25125 Drawings 20250805.pdf
PDF 13 MB Posted
- Solicitation number
- RFQ-171-250000000589-2
- Issued by
- Eaton County, Detroit City, Michigan
About this file
These are architectural and engineering design documents for the State of Michigan's Treasury Operations Center New HR Suite renovation project, located at 7285 Parsons Drive in Dimondale, Michigan. The project is being managed by the Department of Technology, Management and Budget (DTMB), Procurement and Real Estate Services Administration, Design and Construction Division. The design is by Hobbs + Black Associates, Inc., with mechanical and electrical engineering by Matrix Consulting Engineers, Inc. The project involves a comprehensive renovation of the HR suite, including mechanical, electrical, and architectural modifications. The design documents are dated for bidding on 08/04/2025, with detailed plans for demolition, new construction, HVAC systems, lighting, and power infrastructure.
The documents include detailed floor plans showing the reconfiguration of office spaces, with specific notes on mechanical systems, electrical zoning, lighting relocation, and power infrastructure. The renovation includes multiple office spaces, open office areas, and supporting rooms such as a mechanical room, electrical room, and break room. The design emphasizes flexible workspace configuration, with careful planning of HVAC diffusers, electrical outlets, and lighting zones. The mechanical plans show VAV (Variable Air Volume) terminal units with hydronic reheat capabilities, and the electrical plans detail lighting and power distribution, including provisions for furniture feeds and potential future modifications. The project appears to be funded through the State of Michigan's capital improvement or renovation budget, with a focus on modernizing and optimizing the workspace for the Treasury Operations Center's HR department.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MICHIGAN
Treasury Ops Center
New HR Suite
MECHANICAL & ELECTRICAL
MATRIX CONSULTING ENGINEERS, INC.
544 CHERBOURG DRIVE
LANSING, MI 48917
ARCHITECT OF RECORD
HOBBS + BLACK ASSOCIATES, INC.
117 E. ALLEGAN ST.
LANSING, MI 48933
PH: (517) 484-4870
7285 Parsons Drive Dimondale, MI 4821
HOBBS + BLACK PROJECT #: 25308
DTMB FILE #: 271/25125.GSA
GENERAL
G-000 TITLE SHEET AND SHEET INDEX
ARCHITECTURAL
A-010 1ST FLOOR CODE COMPLIANCE
A-100 1ST FLOOR PLAN
A-110 ENLARGED FLOOR PLAN
A-210 ENLARGED REFLECTED CEILING PLAN
INDEX OF DRAWINGS:
G -0
TI
TL
E
SH
EE
T A
N D
S H
EE
T
IN
D
EX
JB JM
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
ER
E I
S P
E N
I N
S U
L
AM
A M
OE
N
A M
PL
U
RI
B
U E
S U
N
UM
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
P
:\2
\2
S
O M
T re as ur y O ps C en te r N ew
H R S ui te
\5
-D ra w in gs \5
-C
D \Z
FS
H
TA
.d w g
D at e:
A ug
:5 am
La yo ut
G
-0 x2
Pl ot te d by jb ur tk a
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
MECHANICAL
M-100 MECHANICAL SYMBOLS, ABB., NOTES, AND SCHEDULES
M-300 ENLARGED FLOOR PLAN - MECHANICAL DEMOLITION
M-400 ENLARGED FLOOR PLAN - MECHANICAL NEW
M-800 MECHANICAL CONTROLS AND DETAILS
ELECTRICAL
E-100 ELECTRICAL SYMBOLS, ABB., NOTES, AND SCHEDULES
E-300 ENLARGED FLOOR PLAN - ELECTRICAL DEMOLITION
E-400 ENLARGED FLOOR PLAN - LIGHTING
E-500 ENLARGED FLOOR PLAN - POWER
B
ID
D
IN
G
P
ER
M
IT
S
/0 4/
OWNER
STATE OF MICHIGAN
7285 PARSONS DR.
DIMONDALE, MI 48821
F E
F E
F E
BF
FIRE
STROBE
2133.6m m
30"D X 36"W
COPY/PRINT
GENERAL BUILDING DATA
PROJECT DESCRIPTION
KEY LEGEND
A -0
JB JM
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
ER
E I
S P
E N
I N
S U
L
AM
A M
OE
N
A M
PL
U
RI
B
U E
S U
N
UM
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
P
:\2
\2
S
O M
T re as ur y O ps C en te r N ew
H R S ui te
\5
-D ra w in gs \5
-C
D \Z
FS
H
TA
.d w g
D at e:
A ug
:5 ut
A -0 te d by jb ur tk a
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te 1S
T
FL
O O
R C
O D
E
PL
A N
B
ID
D
IN
G
P
ER
M
IT
S
/0 4/
F E
F E
F E
BF
FIRE
STROBE
2133.6m m
30"D X 36"W
COPY/PRINT
A -1
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
ER
E I
S P
E N
I N
S U
L
AM
A M
OE
N
A M
PL
U
RI
B
U E
S U
N
UM
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
P
:\2
\2
S
O M
T re as ur y O ps C en te r N ew
H R S ui te
\5
-D ra w in gs \5
-C
D \Z
FS
H
TA
.d w g
D at e:
A ug
:5 ut
A -1 te d by jb ur tk a
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
JB JM
FI
R
ST
F
LO
O R
P
LA
N B
ID
D
IN
G
P
ER
M
IT
S
/0
4/
30"D X 36"W
COPY/PRINT
A -1
JB JM
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
ER
E I
S P
E N
I N
S U
L
AM
A M
OE
N
A M
PL
U
RI
B
U E
S U
N
UM
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
P
:\2
\2
S
O M
T re as ur y O ps C en te r N ew
H R S ui te
\5
-D ra w in gs \5
-C
D \Z
FS
H
TA
.d w g
D at e:
A ug
:5 ut
A -1 te d by jb ur tk a
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
EN
LA
R
G
ED
F
IR
ST
F
LO
O
R P
LA
N
WORK AREA
B
ID
D
IN
G
P
ER
M
IT
S
/0 4/
A -2
JB JM
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
ER
E I
S P
E N
I N
S U
L
AM
A M
OE
N
A M
PL
U
RI
B
U E
S U
N
UM
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
P
:\2
\2
S
O M
T re as ur y O ps C en te r N ew
H R S ui te
\5
-D ra w in gs \5
-C
D \Z
FS
H
TA
.d w g
D at e:
A ug
:5 ut
A -2 te d by jb ur tk a
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
EN
LA
R G
ED
R
EF
LE
C
TE
D C
EI
LI
N G
PL
A
N
WORK AREA
B
ID
D
IN
G
P
ER
M
IT
S
/0 4/
GENERAL HVAC NOTES
1. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
3. ALL EXISTING SYSTEMS INCLUDING AIR HANDLING UNITS THAT
SERVES AREAS BEING RENOVATED SHALL BE REBALANCED AS
REQUIRED.
4. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION
THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.
5. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS
NEEDED.
6. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.
7. PROVIDE BALANCE DAMPERS FOR EACH DIFFUSER/GRILLE
AND BRANCH DUCT.
8. MAXIMUM LENGTH OF FLEXIBLE DUCT TO AIR TERMINAL
DEVICES SHALL NOT EXCEED 6'-0" IN LENGTH WITH A MAXIMUM
OF ONE 90° TURN AND SHALL BE INSULATED. ELBOWS SHALL
BE MIN. 1.5 RADIUS. CONNECTIONS TO TERMINAL DEVICES
SHALL BE BANDED AND TAPED.
9. ALL REHEAT COIL HS&R RUNOUT PIPES SHALL BE 3/4" UNLESS
OTHERWISE NOTED.
10. PROVIDE ACCESS PANELS ON EACH SIDE OF REHEAT COILS.
11. PROVIDE 5 FT MIN BEFORE ANY DUCT TAKEOFF FOR
DUCTWORK DOWNSTREAM OF VAV BOXES.
12. PROVIDE 1 1/2 DUCT DIAMETERS MIN. DUCT LENGTH OF HIGH
PRESSURE BRANCH DUCTWORK ON THE UPSTREAM SIDE OF
VAV BOXES.
13. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
14. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
15. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT
MAY AFFECT THE WORK.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"
CONDITION DURING CONSTRUCTION.
17. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.
18. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT
FITTINGS IN ACCORDANCE WITH SMACNA. (WYES, RADIUSED
OR VANED TEES, ETC.) DUCTWORK SHALL BE GALVANIZED
SHEET METAL, MIN. 26 GA.
19. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSION.
INCREASE DUCT SIZE FOR LINING.
20. LINE 10'-0" OF SUPPLY DUCTWORK AFTER EACH VAV BOX.
21. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE
FLEXIBLE DUCT CONNECTORS.
22. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST
ITEM SHALL BE USED.
23. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.
IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE
HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
24. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT IN THE
SPECIFICATIONS, OR FOUND IN SPECIFICATIONS AND NOT IN
THE DRAWINGS, SHALL BE CONSTRUED AS TO BE INCLUDED IN
BOTH THE SPECIFICATIONS AND THE DRAWINGS. ANY
CONFLICT BETWEEN THE PLANS AND THE SPECIFICATIONS
WILL BE INTERPRETED BY THE ARCHITECT. IN THE EVENT OF
CONFLICT, FOR THE PURPOSE OF BIDDING, THE CONTRACTOR
SHALL PRESUME THE MOST EXPENSIVE COMBINATION OF
QUALITY AND QUANTITY OF WORK SHALL PREVAIL.
25. ABUSE OF THE REQUEST FOR INFORMATION (RFI) PROCESS
WILL NOT BE TOLERATED. RFI'S REQUESTING INFORMATION
ALREADY CONTAINED IN THE DESIGN DOCUMENTS, INVOLVING
MEANS AND METHODS OF CONSTRUCTION, COORDINATION OF
WORK BETWEEN TRADES, OR ITEMS NOT PREVIOUSLY AND
THOROUGHLY INVESTIGATED AND RESEARCHED BY THE
GENERAL CONTRACTOR WILL BE RETURNED UNANSWERED TO
THE GENERAL CONTRACTOR. ALLOW TWO WEEKS FOR RFI
RESPONSES FROM THE DESIGN TEAM.
26. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,
REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE
STATUTES, ORDINANCES, CODES OR REGULATIONS OF
FEDERAL, STATE, AND LOCAL AUTHORITIES HAVING
JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
27. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY
OSHA, UNDERWRITERS, LABORATORIES, AMERICAN CODES,
ASA, ASHRAE, ARI, NEC, STATE FIRE INSURANCE REGULATION
BODY, NFPA OR OTHERS, THESE STANDARDS SHALL BE
FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWING
AND SPECIFICATIONS.
28. DUCT/PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED,
ARCHITECTURAL DRAWINGS, AND ALL OTHER TRADES PRIOR
TO INSTALLATION. ANY CONTRACTOR INSTALLING WORK
WITHOUT PRIOR COORDINATION SHALL RELOCATE HIS WORK
AT HIS EXPENSE TO ALLOW PROPER INSTALLATION OF ANY
AND ALL TRADES WORK.
29. DUCT/PIPING SHALL NOT BE RUN ABOVE ELECTRICAL GEAR IN
THE SERVICE SPACE REQUIRED BY THE NATIONAL ELECTRICAL
CODE.
30. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS
REQUIRED SHALL BE PROVIDED BY THE HVAC CONTRACTOR.
CONTROL WIRING SHALL BE RUN IN CONDUIT IF REQUIRED BY
LOCAL CODES OR THE SPECIFICATIONS. POWER SHALL BE
PROVIDED BY THE ELECTRICAL CONTRACTOR.
31. MOUNT THERMOSTAT/SENSORS AT 48" AFF UNLESS NOTED
OTHERWISE.
32. THE HVAC CONTRACTOR SHALL CLOSELY COORDINATE AIR
DEVICE AND DUCTWORK LOCATIONS WITH REFLECTED CEILING
AND STRUCTURAL PLANS.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLSHVAC PIPING
HVAC DUCTWORK
F/S F/S s s
TEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
TURNING VANES
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
90° TEE W/45° APPROACH
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
EXISTING VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
EXISTING HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWS
S
L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
P
H
S
T
T P
T N
M
M
SD
1. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
2. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED, ARCHITECTURAL DRAWINGS AND ALL
OTHER TRADES PRIOR TO DEMOLITION.
3. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
4. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE
STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE
DRAWING AND SPECIFICATIONS.
5. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.
6. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY
KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.
7. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES LEFT DAMAGED OR
INCOMPLETE FROM REMOVAL OF EXISTING PARTITIONS, MILLWORK,
CASEWORK, OR OTHER FIXED ACCESSORIES AND EQUIPMENT WITH
MATERIALS TO MATCH EXISTING, AS ACCEPTABLE TO THE ARCHITECT.
8. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL
ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE
DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE
REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR
RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE
NEW WORK AS SHOWN.
9. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE
REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO
FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF
THIS WORK.
10. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO
COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND
APPROVAL OF THE LOCAL CODE JURISDICTIONS.
11. ASBESTOS ABATEMENT: CONTRACTOR SHALL NOTIFY BUILDING
REPRESENTATIVE IMMEDIATELY WHEN AND IF ANY ITEMS ARE ENCOUNTERED
THAT IN ANY WAY, SHAPE, OR FORM APPEAR TO BE HAZARDOUS OF NATURE.
ASBESTOS ABATEMENT IS NOT PART OF THE SCOPE OF THE DESIGN
PROFESSIONALS DOCUMENTATION OR RESPONSIBILITY TO SURVEY, IDENTIFY,
OR FOR CONSULTATION OF PROPER DISPOSAL.
12. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN
APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.
13. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED
IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE
CONTRACTOR.
14. TEMPORARY LIGHTING AND POWER SHALL BE PART OF THE SCOPE OF THIS
WORK; SEE ELECTRICAL.
15. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING
REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE
DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.
GENERAL DEMOLITION NOTES
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I Q
U E
R E I
S P E
N I
N
SU
L
AM
A M
OE
N
A M
PL
UR
IB
U
E S
U N U
M
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
S
:\P ro je ct s\
\2
S O
M O
PS
T re as ur y
H R S ui te
\D ra w in gs \M
-E \M
-2
.d w g
D at e:
A ug
:3 ut x3 te d by
B S m ith
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
M A
T R
I X
M -1
ST
S C
A T
ST
S
C A
T
M
EC
H A
N
IC
A L
SY
M
B O
LS
, A
B B
N
O
TE
S, A
N D
S C
H
ED
U
LE
S
/0 5/
B
ID
S
CRAIG A.
TRIERWEILER
ENGINEER
NO.
6201049255
NAGIHCIMFOETATS
LICENSED
PROFESSIONAL ENG
IN
EE
R
SS
X-12x12 SA
X-12x12 SA
X-20x12 SA
X-14Ø SA
X-22x12 SA
X-14x12 SA
X-12x12 SA
X-14Ø SA
X-18x14 SA
X-24x14 SA
X-38x14 SA
X-38x14 SA
X-14Ø SA
X-VAV
X-48x24 RA X-48x24 RA
X-48x24 RA
S
X-42x14 SA
X-VAV
X-VAV
X-38x14 SA
X-14x12 SA
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-20x12 SA X-12x12 SA
X-RG ---
48x24 ---
X-RG ---
48x24 --- X-RG ---
48x24 ---
X-SD 195
8"Ø ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-6" HR
X-CWR
X-CWS
X-8" CWS
X-8" CWR
X-CWR
X-CWS
X-6" HR
X-3" HS X-3" HS
X-6" HR
X-HR
X-CWS
X-12" CWS & CWR
BELOW FINISH FLOOR,
IN 24" DP TUNNEL
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-CWR
DEMOLITION NOTES
1 DISCONNECT, REMOVE, AND RELOCATE EXISTING SUPPLY DIFFUSER AT
LOCATION SHOWN. DEMO ASSOCIATED SUPPLY DUCTWORK TO EXTENTS
SHOWN.
REMOVE AND RELOCATE EXISTING RETURN GRILLE AT LOCATION SHOWN.2
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
E R
E I S
P E
NI
N
SU
L
AM
A
M
OE
N A
M
PL
UR
IB
U
E S
U N U
M
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
S
:\P ro je ct s\
\2
S O
M O
PS
T re as ur y
H R S ui te
\D ra w in gs \M
-E \M
-2
.d w g
D at e:
A ug
:3 ut te d by
B S m ith
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
M A
T R
I X
M -3
N ENLARGED FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5 10
ST
S
C A
T
ST
S
C A
T
EN
LA
R G
ED
F
LO
O
R P
LA
N
M
EC
H
A N
IC
A
L D
EM
O
LI
TI
O N
N KEY PLAN
SCALE: NTS
WORK AREA
/0
5/
B
ID
S
CRAIG A.
TRIERWEILER
ENGINEER
NO.
6201049255
NAGIHCIMFOETATS
LICENSED
PROFESSIONAL ENG
IN
SS
S
F1
X-RG ---
48x24 ---
X-RG ---
48x24 ---
X-RG ---
48x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
X-RG ---
24x24 ---
VAV-2
VAV-1
X-12x12 SA
X-20x12 SAX-14Ø SA
X-22x12 SA
X-14x12 SA
X-14Ø SA
X-18x14 SA
X-24x14 SA
X-38x14 SA
X-38x14 SA
X-14Ø SA
X-VAV
X-48x24 RA
X-48x24 RA X-48x24 RA
X-VAV
X-38x14 SA
X-14x12 SA
X-20x12 SA X-12x12 SA
X-6" HR
X-CWR
X-CWS
X-8" CWS
X-8" CWR
X-CWR
X-CWS
X-6" HR
X-3" HS X-3" HSX-CWR
X-6" HR
X-HR
X-CWS
X-VAV
3/4" HS
3/4" HR
6x8 SA
X-12" CWS & CWR
BELOW FINISH FLOOR,
IN 24" DP TUNNEL
SD-1 130
6"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
6x8 SA
S
S
S
RG-1 ---
24x8 ---
RG-1 ---
24x8 ---
RG-1 ---
24x8 ---
X-12x12 SA
3/4" HS
F1
F1
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
3/4" HS/HR
X-12x12 SA
3/4" HS/HR
X-RG ---
24x24 ---
SD-1 130
6"Ø ---
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
2 2
X-42x14 SA
X-SD 195
8"Ø ---
X-SD 195
8"Ø ---
SD-1 130
6"Ø ---
VAV-3
6x8 SA
F1
MECHANICAL KEY NOTES
INSTALL ROOM SENSOR ON RETURN BOOT AT LOCATION SHOWN.
RELOCATE AND INSTALL EXISTING SUPPLY DIFFUSER AT LOCATION
SHOWN. MODIFY SUPPLY DUCTWORK AS REQUIRED.
RELOCATE AND INSTALL EXISTING RETURN GRILLE AT LOCATION SHOWN.
FIRE PROTECTION KEY NOTES
SPRINKLER SYSTEM MODIFICATIONS BY OWNER.
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
SI
Q
U E
R E I
S P
EN
I
N
SU
L
AM
A M
OE
N
A M
PL
UR
IB
U
E S
U N U
M
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
S
:\P ro je ct s\
\2
S O
M O
PS
T re as ur y
H R S ui te
\D ra w in gs \M
-E \M
-2
.d w g
D at e:
A ug
:3 ut te d by
B S m ith
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
M A
T R
I X
M -4
N ENLARGED FLOOR PLAN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
0 1 5 10
ST
S
C A
T
ST
S
C A
T
EN
LA
R G
ED
F
LO
O
R P
LA
N
M
EC
H
A N
IC
A
L N
EW
N KEY PLAN
SCALE: NTS
WORK AREA
/0
5/
B
ID
S
CRAIG A.
TRIERWEILER
ENGINEER
NO.
6201049255
NAGIHCIMFOETATS
LICENSED
PROFESSIONAL ENG
IN
4 SUPPLY AIR DIFFUSER DETAIL
SCALE: NTS
CONICAL TAKE-OFF WITH
VOLUME DAMPER (TYP)
SUPPLY AIR
BRANCH DUCT
FLEXIBLE DUCT
LAY-IN CLG TILE (TYP)
CEILING SUPPORT
TEE (TYP)
SUPPLY DIFFUSER
(SEE SCHEDULE FOR
TYPE)
COLLAR
HARD ELBOW
(AS REQ'D)
3 DUCT TRANSITION DETAIL
SCALE: NTS
L
W
SA FLOW
RA FLOW
MAIN AIR DUCT
BALANCING DAMPER IN ALL
SA AND RA BRANCHES TO
AIR OUTLETS
BRANCH AIR DUCT
(TYPICAL)
NOTE:
L=1/4 W (4" MIN.)
45°
8"
18"
B
A
A
1/2" THICK ACOUSTIC
LINING
OPEN TO SPACE
ABOVE CEILING TO
MATCH DUCT SIZE
DUCT SIZE SHALL BE
REGISTER SIZE
RETURN GRILLE
1 RETURN BOOT DETAIL
SCALE: NTS
2 VAV TERMINAL UNIT DETAIL
SCALE: NTS
NOTES:
1. FLEXIBLE DUCTWORK SHALL NOT BE PERMITTED
UPSTREAM OF VAV BOXES.
2. DUCT TRANSITIONS SHALL BE A MINIMUM OF 3
DUCT DIAMETERS UPSTREAM OF ANY VAV BOX.
REDUCER OR INCREASER
IF REQUIRED
LINED SHEET METAL
RUN-OUT, SIZE AS SHOWN ON
PLAN, 5 FT. MIN. BEFORE
TAKE OFF
SUPPLY DIFFUSER (SEE
SCHED. FOR TYPE)
COLLAR
FLEX ELBOW
DIFFUSER
NECK SIZE
FLEXIBLE DUCT
PROVIDE HANGER
CEILING
SHEET METAL RUN-OUT
SIZE AS SHOWN ON PLAN
BALANCE DAMPER
FLOW RING
TERMINAL UNIT
SUPPLY AIR
DUCT
CONICAL TAP.
RUNOUT SIZE
PER PLAN
TRANSITION AS
REQUIRED
3 DUCT
DIA. MIN.
5 DUCT DIA. MIN.
6'-0" MAX.
5 VAV TERMINAL UNIT HYDRONIC PIPING DIAGRAM
SCALE: NTS
COIL
HS
HR
3/4" HOSE END
DRAIN VALVE 2-WAY CONTROL VALVE
(MODULATING)
STRAINER
CIRCUIT SETTER
UNION (TYP)
MANUAL AIR VENT
P/T TAP (TYP.)
BALL VALVE (TYP.)
FLOW DIAGRAM: VAV 1,2,3
OCC SP (NET)
DAT (AI)
DA FLW (AI)
AIR VLV (AO)
SPT (AI)
SPT SP (AI)
HW VLV (AO)
DASA D - 3
OCC - 2
T - 7
AFS - 2
ACT - 5
T - 3
V - 7
SEQUENCE OF OPERATION: VAV 1,2,3
BUILDING AUTOMATION SYSTEM INTERFACE:
THE TRIDIUM BUILDING AUTOMATION SYSTEM (BAS) SHALL SEND THE
CONTROLLER OCCUPIED, AND UNOCCUPIED COMMANDS. THE BAS MAY
ALSO SEND A HEAT/COOL MODE, PRIORITY SHUTDOWN COMMANDS,
SPACE TEMPERATURE AND/OR SPACE TEMPERATURE SETPOINT. IF
COMMUNICATION IS LOST WITH THE BAS, THE CONTROLLER SHALL
OPERATE USING ITS LOCAL SETPOINTS.
OCCUPIED:
THE OCCUPANCY MODE WILL BE COMMUNICATED OR HARDWIRED TO THE
CONTROLLER VIA A BINARY INPUT. WHEN THE UNIT IS IN THE OCCUPIED
MODE THE VAV WILL MAINTAIN THE SPACE TEMPERATURE AT THE ACTIVE
OCCUPIED HEATING OR COOLING SETPOINT. APPLICABLE VENTILATION
AND AIRFLOW SETPOINTS WILL BE ENFORCED. THE OCCUPIED MODE WILL
BE THE DEFAULT MODE OF THE VAV. APPLICABLE VENTILATION AND
AIRFLOW SETPOINTS WILL BE ENFORCED. THE OCCUPIED MODE WILL BE
THE DEFAULT MODE OF THE VAV.
OCCUPIED STANDBY:
THE OCCUPANCY MODE WILL BE COMMUNICATED OR HARDWIRED TO THE
CONTROLLER VIA A BINARY INPUT, EVEN THOUGH THE BAS HAS
SCHEDULED THE SPACE AS OCCUPIED. IN THE OCCUPIED STANDBY MODE,
THE ACTIVE COOLING AND HEATING SETPOINTS SHALL BE RELAXED (SEE
COOLING AND HEATING MODE) AND BOTH THE VENTILATION AIRFLOW AND
MINIMUM AIRFLOW SETPOINTS SHALL BE LOWERED (SEE VAV SCHEDULE).
OCCUPIED BYPASS:
MODE USED TO TEMPORARILY PLACE THE UNIT INTO THE OCCUPIED
OPERATION. TENANTS SHALL BE ABLE TO OVERRIDE THE UNOCCUPIED
MODE FROM THE SPACE SENSOR. THE OVERRIDE SHALL LAST FOR A
MAXIMUM OF 4 HOURS (ADJ.). THE TENANTS SHALL BE ABLE TO CANCEL
THE OVERRIDE FROM THE SPACE SENSOR AT ANY TIME. DURING THE
OVERRIDE THE UNIT SHALL OPERATE IN OCCUPIED MODE.
HEAT/COOL MODE:
THE HEAT/COOL MODE SHALL BE SET BY A COMMUNICATED VALUE OR
AUTOMATICALLY BY THE VAV. IN STANDALONE OR AUTO MODE THE VAV
SHALL COMPARE THE PRIMARY AIR TEMPERATURE WITH THE CONFIGURED
AUTO CHANGEOVER SETPOINT TO DETERMINE IF THE AIR IS "HOT" OR
"COLD". HEATING MODE IMPLIES THE PRIMARY AIR TEMPERATURE IS HOT.
COOLING MODE IMPLIES THE PRIMARY AIR TEMPERATURE IS COLD.
COOLING MODE:
WHEN THE UNIT IS IN COOLING MODE, THE VAV CONTROLLER SHALL
MAINTAIN THE SPACE TEMPERATURE AT THE ACTIVE COOLING SETPOINT
BY MODULATING THE AIRFLOW BETWEEN THE ACTIVE COOLING MINIMUM
AIRFLOW SETPOINT TO THE MAXIMUM COOLING AIRFLOW SETPOINT. THE
VAV SHALL USE THE MEASURED SPACE TEMPERATURE AND THE ACTIVE
COOLING SETPOINT TO DETERMINE THE REQUESTED COOLING CAPACITY
OF THE UNIT. THE OUTPUTS WILL BE CONTROLLED BASED ON THE UNIT
CONFIGURATION AND THE REQUESTED COOLING CAPACITY.
BASED ON THE VAV CONTROLLER OCCUPANCY MODE, THE ACTIVE
COOLING SETPOINT WILL BE ONE OF THE FOLLOWING:
SETPOINT DEFAULT VALUE
OCCUPIED COOLING SETPOINT 74.0 DEG. F
UNOCCUPIED COOLING SETPOINT 85.0 DEG. F
OCCUPIED STANDBY COOLING SETPOINT 78.0 DEG. F
OCCUPIED MIN COOLING AIRFLOW SETPOINT SEE VAV SCHEDULE
OCCUPIED MAX COOLING AIRFLOW SETPOINT SEE VAV SCHEDULE
HEAT/COOL SETPOINT:
THE SPACE TEMPERATURE SETPOINT SHALL BE DETERMINED EITHER BY A
LOCAL (E.G., THUMBWHEEL) SETPOINT, THE VAV DEFAULT SETPOINT OR A
COMMUNICATED VALUE. THE VAV SHALL USE THE LOCALLY STORED
DEFAULT SETPOINTS WHEN NEITHER A LOCAL SETPOINT NOR
COMMUNICATED SETPOINT IS PRESENT. IF BOTH A LOCAL SETPOINT AND
COMMUNICATED SETPOINT EXIST, THE VAV SHALL USE THE
COMMUNICATED VALUE.
COMMUNICATED VALUE.
REHEAT CONTROL MODE:
REHEAT WILL ONLY BE ALLOWED WHEN THE SUPPLY AIR TEMPERATURE IS
5.0 DEG. F BELOW THE CONFIGURED REHEAT ENABLE SETPOINT OF 70.0
DEG. F (ADJ.). THE REHEAT WILL BE ENABLED WHEN THE SPACE
TEMPERATURE DROPS BELOW THE ACTIVE HEATING SETPOINT AND THE
MINIMUM AIRFLOW REQUIREMENTS ARE MET. DURING REHEAT THE VAV
WILL OPERATE AT ITS MINIMUM HEATING AIRFLOW SETPOINT AND
ENERGIZE THE HEAT AS FOLLOWS:
SETPOINT DEFAULT VALUE
OCCUPIED HEATING SETPOINT 71.0 DEG. F
UNOCCUPIED HEATING SETPOINT 60.0 DEG. F
OCCUPIED STANDBY HEATING SETPOINT 67.0 DEG. F
OCCUPIED MIN HEATING AIRFLOW SETPOINT SEE VAV SCHEDULE
OCCUPIED MAX HEATING AIRFLOW SETPOINT SEE VAV SCHEDULE
REHEAT WILL ONLY BE ALLOWED WHEN THE SUPPLY AIR TEMPERATURE IS
5.0 DEG. F BELOW THE CONFIGURED REHEAT ENABLE SETPOINT OF 70.0
DEG. F (ADJ.). REHEAT CONTROL:
IN HEAT MODE, REHEAT WILL BE ENABLED WHEN:
· PRIMARY AIR TEMPERATURE IS 5.0 DEG. F BELOW THE CONFIGURED
REHEAT ENABLE SETPOINT OF 70.0 DEG. F (ADJ.).
· SPACE TEMPERATURE DROPS BELOW THE ACTIVE HEATING SETPOINT
AND THE MINIMUM AIRFLOW REQUIREMENTS ARE MET.
SUPPLY AIR TEMPERATURE IS BELOW THE CONFIGURED REHEAT
ENABLE SETPOINT.
WHEN REHEAT ENABLED, THE VAV WILL OPERATE AT ITS MINIMUM
HEATING AIRFLOW SETPOINT AND CONTROL THE HEAT AS FOLLOWS:
MODULATING HOT WATER REHEAT:
IF THE SPACE TEMPERATURE IS BELOW THE HEATING SETPOINT THE HOT
WATER REHEAT VALVE WILL MODULATE AS REQUIRED TO MAINTAIN SPACE
TEMPERATURE AT THE ACTIVE HEATING SETPOINT WHILE THE VAV
OPERATES AT ITS MINIMUM HEATING AIRFLOW SETPOINT. IF THE
DISCHARGE AIR TEMPERATURE REACHES THE DESIGN HEATING
DISCHARGE AIR TEMPERATURE SETPOINT (ADJ.), THE VAV WILL MODULATE
AIRFLOW BETWEEN THE MINIMUM HEATING AIRFLOW SETPOINT AND THE
MAXIMUM HEATING AIRFLOW SETPOINT AS REQUIRED TO MAINTAIN SPACE
TEMPERATURE AT THE ACTIVE HEATING SETPOINT, WHILE THE HOT
WATER REHEAT VALVE MODULATES TO MAINTAIN DISCHARGE AIR
TEMPERATURE AT THE DESIGN HEATING DISCHARGE AIR TEMPERATURE
SETPOINT. IF THE AIRFLOW REACHES THE MAXIMUM HEATING AIRFLOW
SETPOINT, THE VAV WILL MODULATE THE HOT WATER REHEAT VALVE AS
REQUIRED TO MAINTAIN SPACE TEMPERATURE AT THE ACTIVE HEATING
SETPOINT, WHILE THE VAV OPERATES AT ITS MAXIMUM HEATING AIRFLOW
SETPOINT.
HEATING MODE:
WHEN THE UNIT IS IN HEATING MODE, THE VAV CONTROLLER WILL
MAINTAIN THE SPACE TEMPERATURE AT THE ACTIVE HEATING SETPOINT
BY MODULATING THE VAV DAMPER (BETWEEN THE ACTIVE HEATING
MINIMUM AND MAXIMUM AIRFLOW SETPOINTS). BASED ON THE VAV
CONTROLLER OCCUPANCY MODE, THE ACTIVE HEATING SETPOINT WILL BE
ONE OF THE FOLLOWING:
SETPOINT DEFAULT VALUE
OCCUPIED HEATING SETPOINT 71.0 DEG. F
UNOCCUPIED HEATING SETPOINT 60.0 DEG. F
OCCUPIED STANDBY HEATING SETPOINT 67.0 DEG. F
OCCUPIED MIN HEATING AIRFLOW SETPOINT SEE VAV SCHEDULE
OCCUPIED MAX HEATING AIRFLOW SETPOINT SEE VAV SCHEDULE
LOCAL REHEAT CONTROL:
REHEAT WILL ONLY BE ALLOWED WHEN THE PRIMARY AIR TEMPERATURE
IS 5.0 DEG. F BELOW THE CONFIGURED REHEAT ENABLE SETPOINT OF 70.0
DEG. F (ADJ.). THE REHEAT SHALL BE ENABLED WHEN THE SPACE
TEMPERATURE DROPS BELOW THE ACTIVE HEATING SETPOINT AND THE
MINIMUM AIRFLOW REQUIREMENTS ARE MET. DURING REHEAT THE VAV
SHALL OPERATE AT ITS MINIMUM HEATING AIRFLOW SETPOINT AND
ENERGIZE THE HEAT AS FOLLOWS:
PROPORTIONAL HOT WATER REHEAT:
IF THE SPACE TEMPERATURE IS BELOW THE HEATING SETPOINT THE HOT
WATER REHEAT VALVE SHALL CONTROL AS REQUIRED TO MAINTAIN THE
ACTIVE HEATING SETPOINT.
POINTS LIST: VAV 1,2,3
SYSTEM POINT DESCRIPTION POINTS ALARMS
NOTE: THE CONTROLS POINTS LIST
FOR THE ASSOCIATED EQUIPMENT
INCLUDES, BUT IS NOT LIMITED TO,
THE FOLLOWING POINTS.
CONTROLS CONTRACTOR IS
RESPONSIBLE FOR PROVIDING AND
INSTALLING ALL NECESSARY POINTS
TO CONTROL EQUIPMENT PER THE
SEQUENCE OF OPERATION.
G R
A
PH
IC
A
N A
LO
G
H A
R D
W A
R E
IN
PU
T (A
I) B
IN
A
R Y
H A
R D
W A
R E
IN
PU
T (B
I) A
N A
LO
G
H A
R D
W A
R E
O U
TP
U
T (A
O
B
IN
A R
Y H
A R
D W
A R
E O
U
TP
U T
(B O
SO
FT
W
A R
E
PO
IN
T
(S
FT
H
A R
D W
A R
E
IN
TE
R
LO
C
K (H
D W
W
IR
EL
ES
S
(W
LS
N
ET
W
O R
K (N
ET
H
IG
H A
N A
LO
G
L
IM
IT
LO
W A
N A
LO
G
L
IM
IT
B
IN
A
R Y
LA
TC
H D
IA
G
N O
ST
IC
SE
N
SO
R
F A
IL
C
O M
M U
N
IC
A
TI
O N
F A
IL
AIR VALVE MODULATION COMMAND
AIR VLV
X X
DISCHARGE AIR TEMPERATURE
DAT
X X X X X
LOCAL HEAT VALVE COMMAND
HW VLV
X X
SPACE OCCUPANCY INPUT
SP OCC
X X
SPACE TEMPERATURE LOCAL
SPT
X X
SPACE TEMPERATURE SETPOINT
LOCAL
SPT SP
X X
SUPPLY AIRFLOW
DA FLW
X X X X
BAS COMMUNICATION STATE
BAS COM
X X
DESIGN HEAT DISCHARGE AIR TEMP
SETPOINT
DSNG HT DAT SP
X
MAXIMUM COOLING AIRFLOW
SETPOINT
MAX CLG FLW SP
X
MINIMUM COOLING AIRFLOW
SETPOINT
MIN CLG FLW SP
X
MAXIMUM HEATING AIRFLOW
SETPOINT
MAX HTG FLW SP
X
MINIMUM HEATING AIRFLOW
SETPOINT
MIN HTG FLW SP
X
OCCUPIED BYPASS TIMER
OCC TMR
X X
OCCUPIED COOLING SETPOINT
OCC CLG SP
X X
OCCUPIED HEATING SETPOINT
OCC HTG SP
X X
UNOCCUPIED COOLING SETPOINT
UNOCC CLG SP
X X
SPACE OCCUPANCY
(COMMUNICATED)
OCC SP
X X
UNOCCUPIED HEATING SETPOINT
UNOCC HTG SP
X X
DEMAND CONTROL VENTILATION:
WHEN THE UNIT IS IN UNOCCUPIED MODE, THE VENTILATION AIRFLOW
SETPOINT WILL BE ZERO. WHEN THE UNIT IS IN OCCUPIED MODE, THE
VENTILATION AIRFLOW SETPOINT SHALL EQUAL THE DESIGN OUTDOOR
AIRFLOW (SEE VAV SCHEDULE).
THE CURRENT VENTILATION AIRFLOW SETPOINT SHALL BE
COMMUNICATED TO THE BAS FOR CONTROL OF THE SYSTEM
OUTDOOR-AIR INTAKE.
SPACE SENSOR FAILURE:
IF THERE IS A FAULT WITH THE OPERATION OF THE ZONE SENSOR AN
ALARM SHALL BE ANNUNCIATED AT THE BAS. SPACE SENSOR FAILURE
SHALL CAUSE THE VAV TO DRIVE THE DAMPER TO MINIMUM AIR FLOW IF
THE VAV IS IN THE OCCUPIED MODE, OR DRIVE IT CLOSED IF THE VAV IS IN
THE UNOCCUPIED MODE.
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
SI
Q
U E
R E I
S P
EN
I
N
SU
L
AM
A M
OE
N
A M
PL
UR
IB
U
E S
U N U
M
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
S
:\P ro je ct s\
\2
S O
M O
PS
T re as ur y
H R S ui te
\D ra w in gs \M
-E \M
-2
.d w g
D at e:
A ug
:3 ut te d by
B S m ith
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
M A
T R
I X
M -8
ST
S C
A T
ST
S
C A
T
M
EC
H A
N
IC
A L
C O
N
TR
O
LS
A N
D D
ET
A
IL
S
B
ID
S
/0 5/
CRAIG A.
TRIERWEILER
ENGINEER
NO.
6201049255
NAGIHCIMFOETATS
LICENSED
PROFESSIONAL ENG
IN
FCPS
V
M C
VI
AV
B
C
DC
M
B
KP
SSCP
CR
SS
AS
TS
G
NCC
M P
E
A L B1 B2
S
SRS
X
X
X
CB
EMERGENCY PUSH STATION
CODE BLUE STATION
TVSS
VFD
TRANSIENT VOLTAGE SURGE SUPPRESSION
VARIABLE FREQUENCY DRIVE
GLASS BREAK
DS
DUPLEX RECEPTACLE
TEACHER STATION
ADMINISTRATION STATION
STUDENT STATION
CARD READER
CO CARBON MONOXIDE DETECTOR
H
DOCK LIGHT FIXTURE
CONTROL MODULE
S
TELEPHONE / DATA OUTLET
DUTY STATION
STAFF STATION
STAFF REGISTER STATION
DOME LIGHT
DUAL BED STATION
SINGLE BED STATION
BED / LIGHT INTERFACE
PENDENT INTERFACE
EMERGENCY PULL STATION
MASTER STATION
NURSE CALL CONTROLLER
NURSE CALL
ADDENDUM NOTE
PLAN NOTE
DEMOLITION NOTE
THREE PHASE MOTOR
BELL
AUDIO / VIDEO INPUT
VIDEO INPUT
WALL MOUNTED SPEAKER / CLOCK COMBO
WALL MOUNTED SPEAKERS
DUAL FACE CLOCK
CCTV CONTROL PANELCCTV
SECURITY SYSTEM CONTROL PANEL
KEY PAD
BEAM DETECTOR
MOTION DETECTOR
DOOR CONTACT
CAMERA
MONITOR MODULE
FIRE CONTROL POWER SUPPLY
VISUAL ONLY UNIT
ELECTRICAL SYMBOLS LEGEND
DH
V
S
C
M
I
J
SINGLE RECEPTACLE (120 VOLT)
EMERGENCY RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
SINGLE FACE CLOCK
FLUSH FLOOR BOX
SURFACE FLOOR BOX
SPECIAL EQUIPMENT RECEPTACLE
TELEPHONE OUTLET
DATA OUTLET
POWER POLE
JUNCTION BOX
WALL JUNCTION BOX
PULL (JUNCTION) BOX
UNDERFLOOR JUNCTION BOX
OUTLETS
LIGHT FIXTURE
STRIP FIXTURE
IN-GRADE LIGHT FIXTURE
SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)
WALL MOUNT LIGHT FIXTURE
CEILING LIGHT FIXTURE
TRACK & FIXTURE
STREET TYPE POLE FIXTURE
POLE MOUNTED LIGHT FIXTURE
EXTERIOR WALL MOUNT LIGHT FIXTURE
WALLPACK LIGHT FIXTURE
SPECIAL PURPOSE LIGHT FIXTURE
HIGH BAY LIGHT FIXTURE
EMERGENCY EGRESS LIGHT FIXTURE
(number of heads shown)
EMERGENCY LIGHT FIXTURE
FIXTURES
SWITCHES
SINGLE-POLE SWITCH
DIMMER SWITCH
TIME SWITCH
KEY SWITCH
MANUAL MOTOR SWITCH
THERMAL OVERLOAD SWITCH
SWITCH WITH PILOT LIGHT
FOUR-WAY SWITCH
THREE-WAY SWITCH
CIRCUITRY and RACEWAYS
UNDERFLOOR DUCT
BUS DUCT
PLUGMOLD AS SPECIFIED
WIREMOLD AS SPECIFIED
FLEXIBLE PIGTAILS/CONNECTIONS
"CONDUIT RUN CONTINUES" INDICATION
END OF CONDUIT RUN, CAP AND STAKE
END OF CONDUIT RUN
HOME RUN (with circuit numbers)
CONDUIT STUB DOWN
CONDUIT STUB UP
CONDUIT INSTALLED
CONDUIT INSTALLED
MECHANICAL
ELECTRIC WATER HEATER
ELECTRIC UNIT HEATER
PIPE TRACE HEATER
RESISTANCE HEATER, KW SHOWN
SINGLE PHASE MOTOR
SOUND and SIGNAL
INTERCOM OUTLET
MICROPHONE OUTLET
TELEVISION OUTLET
CHIME
BUZZER
VOLUME CONTROL
SPEAKER
SERVICE and EQUIPMENT
THERMOSTAT
CAPACITOR
ENCLOSED CIRCUIT BREAKER
TRANSFER SWITCH
WIREWAY
GROUND CONNECTION PER N.E.C.
TELEPHONE TERMINAL BOARD
GENERATOR, KW SHOWN
CURRENT TRANSFORMERS
UTILITY METER, AS REQUIRED
WEATHERHEAD
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
COMB. STARTER
MAGNETIC STARTER
FUSED DISCONNECT SWITCH
TRANSFORMER
CONTROL
xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt
LIGHTING CONTACTOR
CONTROL TRANSFORMER
buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)
PHOTOCELL (voltage as required)
HUMIDISTAT
FIRE ALARM
TAMPER SWITCH (furnished by FP/C) FLOW SWITCH (furnished by FP/C)
FIREFIGHTER COMMUNICATION JACK
MAGNETIC DOOR HOLDER
REMOTE INDICATING LIGHT, CLG. MTD.
REMOTE INDICATING LIGHT, WALL MTD.
END OF LINE DEVICE
ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
PULL STATION
SPEAKER & LIGHT
SPEAKER
HORN
DUCT SMOKE DETECTOR
HEAT DETECTOR
SMOKE DETECTOR
HORN & LIGHT
DESIGNATIONS
(by E.C.)
(by others)
TT
FACP
ANN
EOL
G
WW
PC
CT
TS
T
H
TC
IC
F
FC
F
T
1,3
OR
PM
WM
BD
UFD
B
F S
J
J
D
WH
PP
J
SWITCH STYLE OCCUPANCY SENSOROC
DIGITAL TIME SWITCH
POWER PACK
DUAL TECHNOLOGY SENSOR - 360° - 500 SQ FT
DUAL TECHNOLOGY SENSOR - 360° - 1000 SQ FT
ULTRASONIC SENSOR - 360° - 2 CIRCUIT
OCCUPANCY SENSOR / PHOTOCELL
WALL MOUNT DUAL TECHNOLOGY SENSOR
OS5
OS4
T
OS2
OS3
OS1
PP
DUCT SMOKE DETECTORF/S
CEILING MOUNTED WIFI
DIGITAL EQUIPMENT METER, AS REQUIRED
POLE
PUMP
PANEL
P
PNL
PVC
PRV-
P-
PB
POLY VINYL CLORIDE
POWER ROOF VENTILATOR
PULL BOX
GENERAL CONTRACTOR
GROUND
HUMIDIFIERH-
GND
GFI
GC
GROUND FAULT INTERRUPTER
ABBREVIATIONS LEGEND
POWER
SWITCH
RECEPT
SF-
SWBD
TCC
SPEC
SW
RGC
RTU-
PWR
VOLTS
WATTS
UF
V
W
UL
VL
UNO
UH-
TS
TYP
TR
ROOF TOP UNIT
RECEPTACLE
SWITCHBOARD
UNDER FLOOR
SPECIFICATIONS
RIGID GALVANIZED STEEL CONDUIT
UNLESS NOTED OTHERWISE
UNDERWRITERS' LABORATORIES, INC.
TAMPER PROOF RECEPTACLE
TAMPER PROOF SWITCH
TEMPERATURE CONTROL CONTRACTOR
VERIFY LOCATION WITH OWNER
TYPICAL
UNIT HEATER
SUPPLY FAN
WITH
WITHOUT
W/
XFMR
W/O
WP
TRANSFORMER
WEATHER PROOF
HOUR
LIGHT
JUNCTION BOX
LIGHT CONTROL
ISOLATED GROUND
HORSEPOWER
MINIMUM
MOUNT
MAKE-UP AIR UNIT
MOTOR CONTROL CENTER
MAIN LUG ONLY
MOUNTED
MOUNTING
MAXIMUM
LIGHTING
LT FLEX
MTD
MUAU-
MTG
MLO
MIN
MT
MC
MAX
MCC
LTG
IG
LC
LT
IMC
JB
HR
HVAC
HOA
HP
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NIGHT LIGHTNL
NTS
NO
NIC
NC
HAND-OFF-AUTO SELECTOR SWITCH
HEATING/VENTILATING/AIR CONDITIONING
INTERMEDIATE METAL CONDUIT
LIQUID TIGHT FLEXIBLE METAL CONDUIT
MECHANICAL CONTRACTOR
HID HIGH INTENSITY DISCHARGE
A
AC
AFF
ACU-
AHJ
AHU-
AS
B-
BC
AIC
ATS
BLDG
CHLR-
CND (C)
CKT BKR
CKT
CUH-
CU-
DISC
DFU-
EF-
EC
DWH-
EBB-
DWG
CT-
EXIST./EX.
EWC
FLEX
FLA
FLR
FSES
FLUOR
EMT
ABOVE FINISHED FLOOR
AIR CONDITIONING UNIT
AMPS
ABOVE COUNTER
AIR HANDLING UNIT
AUTOMATIC TRANSFER SWITCH
AMPS INTERRUPTING CAPACITY
AUTHORITY HAVING JURISDICTION
ABOVE SHELF
BOILER
BUILDING
BELOW COUNTER
CHILLER
DOMESTIC WATER HEATER
CABINET UNIT HEATER
CIRCUIT
CIRCUIT BREAKER
CONDUIT
CONDENSING UNIT
COOLING TOWER
DUCT FURNACE
DRAWING
DISCONNECT
FOOD SERVICE EQUIP. SUPPLIER
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELECTRIC BASEBOARD
ELECTRICAL METALLIC TUBING
EXISTING
EXHAUST FAN
FLOOR
FLUORESCENT
FLEXIBLE CONDUIT
FULL LOAD AMPS
EM EMERGENCY
F/S FIRE/SMOKE
FU- FURNACE
1. ALL WALL AND FLOOR PENETRATIONS ARE TO BE SEALED TO MAINTAIN ORIGINAL
RATING.
2. ALL CONDUITS TO BE FIELD ROUTED ALONG EXISTING PIPING AND STRUCTURAL
STEEL.
3. THE DIVISION 26 CONTRACTORS SHALL VISIT THE PROJECT AND DETERMINE THE
EXACT EXTENT OF THE DEMOLITION WORK REQUIRED BEFORE BIDDING THE PROJECT.
4. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE AND UNUSED EQUIPMENT
WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED OTHERWISE.
5. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD WORK,
SURFACES SHALL BE PATCHED TO MATCH ADJACENT.
6. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL REMAIN
CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF ANY TRADE NEED
NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE CAPPED BELOW FINISH
SURFACE AND THEN PATCHED TO MATCH, OR AS NOTED.
7. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR ENLARGED
TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL REQUIRED CUTTING AND
PATCHING.
8. IF ASBESTOS IS PRESENT, IT WILL BE REMOVED OR RENDERED HARMLESS UNDER
SEPARATE CONTRACT BY THE OWNER.
9. THE DIVISION 26 CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING
WALLS TO MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE MOUNTED
EQUIPMENT.
10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT VOLTAGES AND LOADS PRIOR TO
INSTALLING SERVICE TO EQUIPMENT.
11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENT AND CASUAL FIELD
OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR CLARIFICATION.
GENERAL ELECTRICAL NOTES
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
E R E I
S P
E
NI
N
SU
L
AM
A M
OE
N
A M
PL
UR
IB
U
E S
U N U
M
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
S
:\P ro je ct s\
\2
S O
M O
PS
T re as ur y
H R S ui te
\D ra w in gs \M
-E \E
-2
.d w g
D at e:
A ug
:1 ut te d by ta lle m an
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
M A
T R
I X
E-
EL
EC
TR
IC
A
L
SY
M B
O
LS
, A B
B
N O
TE
S, A N
D S
C H
ED
U
LE
S
TJ
A
R C
H
TJ
A
R C
H
B
ID
S
/0 5/
22222
22222
1 1 1
1 1
1 1
1 1
1 1
1 1
J
1 1 1
1 1
1 1
1 1
2 22 2 2
19'-7"
1'
20'-2"
1' J
17'-2"
8'-1" J
2'
23'
J
7'-7"
10"
J
3'-8"
10" J
7'-6"
8" J
10'-9"
7'-10"
J
7'-812"
3'-7" J
14'-6"
5'-11"
J
25'-5"
6'-11"
J
14'-6"
6'-1"
J
3 3
3 4
EXISTING LIGHT FIXTURE TO REMAIN. LIGHT FIXTURES TO BE REZONED. SEE
NEW PLANS.
LIGHT FIXTURE TO BE RELOCATED. SEE NEW PLANS. REMOVE WIRE AND
CONDUIT BACK TO NEAREST JUNCTION BOX ABOVE FINISHED CEILING.
MAINTAIN EXISTING LIGHTING AROUND RENOVATED SPACE. FIXTURES HAVE
EXISTING RELOC SYSTEM. REMOVE RELOC SYSTEM BACK TO NEAREST
JUNCTION BOX. COORDINATE LENGTHS OF EXISTING RELOC FOR
RELOCATION OF FIXTURES.
FURNITURE FEED TO BE REMOVED BACK TO IN FLOOR SYSTEM. MAINTAIN
CIRCUITS FOR NEW FURNITURE FEEDS.
FURNITURE FEED FLOOR BOX TO RELOCATED. SPLICE AND EXTEND WHIP AS
REQUIRED FOR NEW FURNITURE CONNECTION. SEE NEW PLANS FOR NEW
FURNITURE FEED.
FURNITURE FEED FLOOR BOX TO REMAIN.
EXISTING EXIT SIGN TO REMAIN.
EXISTING RECEPTACLE TO REMAIN FOR NEW EQUIPMENT. SEE NEW PLANS
FOR MORE INFORMATION.
DEMOLITION NOTES
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
ER
EI
S
PE
N I N
SU
L
AM
A
M
OE
N A
M
PL
UR
IB
U
E S
U N U
M
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
S
:\P ro je ct s\
\2
S O
M O
PS
T re as ur y
H R S ui te
\D ra w in gs \M
-E \E
-2
.d w g
D at e:
A ug
:1 ut te d by ta lle m an
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
M A
T R
I X
E-
N
SCALE: 1/4" = 1'-0"
0 1 5 10
FL
O
O R
P
LA
N
EL
EC
TR
IC
A L
D
EM
O
LI
TI
O
N
TJ
A R
C H
TJ
A
R C
H
FLOOR PLAN - DEMOLITION
B
ID
S
/0 5/
1 1 1 11 1 1 11
ZONE 1
ZONE 2
2 2 2
ZONE 3
ZONE 4
ZONE 5 ZONE 6 ZONE 7
ELECTRICAL KEY NOTES
RELOCATED LIGHT FIXTURE. COORDINATE WITH EXISTING FIXTURES FOR
EXISTING RELOC WIRING SYSTEM. EXTEND EXISTING WIRE AND CONDUIT
FOR LIGHTING TO NEW FIXTURE LOCATION FROM EXISTING LIGHTING
JUNCTION BOXES ABOVE CEILING.
FIXTURES TO BE REZONED AS SHOWN. SEE PLANS FOR ZONES 1,2, & 4 - 7.
COORDINATE ALL ZONING WITH OWNER PRIOR TO CONSTRUCTION.
COORDINATE WITH OWNER USAGE OF REMOTE PROGRAMMING
CONTROLLER FOR NEW ZONING OF FIXTURES.
ZONE 3 TO BE CONTROLLED WITH EXISTING OPEN OFFICE LIGHTING TO THE
EAST.
PROVIDE EXIT SIGN. EXIT SIGN TO BE AHEAD OF ALL SWITCHING AND
SERVED FROM UNSWITCHED HOT LEG. CONTRACTOR SHALL COORDINATE
WITH BUILDING STOCK FOR EXIT SIGN BEFORE ORDERING A NEW EXIT SIGN.
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
E R
E I S
P E
N I N
SU
L
AM
A
M
OE
N A
M
PL
UR
IB
U
E S
U N U
M
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
S
:\P ro je ct s\
\2
S O
M O
PS
T re as ur y
H R S ui te
\D ra w in gs \M
-E \E
-2
.d w g
D at e:
A ug
:1 ut te d by ta lle m an
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
M A
T R
I X
E-
N
SCALE: 1/4" = 1'-0"
0 1 5 10
FL
O
O R
P
LA
N
LI
G
H
TI
N G
TJ
A
R C
H
TJ
A
R C
H
FLOOR PLAN - LIGHTING
B
ID
S
/0 5/
J
J J J J J
J
J
J
1111 EX
ELECTRICAL KEY NOTES
RELOCATED FLOOR MOUNTED ELECTRICAL FLOOR BOX. SPLICE AND
EXTEND CONDUIT AND WIRE AS NEEDED TO NEW FURNITURE LOCATION.
PROVIDE ALL BOXES, CONNECTORS, WHIPS, AND OTHER ELECTRICAL
APPURTENANCES FOR A COMPLETE INSTALLATION.
REUSE EXISTING CIRCUITS FROM DEMOLITION FOR NEW FURNITURE FEEDS.
SPLICE AND EXTEND CONDUIT AND WIRE AS NEEDED TO NEW FURNITURE
LOCATION. PROVIDE NEW FURNITURE FEED BOX AS REQUIRED. NEW BOX
TO MATCH EXISTING FURNITURE BOX FEEDS. PROVIDE ALL BOXES,
CONNECTORS, WHIPS, AND OTHER ELECTRICAL APPURTENANCES FOR A
COMPLETE INSTALLATION.
EXISTING RECEPTACLE TO BE USED FOR NEW HUSH POD.
PROVIDE POWER TO HUSH POD VIA RECEPTACLE FROM FURNITURE FEED.
TIE IN NEW FIRE ALARM DEVICE TO EXISTING FIRE ALARM SYSTEM.
D
ES
IG
N
ED
D
A
TE
IS
SU
ED
F
O R
ID
EN
TI
FI
C A
TI
O
N N
O
SH
EE
T D
R A
W N
C H
EC
K
ED
A
PP
R
O
VE
D
FI
LE
N U
M B
ER
ST
A
TE
IN
D
EX
N U
M B
ER
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
PR
O
C U
R
EM
EN
T
A N
D R
EA
L
ES
TA
TE
S
ER
V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
S I
Q U
E R
E I S
P E
NI
N
SU
L
AM
A
M
OE
N A
M
PL
UR
IB
U
E S
U N U
M
I R
C U
M S
P I
C E
1/
5.
G
SA
H +B
N o.
:2
D ra w in g:
S
:\P ro je ct s\
\2
S O
M O
PS
T re as ur y
H R S ui te
\D ra w in gs \M
-E \E
-2
.d w g
D at e:
A ug
:1 ut te d by ta lle m an
Tr ea su ry
O ps
C en te r
P ar so ns
D riv e, D im on da le
, M I 4
ST
A
TE
O
F M
IC
H
IG
A
N
N ew
H R
S ui te
M A
T R
I X
E-
N
SCALE: 1/4" = 1'-0"
0 1 5 10
TJ
A
R C
H
TJ
A
R C
H
FL
O
O R
P
LA
N
PO
W
ER
FLOOR PLAN - POWER
B
ID
S
/0 5/
| 25125 ARCH Drawings 20250805 |
| 25125 MECH Drawings 20250805 |
| 25125 ELEC Drawings 20250805 |
File details come from the government source that posted it. Updated .