26-0047-UT_Rehab_of_LS_13_51_and_58_IFB_Drawings_6_23_2026.pdf
PDF 48 MB Posted
- Attached to
- Rehabilitation of Lift Station 13, 51, and 58
- Solicitation number
- 26-0047-UT
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This is a drawing set for an Invitation for Bid (IFB) issued by the State of Florida for the rehabilitation of three lift stations (LS 13, 51, and 58) in wastewater infrastructure. The project encompasses comprehensive upgrades to multiple lift station facilities with distinct scope requirements for each location. Lift Station 13 requires installation of wet well and valve vault structures, access hatches, magnetic flow meter, natural gas generator with foundation, electrical work, instrumentation integration, site work including gravity sewer relocation, natural gas coordination with Clearwater Gas (CGS Energy), and surface restoration. Lift Station 51 involves installation of wet well components, safety grates, magnetic flow meter, natural gas generator, electrical and instrumentation work, water service relocation, fence and gate installation, and tree management. Lift Station 58 requires pump base components, discharge piping, wet well infrastructure, bollards, instrumentation, odor control media replacement, flow control systems, and bypass connection testing. All three stations include site work, surface restoration, start-up and testing procedures, and fixed project signage as specified in the contract documents. The drawings are dated June 23, 2026, and serve as the technical basis for contractor bid preparation and project execution.
The drawing set functions as the primary technical and design documentation that contractors must reference when preparing bids and executing work under the IFB. These drawings establish the specific construction standards, equipment specifications, spatial configurations, and technical requirements for all work at the three lift station locations. Contractors are required to coordinate with Clearwater Gas (CGS Energy) for natural gas services and maintain continuous wastewater flow operations throughout construction phases at all three facilities. The project includes provisions for temporary electrical systems during construction and permanent electrical integration upon completion, along with comprehensive instrumentation and SCADA integration requirements to ensure operational readiness of all three rehabilitated lift stations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .