26-015 Drainage Pump Rockleigh PS Specifications Division 1 - 26 Final 2026-05-01.pdf

PDF 14 MB Posted

Attached to
Rehabilitation of the Rockleigh Golf Course Stormwater Pump Station
Solicitation number
BC-C-26-015
Issued by
Bergen County, New Jersey

About this file

This document is a Division 1 General Requirements and Division 2 Selective Demolition specification for the Rehabilitation of the Rockleigh Golf Course Stormwater Pump Station, a project under the County of Bergen in New Jersey. The project involves furnishing all labor, materials, and equipment required for the comprehensive rehabilitation of a drainage pump station at Rockleigh, including demolition of the existing pump station, construction of pump station upgrades, testing, commissioning, and site restoration. The contractor must coordinate work with a project manager on-site, provide all administrative and scheduling personnel, temporary facilities, and utilities, and maintain existing public roads in safe condition. Work must be completed according to the specified construction sequence: shop drawing submission, site mobilization, bypass pumping system setup, wet well cleanout and verification, existing pump station demolition, construction of upgrades while flow is bypassed, testing and commissioning, and final site restoration and demobilization. All work must comply with Federal, State, and local statutes, regulations, and codes, with particular emphasis on environmental protection, labor safety, and sanitation requirements. The contractor is required to maintain emergency telephone contact after regular working hours and be prepared to respond to emergency conditions within two hours.

The specifications establish comprehensive requirements for materials, equipment, workmanship, and testing procedures. All equipment must be new unless otherwise approved, with manufacturers possessing at least five years of successful operational experience with similar equipment. The contractor must provide detailed shop drawings, samples, color charts, and operating manuals for engineer approval, with initial submissions required within ten days of contract signing and resubmissions within thirty days. Equipment testing includes preliminary field tests marked with a Yellow Tag and final field tests marked with a Green Tag, encompassing mechanical testing with at least twelve continuous operating hours and duty tests demonstrating efficiency and capacity. The contractor bears all costs for testing, manufacturer's field representatives, initial startup procedures, lubricants, and commissioning activities. All work must be completed during specified hours (7:00 AM to 6:00 PM, with noisy operations limited to 7:30 AM to 6:00 PM), with strict enforcement by the Borough of Rockleigh Police Department, and the contractor must account for any hardship in bid items.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 1

GENERAL REQUIREMENTS 1000-1

SECTION 1000

GENERAL REQUIREMENTS

PART 1 GENERAL

1.01 CONTRACT DOCUMENTS

The Contract Documents for this work are identified in the Article of the Contract entitled Definitions.

1.02 WORK INCLUDED

The following information is part of this Division:

1000 - General Requirements 1010 - Additional Information 1020 - Special Project Procedures 1030 - Coordination 1040 - Field Engineering 1050 - Regulations 1060 - Alternates 1070 - Measurement and Payment 1080 - Project Meetings 1090 - Submittals 1100 - Quality Control 1110 - Construction Facilities and Temporary Utilities 1120 - Material and Equipment 1130 - Special Conditions 1610 - General Equipment Stipulations 1750 - Starting and Adjusting of Systems

1.03 PROJECT DESCRIPTION

The Contractor is to furnish all labor, materials and equipment required for the project and related construction for the bid price. The work is to be coordinated by the Contractor with a Project Manager located on the construction site.

The Contractor is to provide administrative and scheduling personnel as well as provide all the labor, superintendence, materials, plant, tools, and equipment necessary and required for properly performing and completing the work as described and more particularly specified within the time stipulated. He/she is to furnish, erect, maintain, and remove the construction plant and such temporary works as may be required. These requirements include, but are not restricted to, suitable quarters for workers where necessary, including temporary sanitary facilities, water supply, heat, and light for the workers as well as for construction purposes. Existing public roads which are adjacent to the construction site may be affected by construction activities on the site. The Contractor will be required to keep these roads open at all times during the contract and maintain these roads in a safe condition which is suitable for the public use. The cost of connection to, or extension of, existing utility services from locations on the existing property is to be borne by the Contractor under this Contract. Temporary roads, guards, lights, and

GENERAL REQUIREMENTS 1000-2

signposts are to be included, as necessary. The Contractor is to furnish all material, equipment, and labor necessary to complete his work in accordance with the terms of this Contract and the requirements thereunder, including all general and detailed Specifications hereinafter outlined.

A description of the work is included in the Scope of Contract section of the specifications. This description generally defines the work to be undertaken on this project and is to be supplemented by the remaining Contract Documents.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

END OF SECTION

ADDITIONAL INFORMATION 1010-1

SECTION 1010

ADDITIONAL INFORMATION

PART 1: GENERAL

1.01 INSURANCE AND TIME LIMITS

The Contractor is to refer to the appropriate sections of the Information for Bidders and the Contract (“CON“) pages for insurance requirements and time limits relating to project completion.

1.02 ALLOWANCES

See the Section of the Information for Bidders Entitled “Allowances”.

1.03 PATENTS AND COPYRIGHTS

See the Article of the Contract Entitled “Patents and Copyrights”.

1.04 GUARANTEES

See the Article of the Contract Entitled “Warranty”.

1.05 SECURITY MEASURES OF OWNER

See the Article of the Information for Bidders Entitled “Security Measures of Owner”.

1.06 OTHER CONTRACTS

The Owner may have other contracts with work related to the work of the Contractor. The Contractor is to cooperate with other contractors with regard to storage of materials and execution of the work. It is the Contractor’s responsibility to inspect all work by other contractors affecting his work and to report to the Owner any irregularities which will not permit him to complete his work in a satisfactory manner.

His/Her failure to notify the Owner of such irregularities indicates the work of other contractors has been satisfactorily completed to receive his work. The Contractor is not responsible for defects of which he/she could not have known, which develop in the work of others after the work is completed. Where work under this Contract is to be connected to work under other contracts, it is the responsibility of the Contractor to measure the completed work in place and report to the Owner immediately any difference between completed work by others and the provisions of the Contract Documents.

1.07 WITNESS TESTING

All testing of materials and equipment specified under the various sections of these Contract Documents is to be witnessed by the Engineer. Contractor will give the Engineer reasonable advance notice of such testing and will make reasonable accommodations for the Engineer to witness such testing.

ADDITIONAL INFORMATION 1010-2

PART 2: PRODUCTS

PART 3: EXECUTION

SPECIAL PROJECT PROCEDURES 1020-1

SECTlON 1020

SPECIAL PROJECT PROCEDURES

1.01 WORK INCLUDED

The Contractor shall furnish all labor, equipment, materials and means necessary to provide and maintain facilities required by the engineer and regulatory agencies for the project. The cost for all equipment and services provided under this section shall be included in the lump sum prices bid and no additional payments will be considered by the Owner.

2.01 ENGINEER’S FIELD OFFICE (NOT IN CONTRACT)

2.02 PHOTOGRAPHS

The Contractor is to refer to the appropriate section of the Information for Bidders for requirements on monthly progress photographs.

2.03 PROJECT SIGN (NOT IN CONTRACT)

3.01 EMERGENCY TELEPHONE

The Contractor is to maintain telephones at all (times after regular working hours, including weekends and holidays, where he or his representatives can be reached on an emergency basis. The Contractor or his/her representatives are to be prepared to act to correct conditions on the site deemed to constitute an emergency by either the Owner, his agent, the Engineer, or local authority, but he/she is not to wait for instructions before proceeding to properly protect both life and property. If a condition on the site requires attention after working hours, either the Owner, agent, Engineer, or local authority may call the Contractor or his/her representatives at the emergency telephone number, identify himself/herself and describe the emergency condition. The Contractor is expected to dispatch workers and equipment to adequately institute corrective measures within two (2) hours. If, for some reason, the Contractor or his/her agent cannot be reached at the emergency number after a reasonable time (½ -hour), the Owner will have the right to immediately initiate corrective measures in accordance with the Article which follows, covering Emergency Services to Correct Hazardous Conditions, and the Contractor will be considered to have waived any right to perform emergency service.

3.02 EMERGENCY SERVICES TO CORRECT HAZARDOUS CONDITIONS

In the event that the Contractor fails to maintain safe job conditions or traffic conditions, including, but not limited to, trench settlement and hazardous piling or storage of backfill or construction materials, the

SPECIAL PROJECT PROCEDURES 1020-2

Owner, after failure of the Contractor to commence substantial steps at the job site to rectify the situation within two (2) hours of the time the contractor has been notified, pursuant to the preceding paragraph, of the unsafe conditions, may hire guards, take such precautions, make such repairs and take any other steps which the Owner or the Owner's agent, in its discretion, considers necessary to protect the property, persons, or the Owner. The cost of any of these precautions, guards, or steps will be deducted from the payments due the Contractor, and the Contractor will be billed for these services, work, and materials at prevailing rates.

3.03 NOTIFICATION TO UTILITY COMPANIES AND OWNERS OF BURIED PIPELINES

The Contractor is to comply with all provisions of the “Underground Facility Protection Act” (Public Law 1994, Chapter 118). The Contractor is to give notice at least three (3) business days and not more than ten (10) business days prior to the start of any work in the vicinity of existing utilities or appurtenances to the Garden State Underground Plant Location Service (N.J. One-Call System at 1-800-272-1000). The Engineer is to be furnished, in writing, with the date such notice was given and the Garden State Underground Plant Location Service “Markout Confirmation Number”, prior to the start of any work. In addition, it is the responsibility of the Contractor to notify the Owner of any utility which is not a member of the “N.J. One-Call System”.

3.04 WORK IN BAD WEATHER

During freezing, stormy, or inclement weather, no work is to be done except such as can be done satisfactorily and in a manner to secure first-class construction throughout.

When required, protection is to be provided by use of tarpaulins, wood and building paper shelters, or other acceptable means.

During cold weather, materials are to be preheated, if required, and the materials and adjacent structure into which they are to be incorporated are to be made and kept sufficiently warm so that a proper bond will take place and a proper curing, aging, or drying will result. Protected spaces are to be artificially heated by approved means which will result in a moist or dry atmosphere according to the requirements of the work being protected. Ingredients for concrete and mortar are to be sufficiently heated so that the mixture will be warm throughout when used.

The Contractor shall also take measures to prevent run-off from entering the work area.

3.05 EXPLOSIVES

Explosives are not to be stored at the site of the Project. If explosives are required, their use may be permitted after discussions with the Owner in consultation with the Engineer and written permission from the Owner and authorities having jurisdiction, and only under the supervision of competent licensed blasters.

COORDINATION 1030-1

SECTION 1030

COORDINATION

The review and coordination of shop drawings, actual execution of the work, and testing between general construction work, equipment and piping installation, pertinent instrumentation and electrical work is the responsibility of the Contractor.

The Engineer will check each shop drawing submitted to determine whether it complies with the intent of the Contract Documents and the design. This same requirement is placed on the Contractor and his/her supplier.

It is the intention of the Contract Documents to place various materials of construction and related requirements in their proper place both on the Drawings and in the specifications. However, no guarantee is made that such locations are, in every instance, where the Contractor might expect to find them.

The Contractor is required to provide, or make available, all of the Contract Documents to each vendor and subcontractor, both prior to bid to ensure proper Proposals, and during construction to ensure compliance with the intent of the Contract Documents. This is the sole responsibility of the Contractor.

The Engineer is not responsible for project coordination between various subcontractors, which is the responsibility of the Contractor. The Engineer will observe, by attendance at regularly scheduled job meetings, the orderly flow and progress of the work. The various subcontractors and those people responsible to them are required to interact with each other to ensure that the work progresses in an orderly fashion and without exceeding the time allotted in the Contract.

The Contractor is to refer to the appropriate section of the Contract Documents which defines the limitations of the Engineer’s responsibilities.

The Contractor is responsible for reading all the Specifications and following the various Contract Drawings. His/Her review of all the Contract Documents as well as shop drawings, coordination drawings and other information required to complete the project is his sole responsibility. He/She is to request clarification on any matters where ambiguities might exist, in order to receive instruction as to the proper documents to follow.

All products or materials which require the selection of color finishes are to be submitted early and with sufficient lead time to permit the Owner or his Engineer or Architect to develop an overall color coordination system for use by the Contractor in the final installation. Delays in submitting such product or material samples or color charts at one time may delay the selection process and prevent the Contractor from granting suppliers final releases for fabrication.

PART2: PRODUCTS

COORDINATION 1030-2

3.01 WORKING HOURS

The Contractor should generally limit construction operations and activities between the hours of 7:00 AM to 6:00 PM unless stricter limitations are established by law. No pile driving, pulling or other noisy operations, or operations entailing the use of vibratory hammers or compactors will be permitted, other than between the hours of 7:30 AM to 6:00 PM. The Contractor must also abide by the provisions of the Article of the contract entitled, “Night, Weekend & Holiday Work”.

The Contractor must also have all work completed (including backfilling, plating, and cleanup) on all roads, not closed by temporary detour, by 6:00 PM each afternoon. This requirement will be strictly enforced by the Borough of Rockleigh Police Department, and the Contactor shall include any hardship anticipated in his bid items.

FIELD ENGINEERING 1040 -1

SECTION 1040

FIELD ENGINEERING

1.01 METHOD OF CONSTRUCTION

Before starting the work, and from time to time during its progress as the Engineer may request, the Contractor is to outline to the Engineer the methods he plans to use in performing the work and the various steps he intends to take.

1.02 ADDITIONAL INSTRUCTIONS AND DETAIL DRAWINGS

The Engineer may furnish the Contractor with additional instructions and detailed drawings as may, in the opinion of the Engineer, be required to clarify the work included in the Contract. The additional drawings and instructions, thus supplied to the Contractor, will be coordinated with the Contract Documents and will be so prepared that they can be reasonably interpreted as a part thereof. The Contractor is to carry out the work in accordance with any additional detailed drawings and instructions. Additional instructions and detailed drawings are not to be considered extra work.

1.03 PIPE LOCATION

All new pipe lines are to be located substantially as indicated on the drawings, but the right is reserved to make such modifications in their location as may be found desirable to avoid interference with existing structures or for other sound reasons. Where fittings or accessories are noted on the drawings, such notation is for the Contractor’s convenience and does not relieve him/her from laying and joining different or additional fittings where required to place pipe in proper position, without additional compensation.

Where existing underground utilities are encountered which were not anticipated or indicated, the Contractor is to request from the Engineer such instructions as may be necessary to properly install new piping in order to eliminate the interference.

1.04 CHANGES IN DESIGN

If, during construction, it is found expedient by the Contractor to modify or change the design of any part of the facility, including the equipment or any part thereof, completely detailed and checked working drawings showing the proposed changes are to be submitted to the Engineer for his/her review. Any permitted modification or change of design as set forth above is to be at the sole discretion of the Engineer. Approval of such changes does not release the Contractor from his obligation or guarantees, nor are any of the conditions of the Contract abrogated thereby. Any additional costs, including redesign costs to this Contract resulting from these changes, are to be borne by the Contractor. The Contractor is further to note the Contract Article entitled “Changes”.

FIELD ENGINEERING 1040 -2

REGULATIONS 1050-1

SECTION 1050

REGULATIONS

All work under this Contract is to comply with all applicable requirements of Federal, State, and local statutes, regulations, and codes, and especially the safety provisions contained therein.

Certain work to be done within the scope of this Contract may be required to meet the specification of persons, municipalities, or bodies other than the Owner. The Contractor is to be responsible for obtaining the approval and acceptance of his completed work by such persons, municipalities, counties, and similar bodies. Such work may include but is not to be restricted to installation of sidewalks, curbs, pavement, or utilities; plumbing, electrical, and building construction work or other incidental work required to complete the Contract.

PART 2: PRODUCTS

3.01 ENVIRONMENTAL PROTECTION

The Contractor is to minimize environmental impact due to his construction operations during all phases of his/her work. This shall include, but is not limited to, prohibition of the following construction procedures.

1. Dumping of spoiled material into any stream corridor, any wetlands, any vernal habitats, any surface waters, any sites listed or eligible for listing on the New Jersey or National Registers of Historic Places or any unspecified locations.

2. Indiscriminate, arbitrary, or capricious operation of equipment in any stream corridors, wetlands, vernal habitats, or surface waters.

3. Pumping of silt-laden water from trenches or other excavations into surface waters, stream corridors, wetlands or vernal habitats.

4. Damaging vegetation adjacent to or outside of the access road or the right of way.

5. Disposal of trees, brush, and other debris in any stream corridors, wetlands, vernal habitats, surface waters, or at unspecified locations.

6. Permanent or unspecified alteration of any flow line of any stream.

7. Open burning of project debris.

REGULATIONS 1050-2

8. Use of calcium chloride, petroleum products, or other chemicals for dust control.

9. Use of asphaltic mulch binder.

10. Any unpermitted discharge of sewage.

11. Discharge of test waters with high chemical disinfectant or other pollutant concentrations.

The Contractor shall protect, to the dripline, all trees not designated by the Engineer to be removed.

The Contractor is directed to the appropriate sections of the Specifications for additional information regarding environmental work and protection.

3.02 LABOR, SAFETY, HEALTH AND SECURITY REGULATIONS

The Contractor is to refer to the appropriate portions of Information for Bidders regarding Labor, Safety, Health, and Security Regulations.

The Contractor is to provide adequate signs, barricades, red lights and uniformed guards and take all necessary precautions for the protection of the workers, the work and the safety of the public. All traffic control shall be in accordance with the requirements of the latest edition of the USDOT “Manual of Uniform Traffic Control Devices”. All barricades and obstructions are to be protected at night by suitable signal lights which are to be lit from sunset to sunrise. Barricades are to be of substantial construction and painted such as to increase their visibility at night. Suitable warning signs are to be placed and illuminated at night as to show in advance where construction, barricades or detours exist.

The Contractor is to keep on proper lights each night between the hours of sunset and sunrise at and upon all portions of his work; upon all sites in connection with the work, when required by law or regulations, or when deemed necessary by the Owner or by the proper authorities, or when required by the liability insurance coverers, and is to be solely responsible for all injuries and damages resulting from neglect or failure to comply with the provisions of the Contract in this respect. Night lighting must be sized, concentrated, and located so as to cast sufficient illumination around new construction and excavations.

All excavations and obstructions must be properly marked, lighted, and provided with railing and other guards.

The Contractor is to maintain sufficient guards by day and night to prevent accidents of any kind or character whatsoever and will be solely liable for any damage which may arise from any negligence on his/her part or that of his/her agents and employees.

If, at any time, in the opinion of the Owner or the Engineer, the work is not properly lighted, barricaded, and in all respects safe in respect to public travel, persons on or about the work, or public or private property, the Owner and the Engineer will have the right, but not the obligation, to order such safeguards to be erected and such precautions to be taken as he deems advisable, and the Contractor is to promptly comply with such orders. If, under such circumstances, the Contractor does not or cannot immediately put the same into proper and approved condition or if the Contractor or his representative is not upon the grounds so that he/she can be immediately notified of this insufficiency of safety precautions in accordance with the procedures for notification of the Contractor specified under “Emergency Telephone”, then the Owner may put the work into such a condition that it shall be, in his opinion, safe

REGULATIONS 1050-3

and the Contractor is to pay all expenses of such labor and materials as may have been used for this purpose by him/her or by the Owner. Such action of the Owner and/or Engineer, or their failure to take such action, will in no way relieve the Contractor of the entire responsibility for any cost, loss, or damage by any party sustained on account of the insufficiency of the safety precautions taken by the Contractor or by the Owner acting under authority of this Section.

3.03 SANITATION

Sanitary conveniences, properly screened from public observation, for the use of all persons employed on the work and beginning with the first persons engaged in preliminary operations, are to be provided and maintained by the Contractor in sufficient numbers, in such a manner and at such locations as will be approved. Sanitary facilities are to be completely self-contained, chemically treated, and regularly serviced.

3.04 SALES TAX EXEMPTION

The Contractor is to refer to the Information for Bidders regarding sales tax exemptions.

3.05 FIRE SAFETY

The Contractor is held responsible and is to maintain conditions which promote fire safety in his/her operations at all times. Materials which could constitute a fire hazard such as gasoline, paints, sealants, grouts, wood, and paper products are to be safely stored.

ALTERNATES 1060-1

SECTION 1060

ALTERNATES

The Contractor is to refer to the appropriate section of the Information for Bidders regarding the substitution of alternate materials and equipment.

PART 2: PRODUCTS

MEASUREMENT AND PAYMENT 1070-1

SECTION 1070

MEASUREMENT AND PAYMENT

For the estimating of quantities in which the computation of areas by geometric method would be comparatively laborious, it is stipulated and agreed that the planimeter may be considered an instrument of precision adapted by the measurement of such areas.

It is further stipulated and agreed that the computation of the volume of prismoids is to be by the method of average end areas.

PART 2: PRODUCTS

Not Used

PART 3: WORK INCLUDED

PROJECT MEETINGS 1080-1

SECTION 1080

PROJECT MEETINGS

1.01 PRECONSTRUCTION CONFERENCES

The Contractor shall refer to Information for Bidders, paragraph “Preconstruction and Construction Conferences” for information regarding preconstruction conferences.

1.02 JOB MEETINGS

The Engineer may schedule regular job meetings during the life of the Contract. The time and location of meetings is to be set by the Engineer. The Contractor, unless otherwise notified by the Engineer, is to have authorized representatives attend each meeting. Additional meetings may be called as progress of work on the project requires.

The purpose of these meetings is for maintaining communication between the Owner, Engineer, and Contractor, including the Contractor’s subcontractors and suppliers. The meetings are to be used to coordinate various parts of the work, update construction schedules, prepare progress estimates and respond to questions which may be raised by the various participants.

Attendants at job meetings shall include the Owner, Engineer, and his subconsultants, the Contractor and subcontractors (as may be required or specifically requested by the Owner/Engineer).

SUBMITTALS 1090-1

SECTION 1090

SUBMITTALS

This section covers a variety of different types of documents, drawings, and material which the Contractor is to provide to the Engineer or Owner for his approval, information, or use. Submittals will include, but not be limited to: bonds, bid price breakdown, construction schedule, shop drawing list and schedule, shop drawings, samples, color charts, operating and maintenance manuals, parts lists, spare parts, and materials, special tools, and guarantees.

These items are to be submitted as specified in this Division and other Divisions of the Specifications, in the proper quantities, and in a timely manner.

1.02 SUBMITTALS

A) Shop, Coordination, Setting and Installation Drawings and Samples

The Contractor shall promptly submit to the Engineer, one (1) reproducible and seven (7) copies of detailed shop drawings, guaranteed test curves, and manufacturer’s specifications for all equipment, tools and furnishings to be supplied under this Contract. Detailed shop drawings shall be submitted for items such as piping, ducts, miscellaneous metals, reinforced plastics, structural steel, reinforcing steel, mechanical equipment, fabricated items, electrical components, instrumentation, and other work, whether or not mentioned in this section.

The Contractor shall submit these data with such promptness as to avoid delay in the work. In no case shall shop drawings be submitted later than 10 days after Contract signing. Mechanical items, electrical items, instrumentation, reinforcing steel, and other items requiring long lead times and extensive review time shall be submitted first. Items requiring a lesser degree of lead time or review time may be submitted toward the end of this 10 day period. In order for the Contractor to be deemed to have fulfilled this requirement, his individual submissions must be complete in every respect so that a logical and orderly review might follow. Piecemeal submissions are not acceptable. Final submissions for approval must be complete in all respects.

When dimensions are of particular importance, the drawing must be certified by the manufacturer as correct for this project.

The Engineer will review submitted data within a reasonable time after receipt of such data considering the complexity and completeness of such submissions. He/She shall determine at his/her sole discretion whether the data submitted are sufficient to render a decision. Resubmission of drawings by the Contractor for the Engineer’s approval must be completed within thirty (30) days of the return of the previous submission by the Engineer, unless the Engineer specifically agrees to the contrary.

No materials, equipment or specialties are to be purchased, fabricated, or released until the Engineer has approved the shop or working drawings as conforming to the contract requirements. All materials and work involved in the construction shall then be as represented by such drawings.

SUBMITTALS 1090-2

Shop drawings are to be not smaller in size than 8-½” x 11” nor larger than 30” x 42“. Reproductions of the Engineer’s drawings will not be acceptable as shop drawings. Before submitting shop drawings, the Contractor must check and sign all drawings, noting thereon any deviation from the Contract Drawings and Specifications.

One (1) reproducible and seven (7) copies of shop drawings, test curves, or other material are to be submitted for approval. Following his/her review, the Engineer will return two (2) copies to the Contractor. If shop drawings are checked “Amend and Resubmit” by the Engineer, the Contractor must resubmit one (1) reproducible and six (6) copies of the revised shop drawings, of which two (2) will be returned to the Contractor by the Engineer.

The Contractor is to be responsible for furnishing subcontractors with approved shop drawings as required. No shop drawings are to be used for construction, ordering, fabrication, or other reasons unless marked “No Exceptions Taken” or “Make Corrections Noted” by the Engineer. Should the Contractor desire more than two (2) copies of approved shop drawings, he/she is to submit one (1) additional reproducible drawing, identical to that approved by the Engineer, to the Engineer. The Engineer will then mark this additional reproducible drawing and return it to the Contractor for his use.

The Contractor is to note the difference in action expected by the Engineer with regard to Engineer required drawings such as shop, coordination and installation drawings, and those which are presented by the Contractor, by his own choice, and for his convenience. Engineer required drawings are to be construed as those which define shop systems work, parts drawings, fabrication drawings, test reports, certifications, and manufacturer’s installation requirements. These will be reviewed and stamped appropriately by the Engineer after detailed review.

Contractor’s coordination and/or installation drawings which are presented at his option are to be construed as those which assist the Contractor in his/her orderly execution of the work. Such drawings will be reviewed by the Engineer only as a convenience afforded the Contractor and shall not be stamped by the Engineer.

All Engineer required drawings are to be stamped by the Contractor certifying his review and approval thereof. The stamp is to bear the following information:

APPROVED FOR CONTRACT REQUIREMENTS

The Contractor’s signature below indicates that he has checked the drawing with the Contract Drawings and Specifications and found it to meet all requirements of same including dimensions, and that the Contractor’s guarantee fully applies to the specified material or equipment.

RE: Specification Section Page No. _____Paragraph No. __

Drawing Sheet________ By:

Signature/Contractor

Approval of any shop drawings, manufacturer’s specifications, or other material by the Engineer does not relieve the Contractor of the responsibility for:

a) Errors of any sort in shop or setting drawings or schedules.

SUBMITTALS 1090-3

b) Deviations from Contract Drawings or Specifications unless the Contractor has given written notice to the Engineer of any such deviations at the time of submission.

c) Responsibility for proper performance of his work.

d) Coordination with other trades.

e) Safety and security on the job site.

Data must include dimensions, detailed drawings, and manufacturer’s specifications for all items. Specific data required are set forth under the various Specifications items, but in general, are to include characteristics and efficiency curves for all motors and pumps, as well as weights of equipment to be delivered.

When required by the specifications, the Contractor is to furnish duplicate samples of materials, finishes or other items proposed to be used in the work. All materials, finishes and workmanship incorporated in the work are to be similar and equal to the approved samples. The Engineer shall retain such samples until final acceptance of the project and return only those samples specifically requested.

The Contractor is to prepare and submit to the Engineer for approval, a schedule fixing the respective dates for the submission of shop or setting drawings; the beginning of manufacture, testing and installation of materials, supplies and equipment; and the completion of the various parts of the work.

Such schedules will be subject to change from time to time in accordance with the progress of the work.

Major emphasis will be placed on the submission of the shop drawing schedule which is to include submittal dates, time of starting manufacture, time of testing at place of manufacture where applicable, and date of delivery.

B) Operating and Maintenance Instructions (Not in Contract)

C) Electronic O&M Manual Requirements (Not in Contract)

D) Coordination/Composite Drawings (Not in Contract)

E) Payment Schedule and Cost Breakdown

Prior to contract signing, the Contractor is to have submitted and received approval on a cost breakdown which may be used in preparing the monthly requisition for payment. The breakdown is to be in sufficient detail to facilitate a meaningful and fair estimate of work in place as evaluated by the Engineer. Any unrealistic breakdown of work which is anticipated early in the construction period may be cause for rejection of the breakdown and require resubmittal prior to contract signing.

The cost breakdown is to define costs associated with individual subcontracts by key elements.

SUBMITTALS 1090-4

2.01 SPECIAL TOOLS

The Contractor is to furnish with each equipment item furnished, all special tools required and recommended by the manufacturer. This requirement is in no way intended to cover the furnishing of readily available tools for mechanical work.

2.02 PACKING

All equipment requiring packing is to be furnished newly packed with the packing recommended by the manufacturer of the equipment. The Contractor is to furnish six (6) copies of a schedule listing the type and manufacturer of the packing recommended for each piece of equipment. He is also to furnish sufficient packing to repack each piece of equipment once, or as otherwise specified.

2.03 LUBRICATION

The Contractor is to furnish and use, for each piece of equipment, the type of oil and grease recommended by the manufacturer of the equipment. He/She is to furnish six (6) copies of a schedule listing the type, frequency of application, and manufacturer of the oil and grease recommended for each piece of equipment. At the time of turning the installation over to the Owner, the Contractor is to furnish sufficient quantities of lubricants to cover the period of start-up from regular break-in to the first oil change and time to reorder after takeover by the Owner.

3.01 CERTIFIED TEST REPORTS (Not in Contract)

3.02 RECORD DRAWINGS

The Contractor is to keep accurate records of all deviations of his work from that shown on the Drawings, and indicate the actual construction with colored lines on a set of white drawings.

During the course of construction, the Engineer reserves the right to examine the Contractor’s record drawings to ascertain whether adequate effort is being afforded to the record drawings.

The Contractor’s failure to properly maintain accurate record drawings may result, at the option of the Owner, in sufficient monies being retained from the Contractor’s progress pay estimates to cover the costs of maintaining proper records.

After completion of the project, the Contractor is to turn over to the Engineer one (1) set of white drawings indicating thereon a complete record of any changes or revisions which exist in the completed work.

These drawings are to be used to assist and supplement the Engineer in his preparation of “Record Drawings”.

QUALITY CONTROL 1100-1

SECTION 1100

QUALITY CONTROL

1.01 CONFORMANCE TO DRAWINGS AND SPECI FICATI ONS

All work is to conform during its progress and upon its completion truly to the lines, levels and grades indicated on the Drawings or given by the Engineer and is to be built in a thoroughly substantial and workmanlike manner, in accordance with the Drawings, Specifications, and directions given from time to time by him/her. In no case will any work in excess of Drawing requirements and Specifications be paid for, unless ordered in writing by said Engineer.

1.02 LINES, GRADES AND MEASUREMENTS

The controlling bench marks and field ties as shown on the drawings are to be used by the Contractor, who is to provide at his own expense such stakes, batter boards, forms, materials and labor as may be required. Additional batter boards, lines, grades and forms may be furnished and set by the Contractor if so desired.

The Con tractor is to adequately protect all monuments, stakes and marks set by the Engineer. If they are disturbed or obliterated during the progress of the work, or otherwise they will be replaced by the Engineer at the Contractor’s expense. After the Contractor has erected batter boards or forms, and set elevations for the structures, the Engineer is to be afforded the opportunity to check such work for alignment, grade and location of steel, piping, or equipment.

1.03 DIMENSIONS OF EXISTING STRUCTURES

The Contractor is to verify in the field, the dimensions, the type of material, and locations of existing structures, where an error or incomplete information relative to the location or dimension of existing structures would affect the construction to be done under this Contract. The Contractor is to verify such dimensions and locations before continuing with the construction work to the point where it would be affected.

1.04 DATUM

All elevations shown on the Drawings or used in the Specifications are expressed in feet above the North American Vertical Datum of 1988 (NAVD88), unless otherwise noted.

1.05 STANDARD SPECIFICATIONS

All standard specifications referred to herein, such as NJDOT, ANSI, ASTM, AWWA, and the like, unless otherwise noted are to be the latest revision thereof, at the time of bidding.

1.06 SERVICES OF TESTING LABORATORIES AND SPECIAL CONSULTANTS

The Owner may retain and, except as otherwise specified, pay for the services of an independent testing laboratory to do such sampling and to make such tests as the Owner or Engineer may deem necessary to

QUALITY CONTROL 1100-2

verify that the materials and equipment proposed for or incorporated into the work conform to the requirements of the Contract Documents. Payment for such testing will be provided in the Article of the contract entitled, “Examination of Work and Testing”.

3.01 WATERTIGHTNESS

The attention of the Contractor is called to the specific requirements of this Contract whereby the most rigid supervision will be required to ensure an absolute minimum of leakage or infiltration in the case of liquid conveying or liquid containing structures.

In general, all structures and all pipe and appurtenant structures are to be of watertight construction. Any leakage is to be repaired in accordance with the appropriate sections of the Specifications.

The Contractor is to provide, maintain and operate suitable and adequate dewatering equipment to insure satisfactory construction and maximum progress.

In certain instances, dewatering permits may be required by regulatory agencies. The Owner shall obtain such permits from the New Jersey Department of Environmental Protection.

3.02 CLEAN-UP

During the course of construction all efforts must be made to maintain a neat and orderly project. Clean-up is to be pursued on a regular basis and in conjunction with the construction. The Contractor is to be responsible for clean-up during the life of this Contract with the full cooperation of all subcontractors.

Upon completion of all construction, final clean-up is to include removal of all excess materials, equipment, backfill, etc., and the site is to be restored to a condition equal to or better than that existing prior to construction. Should the Contractor fail to remove such material, equipment and supplies, the Owner has the right to remove them at the expense of the Contractor.

At the completion of construction, the Contractor must tear down and remove all temporary structures unless expressly directed otherwise and remove remaining rubbish of all kinds from all Contract structures, and from the site occupied during the progress of the work. The Contractor is to remove all concrete and ballast droppings, excess grout, sealant, etc. and leave the site and the adjacent property that may have been affected by his operations in a neat and satisfactory condition. All structures and parts thereof constructed by the Contractor are to be thoroughly cleaned and left in first-class condition.

CONSTRUCTION FACILITIES AND TEMPORARY UTILITIES 1110-1

SECTION 1110

CONSTRUCTION FACILITIES AND TEMPORARY UTILITIES

1.01 MAINTENANCE OF STRUCTURES UTILITIES, AND NATURAL OR MAN-MADE

SURROUNDINGS

All existing utilities and/or process systems are to be kept in operation at all times during construction operations unless prior arrangements have been made to provide alternative service.

From the commencement of work, the Contractor is to be solely responsible for the care of the work during its progress for materials delivered and intended to be used, and for the protection to existing structures and trees or shrubs on or adjacent to the site of the work. Any injury or damage to the same is to be made good at the Contractor’s expense.

If any bypassing or disruption to plant operations inadvertently occurs or is anticipated, the Contractor shall immediately notify the Engineer, Owner, and NJDEP.

1.02 OCCUPYING PRIVATE LAND

The Contractor is not to enter or occupy with workers, tools, materials, or equipment, any land outside the easements or property of the Owner, unless written consent from said private property owner has been given to the Contractor and a copy of the consent provided to the Owner beforehand.

1.03 EXISTING CONSTRUCTION AND FACILITIES

When new construction is adjacent to or crosses streets or utilities under the jurisdiction of State, County, City or other public agency, public utility or private entity, the Contractor must secure written permission from the proper authority before executing such new construction. A copy of this written permission must be filed with the Owner before any work is done. The Contractor is to replace or repair all existing construction damaged in the execution of this contract. The Contractor will be required to furnish a release from the proper authority before final acceptance of the work.

1.04 PUBLIC CONVENIENCE

The Contractor is at all times to conduct his/her work so as to insure the least possible obstruction to traffic and inconvenience to the general public and residents in the vicinity of the work, and to insure the protection of persons and property. No road or street is to be closed to the public except with the permission of the proper authorities.

Fire hydrants on or adjacent to the work are to be kept accessible to fire-fighting equipment at all times.

Temporary provisions are to be made by the Contractor to ensure the use of sidewalks and the proper functioning of all gutters, sewer inlets, drainage ditches, and irrigation ditches, which are not to be obstructed.

CONSTRUCTION FACILITIES AND TEMPORARY UTILITIES 1110-2

The Contractor is solely responsible for satisfactorily maintaining flows in the existing utilities, affected by the work, at all times during the course of construction, unless otherwise indicated in the Contract Documents. All costs for such maintenance is deemed to be included under the price bid and no additional costs are to be paid by the Owner for any work involved in this maintenance.

The Contractor is to review his construction schedule with the Township Engineer and the Police Department with respect to interruption of traffic and revise it accordingly if the Township Engineer or the Police Department so requires.

1.05 TEMPORARY UTILITIES

The Contractor is to make all necessary arrangements for temporary utilities required or herein specified.

No specific payment will be made for the costs of such utilities, but the costs thereof are to be included in the various unit prices bid for the work. Upon completion of the work, the temporary utilities are to be removed.

a) Telephone: The Contractor is to provide a job site telephone or use public pay phones at no charge to the Owner.

b) Electric: The Contractor shall provide temporary electricity for himself and his subcontractors.

c) Water: The Contractor may be allowed to use Township water for temporary water required during construction. The Contractor shall obtain written permission from the Owner for use of any hydrants for this project, prior to their use. (A copy of this letter shall be sent to the Engineer.) The cost of temporary utilities is to be borne by the Contractor and included in the various unit prices bid.

MATERIAL AND EQUIPMENT 1120-1

SECTION 1120

MATERIAL AND EQUIPMENT

PART 1: GENERAL

1.01 CONSTRUCTION EQUIPMENT

Bidders are to familiarize themselves thoroughly with the type and nature of the equipment required in the proper execution of the work and are to use and employ only first-class equipment. Previously used equipment must be in safe, first-class working order, and condition. Sufficient equipment must be furnished and used by the contractor to permit the completion of the work within the time specified. The equipment used on any portion of the work is to be such that no injury or damage to the streets, adjacent property, or utilities will result from its use.

2.01 MATERIALS

Unless otherwise indicated on the Drawings or specified, only new materials are to be incorporated into the work. All materials furnished by the Contractor to be incorporated into the work may be subjected to the inspection and approval of the Engineer. No material is to be processed, fabricated, or delivered to the work site without the prior approval of the Engineer, except at the risk of the Contractor.

As soon as possible after the Contract has been executed, the Contractor is to submit, to the Engineer, data relating to materials he/she proposes to furnish for the work. Such data are to be in sufficient detail to enable the Engineer to identify the particular product in question and to form an opinion as to its conformity to the Contract requirements.

Facilities and labor for the handling and inspection of all materials are to be furnished by the Contractor.

Defective materials must immediately be removed from the site of the work.

If the Engineer so requires, either prior to beginning, or during the progress of the work, the Contractor is to submit samples of materials for such specific tests as may be necessary to demonstrate that the materials conform to the Specifications. Such samples are to be furnished, taken, stored, packed, and shipped as directed, at the expense of the Contractor. Except as otherwise noted, the Owner will make arrangements for and pay for tests.

All samples are to be packed so as to reach their destination in good condition and are to be so labeled as to indicate the materials represented, the name of the building or work and location for which the material is intended, and the name of the Contractor submitting the sample. To ensure consideration of samples, the Contractor is to notify the Engineer by letter that the samples have been shipped and is to properly describe the samples in the letter. In no case is the letter of notification to be enclosed with the samples.

The Contractor is to submit data and samples, or place his orders, sufficiently early to permit consideration, inspection, testing, and approval before the materials are necessary for incorporation in the work. Any delay resulting from his failure to do so is not to be used as the basis of a claim against the Owner or the Engineer.

MATERIAL AND EQUIPMENT 1120-2

When required, the Contractor is to furnish to the Engineer, in quadruplicate, sworn copies of manufacturer’s shop or mill tests, or reports from independent testing laboratories relative to material data.

In accordance with the “Buy American” provision in Public Law 95-217 (Section 215 of the Public Law 92- 500 as amended) and implementing EPA regulations and guidelines, N.J. Public Contracts Law 40A:11- 18, and the Contractor agrees that preference will be given to domestic construction material by the Contractor, subcontractor, material suppliers, and equipment suppliers in the performance of this contract.

The Contractor is to certify that the purchased products and materials are in accordance with the above referenced “Buy American” clause and, in addition, is to provide all information required to justify the use of any foreign made product.

3.01 CUTTING AND PATCHING

The Contractor is to do all necessary cutting and patching of the work that may be required to properly receive the work of the various trades or as may be required by the Drawings and Specifications to complete the structures. He/She is to restore all such cut or patched work to a condition which receives the approval of the Engineer. Cutting of structures that may endanger the work, adjacent property, workers or the public is not to be done.

3.02 DELIVERY AND STORAGE

The Contractor is to deliver equipment and materials to the site and store them in original containers suitably sheltered from the elements, but readily accessible for inspection until installed. He/She is to store all items subject to moisture damage (such as controls and electrical equipment) in dry, heated spaces. All excavated materials, construction equipment and materials to be incorporated in the new work are to be so placed as not to damage the work and so placed that free access may be had at any time to all parts of the work and to all public utility installations in the vicinity of the work. If insufficient area is available, the Contractor is to provide off-site areas at his own expense. Materials are to be kept neatly piled and compacted and conveniently stored so as to inconvenience, as little as possible, public travel and adjoining tenants.

3.03 SERVICE OF MANUFACTURER’S REPRESENTATIVES

The Contractor is to provide the services of a skilled and experienced representative of each manufacturer supplying equipment under this Contract, for such periods as, are satisfactory to the Engineer, are essential for the proper and satisfactory installation and testing of the equipment, and training of the Owner’s personnel in its use. In certain instances, particular specification sections may indicate the minimum number of visits and/or hours required to comply with the intent of the specifications regarding services of manufacturer’s representatives.