Project Manual Summary: 26-029 Springport High School & Elementary School Addition and Renovation

This is a Project Manual for a construction project issued by ELITE COMPANIES as Construction Manager on behalf of Springport Public Schools in Springport, Michigan. The project involves addition and renovation work at Springport Elementary School and High School located at 300 W. Main Street, Springport, MI 49284. The project encompasses multiple trade packages including demolition, concrete, masonry, structural steel, general trades, roofing, aluminum glass and glazing, metal studs/drywall/acoustical, flooring, painting, food service equipment, fire protection, plumbing, HVAC, electrical, earthwork, and audio visual work. Sealed bids are due on September 29, 2026, at 3:30 PM local time, with bids opening at 3:45 PM the same day at the school's main address. A pre-bid meeting is scheduled for Monday, September 14, 2026, at 3:30 PM. Construction is scheduled to begin in November 2026 and be completed by January 29, 2028. Bid documents became available on September 8, 2026, through ELITE COMPANIES and various plan rooms. The Request for Information (RFI) submission cutoff is September 22, 2026, at 12:00 PM. Post-bid interviews will be held the week of September 28, 2026, with selected bidders.

All bids must be submitted as sealed proposals on the designated AIA Contract form as lump sum amounts and include a bid bond or certified check equal to 5% of the total bid amount, a Familial Statement of Disclosure, and an Affidavit of Compliance with the Iran Economic Sanctions Act. Trade contracts will be awarded based on the AIA Document A132-2019 Contract standard. Performance and labor/material bonds equal to 100% of the contract amount are required for contracts exceeding $50,000; contracts under $50,000 must provide bonding costs as an alternate. The project imposes strict safety requirements including 100% fall protection policies, comprehensive OSHA compliance, hazardous communication protocols, and detailed submittal requirements. Bidders must provide detailed labor rates, Schedule of Values within 24 hours of bid award, proof of bonding capability, insurance certificates, site-specific safety plans, and Material Safety Data Sheets (MSDS) prior to commencing work. The project requires coordination with multiple trade contractors, adherence to established schedules with no guarantee of continuous work, and weekly reporting and safety meeting documentation. No bids may be withdrawn for 60 days following the bid opening.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26-029 Springport High School & Elementary School Addi�on and Renova�on

ELITE COMPANIES | 211 E. Water Street Suite 201 | Kalamazoo, MI 49007

Springport Public Schools

300 W. Main St. Springport, MI 49284

Project #: 26-029

Date: September 1, 2026

PROJECT MANUAL

Table of Contents - 26-029 Springport High School & Elementary School Addi�on and Renova�on

Invitation to Bid 3

Bid Requirements 5

Forms

Bid Checklist 8

Bid Form 9

RFI Form 13

Familial Statement Disclosure 14

Affidavit of Compliance – Iran Economic Sanctions Act 15

Asbestos Certification 16

Project Contacts 17

Trade Contractor Profile 18

Exhibits

Exhibit A – Contract Agreement/Notice to Proceed 20

Exhibit B – Drawing Log 21

Exhibit D – Subcontractor/Supplier Safety Plan Acknowledgement 22

Exhibit E – Elite Team 36

Exhibit F – Submittal Log 37

Exhibit G – Post Bid Interview 38

Exhibit H – Sample Insurance Certificate 39

Exhibit I – Site Logistics 40

Exhibit J – Project Schedule 41

Exhibit K – Scopes of Work 42

Project Safety & General Scope Requirements

02.5 Demo |; 03.1 Concrete |; 04.2 Masonry |; 05.1 Structural Steel |; 06.1

General Trades |; 07.5 Roofing |; 08.8 Alum. Glass & Glazing |; 09.2 Metal

Studs/Drywall/Acous�cal |; 09.6 Flooring |; 09.9 Pain�ng |; 11.4 Food Service

Equip. |; 21.1 Fire Protec�on |; 22.2 Plumbing & HVAC |; 26.1 Electrical |; 31.1

Earthwork |; 27.9 Audio Visual |

PORTIONS OF THIS MANUAL CONTAIN PROPRIETARY INFORMATION AND MAY NOT BE REPRODUCED WITHOUT ELITE COMPANIES’ WRITTEN

PERMISSION.

Please note your bid will not be accepted if a bid bond (or cer)fied check), Familial Statement of Disclosure, and Affidavit of Compliance – Iran

Economic Sanc)ons Act are not included with your bid.

INVITATION TO BID

At ELITE COMPANIES, we partner with the best in the business when it comes to trade contractors, helping us to exceed client expectations for every project, on time and on budget!

We are inviting you to bid for the next project with us.

Project: 26-029 Springport High School & Elementary School Addi�on and Renova�on

Bids Due: 9/29/2026 3:30 PM(Local Time)

Bids Opening: 9/29/2026 at 3:45 pm (Local Time). Sealed bids will be opened and read at 300 W Main St, Springport, Michigan 49284

Project Descrip'on: Addi�on and Renova�ons at Springport Elementary School and High School.

Project Schedule

The project is scheduled to start November 2026 - January 2028

Pre-Bid Mee'ng

Pre-Bid Mee�ng will be held on Monday September 14, 2026, at 3:30 PM. The pre-bid mee�ng will be located at 300 W Main St. Springport, MI

49284

Bid Packages | All Bidders to Review and Cover Division 00, 01, and 02.

02.5 Demo |; 03.1 Concrete |; 04.2 Masonry |; 05.1 Structural Steel |; 06.1 General Trades |; 07.5 Roofing |; 08.8 Alum. Glass & Glazing |; 09.2

Metal Studs/Drywall/Acous�cal |; 09.6 Flooring |; 09.9 Pain�ng |; 11.4 Food Service Equip. |; 21.1 Fire Protec�on |; 22.2 Plumbing & HVAC |;

26.1 Electrical |; 31.1 Earthwork |; 27.9 Audio Visual |

Document Loca'on

Specifica�ons and building layout/plans, together with all necessary forms and other documents for bidders may be obtained 9/8/2026 by end of day, from ELITE COMPANIES. An email will be sent to all known bidders and plan rooms when bid documents have been posted. Documents are also available in the following plan rooms:

ELITE Plan Room | Builder's Exchange | Public Bid PlaHorms

Bidders Request for Informa'on

Submission cut-off date is: 9/22/2026 12:00 PM

Proposals (Not Prevailing Wage)

Sealed bids will be received at Springport Public Schools, located at 300 W Main St, Springport, Michigan 49284 AKn: Superintendent. No faxed bids will be accepted. Envelopes are to be clearly marked as SEALED BID with Project Name and Number and Bid Package Name and

Number. Not to be folded and in legal size envelope

Bid Bond REQUIRED

Bid bond or cer�fied check of not less than 5% of the bid amount shall be submiKed with bid and made payable to Springport Public Schools.

Type of Contract Required

AIA Contract - The base bid shall be a lump sum amount, for the work as set forth in the bid documents.

Contract Security

The cost of a Performance Bond and a Labor and Material Bond shall be included within the Trade Contractor's bid price in all packages in excess of $50,000. Bidders of all bid packages shall supply, with their proposal, proof of their ability to bond work. This proof shall be in the form of a bid bond in the amount of 5% of the quoted price. All packages less than $50,000 must state, as an alternate, the cost of providing a

Performance Bond and a Labor and Material Bond if so required.

Post Bid Interviews

Post bid interviews will be scheduled accordingly with selected trade/bidders upon review and acceptance. Post bids will be held week of

September 28, 2026.

Rights Reserved

The Owner reserves the right to accept or reject any and all bids, alternates, or proposals, and to accept bids, alternates, or proposals that, in its sole judgment, serve its best interests.

Ques'ons?

Project Execu�ve:

Mark Rimes | mark.rimes@elite-companies.com

Project Coordinator:

Lisa Ruthruff | lisa.ruthruff@elite-companies.com

We appreciate your interest in bidding on our project.

We will be in touch with the next steps.

BID REQUIREMENTS

1.0 DEFINITION OF THE PROJECT

ELITE COMPANIES, as Construction Manager (“Construction Manager”) for [Client] is requesting firm lump sum (or unit price) proposal(s) for furnishing of labor, material, equipment, and all other items required to construct the following (“Project”) as defined by the Project Manual and Contract Documents, for the following stated Project. All capitalized terms herein shall have the meanings as defined in this Project Manual or as otherwise defined herein.

26-029 Springport High School & Elementary School Addi'on and Renova'on

Construction Manager

ELITE COMPANIES Field Office 211 E. Water Street, Ste 201 Field Office will be located at Kalamazoo, MI 49007 300 W. Main St. Springport MI 49284

(269) 910-1347 bids@elite-companies.com

2.0 CONTRACT DOCUMENTS

The bid Contract Documents (the “Contract Documents”) for the Project consist of the following separate documents:

"Project Manual" developed for the project by ELITE COMPANIES.

Project plans and specifications.

All subsequent addendum, bulletins, ASI's, construction change directives, and bid clarifications.

Each Trade Contractor is hereby notified that the above listed documents collectively constitute the Contract Documents. All Trade Contractors are required to review these Contract Documents and treat them as one. All Trade Contractors will be liable for information contained in these separate documents as if they were bound together and issued as one.

3.0 BIDDER RESPONSIBILITY

It is the responsibility of the bidder to view and acknowledge all documents, BRFIs, addenda, and any other documents that may be posted. The bidder is responsible for checking the plan room for updates and revisions.

Trade Contractor releases and discharges the Construction Manager and Owner from all costs, expenses, damages, liabilities, or claims related to the failure of the owner to properly receive and process the Trade Contractor’s bid and bid documents. This shall include any claims against said parties, and their assignees, officers, agents and representatives, for any consequential or special damages, including, but not limited to, any lost profits from the alleged failure of the Trade Contractor to be awarded any Project Work.

4.0 BIDDERS SUBMISSION

It is understood and mutually agreed that by submitting a bid proposal (“Bid Proposal”), the bidder agrees and fully understands the Work (as defined in the General Conditions (“General Conditions”) of this Project Manual) on which the Trade Contractor has bid and has satisfied itself as to the full nature and requirements of the Work.

It is further mutually agreed that the bidder, by submitting a Bid Proposal, acknowledges that it has satisfied itself as to the feasibility and correctness of the Contract Documents (as defined in the General Conditions) and that it accepts all the terms, conditions and stipulations contained herein, and that it will work in cooperation with other Trade Contractors performing Work on the jobsite. The bidder represents and warrants to the Owner and Construction Manager that it has visited the site and has familiarized itself with the local conditions under which the Work is to be performed.

No verbal agreement or conversation with any office, agent, or employee of the Owner, or the Construction Manager, either before or after the execution of a Trade Contract (as defined in the General Conditions), shall affect any of the terms, conditions or other obligations set forth in any of the Contract Documents.

Drawings and Specifications (as defined in the General Conditions) are complementary and that which is called for by one shall be binding as if called for by both.

In case of difference between Drawings of the same scale, or between large scale drawings, or between the Drawings and the Specifications or within the Drawings in the Specifications, the conflicts must be reported before bid due date and that which requires the highest degree of performance (quality, quantity, strength, finish, completion, complexity, sophistication, cost, etc.) will be required and shall be provided at no increase in bid amount if no written clarification is issued. Addenda, which may be issued, will take precedence over Drawings and Specifications in case of conflict.

5.0 QUESTIONS, CLARIFICATIONS, AND INTERPRETATIONS

No oral explanation in regard to the meaning of the bid Contract Documents will be made and no oral instructions will be given before the award of a Trade Contract.

Discrepancies, omissions, questions, needs for clarification or interpretation or doubts as to the true meaning of the Contract Documents should be communicated in writing immediately to the Construction Manager. The Construction Manager will issue a written instruction in the form of an addendum, RFI, or clarification to all bidders of record and shall be included in the bid, and upon execution of a Trade Contract, if the bidder is awarded the same.

6.0 STANDARDS, SUBSTITUTIONS AND "APPROVED EQUALS"

The materials, products and equipment described in the bid Contract Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution.

6.01 All bids must be based on the brands/manufacturers specified or approved in writing prior to bid submission.

6.02 A statement setting forth any changes in other materials, equipment or work that incorporation of the substitute would require shall be included. The burden of proof of the merit of the proposed substitute is upon the proposer.

7.0 PREPARATION OF BIDS

Each Bid Proposal shall be submitted on the designated form and shall be signed in ink. Any changes in the Bid Proposal must be explained or noted and include the signature of the bidder. Bids containing any omissions, unexplained erasures, alterations, irregularities of any kind or items not called for in the bid form may be rejected by the owner.

8.0 MODIFICATION OR WITHDRAWAL OF BID

No bids may be withdrawn for at least sixty (60) consecutive calendar days following the bid opening.

8.01 Prior to the time and date designated for receipt of bids, bids submitted early may be modified or withdrawn only by notice to the party receiving bids at the place and prior to the time designated for receipt of bids. Such notice shall be in writing and include the signature of the bidder. The written confirmation and signature of the bidder must have been submitted and received before the date and time set for receipt of bids or may be rejected. Any modification shall not reveal the amount of the original bid. Withdrawn bids may be resubmitted up to the time designated for the receipt of bids provided that they are then fully in conformance with these Instructions to Bidders.

9.0 CONSIDERATION OF BID

The Owner shall have the right to reject any or all bids and, in particular, to reject a bid not accompanied by data required by the Contract Documents or a Bid Proposal which is in any way incomplete or irregular. The Owner shall have the right to waive any informality or irregularity in any Bid Proposal received.

9.01 The Owner reserves the right to reject any and all Bid Proposals when such rejection is in the interest of the Owner, or to reject the bid of a bidder who, in the Owner's opinion, is not qualified to fulfill the Trade Contract.

10.0 ALTERNATES

The Owner shall have the right to accept or reject alternates in any order or combination and to determine the best Bid Proposal on the basis of the sum of the base bid and the alternates accepted.

11.0 QUALIFICATION OF BIDDERS

The Owner reserves the right to request an audited, current (within 6 months) financial statement together with a statement of past experience, personnel, machinery, and equipment available to perform the proposed Work from any bidder considered for award of a Trade Contract. Failure or refusal to furnish such a statement or statements, to provide such information or to provide a satisfactory statement of financial responsibility, may constitute a basis for disqualifying the bidder.

11.01 Corporate bidders, to be eligible to enter into a Trade Contract, shall be qualified to do business in the location corresponding to Project location. Bidders shall comply with all applicable licensing requirements. Foreign corporations, which have not domesticated or otherwise become licensed in the state, shall obtain a permit to do business pursuant to local requirements.

11.02 Each Bidder, by submitting a Bid Proposal, agrees to meet with the Owner and Construction Manager if so requested, prior to an award.

12.0 CONTRACT AWARD

Prior to Trade Contract award, the successful bidder shall:

12.01 List the names of all proposed Subcontractors and material and equipment Suppliers and list all materials to be used.

12.02 List all delivery dates of all major materials and equipment and any other materials and equipment critical to the progress of construction.

12.03 Provide an itemized breakdown with separate materials and labor (“Schedule of Values”) which comprise the contract price. The breakdown will be used as a basis for partial payments to the Trade Contractor. It is essential that the breakdown be as representative of the true total cost of each item as is possible to ascertain. The Construction Manager shall have the right to require the Trade Contractor to submit to the Construction Manager copies of subcontract agreements or other documentations regarding breakdown costs necessary to confirm the accuracy of the Schedule of Values.

13.0 BONDING

13.01 BID BONDS

Bid security shall be in the form of a bid bond, a certified check, a cashier’s check, or money order in the amount of 5% on the total bid.

One (1) copy of the bid bond are to be submitted with Proposal Form.

When a bid bond is submitted, the owner shall be listed as obligee.

When the bid bond is submitted, the attorney-in-fact who executes the bond on behalf of the surety shall attach to the bond a certified, current copy of this power of attorney.

When a cashier’s check, certified check or money order is submitted, it shall be made payable to the Owner.

The Owner will have the right to retain the bid security of bidders to whom an award is being considered until either (a) the Trade Contract has been executed and bonds, if required, have been furnished, or (b) the specified time has elapsed so that bids may be withdrawn, or (c) all bids have been rejected.

13.02 PAYMENT BONDS, PERFORMANCE BONDS

All successful Bidders may be required to furnish both a Payment Bond and a Performance Bond, each in the amount of one hundred percent (100%) of the Trade Contract amount, with the Owner named as Obligee. All bonding companies must be listed by the U.S. Treasury, must be rated A or better by Best and must be licensed to do business in the state of which the Project is located.

Payment Bonds and Performance Bonds must be separate. The combined form will not be accepted.

When submitted, Payment Bonds and Performance Bonds shall include:

Full name and address of Trade Contractor, surety and Owner The contract date The exact amount of the contract Signature and title Corporate seal, if applicable Notarization Power of Attorney

13.03 BOND COSTS IN BIDS

Include costs for Payment Bonds or Performance Bonds in Base Bids if and called out, if your bid is over $50,000. If your bid is under $50,000, provide this cost as an alternate added cost, separate from your base bid, but within the bid form.

13.04 SUBMISSION OF BONDS

Bonds, if required, shall be submitted to the Owner within fifteen (15) days following the Trade Contractor’s receipt of the Notice to Proceed to commence the Work from the Construction Manager or the Owner/Construction Manager Agreement, whichever is earlier.

If the Work is commenced prior to the execution of the Owner/Construction Manager Agreement in response to a Notice to Proceed, the Trade Contractor shall, prior to commencement of the Work, submit evidence satisfactory to the Construction Manager that required bonds will be furnished within fifteen (15) calendar days from the date of the Notice to Proceed.

14.0 TAXES

The Trade Contractor shall pay all state and federal taxes levied on its business, income or property, including but not limited to taxes on the Trade Contractor's gross or net receipts or income. The Trade Contractor shall also make all contributions for social security and other wage or payroll taxes due. The Trade Contractor shall be solely responsible for such payments and shall indemnify Owner and Construction Manager and hold them harmless for any assessment and payment of same.

15.0 TRADE CONTRACTOR AGREEMENT

Each bidder, by submitting a Bid Proposal, agrees to execute the Trade Contract, which shall be part of the Contract Documents without modification.

16.0 BIDDER EXPECTATIONS – PRE AND POST AWARD

The Owner, Construction Manager, and the entire Project team, upholds the highest level of expectations for the success of the Project. As a result of these expectations, all those who elect to participate in the bidding process and who will be potential awarded contract work for this Project are expected to uphold the highest professional standards possible.

The awarded bidder for any bid category is considered an expert in its field of work and has been contracted to perform a service to the client based on and because of that expertise. The awarded bidder will submit all of its bid development documents, supporting the values submitted on its Schedule of Values, subsequent to the bid award (including all of its calculations) if requested.

17.0 MINORITY, WOMAN, VETERAN, AND HANDICAP SUBCONTRACTORS AND SUPPLIERS

Bidders are urged to utilize minority, woman, veteran, and handicap owned business on this Project where possible

18.0 BID FORMS

Please find the enclosed bid forms for use – RFI Form, Bid Form including all required docs for bid to be read aloud.

BID CHECKLIST

At ELITE COMPANIES, we work with the best in the business and look forward to the opportunity of working with you on this project.

Below we have provided you with a quick checklist to ensure you have all the information completed for consideration.

Bid Form

All highlighted areas to be completed

Bid Form Signed & Dated

Scope of Work (Complete for each bid package submi4ed)

For Public Bids Only

*Bid will not be considered / read aloud without the following a4achments.

Original Bid Bond or Cer fied Check

Familial Disclosure

Affidavit of Compliance – Iran Economic Sanc ons Act

Bids are not to be folded and to be placed in legal size envelope.

Should you have any questions, please reach out to Lisa Ruthruff

Project # 26-029 Springport High School & Elementary School Addi�on and Renova�on

Submitted By: Date:

Contact Name: Email:

Having examined and studied the Project Manual dated September 1, 2026, the instructions to Bidders, and the other Contract

Documents for the Project and having inspected the Site and noted all conditions governing construction of the project.

Bid Package: Description:

We hereby propose to furnish all labor, materials and equipment and perform work described above and listed below, for the following sum(s), which include all applicable taxes.

BASE BID $

Base Bid Typed

Payment & Performance Bond $

Alternate Add Deduct $

Alternate Add Deduct $

Voluntary Alt Add Deduct $

Voluntary Alt Add Deduct $

BRFI’s List receipt of all documents received individually

Addendums

Clarifications

Time of Completion Calendar days to complete

Man Hours On-Site Labor Hours Only

Crew Size Estimated number of persons of average crew size

Vendor Class| Labor Type Indicate if a diversity contract & type of labor Class

Union MBE WBE Open Shop Veteran Owned SBE

In the event the Scope of Work changes per request of Owner or Construction Manager, unit prices will apply as agreed upon. Scopes of

Work and/or the specifications may ask for unit costs for added/deleted work. Trade Contractors may be required to submit an additional schedule of unit prices prior to award of contract. This schedule will be developed by the Construction Manager, and the prices established by contractor thereon will be the basis for Construction Change Orders.

All Trade Contractors shall include labor and equipment billing rates with the Bid Form.

Bid Breakdown

Acknowledgements

Labor & Schedule

BID FORM

List all Subcontractor and/or subsidiaries to be used in performance of the work and describe the Work to be performed.

Subcontractor and/or Subsidiary companies

Description of Work Diversity

Contractor % of Total Lump

Sum Bid Amount

Yes No %

Yes No %

Yes No %

List all major manufacturers and/or suppliers to be used in performance of the Work and describe the material/equipment to be provided by each, including the value of their purchase order.

Manufacturer and/or Supplier Description of Work Diversity

Contractor Contract Value

Yes No $

Yes No $

Yes No $

The following labor rate calculations section is to be completed in its entirety and included with your bid form and is required for all changes in work. A labor rate is required for all divisions of work to be performed on the job site, i.e., Foreman, Journeyman, Laborer, Apprentice, Cement Finisher, Bricklayer, Plumber, Sheet Metal Worker, Etc.

This form is utilized for work added or eliminated from your scope of work during project construction and all labor rates must not exceed rates listed on the standardized pricing form when submitting cost changes.

Company Name: Wage Expires: Upon Contract Completion Bid Package: PLM Bond Rate %:

2nd Tier Sub (if applicable) Work Performed:

Position: Position: Position:

Straight Time Time & One Half Straight Time Time & One Half Straight Time Time & One Half

Taxable Wages Total Fringes

Total Payroll Tax & Insurance Total Hourly Rate

Subcontractors | Subsidiary Companies

Manufacturers | Suppliers

Labor & Equipment Rates

All bids shall be based upon the proprietary brands specified. Bidders desiring to make substitutions for proprietary brands specified shall list such proposed as a voluntary alternate, together with the amount to be added or deducted from the amounts of the base bid.

The Scope of Work is REQUIRED to be included with this bid form. The Scope of Work is located within the ELITE COMPANIES Project Manual and all requested unit pricing and bid breakdown sections must be completed. IF YOU DO NOT SUBMIT WITH YOUR BID, IT WILL BE DEEMED

INCOMPLETE AND MAY BE REJECTED.

Bidders must indicate on the bid form the calendar days required to complete their work in the earliest practical manner. Schedules are subject to negotiation and agreement prior to contract award and each bidder will be required to perform its work in accordance with the Construction Manager’s overall schedule. The initial construction schedule is subject to change as set forth in the General Conditions.

Contractor hereby acknowledges that all shift and overtime premium required to meet the completion dates is included in the base bid.

Bidder estimates on the bid form the number of man-hours that will be required on-site to complete the work on schedule. (Do not include any office, shop, or delivery hours. On-Site Hours Only)

Bidder estimates the number of persons that will make up the average crew size on bid form.

The undersigned hereby warrants that all subcontractors and suppliers of work and/or material to them have been advised that no substitution will be considered for proprietary brands specified other than those listed and authorized prior to award of contract.

It is understood and agreed by the undersigned that bids shall not be altered or withdrawn within 60 days from and after the date set for receiving bids.

It is understood and agreed by the undersigned that the right is reserved by the Construction Manager and/or Owner to accept or reject any and all bids.

By submitting this proposal, we hereby acknowledge that the Contract Documents, including the Trade Contract, General

Conditions, Project Manual, Drawings and Specifications, all Addendums and insurance requirements will be met without deviation.

It is understood by the undersigned that a detailed Schedule of Values will be provided within 24 hours following the bid due date/time, inclusive of an appropriate breakdown of values as listed on the applicable individual scope of work.

Substitutions

Scope of Work

Time of Completion

Proposal Validation

It is understood by the undersigned that the awarded bidder will submit their bid development documents, supporting the values submitted on their schedule of values, subsequent to award.

State in Which Incorporated:

Authorized to do business in State and City/County where Proposed Work is to be Performed: Yes No

Legal Company Name:

Official Address:

State: Zip Code:

Business Phone No:

(Company Name)

(Signature)

(Printed Name, Title)

(Date)

Thank you, We appreciate your interest to bid on our project.

We will be in touch with the next steps.

Signature Page

RFI

Date: Bid Package:

Drawings: Company:

Spec Section: Contact Name:

Contact Email:

RFI Subject:

Answered by: Date:

Request

Response

Familial Statement of Disclosure

Springport Public Schools

300 West Main Street, Springport, MI 49284

Dear Ladies and Gentlemen:

I/We, the undersigned, acknowledge by this sworn and notarized statement disclosing any familial rela�onship (or lack of a rela�onship) that exists between the Owner or any employee of the bidder and any member of the Board of Educa�on of the Springport Public Schools or the Superintendent of the School District. The District shall not accept a bid that does not include a sworn and notarized disclosure statement.

We have prior familial knowledge of parties involved (attached clarification).

We have no prior familial knowledge of parties involved.

Signature

Company Name

STATE OF

COUNTY OF

This instrument was acknowledged before me on the day of ,20 by .

, Notary Public

County, My Commission Expires:

Acting in the County of:

AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT

Michigan Public Act No. 517 of 2012

The undersigned, the owner or authorized officer of the below-named bidder (the “Bidder”), pursuant to the compliance certification requirement provided in the [Client] (the “School District”)

Advertisement to Bid (the “Ad to Bid”), hereby certifies, represents and warrants that the Bidder

(including its officers, directors and employees) is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Bidder is awarded a contract as a result of the aforementioned Ad to Bid, the Bidder will not become an “Iran Linked Business” at any time during the course of performing any services under the contract.

The Bidder further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the

School District’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on an Ad to Bid for three (3) years from the date that it is determined that the person has submitted the false certification.

Bidder:

Name of Bidder

By:

Its:

Date:

STATE OF )

COUNTY OF )

) ss.

This instrument was acknowledged before me on the day of ,20 by .

, Notary Public

County, My Commission Expires:

Acting in the County of:

ASBESTOS CERTIFICATION

At the comple�on of all work, all contractors are to submit, along with their warran�es and other final paperwork, the following cer�fica�on that asbestos-free materials have been used in the construc�on.

Contractor Certification of Asbestos-Free Product Installation:

Project Name:

Trade Contractor's Name:

Address:

Telephone:

Email:

Bid Category:

Brief Descrip�on of Contracted Ac�vi�es:

Cer'fica'on Statement:

I (name), represen�ng and having authority for (company), hereby cer�fy that any and all products/materials which will be and/or have been installed or introduced into the above-men�oned school district are asbestos-free (or less than 1% asbestos by weight).

1. Print Name:

2. Signature:

3. Date:

4. Company:

5. Posi�on:

PROJECT TEAM CONTACT LIST

DATE:

JOB NUMBER:

PROJECT NAME: 26-029 Springport High School & Elementary School Addition and Renovation

COMPANY NAME:

Please complete all items below and note the same person may function in many roles. In order to receive project communication through Procore, a person must be designated for each role.

NAME

TITLE

ROLE

PHONE

(CELL)

EMAIL

Project Manager

Project Foreman

Project Administrator

RFI Coordinator

Submittal Coordinator

Closeout Coordinator

Insurance Coordinator

Accounting Manager

Safety Officer

Emergency Contact

Quality Control Manager

Office Manager

Contractor ITB Profile In an effort to streamline our process,s ELITE COMPANIES will be requesting the Trade Contractor Profile Form along with the documents listed on the following page on an annual basis with updates submitted as needed or as project specific information is required.

Please complete the Trade Contractor Profile Form and email to lisa.ruthruff@elite-companies.com

COMPANY INFORMATION

Company Name:

Address:

City: State: Zip Code:

Phone:

Website:

Company Size (# of EE’s)?

Bonding: Single: Aggregate:

Bonding % Rate

EMR Rating: EMR Year:

TRIR Number: TRIR Year:

Type of Entity:

ASSOCIATIONS / MINORITY

WBE - Women’s Business Enterprise DBE – Disadvantaged Business Enterprise MBE – Minority Business Enterprise MWBE – Minority Women’s Business Enterprise VOSB – Veteran Owned Small Business

VBE – Veteran Business Enterprises DVBE – Disabled Veteran Business Enterprise

CONTACTS:

Project Managers & Field Staff will be requested for each specific project. Please include your company’s core contacts to ensure we are getting information to your teams for Safety, Emergencies, Accounting, Sales, Estimating, and Executives

Name Email Phone Role Send ITB’s to?

Estimator

Accounting

Project Manager

Post Bid Interviews

Safety

Authorized Contract Signer

INVITATIONS TO BID:

Would you like to be included on our bidder’s list? Yes No

BID PACKAGES:

Please select which bid packages your company is available for work.

02.0 Abatement

02.5 Demolition

03.1 Concrete

03.4 Precast Concrete

04.2 Masonry

05.1 Structural Steel

06.0 Building Materials

06.1 General Trades

06.4 Architectural Woodwork

06.5 Building Framing Labor

07.2 Thermal Protection

07.4 Metal Panels

07.5 Membrane Roofing

07.9 Joint Protection

08.1 Doors | Frames | Hardware

08.3 Overhead Doors

08.8 Alum. Glass & Glazing

09.2 Metal Studs | Drywall | Acoustical

09.6 Flooring

09.7 Specialty Flooring

09.9 Painting

10.2 Interior Specialties

11.4 Food Service Equipment

11.6 Athletic Equipment

13.4 PEMB Erection

14.2 Elevators

21.1 Fire Protection

22.1 Plumbing

23.9 Building Controls

23.1 Mechanical

26.1 Electrical

28.1 Security Systems

31.1 Earthwork

32.1 Asphalt Paving

32.3 Fencing

32.9 Landscaping

Other

INDUSTRY SECTORS

Please select which industries your company is available for work.

Commercial Residential

Industrial/Manufacturing Education

Healthcare

At ELITE COMPANIES we partner with the best in the business when it comes to Trade Contractors, helping us to exceed in client expectations for every project, on time and on budget!

Thank You!

EXHIBIT A – CONTRACT AGREEMENT/NOTICE TO PROCEED

Owner/Contractor Agreement

All contracts for construc�on will be contracts with Springport Public Schools and issued on the standard AIA

Document A132-2019 Contract. (Sample Contract available upon request)

Overall administra�on of the project will be the responsibility of the Construc�on Management Firm.

ELITE COMPANIES,

211 E. Water Street, Suite 201

Kalamazoo, Michigan 49007

Phone (269) 910-1347

Contracts will be awarded to separate contractors for the separate bid packages or combina�ons of bid packages.

Awarded contract will be based on bidder’s proposal and the ability to perform. Decisions regarding the bidder’s ability affec�ng contract award will be made by the Owner.

The Owner intends to award contracts to bidders who submit proper bids in accordance with the bidding documents.

The Owner reserves the right to waive any informality or irregularity in any bid.

The Owner reserves the right to reject any bid.

All Awards will be made in the Owner’s best interest.

No'ce to Proceed

The Owner may elect to issue No�ces to Proceed prior to the execu�on of the Contract Agreement.

Upon receipt of the No�ce to Proceed, each contractor shall commence work in accordance with the condi�ons of the No�ce to Proceed.

No contractor shall commence work un�l all required insurance requirements have been met and cer�ficates of insurance have been submiKed to Elite Companies.

EXHIBIT B – DRAWING LOG

ELITE COMPANIES | 211 E. Water Street Suite 201 | Kalamazoo, MI 49007

EXHIBIT D

SUBCONTRACTOR/SUPPLIER SAFETY PLAN ACKNOWLEDGEMENT

(SEE NEXT PAGE)

ELITE COMPANIES | 211 E. Water Street Suite 201 | Kalamazoo, MI 49007

EXHIBIT “D”

Subcontractor and Supplier

Safety Plan Acknowledgement

No�ce: Subcontractors, Suppliers and Vendors are to complete and return this acknowledgement prior to commencement of work.

Failure to comply with the requirements shall result in contract cancella�on and work stoppage!

WELCOME!

It is ELITE COMPANIES goal to establish and maintain the safest workplace possible. To help accomplish this task we have ins�tuted safety standards that we feel are more stringent than OSHA regula�ons and well above what is commonly accepted around the construc�on industry. Obviously, this higher level of safety cannot be achieved throughout the jobsite unless all individuals contribute by adhering to and ensuring that all behave in a manner that meets ELITE COMPANIES standards. The Subcontractor is financially responsible for all costs incurred by ELITE COMPANIES necessary to replace said safety equipment and hereby waive any no�fica�on requirements.

General Safety Plan

“A Brief Summation of Requirements”

More complete information can be found in 29 CFR 1926, The Code of Federal Regulations describing Construction Safety for OSHA Compliance

TABLE OF CONTENTS

1926 OSHA Chapter

1. PPE (Personal Protec�ve Equipment) Subpart E

2. Excava�ons and Trenching Subpart P

3. Fall Protec�on Subpart M

4. Materials Handling, Storage, and Use Subpart H

5. Tools Subpart I

6. Electrical Subpart K

7. Scaffolding Subpart L

8. Stairway and Ladders Subpart X

9. Inspec�ons

10. Repor�ng Incidents and Occupa�onal Injuries

11. Hazardous Communica�on (MSDS) Subpart D

12. Safety Training, Cer�fica�ons, and Educa�on Subpart C

13. Housekeeping Subpart C

14. First Aid Subpart C

15. ForkliW and Arial LiW Operators Subpart O

16. Hois�ng and Cranes Subpart N

17. Job Site Violence Protocol

18. Safety Viola�on Schedule

19. Safety SubmiKals

OSHA References are provided for Complete Compliance

COMPANY NAME: _______________________________________

SIGNATURE: ____________________________________________

Personal Protec+ve Equipment (1926.95)

Our Subcontractors must provide and assure proper use of appropriate protec�ve equipment, including, but not limited to personal protec�ve equipment for the eyes, hands, face, head, feet, torso, and extremi�es. Addi�onally, appropriate protec�ve clothing and respirator devices, must be provided, used, and maintained in a sanitary condi�on.

1. Head Protec'on: Hard hats are to be worn at all +mes by all employees and visitors. Only our Safety Director or Safety

Consultant can determine when the use of hard hats is no longer required.

2. Hearing Protec'on: Approved hearing protec�on must be used wherever it is required to reduce the exposure to noise levels. Plain coKon is not an acceptable protec�ve device.

3. Eye Protec'on: ANSI approved safety glasses must be worn at all �mes. Eye protec�on with clear lenses is required for interior or low light work (or goggles as warranted).

4. Respiratory Protec'on: When engineering is not affec�ve our Subcontractors will provide appropriate NIOSH approved respirators to protect the health of their employees. These respirators must be designed to protect the employee against the specific hazard and the employee must be trained in the proper use and care of the respirator.

5. Foot Protec'on: In most cases, work boots or work shoes are to be worn at all �mes and during all phases of construc�on.

In certain applica�ons (working in wet concrete or on sloped roof), with permission of our Site Project Manager, this rule may be waived for a short amount of �me.

6. Clothing: The wearing of loose, dangling clothing is prohibited. Long, full length, pants and shirts with 4” sleeves are required at all �mes.

Excavations and Trenching (1926.650)

While working in or around trenches or other excavated area, our Subcontractors’ Competent Person1 will establish the following protocols:

1. Access and Egress: Stairways, ladders, or ramps must be correctly established in trenches or excava�ons that are four (4) feet or more in depth. They must be located so that no employee has more than twenty-five (25) feet of unobstructed lateral travel to a means of escape.

2. Exposure to Falling Loads: No employee will be permiKed underneath loads handled by liWing or digging equipment.

3. Cau�on tape, barricades or other approved marking must be used around the perimeter of any excava�on.

4. Protec�on of employees is the direct responsibility of the Subcontractor’s Competent Person. Listed below are some basic protocols:

a. All equipment and spoil material must be at least two (2) feet from the edge of excavations.

b. Excavation must be inspected daily, by the Subcontractor’s Competent Person before allowing employees to enter the excavated area.

c. Employees will not be allowed to work in trenches where there is accumulated water unless the water is controlled by the use of water removal equipment. The Subcontractor’s Competent Person must establish and monitor the water removal equipment and procedures.

d. Refer to the OSHA Standards for the Construction Industry for proper sloping, benching, and shoring.

Fall Protection (1926.500)

1 “Competent Person is defined as one capable of recognizing safety hazards and with the authority to take whatever action is necessary to immediately abate Safety hazards.”

ELITE COMPANIES | 211 E. Water Street Suite 201 | Kalamazoo, MI 49007

ELITE COMPANIES believes that the use of a conven�onal means of fall protec�on provides a superior form of protec�on and is required at all our construc�on sites where the walking or working surface is six (6) feet or more above a lower level. However, if the conven�onal means are infeasible or create a greater hazard, an alterna�ve means of fall protec�on may be use. This alterna�ve must be site specific, in wri�ng and pre-approved by our Safety Commi'ee before it may be implemented.

Our Subcontractor’s Competent Person for fall protec*on is responsible for establishing and monitoring of their employee’s fall protec*on and must be registered in our Project Manager office.

1. Guardrails (1926.502 (b))

Each Subcontractor is responsible for replacement of safety rails that are removed or damaged in connec�on with his own work and is responsible for safety viola�ons created by such removal or damage. Handrails shall never be removed without our Site Project Manager permission. Should any Subcontractor or employee of a Subcontractor not replace safety rails or posts, which have been removed, that employee shall be expelled from the job site immediately upon the direc�on of our

Project Manager. Further, the Subcontractor is financially responsible for all costs incurred by ELITE COMPANIES necessary to replace said safety railing and hereby waive any no�fica�on requirements. Should safety railing not be installed in an area where this Subcontractor is currently working, it is the Subcontractor’s responsibility to ensure that his workmen are properly �ed off and otherwise adequately protected.

2. Personal Fall Arrest Systems - PFAS (1926.502 (d)):

a. All components of a PFAS must have a minimum breaking strength of five thousand (5,000) pounds and used correctly.

b. When ver�cal lifelines are used, each employee shall be aKached to a separate lifeline.

c. Lifelines shall be protected against cuts or abrasions.

d. Anchorages used for aKachment of personal fall arrest equipment shall be independent of any anchorages being used to support plaHorms and capable of suppor�ng five thousand (5,000) pounds per employee aKached.

e. PFAS are to be rigged such that employees can neither free fall more than six (6) feet, nor contact any lower level.

f. Lifelines will be inspected by the Competent Person prior to being used each day.

g. Self-manufactured anchors must be engineered, and sealed prints must be submiKed to ELITE COMPANIES and approved prior to use.

3. Covers (1926.502 (i)):

a. All covers shall be fastened to the slab using four (4) Tapcons.

b. If a Subcontractor removes a cover, it will be the responsibility of that Subcontractor to protect all employees from the hazard created by its removal and to replace and refasten the cover when work is completed, if the hole s�ll exists.

4. Safety Monitoring Systems (1926.502 (h)):

Safety Monitoring Systems are an alterna�ve means of fall protec�on. They afford the least amount of protec�on for employees allowed by OSHA regula�ons. The Safety Monitor must be easily iden�fiable and have no other du�es that interfere with his or her ability to control safety in the area of responsibility.

5. Warning Lines (1926.502 (f)):

a. Can never be closer than six (6) feet to the hazard, usually more distance is required.

b. Can never be a painted line, elevated warning is required in commercial work.

Materials Handling, Storage, and Use (1926.250)

Handling and storage of materials is the Subcontractor’s responsibility. At a minimum, onsite materials must comply with the following:

1. Material stored on leading edge will be at least six (6) feet away from the edge.

2. Means of egress must be kept clear.

ELITE COMPANIES | 211 E. Water Street Suite 201 | Kalamazoo, MI 49007

3. Rolling stock must be secured.

4. Nails shall be removed from used lumber.

5. Fall arrest systems shall be used on outriggers.

6. Materials shall not be stored on scaffolding in excess of supplies needed or more than the designed weight for the scaffold.

7. Aisles and passageways shall be kept clear to provide free and safe movement.

8. Flammable materials shall be kept in storage areas designated by our Project Manager. Appropriate signage, barricading, containment, and fire ex�nguisher must be used.

Rigging Equipment for Material Handling is the responsibility of our Subcontractors’ Competent Person. At a minimum the following rules must be complied with:

1. Daily inspec�on and approval of all rigging equipment prior to use. All sling, fastenings and aKachments must be visually inspected for damage or defects and their rated capaci�es must be appropriate for the designated task(s).

2. Tower crane operators must submit crane safety inspec�ons to our Project Manager office.

3. All cranes must have annual inspec�ons and submiKed to ELITE COMPANIES with their contract documents and to our Site

Project Manager.

4. All cranes that are leW on site for more than thirty (30) days must have third-party inspec�ons and suppor�ng documenta�on must be submiKed to our Site Project Manager.

5. Cer�fica�ons for equipment and equipment operators must be filed with our Site Project Manager.

Tools (1926.300)

Tool use is the responsibility of our Subcontractor. At a minimum:

1. Tools and machines will be used within design parameters.

2. Use recommended Personal Protec�ve Equipment (PPE) in accordance to manufacture recommenda�on.

3. Guards must be firmly in place preven�ng workers from coming in contact with moving parts. If they are not supplied by the manufacturer, they must be designed and installed to meet this requirement.

4. All electric tools must be grounded.

5. Disconnect tools when not in use, before servicing, when removing guards or changing accessories such as bits and blades.

6. Sugges�on:

a. Never carry a tool by the cord or hose.

b. Never yank the cord or the hose to disconnect it from the receptacle.

Powder-Actuated Tools:

1. Only employees that have a card cer�fying that they have been trained to operate a specific power-actuated tool will be allowed to operate that tool.

2. Every individual who is in the area where powder-actuated tools are in opera�on must use appropriate Personal Protec�ve

Equipment (PPE).

3. Warning signs shall be posted while the powder-actuated tool is in use.

4. All powder-actuated tools must be used in accordance with manufactures specifica�ons.

5. Basic Safety Protocols:

a. Do not load a cartridge before you need it.

b. Do not leave a loaded tool lying about.

c. Do not point a tool at persons.

d. Do not leave cartridges blank or loaded on the ground.

e. Do not insert cartridges before the nail or stud is loaded.

f. If cartridge does not fire, follow specific manufactures’ designated protocols.

Electrical (1926.400)

When working at ELITE COMPANIES Site:

1. The Subcontractors’ Competent Person must:

a. Inspect all tools, cords, and equipment prior to bringing them on site to assure appropriate, safe working order.

b. Cer�fy that portable generators greater than five-thousand-volt amperes (5KVA) are GFCI protected.

c. Cer�fy that path to ground is to be con�nuous, no missing ground pin.

d. Establish quarterly inspec�on on electrical cords to be iden�fied as follows:

1. January through March (Red).

2. April through June (Blue).

3. July through September (White).

4. October through December (Green).

* Remember, repairs can only be made to twelve (12) gauge or larger cords

2. The Subcontractor is responsible for assuring that:

a. All his/her equipment are being used per instruc�ons.

b. Flexible cords and cables are protected from damage.

c. Cords are not run through pinch points.

d. All extension cords are three-wire (3-wire) type and hard or extra hard duty.

e. Nails, staples, or wires cannot suspend electrical extension cords.

f. Controls and energy sources on tools or equipment being serviced or repaired are locked/tagged “Out of Service” to prevent unauthorized reenergizing at any point.

g. All ac+vi+es must adhere to the ten (10) foot minimum distance from energized power lines of fi;y thousand volts

(50KV) or less.

* Cords that are not iden�fiable as hard or extra hard duty, have missing pins, or have damage that has not been properly repaired will have the ends cut off.

3. The electrical contractor is responsible for assuring:

a. All breakers are properly labeled.

b. All service panels and other live parts guarded to exclude any unauthorized personnel.

c. All service panels shall be de-energized before work.

d. Ground Fault Circuit Interrupter (GFCI) protec�on is provided on all one hundred twenty (120) volt, fiWeen (15) and twenty (20) ampere outlets.

e. All lamps in temporary lights are to be protected from contact or breakage.

f. Temporary lights are not to be hung by wiring unless designed for this use.

g. Proper signage required at all service areas.

h. Weekly Ground Fault Circuit Interrupter (GFCI) tests must be performed and documented.

Scaffolding (1926.450)

The Competent Person for the Subcontractor erec�ng the scaffolding (all scaffolding, including “Baker”) is responsible for:

1. Registering with our Site Project Manager prior to scaffolding component arrival.

2. Training all scaffold users and erectors prior to use. Only trained employees may use scaffolding.

a. Hardhats are required.

b. No one may climb on cross braces.

3. Inspec�ng all scaffolding components upon arrival at our site.

4. Rejec�ng and returning, on delivery truck, all substandard components and immediately reordering replacement.

5. Erec�ng and dismantling scaffolding (Manufacture recommenda�ons shall be adhered to.) Our major objec�ves are to:

ELITE COMPANIES | 211 E. Water Street Suite 201 | Kalamazoo, MI 49007

a. Maintain appropriate clearances from power lines.

b. Fully plank all plaHorms.

c. Install guardrails or fall arrest systems. (Ten (10) foot trigger height).

d. Use approved means of egress. Ladders must have a three (3) foot extension above landing point.

e. Use base plates, screw jack or casters (required all applica�ons).

f. Use mudsills on earthen applica�ons.

g. Protect employees from falling objects by using:

1. Barricades.

2. Toe boards.

3. Control zones.

6. All scaffolding altera�ons.

7. Daily inspec�ons of scaffolding prior to the start of each shiW and making compliance (safety) correc�on prior to use.

Addi'onal Requirements:

1. When required, engineered stamped drawings for scaffolding systems shall be submitted to ELITE COMPANIES before erection.

2. Suspended scaffolding must be designed and installed by a qualified person. No homemade scaffolding will be permitted.

3. All personnel on mast climbers or swing stage must be tied off to the building (structure) at all times.

Ladders and Stairs (1926.1053)

When using ladders or stairways the Subcontractor is responsible for training their employees to:

1. Adhere to all manufacturer’s direc�ons and instruc�ons.

2. Do Not use ladders that have loose, cracked, or…