplar Street, Macon, Georgia 31201, no later than 12:00 p.m. noon on Thursday, February 26, 2026. A pre-bid conference is scheduled for 10:00 a.m. on Wednesday, February 4, 2026, in the Macon-Bibb Board of Commissioners Chambers, though attendance is not mandatory. The deadline for submitting questions is Friday, February 6, 2026, at 3:00 p.m. eastern standard time, with questions to be directed via email to Lhardwick@maconbibb.us. Bids will be publicly opened on Thursday, February 26, 2026, at 2:00 p.m. in the Board of Commissioners Chamber. Bid documents are available for examination at the Procurement Department or may be downloaded from the Georgia Procurement Registry website or the Macon-Bibb County Procurement page.
The solicitation encourages participation from Minority, Women Owned, and Disadvantaged Business Enterprises, with respondents urged to utilize M/W/DBE subcontractors where feasible. Small and disadvantaged businesses requiring assistance with the competitive process may contact Charise Stephens, Director of Small Business Affairs, at (478) 300-2297 or Cstephens2@maconbibb.us. Bids must be accompanied by a bid bond to be considered for award. The procurement documents note that no bids will be accepted after the designated submission time of 12:00 p.m. noon on February 26, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26_034_LH PavingThe Way Project_5 IFB.pdf | ||
| 26_034_LH Attachment A.pdf | ||
| 26_034_LH Frequently Asked Questions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Quantity Sheet for Package 5 Road List
Road Name From To Rating Length Miles Width (Ft) Square Yards Patchwork,SY, E Patchwork,SY,A Price Cont Amt Actual Amt Difference
Clinton Rd Upper River Rd Gray Hwy 72 5341 1.01 28 18610.44 1861.04 0 0 0 0 0 Upper River Rd County Line Clinton Rd 64 9705 1.84 22 26538.33 2653.83 0 0 0 0 0 Riggins Mill Rd Frederick Dr Bibb County Line 58 8830 1.67 22 21584.44 2158.44 0 0 0 0 0 Millerfield Rd Shurling Dr 500ft South of Donald Ave 71 5101 0.97 32 19546.89 1954.69 0 0 0 0 0
8628.01
Item Unit Quantity Unit Price Total
Milling TONS 7118.1
Bituminous Tack GAL 5176.81
Roadway Patching SY 8628.01
12.5 mm Superpave Asphalt TONS 7118.1
9.5 mm Superpave Asphalt TONS 0
Install Furnished Sewer Manhole, Storm Manholes, EA 62
Install Furnished Water Valve Riser EA 21
Manhole (Adjustment) EA 62
Water Valve (Adjustment) EA 21
Traffic Signal Loop Install EA 4
Striping (Center Lines, Edge Lines, Lane Lines)
LF 110435
Painted Arrows EA 30
Bike Symbols EA 0
Painted Messages EA 0
Painted Crosswalks LF 616
Painted Stop Bars LF 102
Painted RR Symbols EA 2
Painted Hatching LF 1135
Rumble Stripe SET 0
RPMs MILE 5.49
Clipping Grassed Shoulders MILE 0.98
Road Name From To Miles
Clinton Rd Upper River Rd Gray Hwy 1.01 Upper River Rd County Line Clinton Rd 1.84 Riggins Mill Rd Frederick Dr Bibb County Line 1.67
Millerfield Rd Shurling Dr 500ft South of Donald Ave 0.97
5.49
Sheet1