25QB083 PWS J Hangar Compressor Sys REV1.docx

DOCX document 18 KB Posted

Attached to
Compressor for Compressor for Utility Air and Breathing Systemfor Utility Air and Breathing Systemty Air and Breathing System
Solicitation number
25QB083
Issued by

About this file

This Performance Work Statement (PWS) details the procurement of an air compressor system for Patrick Space Force Base Hangar, aimed at supporting mission-critical operations with a reliable compressed utility and breathing air solution. The requirement includes multiple air compressor units with specific technical specifications: a 100 HP QGV Rotary Air Compressor capable of 466.6 ACFM at 125 PSIG, a 10 HP QOF-10 Oil-Free Scroll Compressor with ISO 8573-1 Class 0 certification, and a 20 HP Reciprocating Air Compressor. Additional system components include a 400-gallon vertical air receiver tank, a 530 CFM compressed air dryer with a 39°F dew point, and a 700 CFM compressed air filter. The system will be delivered and installed at Patrick Space Force Base in Florida, with requirements for proper equipment mounting, electrical connections, and compliance with applicable building and base standards. The contractor must provide comprehensive documentation, including technical manuals, warranty documents, and ISO compliance certifications, with equipment warranties covering 10 years for air ends and 1 year for full unit installation.

View the file

Other files

File Type Posted
25QB083 Sources Sought Rev1.docx DOCX document
25QB083 Site Visit Rev1.docx DOCX document
25QB083 Sources Sought.docx DOCX document
25QB083 Site Visit.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Air Compressor System Procurement for Parick Space Force Base Hangar 24 June 25

1.0 Scope

The objective of this requirement is to furnish and deliver and install a complete air compressor system suitable for installation and operation. This system shall support mission-critical operations by providing a reliable source of compressed utility and breathing air.

2.0 Background

The hangar operations require a high-efficiency, low-maintenance compressed air solution to support various applications. The system shall include rotary air compressors, an air receiver tank, air dryer, and filtration components, all compliant with USAF standards and energy-efficient specifications.

3.0 Requirements

3.1 Equipment Specifications

The contractor shall provide equipment that meets or exceeds the following minimum requirements:

· QGV Rotary Air Compressor

· 100 HP

· Capacity: Minimum 466.6 ACFM at 125 PSIG

· TEFC motor, variable speed drive, 10-year air end warranty

· Sound level: Max 75 dB(A)

· QOF-10 Oil-Free Scroll Compressor

· 10 HP

· Max Pressure: 145 PSIG

· Capacity: Minimum 24.2 ACFM

· Integrated refrigerated dryer

· ISO 8573-1 Class 0 certified

· Reciprocating Air Compressor

· 20 HP

· 64 ACFM @ 175 PSIG

· Mounted on a 120-gallon tank

· ODP premium efficiency motor

· Air Receiver Tank

· Capacity: 400 gallons

· Max Pressure: 165 PSIG

· Vertical configuration

· Compressed Air Dryer

· Capacity: 530 CFM

· Dew Point: 39°F

· Zero-loss drain and diagnostic display

· Compressed Air Filter

· Capacity: 700 CFM

· Filtration Rating: 0.003 PPM

· ISO-compliant housing

3.2 Delivery and Installation

· Delivery shall be FOB destination to the designated USAF facility Patrick SFB, Florida.

· Installation will require the installation of concrete equipment pads designed and constructed in accordance with applicable building codes and PSFB Standards. All compressor-related equipment will be securely anchored to these pads using vibration isolation mounts, as necessary, to minimize noise and vibration transmission.

· Make power connections to existing power systems to include breakers/fused disconnect IAW NEC, building codes and PSFB Standards and must be performed by a qualified licensed electrician.

· Making connections to existing air distribution lines must maintain system integrity and efficiency, adhering to applicable building codes and PSFB Standards. The fresh air inlet and exhaust louvers must be inspected to ensure proper operation and compliance with applicable building codes and PSFB Standards, including verification of adequate airflow and proper sealing to prevent air leakage."

3.3 Documentation The contractor shall provide the following:

· Technical manuals and warranty documents

· Dimensional drawings and maintenance guidelines

· Certification of ISO compliance for oil-free compressor components

· Certification of the breathing air system in accordance with applicable codes and PSFB Standards

4.0 Place of Performance Delivery Address:

Patrick Space Force Base (920th Supply address)

5.0 Warranty

Equipment must include the manufacturer’s standard warranties, including a 10-year warranty and 1-year full unit warranty including installation, where applicable.

File details come from the government source that posted it. Updated .