250924 LPS STEVENSON HYDRATION STATIONS ADDENDUM 01 DRAWINGS (25-040).pdf

PDF 2 MB Posted

Attached to
2022 Bond- Asbestos Abatement for BP10
Solicitation number
RFP-WCS-250000003095-1
Issued by
Macomb County, Westland City, Michigan

About this file

This document is a set of architectural and engineering plans for the Livonia Public Schools Hydration Stations project at Stevenson High School in Livonia, Michigan, dated September 24, 2025. The project involves installing new drinking fountains and bottle filling stations at various locations throughout the school, with work to be performed across multiple building units and floors. The plans include detailed demolition of existing drinking fountains, electrical and plumbing modifications, and installation of new Elkay electric water coolers with bottle filling capabilities. The project number is 2025-040, and the bid documents were originally issued on August 8, 2025, with an addendum released on September 24, 2025.

The plans specify detailed technical requirements for removing existing drinking fountains, extending water and electrical connections, and installing new barrier-free hydration stations. The new fixtures are Elkay model LZS8WSLP electric water coolers with bottle filling functionality, which will be provided by the owner. The project involves electrical work such as running new conduit and wiring, and plumbing work including extending cold water, vent, and sanitary pipes. The scope covers multiple areas including corridors, toilets, and mechanical rooms across different units of the school building, with careful consideration for maintaining existing building operations during the installation process.

View the file

Other files

File Type Posted
WCS - 2025 Bond - Asbestos Abatement for BP10.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VESTIBULE

A100

LOBBY

A101

TICKETS/

CONCESSIONS

A102LIFT

A103

OFFICE

A105

CORRIDOR

A104

STAIR

A106

CORRIDOR

A107

MENS

TOILET

A109

WOMENS

TOILET

A108 JC

A111

CORRIDOR

A110

CORRIDOR

A112

VESTIBULE

A113

VESTIBULE

A114

HOUSE

A115

STAIR

A117

ORCHESTRA

PIT

A116

VESTIBULE

A118

IDF

A119

CHURCH

STORAGE

A120

STAIR

A121

VESTIBULE

A122

STAGE

A123

CORRIDOR

A126

INSTRUMENTAL

A127

OFFICE

A128

PASSAGE

A129

PRACTICE

A131

PRACTICE

A130

INSTRUMENT

STORAGE

A132

VOCAL

A136

PRACTICE

A134

PRACTICE

A133

OFFICE

A135

DIMMER

ROOM

A125

VESTIBULE

A124

VESTIBULE

D101

CORRIDOR

D100

FIRE

PUMP

D102

ELEC

D103

SCENE

STORAGE

D105

AUTO SHOP

D106

OFFICE

D107

STORAGE

D108

STORAGE

D109

STORAGE

D110

STORAGE

D111

PARTS

STORAGE

D112

STORAGE

D113

DUST

STORAGE

D114

SCENE SHOP/

WOOD SHOP

D115

ENGLISH/DRAMA

CLASSROOM

D116

CAFETERIA

SEATING

D117

CORRIDOR

A137

CORRIDOR

B113

JC

B114

MENS

TOILET

B115

TEACHER

WORKROOM

B116

CLASSROOM

B118

CLASSROOM

B119

OFFICE

B121

CLASSROOM

B120 PASSAGE

B122

WORKROOM

B124

CLASSROOM

B125

CORRIDOR

B126

CLASSROOM

B127

CLASSROOM

B128

CLASSROOM

B129

CLASSROOM

B130

CORRIDOR

E101

STORAGE

B117

TECH

B123

OFFICE

B136

OFFICE

B137

OFFICE

B139

OFFICE

B140

OFFICE

B141

MAIN ELEC

ROOM

B142

SPECIAL

EDUCATION

C100

CLASSROOM

B131

CLASSROOM

C106

CLASSROOM

C107

CLASSROOM

C108

CLASSROOM

C109

CORRIDOR

C110

CLASSROOM

C111

CLASSROOM

C112

CLASSROOM

C113

CLASSROOM

C114

WORKROOM

C105AP OFFICE

C104

OFFICE

C103

SCHEDULING

OFFICE

C102

OFFICE

C101

CORRIDOR

C210

CLASSROOM

C115

CLASSROOM

C116

CLASSROOM

C120

OFFICE

C117

PASSAGE

C118

OFFICE

C119

CLASSROOM

C121

TOILET

ROOM

C122

TOILET

ROOM

C123

WOMENS

TOILET

F126

MECH

ROOM

F125

CLASSROOM

C124

CORRIDOR

F128

MAIN

OFFICE

B101

OFFICE

B104LIASON

B102

OFFICE

B103

OFFICE

B105

PASSAGE

B106

CLINIC

B107

MONITOR

B111

CONFERENCE

ROOM

B112

STR

B108

TOILET

B110

PROPS

STORAGE

A138

INSTRUMENT

STORAGE

A139

ENSEMBLE

ROOM

A140

OFFICE

A141

OFFICE

A144

STUDENT

INSTRUMENT

A145

STRINGS

STORAGE

A146

MUSIC

LIBRARY

A147

JC

A148

WOMENS

DRESSING

A150

PASSAGE

A152

TOILET

A151

PASSAGE

A153

MENS

DRESSING

A155

TOILET

A154

ROBE/UNIFOMR

GEN STOR

A149

CAREER

TECH

A143

STAIR

E102

JC

E103

TOILET

E105

TOILET

E106

PASS

E104

OFFICE

E139

OFFICE

E140

HEALTH

CLASSROOM

E107

OFFICE

E137

OFFICE

E143

OFFICE

E142

OFFICE

E136

OFFICE

E135

OFFICE

E134

OFFICE

E133

OFFICE

E132

OFFICE

E130

STORAGE

E126

STORAGE

E129

GUIDANCE

OFFICE

E144

CONF

ROOM

E125

CONF

ROOM

E128

GROIUP

ROOM

E124

CLASSROOM

E123

VIDEO ROOM

E122

RADIO/TV CR

E121

STORAGE

B131

DARK ROOM

E115

CLASSROOM

H109

WOMENS

TOILET

H108

CORRDIOR

H100

CLASSROOM

E120DARK

ROOM

E119

YEARBOOK

E117

PHOTOGRAPHY

E114

PASS

E118

STUDENT

ACTIVITIES

E113

MARKETING

CLASSROOM

E112

OFFICE

E111

STORAGE

H106

KILN

ROOM

H105

ART

CLASSOOM

H104

STORAGE

H103

OFFICE

H102

ART

CLASSROOM

H101

WOMENS

TOILET

E109

MENS

TOILET

E108

STUDENT

STORE

E110

STORAGE

E116

CORRDIOR

H107

WORK RM

F123

OFFICE

F120

LMC

OFFICE

F121

LMC

WORK ROOM

F122

OPEN

LEARNING

F115

CORRIDOR

J128

MENS

TOILET

F108

MECH

ROOM

F109

FLEX

SPACE

F113

BOOK

STACKS

F112

BOOK

STACKS

F111

TECH

F106

STORAGE

E146

COMPUTER

LAB

E147

OFFICE

E148

COMPUTER

LAB

E150

OFFICE

E151

CORRIDOR

F100

COMPUTER

LAB

F101

OFFICE

F102

COMPUTER

LAB

F103

CORRIDOR

F105

CORRIDOR

F104

STR

E149

OFFICE

J107

CLOSET

H135

STORAGE

H136

ATTENDANCE

OFFICE

H137OFFICE

H134

STAFF

TOILET

H133

WORK ROOM

H132

TEACHER

WORKROOM

J100

OFFICE

J101

WOMENS

TOILET

J102

MENS

TOILET

J103

OFFICE

J105

OFFICE

J106

CLASSROOM

J108

STORAGE

J122

STORAGE

J123

HOME

ECON

J121

COMPUTER

ROOM

J124

CLASSROOM

J126

TOILET

ROOM

J127

VEST

J129

SOUTH

CAFETERIA

D119

KITCHEN

D124

DISHWASH

D125

REFRIGERATOR

D127

OFFICE

D128

STORAGE

D122

FREEZER

D121

PASSAGE

D120

JC

D130

COMP

D131

TOILET

D132

STORAGE

D133

BAKERY

D129

NORTH

CAFETERIA

D134

CORRIDOR

G100

CORRIDOR

D126

CORRIDOR

D118

STORAGE

G120STORAGE

G110 JC

G119

STAIR

G109

OUTSIDE

STORAGE

G101

RECEIVING

G102

TEAM

ROOM

G111

CUSTODIAN WORK

AREA

G104 OFFICE

G103

MAIN ELEC

ROOM

G105

MENS LOCKERS/

CUST TOILET

G106

BOILER

ROOM

G107

TRAINING

G114

UNISEX

CHANGING

G112

OFFICE

G115

OFFICE

G116

CORRIDOR

G108

CORRIDOR

G117

STAIR

G113 STAIR

G132

GYMNASIUM

G118

CONCESSIONS

G122 STAIR

G123

MACHINE

G124

ELEV

G125

TICKET

G128 STAIR

G127

STORAGE

G129

CENTRAL

BOOK

G130

ATHLETIC

STORAGE

G131

PASSAGE

G133

STORAGE

G134

STORAGE

G135

CORRIDOR

G136 VEST

G137

CORRIDOR

G126

BIOLOGY

CLASSROOM

H110

PREP

ROOM

H112

BIOLOGY

LAB

H111

PASS

L110

PREP

ROOM

H114

BIOLOGY

CLASSROOM

H115

BIOLOGY

CLASSROOM

H116

PREP

ROOM

H120

PASS

H121

BIOLOGY

LAB

H119

OFFICE

H122

BIOLOGY

CLASSROOM

H123

CLASSROOM

H130

CLASSROOM

H131

CORRIDOR

H129

CHEMISTRY

CLASSROOM

L101

OFFICE

L103

PHYSICS

LAB

H128

WORK

ROOM

H127

WORK

ROOM

H126

STORAGE

H125

CORRDIOR

H124

LAB

L119

CLASSROOM

J110

CLASSROOM

J111

CLASSROOM

J112

CLASSROOM

J113

CLASSROOM

J114

CLASSROOM

L121

CLASSROOM

L133

CLASSROOM

J116

OFFICE

J117

CLASSROOM

J118

CLASSROOM

J119

CLASSROOM

J120

CORRDIOR

J115

STAIR

G139

CORRIDOR

G138

WOMENS POOL

LOCKER RM

G141

CHANGING

G143

TOILET

G142

WOMENS COACHES

OFFICE

G150

TOILET

G151

CORRIDOR

G157

SHOWER

G149

SHOWER

G152

CORRIDOR

G144

TOILET

G148

STORAGE

G146 TOILET

G145

PASSAGE

G147

TOILET

K104

WOMENS GYM

LOCKER RM

G156

CHANGING

G153

JC

G158

TOILET

G155

TEAM

ROOM

G159

STORAGE

G160

STORAGE

G161

CHANGING

G162

MENS GYM

LOCKER RM

G164

CORRIDOR

G166

LOCKER RM

G167

TOILET

G168

TOILET

G165

SHOWER

G163

TOILET

G169

SHOWER

G171

STAIR

G180

MENS

LOCKER RM

G170

MENS POOL

LOCKER RM

G178

TOILET

G177

TOILET

G172

PASSAGE

G173TRAINING

G174

STORAGE

G175TOILET

G176

POOL

MECHANICAL

K102

PASS

G140

TOILET

K105

STORAGE

K106

PASSAGE

K107

STORAGE

K108

OFFICE

K111

CONF

ROOM

K110

OFFICE

K112

NATATORIUM

K103

STAIR

K100

STORAGE

K101

OFFICE

L105

CHEMISTRY

LAB

L102

CHEMISTRY

CLASSROOM

L107

CHEMISTRY

CLASSROOM

L112

OFFICE

L111

PREP

ROOM

L109

CHEMISTRY

LAB

L108

CORRDIOR

L113

CORRDIOR

L118

EARTH SCIENCE

LAB

L117

OFFICE

L116

WORK

ROOM

L115

EARTH SCIENCE

LAB

L114

CLASSROOM

J109

CLASSROOM

L123

CLASSROOM

L124

CLASSROOM

L125

CLASSROOM

L126

CLASSROOM

L128

CLASSROOM

L129

CLASSROOM

L130

CLASSROOM

L131

CLASSROOM

L132

CORRDIOR

L122

CORRDIOR

L127

CORRIDOR

K113VEST

K114

GYMNASIUM

SOUTH

K115

GYMNASTICS

K122

STORAGE

K120

JC

K121

MACHINE

ROOM

K117

ELEV

K118

LOCKER ROOM

M103PASSAGE

M102

TOILET

M106

TOILET

M107

STAIRS

M109

UNIT D

UNIT A

U N

IT

A

U N

IT

B

CORRIDOR

A142

VESTIBULE

B100

PASSAGE

B109

CLASSROOM

B132

CLASSROOM

B133

CLASSROOM

B134

CLASSROOM

B135

PASS

B138

PASS

D104

PASSAGE

D123

CORRIDOR

E100

PASS

E127

PASS

E138

PASS

E141

CORRIDOR

E145

PASS

F107

MEDIA

CENTER

F114

CORR

F119

CORR

F124

CORRIDOR

F127

VEST

F129

STORAGE

F110

STORAGE

G121

CORRIDOR

G179

STORAGE

G154

VEST

H117

STOR

H118

CORRIDOR

J104

STORAGE

J125

CORRIDOR

K109

CORRIDOR

K116

STORAGE

K119

GYMNASIUM

SOUTH

M100

GYMNASTICS

M101

LOCKER ROOM

M104

LOCKER ROOM

M105

WIEGHT ROOM

M108

UNIT F

UNIT C

UNIT J

UNIT F

U N

IT

B

U N

IT

C

U N

IT

G

U N

IT

D

U N

IT

G

U N

IT

H

U N

IT

H

U N

IT

J

UNIT K

UNIT G

UNIT K

UNIT G

UNIT L

UNIT H

CORRDIOR

L100

CHEMISTRY

CLASSROOM

L106

CORRDIOR

L120

UNIT L

UNIT H

UNIT L

UNIT J

UNIT L

UNIT J

UNIT M

UNIT K

UNIT M

UNIT K

PASS

L104

PASS

L110

C O

PI

ER

ENTRY

F117

C O

PI

ER

COPIER

OFFICE

H138

COPIER

FE

B

R F

SCALE:

COMPOSITE FIRST FLOOR PLAN

1/64" = 1'-0"

VEST

K201

STORAGE

K201

ELEV

K202

STAIRS

K203

STORAGE

K204

PASS

K205

MECH

K206

ACTIVITY

K207

ACTIVITY

M200

TBD

M201

STORAGE

M202

MECH

M203

ACTIVITY

M204

STAIRS

M205

UPPER

NATATORIUM

G200

MECHANICAL

G201

UNIT D

UNIT A

U N

IT

A

U N

IT

B

U N

IT

G

U N

IT

D

U N

IT

G

U N

IT

H

UNIT K

UNIT G

UNIT K

UNIT G

UNIT M

UNIT K

UNIT M

UNIT K

TBD

M206

SCALE:

COMPOSITE SECOND FLOOR PLAN

1/64" = 1'-0"

A2.01

COMPOSITE

PLAN

09/24/2025 ADDENDUM 1

ISSUE DATE ISSUED FOR

CHECKED

APPROVED

DRAWN

PROJECT

SHEET

PROJECT NUMBER

SHEET NUMBER

08/08/2025 BIDS

Livonia Public Schools Hydration Stations Stevenson High School

LIVONIA,

MICHIGAN

2025-040

-0

LP

S

HY

DR

AT

IO

N

ST

AT

IO

NS

GRS

AMN

DCJ

KEY PLAN

E D

F

G H J

K

A B C

L L

M

2851 High Meadow Circle | Suite 100 Auburn Hills | MI 48326

248.656.1377

ADD

AutoCAD SHX Text

MAX Q

AutoCAD SHX Text 21x48

AutoCAD SHX Text 533x1219

AutoCAD SHX Text

MAX Q

AutoCAD SHX Text 21x48

AutoCAD SHX Text 533x1219

AutoCAD SHX Text

MAX Q

AutoCAD SHX Text 21x48

AutoCAD SHX Text 533x1219

AutoCAD SHX Text

MAX Q

AutoCAD SHX Text 21x48

AutoCAD SHX Text 533x1219

AutoCAD SHX Text

MAX Q

AutoCAD SHX Text 21x48

AutoCAD SHX Text 533x1219

SCALE:

UNIT A FIRST FLOOR PLAN

3/32" = 1'-0"

VESTIBULE

A100

LOBBY

A101

TICKETS/

CONCESSIONS

A102LIFT

A103

OFFICE

A105

CORRIDOR

A104

STAIR

A106

CORRIDOR

A107

MENS

TOILET

A109

WOMENS

TOILET

A108 JC

A111

CORRIDOR

A110

CORRIDOR

A112

VESTIBULE

A113

VESTIBULE

A114

HOUSE

A115

STAIR

A117

ORCHESTRA

PIT

A116

VESTIBULE

A118

IDF

A119

CHURCH

STORAGE

A120

STAIR

A121

VESTIBULE

A122

STAGE

A123

CORRIDOR

A126

INSTRUMENTAL

A127

OFFICE

A128

PASSAGE

A129

PRACTICE

A131

PRACTICE

A130

INSTRUMENT

STORAGE

A132

VOCAL

A136

PRACTICE

A134

PRACTICE

A133

OFFICE

A135

DIMMER

ROOM

A125

VESTIBULE

A124

VESTIBULE

D101

CORRIDOR

D100

CORRIDOR

A137

PROPS

STORAGE

A138

INSTRUMENT

STORAGE

A139

ENSEMBLE

ROOM

A140

OFFICE

A141

OFFICE

A144

STUDENT

INSTRUMENT

A145

STRINGS

STORAGE

A146

MUSIC

LIBRARY

A147

JC

A148

WOMENS

DRESSING

A150

PASSAGE

A152

TOILET

A151

PASSAGE

A153

MENS

DRESSING

A155

TOILET

A154

ROBE/UNIFOMR

GEN STOR

A149

CAREER

TECH

A143

CORRIDOR

D118

UNIT D

UNIT A

U N

IT

A

U N

IT

B

CORRIDOR

A142

VEST

B100

5/8" HIGH IMPACT GYPSUM BOARD EACH SIDE OF METAL STUD AT 16" O.C.

REFER TO PARTITION TYPE TAG. ALL INTERIOR PARTITIONS TO

UNDERSIDE OF DECK U.N.O.

EXTERIOR WALLS TO BE 4" NOMINAL BRICK ON CONCRETE BLOCK WALL

WITH 3" RIGID CAVITY INSULATION

C.M.U. PARTITION AS DIMENSIONED. REFER TO PARTITION TYPE TAG.

FLOOR PLAN LEGEND

INDICATES BATT SOUND ATTENUATION INSULATION

FLOOR PLAN NOTES

ALL INTERIOR PARTITIONS SHALL EXTEND UP TO UNDERSIDE OF ROOF DECK

UNLESS OTHERWISE INDICATED.

PATCH ALL HOLES FROM REMOVED ITEMS SUCH AS, BUT NOT LIMITED TO

THERMOSTATS, NAIL HOLES, WALL MOUNTED CASEWORK, ETC.

COURSE IN NEW BRICK TO MATCH EXISTING WHERE PLUMBING WORK IS BEING

DONE. TOOTH-IN TO MATCH COURSING - TYPICAL.

1.

2.

3.

ALL INTERIOR WALLS TO EXTEND TO DECK UNLESS OTHERWISE

INDICATED.

PARTITION TYPE. REFER TO SHEET A0.03 FOR PARTITION

TYPES LEGENDX-X12

GENERAL NOTES

ALL STUD PARTITIONS TO BE TYPE U.N.O.1.

ALL MASONRY PARTITIONS TO BE TYPE U.N.O.2.

S4

M8

ALL GYP. BD. IN CLASSROOMS AND CORRIDORS TO BE HIGH IMPACT3.

USE EXISTING

CONNECTIONS FOR

INSTALLATION OF

COMPLIANT FOUNTAIN

A3.02A

A

CH4

±4'-4 3/4"

A2.10A

UNIT A

FIRST FLOOR PLAN

09/24/2025 ADDENDUM 1

ISSUE DATE ISSUED FOR

CHECKED

APPROVED

DRAWN

PROJECT

SHEET

PROJECT NUMBER

SHEET NUMBER

08/08/2025 BIDS

Livonia Public Schools Hydration Stations Stevenson High School

LIVONIA,

MICHIGAN

2025-040

-0

LP

S

HY

DR

AT

IO

N

ST

AT

IO

NS

GRS

AMN

DCJ

KEY PLAN

E D

F

G H J

K

A B C

L L

M

2851 High Meadow Circle | Suite 100 Auburn Hills | MI 48326

248.656.1377

ADD

ROOM FINISH SCHEDULE REMARKS

1. PATCH AND PAINT WALL AND INSTALL NEW WALL BASE AS REQUIRED FOR NEW HYDRATION STATIONS

2. INSTALL NEW WALL TILE ON NEW CHASE WALL (FULL HEIGHT) FOR NEW HYDRATION STATIONS - REFER TO ELEVATIONS

ROOM FINISH SCHEDULE GENERAL NOTES

ROOM FINISH SCHEDULE ABBREVIATIONS

A. PAINTING OF EXISTING WALLS - REMOVE ALL EXISTING CLOCKS, SPEAKERS, SWITCH PLATE COVERS, OUTLET COVERS, THERMOSTATS, DIFFUSERS, GRILLES, REGISTERS, BLINDS, SHADES, EQUIPMENT, MARKERBOARDS, TACKBOARDS, ARTWORK AND OTHER MATERIALS PRIOR TO PAINTING AND RE-INSTALL IN THE SAME LOCATION AFTER PAINTING IS COMPLETE. PAINT ANY ITEMS THAT ARE CURRENTLY THE SAME COLOR AS THE EXISTING WALL. PAINT EXISTING CONDUIT TO MATCH THE WALL. PROTECT EXISTING FIRE ALARM DEVICES TO REMAIN IN PLACE.

B. SEE THE A7 & A9 SERIES SHEETS FOR PAINT DESIGNATIONS.

C. SEE THE A9 SERIES SHEETS FOR FLOOR PATTERNS.

D. PROVIDE RADIUS EDGE AT COUNTERTOPS.

E. DO NOT PAINT OVER EXISTING MURALS, LETTERS, QUOTES, ETC. UNLESS NOTED OTHERWISE AND DIRECTED BY OWNER

F. DO NOT PAINT OVER ANY EXISTING EXPOSED BRICK

H. PROVIDE METAL SCHLUTER STRIP AT BOTTOM OF NEW WALL TILE AND OUTSIDE WALL CORNERS - TYP.

I. ALL AREAS OF PEELING COATING MUST BE REMOVED TO A SOUND SUBSTRATE AND CLEANED TO REMOVE ANY OILS, GREASE OR OTHER SOLUBLE CONTAMINANTS.

STAINLESS STEEL

SPLIT FACE CMU

SPORTS IMPACT

SHEET VINYL

TERRAZZO

VINYL COMPOSITION TILE

WATERPROOF

SS

SP CMU

SPI

SV

TER

VCT

WP

SSM SOLID SURFACE MATERIAL

EXPO

EXIST

CT

CPT

CPL

CONC

CMU

BRICK

B CMU

ANOD

ACT

GLASS

EXPOSED

EXISTING

CERAMIC TILE

CARPET

CEMENT PLASTER

CONCRETE

CONCRETE MASONRY UNIT

BRICK

BURNISHED CMU

ANODIZED

ACOUSTICAL CEILING TILE

RBF

QT

PTD

PT

PLAS

PLAM

PART'N

NSF

MP

LMC

GYP

GCMU

RUBBER TILE

QUARRY TILE

PAINTED

PORCELAIN TILE

VENEER PLASTER

PLASTIC LAMINATE

MOVEABLE PARTITION

NON-SLIP FINISH

METAL PANEL

LINEAR METAL CEILING

GYPSUM BOARD

GLAZED CMU

SEAL

SAAC

RB

CONCRETE SEALER

SPRAY-APPLIED ACOUSTICAL COATING

RESILIENT WALL BASE

MATCH EXISTINGMA EX

GL

ROOM FINISH SCHEDULE UNIT A

RM.

NO. ROOM NAME

MAT. FINISH

FLOOR

MAT. FINISH

BASE

MAT. FINISH

NORTH

MAT. FINISH

EAST

MAT. FINISH

SOUTH

MAT. FINISH

WEST

WALLS

DOOR

FRAME

MAT. FINISH HGT.

CEILING

M/C FINISH

MILLWORK/CASEWORK

REMARKS

A110 CORRIDOR - - - - - - - - GYP CT3/C4 - - - - - - - - 2

ROOM FINISH SCHEDULE UNIT B

RM.

NO. ROOM NAME

MAT. FINISH

FLOOR

MAT. FINISH

BASE

MAT. FINISH

NORTH

MAT. FINISH

EAST

MAT. FINISH

SOUTH

MAT. FINISH

WEST

WALLS

DOOR

FRAME

MAT. FINISH HGT.

CEILING

M/C FINISH

MILLWORK/CASEWORK

REMARKS

B131 CLASSROOM - - EX/RB EX/B1 - - - - - - EX/CMU EX/ P1SG-A - - - - - - 1

ROOM FINISH SCHEDULE UNIT F

RM.

NO. ROOM NAME

MAT. FINISH

FLOOR

MAT. FINISH

BASE

MAT. FINISH

NORTH

MAT. FINISH

EAST

MAT. FINISH

SOUTH

MAT. FINISH

WEST

WALLS

DOOR

FRAME

MAT. FINISH HGT.

CEILING

M/C FINISH

MILLWORK/CASEWORK

REMARKS

F104

F108

CORRIDOR

MENSTOILET

EX/RB

EX/RB

EX/B1

EX/B1

EX/CMU

EX/P1SG-A

EX/CMU

EX/P1SG-A

KEY MANUFACTURER STYLE COLOR DESCRIPTION INSTALLATION / LOCATION NOTES

C

EI

LI

N

G

W

AL

L

BA

SE

B1 TARKETT RUBBER WALL BASE MATCH EXISTING ROLLED RUBBER GOOD -

FL

O

O R

IN

G

W

AL

L

TI

LE

CT3 DALTILE COLOR WHEEL CLASSIC COLOR TBD 3" x 6" DRINKING FOUNTAIN TILE

CT4 DALTILE COLOR WHEEL CLASSIC COLOR TBD 3" X 6" DRINKING FOUNTAIN TILE

PA

IN

T

P1SG-A SHERWIN WILLIAMS MATCH EXISTING SHEEN MATCH EXISTING SINGLE COMPONENT EPOXY MATCH EXISTING FIELD COLOR

M

IL

LW

O

R K

M

IS

C

EL

LA

N

EO

U

S

MATERIAL AND COLOR SCHEDULE

SCALE:

CORRIDOR A110

1/4" = 1'-0" A

A2.10A

Bottles savedFilter status

Bottles savedFilter status

NEW STUD CHASE

WALL WITH

DRYWALL BEHIND

CT3

PLUMBING FIXTURES

- SEE MECH

CT4

CT3

A3.02A

ROOM FINISH

SCHEDULE, MATERIAL

AND COLOR

SCHEDULE

09/24/2025 ADDENDUM 1

ISSUE DATE ISSUED FOR

CHECKED

APPROVED

DRAWN

PROJECT

SHEET

PROJECT NUMBER

SHEET NUMBER

08/08/2025 BIDS

Livonia Public Schools Hydration Stations Stevenson High School

LIVONIA,

MICHIGAN

2025-040

-0

LP

S

HY

DR

AT

IO

N

ST

AT

IO

NS

GRS

AMN

DCJ

KEY PLAN

E D

F

G H J

K

A B C

L L

M

2851 High Meadow Circle | Suite 100 Auburn Hills | MI 48326

248.656.1377

ADD

ADD

ADD

ADD

ADD

(E)DF

(E)DF1

MENS

TOILET

F108

GENERAL DEMOLITION NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF

DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.

B

ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL

BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S

REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT

BUILDING'S OPERATION.

C

PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE

SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,

SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY

INTERFERENCES OR DISCREPANCIES.

D

ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED

COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,

SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES

AND DUCTS.

E

THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT

BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING

RELOCATED AND OWNER-PROVIDED EQUIPMENT.

F

VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING

UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION, PRIOR TO

STARTING WORK.

G

ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING

UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN

LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND

REQUIRES FIELD VERIFICATION.

H

ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.

WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING

DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS

REQUIRED TO MATCH EXISTING.

DEMOLITION KEYED NOTES

1 REMOVE DRINKING FOUNTAIN/BOTTLE FILLING STATION COMPLETE. REMOVE

STOPS, TEMPORARILY CAP, AND PREPARE PIPING FOR NEW CONNECTION.

X

(E)DF

(E)DF

MENS

TOILET

B115

1(E)DF

CORRIDOR

A110

CORRIDOR

A112

(E)DF

(E)CP

(E)DF1

MECH

M203

EWC-1 1

EWC-12

MECH

M203

CORRIDOR

A110

CORRIDOR

A112

EWC-1 2

EWC-1 1

MENS

TOILET

B115

CORRIDOR

E101

PLUMBING GENERAL NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF

DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.

B

ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL

BE PERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER'S

REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT

BUILDING'S OPERATION.

C

PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE

SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,

SYSTEMS, AND UTLITIES. NOTIFY DESIGN PROFESSIONAL OF ANY

INTERFERENCES OR DISCREPANCIES.

D

ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED

COMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,

INSULATION, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTS.

E

THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT

BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING

RELOCATED AND OWNER PROVIDED EQUIPMENT.

F

VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING

UTILITIES IN THE FIELD. INCLUDING POINTS OF CONNECTION PRIOR TO

STARTING ANY WORK.

G

ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING

UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN

LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND

REQUIRES FIELD VERIFICATION.

H

ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.

WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING

DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS

REQUIRED TO MATCH EXISTING.

J

INSTALL ALL SANITARY AND STORM PIPING 2 1/2" OR LESS AT 1/4" PER

FOOT AND 3" AND LARGER PIPING AT 1/8" PER FOOT MINIMUM UNLESS

NOTED OTHERWISE. MINIMUM UNDERGROUND PIPE SIZE SHALL BE 3".

K PROVIDE "INLINE" WATERLESS PRIMER TRAP SEAL PROTECTION ON ALL

FLOOR DRAINS AND TRAPS SUBJECT TO EVAPORATION.

L AT EACH CONNECTION OF GAS SUPPLY TO EQUIPMENT, PROVIDE A PIPE

UNION, GAS SHUT OFF VALVE, TEE, AND 6" LONG DIRT LEG WITH CAP.

M

THE CEILING SPACE IS USED AS A RETURN AIR PLENUM. NO PLASTIC

MATERIALS INCLUDING PVC PIPING, CONDUIT WIRING, ETC. SHALL BE

USED. ALL MATERIALS TO BE USED ARE TO BE PLENUM RATED.

NEW WORK KEYED NOTES

EXTEND 1/2" CW, 1 1/2" V, AND 1 1/2" SAN FROM PIPING IN WALL AND CONNECT

TO ELECTRIC WATER COOLER. TERMINATE WITH STOPS. REMOVE BLOCK WALL

AS REQUIRED FOR INSTALLATION. SEE ARCHITECTURAL DRAWINGS FOR MORE

INFORMATION.

EXTEND AND REARRANGE 1/2" CW, 1 1/2" V, AND 1 1/2" SAN FROM EXISTING

PIPING IN FURRED OUT WALL AND CONNECT TO TWO ELECTRIC WATER

COOLERS. TERMINATE WITH STOPS. MINIMUM DISTANCE FROM CENTER OF EACH

FIXTURE TO ADJACENT WALL SHALL BE 15". SEE ARCHITECTURAL DRAWINGS FOR

MORE INFORMATION.

X

EWC-11

MENS

TOILET

F108

PLUMBING FIXTURE SCHEDULE

TAG BARRIER

FREE ITEM

PIPE CONNECTION SIZES MANUFACTURER &

MODEL NO. ACCESSORIES

WASTE VENT CW HW

EWC-1 Y

FILTERED ELECTRIC

WATER COOLER WITH

BOTTLE FILLER

1 1/2" 1 1/2 1/2" - ELKAY: LZS8WSLP

FIXTURE TO BE PROVIDED BY

OWNER. CONTRACTOR TO PROVIDE

CANE APRON ELKAY: LKAPREZL

EWC-2 - NOT USED - - - - - -

NOTES:

1. PROVIDE ALL ACCESSORIES NECESSARY FOR COMPLETE AND OPERABLE INSTALLATION.

2. ALL FIXTURES SHALL MEET MICHIGAN DEPT. OF PUBLIC HEALTH REQUIREMENTS, AND SHALL BE SUITABLE FOR FOOD PREPARATION AREAS.

ENLARGED PLUMBING

DEMOLITION AND NEW

WORK PLANS

P4.10

ISSUE DATE ISSUED FOR

CHECKED

APPROVED

DRAWN

PROJECT

SHEET

PROJECT NUMBER

SHEET NUMBER

MPH

MPH

MB

2851 High Meadow Circle | Suite 100 Auburn Hills | MI 48326

248.656.1377

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 029.25.08 - ST

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

2025-xxx.x

X

2025-040.0

-0

.0

LP

S

HY

DR

AT

IO

N

ST

AT

IO

NS

Livonia Public Schools Hydration Stations

LIVONIA,

MICHIGAN

KEY PLAN

E D

F

G H J

K

A B C

L L

M

08/08/2025 BIDS

Stevenson High School

SCALE:

ENLARGED PLUMBING

DEMOLITION PLAN - F-108

1/4" = 1'-0"

P1.01

SCALE:

ENLARGED PLUMBING DEMOLITION

PLAN - B-115 / CORRIDOR E-101

1/4" = 1'-0"

P1.01

SCALE:

ENLARGED PLUMBING DEMOLITION

PLAN - CORRIDOR A-110

1/4" = 1'-0"

P1.01

SCALE:

ENLARGED PLUMBING DEMOLITION

SECOND FLOOR PLAN - M-203

1/4" = 1'-0"

P1.02

SCALE:

ENLARGED PLUMBING

NEW WORK PLAN - F-108

1/4" = 1'-0"

P1.01

SCALE:

ENLARGED PLUMBING NEW WORK

PLAN - B-115 / CORRIDOR E-101

1/4" = 1'-0"

P1.01

SCALE:

ENLARGED PLUMBING NEW WORK

PLAN - CORRIDOR A-110

1/4" = 1'-0"

P1.01

SCALE:

ENLARGED PLUMBING NEW WORK

SECOND FLOOR PLAN - M-203

1/4" = 1'-0"

P1.02

ADDENDUM 0109/24/2025

AutoCAD SHX Text

OS

OS

GENERAL DEMOLITION NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF

DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.

B

ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL

BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S

REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT

BUILDING'S OPERATION.

C

PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE

SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,

SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY

INTERFERENCES OR DISCREPANCIES.

D

ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED

COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,

SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES

AND DUCTS.

E

THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT

BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING

RELOCATED AND OWNER-PROVIDED EQUIPMENT.

F

VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING

UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION, PRIOR TO

STARTING WORK.

G

ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING

UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN

LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND

REQUIRES FIELD VERIFICATION.

H

ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.

WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING

DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS

REQUIRED TO MATCH EXISTING.

DEMOLITION KEYED NOTES

RECEPTACLE TO BE REMOVED COMPLETE. TAKE CONDUIT AND WIRING

BACK TO SOURCE. PREP CIRCUIT FOR CONNECTION TO NEW

RECEPTACLE. REFER TO NEW WORK PLANS.

X

CORRIDOR

A110

CORRIDOR

A112

MECH

M203

EWC-1

EWC-1

GF

I

GFI

CP-FITNESS-10

CP-FITNESS-12

CORRIDOR

A110

CORRIDOR

A112

EWC-1

GFI

GFI

MENS

TOILET

B115

CORRIDOR

E101

EWC-1

CP

E) -R

P-

BB

-M

GFI

LP-D-21

NEW WORK KEYED NOTES

RUN NEW WIRE AND CONDUIT FOR NEW DRINKING FOUNTAIN GFCI

RECEPTACLE. RECEPTACLE SHALL BE READILY ACCESSIBLE. CIRCUIT TO

EXISTING SPARE 20A BREAKER AS SHOWN

2 EXTEND EXISTING SPARE CIRCUIT MADE AVAILABLE DURING

DEMOLITION. EXTEND CONDUIT AND WIRING AS REQUIRED.

X

POWER GENERAL NOTES

A

THESE DRAWINGS ARE DIAGRAMMAITC AND REPRESENT THE GENERAL

EXTENT OF THE WORK TO BE PERFORMED. PROVIDE AND EXECUTE ALL

HVAC SYSTEMS PER ENGINEER'S SPECIFICATION, AND LOCAL APPLICABLE

CODES INCLUDING AMENDMENTS, BULLETINS, ETC. AS WELL AS THE

STANDARDS OF INSTALLATION AND EQUIPMENT ESTABLISHED FOR THE

BUILDINGS, AND REQUIREMENTS OF THE OWNER.

B

EXCEPT FOR CHANGES AS MAY BE SPECIFICALLY APPROVED BY THE

ENGINEER OF RECORD. IN ACCORDANCE WITH ALTERNATES OF OPTIONS

AS STATED HEREINAFTER, ALL WORK MUST BE IN FULL ACCORDANCE

WITH THE INTENT OF THE PLANS AND SPECIFICATIONS. SYSTEMS ARE

TO BE COMPLETE, EFFICIENT, AND SATISFACTORY OPERATION WHEN

PROJECT IS DELIVERED TO THE OWNER.

D

CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVAL

FROM GOVERNING AUTHORITIES AND FILE NECESSARY FORMS, PAY ALL

INSPECTION FEES.

E

ELECTRICAL CONTRACTOR SHALL COMPLY WITH THE LATEST NATIONAL

ELECTRICAL CODE, LIFE SAFETY CODE AND APPLICABLE STATE AND

LOCAL CODES AND ORDINANCES.

F

ELECTRICAL EQUIPMENT AND WIRING SHALL BE NEW AND SHALL BE

FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR, UNLESS

OTHERWISE NOTED.

G WIRING SHALL BE IN CONDUIT. CONDUIT SHALL BE 3/4" CONDUIT

MINIMUM. CONDUITS IN FINISHED AREAS SHALL BE CONCEALED

H

NEW WIRES SHALL BE TYPE THHN. MINIMUM SIZE SHALL BE #12 AWG,

UNLESS OTHERWISE NOTED. FINAL CONNECTIONS TO EQUIPMENT,

FURNISHED AND INSTALLED BY OTHERS, SHALL BE PROVIDED BY THIS

CONTRACTOR.

MENS

TOILET

F108

EWC-1

GF

I

LP-E-34

ENLARGED ELECTRICAL

POWER DEMOLITION

AND NEW WORK PLANS

E4.10

ISSUE DATE ISSUED FOR

CHECKED

APPROVED

DRAWN

PROJECT

SHEET

PROJECT NUMBER

SHEET NUMBER

MPH

RDL

RDL

2851 High Meadow Circle | Suite 100 Auburn Hills | MI 48326

248.656.1377

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 029.25.08 - ST

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

2025-xxx.x

X

2025-040.0

-0

.0

LP

S

HY

DR

AT

IO

N

ST

AT

IO

NS

Livonia Public Schools Hydration Stations

LIVONIA,

MICHIGAN

KEY PLAN

E D

F

G H J

K

A B C

L L

M

08/08/2025 BIDS

Stevenson High School

SCALE:

ENLARGED ELECTRICAL POWER

DEMOLITION PLAN - CORRIDOR A-110

1/4" = 1'-0"

E1.01

SCALE:

ENLARGED ELECTRICAL POWER

NEW WORK PLAN - F-108

1/4" = 1'-0"

E1.01

SCALE:

ENLARGED ELECTRICAL POWER

NEW WORK PLAN - B-115 / E-101

1/4" = 1'-0"

E1.01

SCALE:

ENLARGED ELECTRICAL POWER

NEW WORK PLAN - CORRIDOR A-110

1/4" = 1'-0"

E1.01

SCALE:

ENLARGED ELECTRICAL POWER

NEW WORK SECOND FLOOR PLAN - M-203

1/4" = 1'-0"

E1.02

ADDENDUM 0109/24/2025

OS

25040 STEVENSON A210A-A210A
25040 STEVENSON ca01-A302A
P4.10 ENLARGED PLUMBING DEMOLITION AND NEW WORK PLANS
P4.10 ENLARGED PLUMBING DEMOLITION AND NEW WORK PLANS
E4.10 ENLARGED ELECTRICAL POWER DEMOLITION AND NEW WORK PLANS
E4.10 ENLARGED ELECTRICAL POWER DEMOLITION AND NEW WORK PLANS