250826 _Tiverton Phase1_BID Set.pdf
PDF 7 MB Posted
- Solicitation number
- 2025 - Library Landscape
- Issued by
- Newport County, Rhode Island
About this file
These construction documents are for the Tiverton Public Library Learning Landscape Phase 1 project located at 34 Roosevelt Avenue in Tiverton, Rhode Island. The project involves landscape redesign and renovation, including a new storywalk path, site grading, planting, and various site improvements. The documents were prepared by Eponymous Practice landscape architecture studio and are dated August 26, 2025, issued for bidding. The project includes multiple alternate options, such as transplanting existing trees and adding shrub plantings, with a focus on creating an enhanced outdoor learning and reading environment around the library.
The project includes detailed specifications for site preparation, materials, and construction, with specific requirements for path construction, boulder retaining walls, split rail fencing, and landscaping. The site work involves removing existing vegetation, creating a winding storywalk path with specific grading and material requirements, installing storywalk sign posts, and implementing new lawn and shrub plantings. The documents provide comprehensive technical details, including construction methods, material specifications, and installation guidelines. The project appears to be funded locally and will be executed in phases, with careful attention to preserving existing site features and creating an engaging outdoor space for library patrons.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tiverton Library Contract Documents_082625.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1. Existing conditions and topography data are from a survey prepared by Civil Engineering Concepts, inc. 34A Main Street, Little Compton, RI 02837. Phone:
401-592-0177 Fax: 401-592-0178, Dated August 10, 2023.
2. Contractor shall verify location of any existing utilities and services and provide protection during construction. Utilities damaged during construction shall be repaired at contractors expense.
3. Contractor shall obtain permits for the work as required and comply with all laws, ordinances, rules and regulations of the local jurisdiction, the state, and all other authorities having jurisdiction.
4. Contractor shall leave site clean and orderly during construction process.
Remove from site all excess materials, soil, debris and equipment. Store materials only in an approved location.
5. All operations will be conducted with the minimum interference to both vehicular and pedestrian traffic.
6. Contractor shall not close or obstruct any public street or sidewalk without permitfrom and notification of the proper authorities.
TIVERTON PUBLIC LIBRARY
LEARNING LANDSCAPE
PHASE 1
34 ROOSEVELT AVENUE
TIVERTON, RI 02878
Sheet Title
Sheet Number
Stamp
0' 32'16'8'
Job No.
Drawn by: Checked by:
Scale Date
Issuance Date Description
2216.02
EP JJ
eponymous practice landscape architecture studio
183 High Street Bristol, RI 02809
T 617-999-9345 www.eponymouspractice.com
06.02.2025 PERMITTING
1/16" = 1'-0" 08.26.2025
2 08.26.2025 ISSUED FOR BID
COVERSHEET
L-000
TIVERTON PUBLIC LIBRARY
LEARNING LANDSCAPE PHASE 1
SHEETS:
ISSUED 08.26.2025 FOR BID
L-000 COVER SHEET
SITE SURVEY
L-100 SITE DEMO AND PREPARATION
L-200 SITE MATERIALS & GRADING PLAN
L-300 SITE PLANTING PLAN
L-400 SITE DETAILS
242.20
DH PT 140
238.67
ESW
238.70
TC
238.13
BC
239.64
UP 105
239.91
ESW
240.03
TC
239.50
BC
241.39
BC
241.80
TC
241.80
ESW
244.57
UP 106
244.64
ESW
244.66
TC
244.14
BC
241.32
EP
239.29
EP
237.75
241.99
TC
241.65
BC
241.61
CONC
241.52
TC
241.08
BC
241.79
CONC
241.70
CONC
241.59
CONC50
241.37
CONC
241.38
CONC
241.15
CONC
241.21
CONC
241.07
BOT RAMP
241.11
CONC
240.91
CONC
240.93
CONC
240.88
CONC
240.69
TREE 6" [N]60
241.12
CONC
240.65
BOT STAIR
240.52
BOT STAIR
240.56
CONC
239.87
CONC
239.32
CONC
238.88
CONC
239.40
FSW
240.53
TLP WALL
237.88
CONC
237.41
FSW
240.29
TOP WALL
237.23
FSW
237.24
CONC
236.66
CONC
236.54
CONC
236.05
CONC
235.89
CONC
235.88
CONC
236.00
BIKE
235.90
BIKE
235.84
BIKE
235.86
236.75
FSW
240.27
TOP WALL
235.12
FACE STONE ST
235.57
FACE STONE
235.75
FACE STONE
235.70
FACE STONE
235.54
FACE STONE
236.22
FACE STONE
235.24
FACE STONE END
237.40
FSW 99
240.24
TOP WALL
240.58
TOP WALL
238.14
FSW
237.75
FSW
240.20
TOP WALL
237.83
FSW
240.27
TOP WALL
240.36
WALL
239.92
FSW END
240.45
GS
240.41
GS
241.89
GS
241.66
GS
242.12
GS
242.27
GS
243.81
CO
242.91
SMH
242.87
SMH
243.93
SMH
244.06
SMH
242.87
GS
243.75
GS
243.59
TC
243.42
TC
245.57
GS
245.40
GS
245.88
GS
244.98
GS
245.52
VENT
245.67
GS
245.73
GS
243.12
BC
243.57
TC
243.62
GS
243.34
TC
242.90
BC
242.67
TRASH
242.84
TRASH
242.74
TRASH
242.99
TRASH
244.71
GS
245.25
GS
245.68
GS
245.85
EVEG
246.02
EVEG
245.49
EVEG
244.92
EVEG
243.65
EVEG
243.39
EVEG
242.86
EVEG
242.98
EVEG
242.93
EVEG
244.09
EVEG
243.17
CLSW SCATTERED
240.45
CLSW SCATTERED/CLSW
241.07
EVEG
240.19
EVEG
241.43
EVEG
242.19
EVEG
242.25
GS 159
241.64
GS
239.50
GS161
239.44
EVEG
239.38
EVEG
241.18
EVEG
241.75
EVEG
241.14
EVEG
240.59
EVEG
239.86
EVEG
239.49
EVEG
237.64
EVEG
236.71
EVEG
236.19
EVEG
236.22
EVEG
236.01
EVEG
236.17
EVEG
233.23
BB
235.92
TB
236.37
TB
235.90
TB
233.98
EVEG
233.41
BB
234.44
BB
234.01
BB
232.21
BB
233.92
TOP RR
232.76
232.97
234.82
RR
235.16
RR
232.49
232.40
BB
232.55
BB
232.31
BB
232.42
BB
232.54
BB
232.11
BOTTOM
232.17
BOTTOM
233.98
BB
232.31
BB
236.25
SHRUB DRIP
236.38
SHRUB DRIP
236.43
SHRUB DRIP
236.06
SHRUB DRIP
235.99
SHRUB DRIP
235.80
EVEG
235.42
EVEG
236.28
TC
235.72
BC
236.46
BC
236.89
TC
238.27
TC
237.83
BC
238.47
BC
238.91
TC
239.27
TC
238.74
BC
238.93
BC
239.45
TC
239.47
TC
239.09
BC
239.18
BC
239.42
BC
239.61
BC
240.07
TC
240.25
TC
239.68
BC
239.88
BC
240.40
TC
240.34
TC
240.04
BC
240.26
BC
240.23
BC
240.38
BC
240.88
TC
241.10
TC
240.64
BC
240.67
BC
240.70
BC
240.88
BC
241.40
TC
240.81
WG 297
241.00
WG
241.50
TC
241.09
BC
241.21
BC
241.67
TC
241.22
CB
241.32
BC
241.79
TC
242.11
BOT RAMP
243.53
DOOR
241.59
HYDRANT
241.99
TC
241.68
BC
241.68
BC
241.87
BC
242.14
BC
242.56
TC
242.30
ELEC BOX
242.76
TC
242.32
BC
243.13
TC
242.46
BC
242.65
BC
243.14
BC
242.97
BC
243.76
TC
243.99
TC
243.46
BC
243.16
BC
243.58
TC
243.25
TC
242.86
BC
242.72
BC
242.70
BC
242.66
BC
243.19
TC
243.17
TC
242.62
BC
242.71
BC
243.23
TC
243.10
SHRUB DRIP
243.17
SHRUB DRIP339
243.18
SHRUB DRIP
244.90
TREE 6" [N]
239.08
GS
241.65
TB
242.11
TB
241.05
EVEG
242.08
TB
241.31
TB
240.91
TOP HEADWALL 6"
240.87
TOP HEADWALL 6"
240.46
RR
239.22
RR
239.23
RR
239.41
RR
240.40
RR
241.22
GS355
240.91
GS
240.27
RR
239.96
RR
239.87
RR
240.81
RR
239.64
GS
239.93
EVEG
239.53
TB
238.96
EVEG
238.18
EVEG
238.31
EVEG
238.41
EVEG
238.29
EVEG
237.71
EVEG
237.61
RR
237.92
RR 371
238.51
RR
238.96
TOP HEADWALL 6"
238.88
TOP HEADWALL 6"
236.72
RR
236.38
RR
236.36
BB
236.34
BB
236.59
BB
236.53
BB
236.45
BB
236.45
BB
236.57
BB
236.57
RR
236.90
TOP RR
236.17
RR
236.50
RR
236.77
RR
236.35
BB
236.04
BB
236.39
RR
236.54
BB
239.75
DMH
BULGARMARSH ROAD
PLANTER
PLANTER
12" Dia. ADS STORM DRAIN
EXISTING DRAIN MANHOLE
RIM = 234.67
12" ADS INV = 231.94
EXISTING CATCH BASIN
SMH
SMH
T
EMH
HYD.
6" TREE
6" TREE
EXISTING LIBRARY BUILDING
STAIRCASE
RAMP
RAMP
BUSH
BUSH
INFIL. POND
INFIL. POND
IN
FIL. PO
N D
EXISTING DRAIN MANHOLE
HYD.
CONCRETE SIDEWALK
EXIST.
X-FORMER
CATCH
BASIN
CATCH
BASIN
CATCH
BASIN
CATCH
233234
239238 24
240 242
24023923
TRASH REC.243.34
243.34
243.34
243.34
242.27 242.12
241.66
241.89
240.41 24
240.45
240.52
240.65
242.11
241.07
243.53
C.O.
320'±
127'±
0'
4'
L.O.W.
L.O.W.
L.O.W.
L.O .W
L.O .W
WOODLAND VEGETATION TO BE
CLEARED FOR PATH. TREES TO BE
FELLED WITH STUMPS REMOVED AND
ROOTS GRUBBED. TREE LIMBS AND
OTHER OVERHANGING BRANCHES TO
BE SELECTIVELY CUT BACK. REVIEW
WITH LANDSCAPE ARCHITECT IN FIELD
PRIOR TO COMMENCING CLEARING
OPERATIONS.
AREA OF PATH: CUT AND
REMOVE SOD, STRIP TOPSOIL
AND CUT SUBSOIL TO DEPTH
FOR PAVING BASE.
EXISTING WITCH-HAZEL TO BE
TRANSPLANTED. REFER TO PLANTING
PLAN FOR LOCATION
BASE BID: TREE TO BE FELLED, WITH
STUMP REMOVED AND ROOTS GRUBBED.
ADD ALTERNATE 1: EXISTING TREE TO BE
TRANSPLANTED. REFER TO PLANTING
PLAN FOR NEW LOCATION
EXISTING WALKS, CURBS,
SITEWALLS, AND BUILDING TO
REMAIN AND BE PROTECTED
DURING CONSTRUCTION
EXISTING SIDEWALK TO REMAIN AND BE
PROTECTED THROUGHOUT CONSTRUCTION
EXISTING TURF TO BE REMOVED. RETAIN TOPSOIL IN
PLACE FOR GRADING AND RE-SEEDING
EROSION CONTROL FENCING, TYP.
PROPOSED CONSTRUCTION ENTRANCE.
PROVIDE VEHICULAR TRACKING PAD TO
CONTROL SEDIMENT FROM LEAVING SITE
EXISTING SEPTIC SYSTEM TO
REMAIN AND BE PROTECTED
THROUGHOUT CONSTRUCTION.
CONTRACTOR TO STAKE OUT
BOUNDARY OF SEPTIC SYSTEM
PRIOR TO THE START OF
CONSTRUCTION. NO GRADING OR
EXCAVATION OVER EXISTING
SYSTEM.
CONSTRUCTION FENCE:
ORANGE SNOW FENCING,
TYPICAL.
L-100
24'-0"
EXISTING WALKS, CURB, SITE
WALLS AND BUILDING TO
REMAIN AND BE PROTECTED
DURING CONSTRUCTION
EXISTING VEGETATION TO REMAIN
GENERAL NOTES
1. Existing conditions and topography data are from a survey prepared by Civil Engineering Concepts, inc. 34A Main Street, Little Compton, RI 02837. Phone:
401-592-0177 Fax: 401-592-0178, Dated August 10, 2023.
2. Contractor shall verify location of any existing utilities and services and provide protection during construction. Utilities damaged during construction shall be repaired at contractors expense.
3. Contractor shall obtain permits for the work as required and comply with all laws, ordinances, rules and regulations of the local jurisdiction, the state, and all other authorities having jurisdiction.
4. Contractor shall leave site clean and orderly during construction process.
Remove from site all excess materials, soil, debris and equipment. Store materials only in an approved location.
5. All operations will be conducted with the minimum interference to both vehicular and pedestrian traffic.
6. Contractor shall not close or obstruct any public street or sidewalk without permitfrom and notification of the proper authorities.
TIVERTON PUBLIC LIBRARY
LEARNING LANDSCAPE
PHASE 1
34 ROOSEVELT AVENUE
TIVERTON, RI 02878
Sheet Title
Sheet Number
Stamp
0' 32'16'8'
Job No.
Drawn by: Checked by:
Scale Date
Issuance Date Description
2216.02
EP JJ
eponymous practice landscape architecture studio
183 High Street Bristol, RI 02809
T 617-999-9345 www.eponymouspractice.com
06.02.2025 PERMITTING
1/16" = 1'-0" 08.26.2025
2 08.26.2025 ISSUED FOR BID
SITE DEMO &
PREPARATION
PLAN
L-100
1/16" = 1'-0" 30 MAY 2025
SITE DEMOLITION NOTES
1. Contractor shall verify all existing conditions in the field and report any discrepancies between plans and actual conditions to Landscape Architect before beginning work.
2. Building, structure and paving removal shall include the disconnection and capping of any utilities, footings, slabs, associated base material and satisfactory off-site disposal of all debris produced through the removal operations.
3. Tree and shrub removal shall include the felling, cutting, grubbing out of roots and satisfactory off-site disposal of all stumps vegetative and extraneous debris produced through the removal operations.
4. Existing trees and shrubs to remain shall not be altered under any circumstances and must remain in the same condition as observed prior to construction.
5. No heavy machinery is to be used within the root system of existing trees. Excavation within root system zones is to be performed by hand.
6. Any items scheduled to remain which are damaged by Contractor's operations shall be at Contractor's expense.
7. Any items scheduled to be stockpiled on site which are damaged by Contractor's operations shall be at Contractor's expense.
8. Area for stockpiled items shall be located by Landscape Architect and approved by owner prior to removal operations.
9. Contractor shall leave work site free of any debris at the end of each day's operations.
10. All erosion and sediment control measures to be installed prior to the start of any construction activites.
12" DIA. COIR LOG, TYP.
2X2X24" WOOD STAKE @3' O.C.
OR AS NEEDED TO SECURE
FLOW
NOTE: CONTRACTOR TO PROVIDE
AND MAINTAIN EROSION CONTROL
FOR CONTROL OF RUNOFF OF SILT
UNTIL ALL DISTURBED AREAS HAVE
BEEN PERMANENTLY STABILIZED.
CONTRACTOR TO REMOVE ALL
EROSION CONTROL MEASURES AT
THE COMPLETION AND
ACCEPTANCE OF THE PROJECT.
EROSION CONTROL DETAIL
Scale: 3/4" = 1'-0"1
L.O.W.
DESCRIPTIONSYMBOL
LEGEND
PLANT TO BE TRANSPLANTED
AREA OF PATH: TURF, TOPSOIL,
AND SUBSOIL TO BE REMOVED
TO DEPTH OF PAVING BASE
TURF TO BE REMOVED;
TOPSOIL TO REMAIN
WOODLAND VEGETATION TO BE
CLEARED FOR PATH
EROSION CONTROL FENCING
CONSTRUCTION FENCING
LIMIT OF WORK
data are from a survey prepared by Civil Engineering Concepts, inc. 34A Main Street, Little Compton, RI 02837. Phone:
401-592-0177 Fax: 401-592-0178, Dated August 10, 2023.
2. Contractor shall verify location of any existing utilities and services and provide protection during construction. Utilities damaged during construction shall be repaired at contractors expense.
3. Contractor shall obtain permits for the work as required and comply with all laws, ordinances, rules and regulations of the local jurisdiction, the state, and all other authorities having jurisdiction.
4. Contractor shall leave site clean and orderly during construction process.
Remove from site all excess materials, soil, debris and equipment. Store materials only in an approved location.
5. All operations will be conducted with the minimum interference to both vehicular and pedestrian traffic.
6. Contractor shall not close or obstruct any public street or sidewalk without permitfrom and notification of the proper authorities.
TIVERTON PUBLIC LIBRARY
LEARNING LANDSCAPE
PHASE 1
34 ROOSEVELT AVENUE
TIVERTON, RI 02878
Sheet Title
Sheet Number
Stamp
0' 32'16'8'
Job No.
Drawn by: Checked by:
Scale Date
Issuance Date Description
2216.02
EP JJ
eponymous practice landscape architecture studio
183 High Street Bristol, RI 02809
T 617-999-9345 www.eponymouspractice.com
06.02.2025 PERMITTING
1/16" = 1'-0" 08.26.2025
2 08.26.2025 ISSUED FOR BID
SITE MATERIALS
& GRADING PLAN
L-200
1/16" = 1'-0" 30 MAY 2025
LAYOUT NOTES
1. Do not scale drawings.
2. Contractor shall verify all existing conditions and layout dimensions in the field. Report any discrepancies to the Landscape Architect for design prior to commencing construction.
3. Stake or otherwise flag all design elements and features in the field. Obtain Landscape Architect's approval prior to commencing construction.
4. All dimensions from structure are from face of finish of exterior wall unless otherwise stated.
5. All angles are assumed to be 90 degrees unless otherwise stated.
6. See planting plans for location of trees and shrubs, planting beds and extent of sodding and seeding.
7. See architectural drawings for all building dimensions.
8. Dimensions at curbs of pavement edging are given from outside face of curb to outside face of curb unless otherwise stated.
9. Any changes proposed to dimensions shown on this drawing shall be approved by the Landscape Architect prior to construction.
GRADING NOTES
1. Contractor shall verify all existing grades in the field and report any discrepancies immediately to the landscape architect.
2. Stake proposed finish grade and cut/fills of existing grade in the field. Obtain Landscape Architect's approval prior to commencing construction.
3. Slope away from all buildings.
4. Provide vertical curves or roundings at abrupt changes in grade unless otherwise noted. Blend new earthwork smoothly into existing grades.
5. Maintain existing grades at existing plant material to remain
6. Grade surfaces to assure positive drainage from all structures and to prevent ponding of surface drainage.
7. All fill material is subject to approval by Landscape Architect.
8. Pitch evenly between spot grades. All paved areas must pitch to drain at a minimum of 1/8” per foot, unless otherwise noted. Any discrepancies not allowing this to occur shall be reported to the Landscape Architect prior to continuing work.
9. Once grading operations are completed, all disturbed areas within or outside of the limits of work shall be stabilized by fine grading and seeding or mulching as directed by the Landscape Architect.
10. All erosion control measures are to be constructed to meet field conditions at the time of construction and prior to any grading or disturbance of existing material on balance of site.
242.20
DH PT 140
237.40
ESW
237.47
TC
236.92
BC
238.67
ESW
238.70
TC
238.13
BC
239.64
UP 105
239.91
ESW
240.03
TC
239.50
BC
241.39
BC
241.80
TC
241.80
ESW
244.57
UP 106
244.64
ESW
244.66
TC
244.14
BC
241.32
EP
239.29
EP
237.75
EP
241.99
TC
241.65
BC
241.61
CONC
241.52
TC
241.08
BC
241.79
CONC
241.70
CONC
241.59
CONC50
241.37
CONC
241.38
CONC
241.15
CONC
241.21
CONC
241.07
BOT RAMP
241.11
CONC
240.91
CONC
240.93
CONC
240.88
CONC
240.69
TREE 6" [N]60
241.12
CONC
240.65
BOT STAIR
240.52
BOT STAIR
240.56
CONC
239.87
CONC
239.32
CONC
238.88
CONC
239.40
FSW
240.53
TLP WALL
237.88
CONC
237.41
FSW
240.29
TOP WALL
237.23
FSW
237.24
CONC
236.66
CONC
236.54
CONC
236.05
CONC
235.89
CONC
235.88
CONC
236.00
BIKE
235.90
BIKE
235.84
BIKE
235.86
236.75
FSW
240.27
TOP WALL
235.12
FACE STONE ST
235.57
FACE STONE
235.75
FACE STONE
235.70
FACE STONE
235.54
FACE STONE
236.22
FACE STONE
235.24
FACE STONE END
237.40
FSW 99
240.24
TOP WALL
240.58
TOP WALL
238.14
FSW
237.75
FSW
240.20
TOP WALL
237.83
FSW
240.27
TOP WALL
240.36
WALL
239.92
FSW END
240.45
GS
240.41
GS
241.89
GS
241.66
GS
242.12
GS
242.27
GS
243.81
CO
242.91
SMH
242.87
SMH
243.93
SMH
244.06
SMH
242.87
GS
243.75
GS
243.59
TC
243.42
TC
245.57
GS
245.40
GS
245.88
GS
244.98
GS
245.52
VENT
245.67
GS
245.73
GS
243.12
BC
243.57
TC
243.62
GS
243.34
TC
242.90
BC
242.67
TRASH
242.84
TRASH
242.74
TRASH
242.99
TRASH
244.71
GS
245.25
GS
245.68
GS
245.85
EVEG
246.02
EVEG
245.49
EVEG
244.92
EVEG
243.65
EVEG
243.39
EVEG
242.86
EVEG
242.98
EVEG
242.93
EVEG
244.09
EVEG
243.17
CLSW SCATTERED
240.45
CLSW SCATTERED/CLSW
241.07
EVEG
240.19
EVEG
241.43
EVEG
242.19
EVEG
242.25
GS 159
241.64
GS
239.50
GS161
239.44
EVEG
239.38
EVEG
241.18
EVEG
241.75
EVEG
241.14
EVEG
240.59
EVEG
239.86
EVEG
239.49
EVEG
237.64
EVEG
236.71
EVEG
236.19
EVEG
236.22
EVEG
236.01
EVEG
236.17
EVEG
233.23
BB
235.92
TB
236.37
TB
235.90
TB
233.98
EVEG
233.41
BB
234.44
BB
234.01
BB
232.21
BB
236.21
TB
236.17
TB
234.16
235.84
233.07
BB
232.07
BB
232.20
BB RR
232.10
BB RR
235.60
TB/EVEG
232.43
BB
233.92
TOP RR
232.54
BB
232.76
BB/RR
232.92
BB/RR
232.97
RR
232.66
RR
232.79
RR
234.82
RR
235.16
RR
232.17 226 232.35
INSP PORT
232.49
BB
232.40
BB
232.55
BB
232.31
BB
232.42
BB
232.54
BB
232.11
BOTTOM
232.17
BOTTOM
232.24
BOTTOM
233.98
BB
232.31
BB
236.25
SHRUB DRIP
236.38
SHRUB DRIP
236.43
SHRUB DRIP
236.06
SHRUB DRIP
235.99
SHRUB DRIP
235.80
EVEG
235.42
EVEG
236.28
TC
235.72
BC
236.46
BC
236.89
TC
238.27
TC
237.83
BC
238.47
BC
238.91
TC
239.27
TC
238.74
BC
238.93
BC
239.45
TC
239.47
TC
239.09
BC
239.18
BC
239.42
BC
239.61
BC
240.07
TC
240.25
TC
239.68
BC
239.88
BC
240.40
TC
240.34
TC
240.04
BC
240.26
BC
240.23
BC
240.38
BC
240.88
TC
241.10
TC
240.64
BC
240.67
BC
240.70
BC
240.88
BC
241.40
TC
240.81
WG 297
241.00
WG
241.50
TC
241.09
BC
241.21
BC
241.67
TC
241.22
CB
241.32
BC
241.79
TC
242.11
BOT RAMP
243.53
DOOR
241.59
HYDRANT
241.99
TC
241.68
BC
241.68
BC
241.87
BC
242.14
BC
242.56
TC
242.30
ELEC BOX
242.76
TC
242.32
BC
243.13
TC
242.46
BC
242.65
BC
243.14
BC
242.97
BC
243.76
TC
243.99
TC
243.46
BC
243.16
BC
243.58
TC
243.25
TC
242.86
BC
242.72
BC
242.70
BC
242.66
BC
243.19
TC
243.17
TC
242.62
BC
242.71
BC
243.23
TC
243.10
SHRUB DRIP
243.17
SHRUB DRIP339
243.18
SHRUB DRIP
244.90
TREE 6" [N]
239.08
GS
241.65
TB
242.11
TB
241.05
EVEG
242.08
TB
241.31
TB
240.91
TOP HEADWALL 6"
240.87
TOP HEADWALL 6"
240.46
RR
239.22
RR
239.23
RR
239.41
RR
240.40
RR
241.22
GS355
240.91
GS
240.27
RR
239.96
RR
239.87
RR
240.81
RR
239.64
GS
239.93
EVEG
239.53
TB
238.96
EVEG
238.18
EVEG
238.31
EVEG
238.41
EVEG
238.29
EVEG
237.71
EVEG
237.61
RR
237.92
RR 371
238.51
RR
238.96
TOP HEADWALL 6"
238.88
TOP HEADWALL 6"
236.72
RR
236.38
RR
236.36
BB
236.34
BB
236.59
BB
236.53
BB
236.45
BB
236.45
BB
236.57
BB
236.57
RR
236.90
TOP RR
236.17
RR
236.50
RR
236.77
RR
236.35
BB
236.04
BB
236.39
RR
236.54
BB
239.75
DMH
F-2
E-6
BULGARMARSH ROAD
PLANTER
PLANTER
12" Dia. ADS STORM DRAIN
12" Dia. ADS STORM DRAIN
EXISTING DRAIN MANHOLE
RIM = 234.67
12" ADS INV = 231.94
EXISTING CATCH BASIN
EXISTING 12" DISCHARGE
SMH
SMH
T
EMH
HYD.
6" TREE
6" TREE
EXISTING LIBRARY BUILDING
STAIRCASE
RAMP
RAMP
BUSH
BUSH
INFIL. POND
INFIL. POND
IN
FIL. PO
N D
EXISTING DRAIN MANHOLE
HYD.
CONCRETE SIDEWALK
EXIST.
X-FORMER
CATCH
BASIN
CATCH
BASIN
CATCH
BASIN
CATCH
233234235
239238 24
242240
240 242
24023923
233 235
TRASH REC.243.34
243.34
243.34
243.34
242.27 242.12
241.66
241.89
240.41 24
240.45
240.52
240.65
242.11
241.07
243.53
C.O.
320'±
127'±
0'
4'
MEET EXISTING WALK SMOOTHLY
AND CONSISTENTLY
TW 244.5 +/-
TW 245.5 +/-
+243.5
+243.66
L.O.W.
L.O.W.
L.O.W.
L.O .W
L.O .W
STORYWALK PATH
FURNISHINGS PROVIDED BY OWNER; CONTRACTOR TO
PLACE PER LIBRARY'S DIRECTION
STORYWALK SIGN POST, TYP.
EXISTING BOULDER
TO REMAIN AND BE
PROTECTED DURING
CONSTRUCTION
BOULDER RETAINING WALL
SPLIT RAIL FENCE
SPLIT RAIL FENCE2,3
L-400
L-400
L-400
L-400
2,3 L-400
30'-0"
6'-10"
18'-4"
25'-4"
22'-7"
EQ
EQ
25'-7"
EQ
EQ
47'-5"
33'-1"
33'-6"
3'-4"
15'-9"
7'-5"
28'-6" 13'-0"
7'-8"
EQ.
EQ.
12'-8"
EQ.
EQ.
17'-5"
34'-11"
33'-7"
PATHWAY LAYOUT
DIMENSIONS ARE TO
CENTERLINE OF PATH
13'-5"
TO FACE OF RETAINING
WALL V.I.F
15'R
15'R
20'R
15'R
15'R 20'R
15'R
15'R 20'R
38'-2"
EQ
EQ
29'-9"
11'-6"
7'-3"
46'-7"
6'-11"
38'-11" 5'R
5'R
5'R
5'-0"
PATH AND EXCAVATION OF
PATH TO REMAIN OUTSIDE
A 5'-0" OFFSET OF
EXISTING SEPTIC SYSTEM
STORYWALK SIGNS TO BE STAKED IN THE
FIELD BY CONTRACTOR AND APPROVED BY
LIBRARY AND LANDSCAPE ARCHITECT PRIOR
TO CONSTRUCTION.
12'-2"
12'-2"
'-1
0"
3'
'-0
66'-0"
STORYWALK PATH CENTERLINE TO BE STAKED
IN THE FIELD BY CONTRACTOR AND APPROVED
BY LIBRARY AND LANDSCAPE ARCHITECT
PRIOR TO CONSTRUCTION.
4.
8%
M
AX
1.8% MAX
5'-0"
5'-0"
5'-0"
DESCRIPTIONSYMBOL
LEGEND
STORYWALK PAVING
SPLIT RAIL FENCE
STORYWALK SIGN
BOULDER RETAINING WALL
L.O.W. LIMIT OF WORK
245 PROPOSED CONTOURS
EXISTING CONTOURS
PROPOSED SPOT GRADE
EXISTING SPOT GRADE242.11
TW 254.5
data are from a survey prepared by Civil Engineering Concepts, inc. 34A Main Street, Little Compton, RI 02837. Phone:
401-592-0177 Fax: 401-592-0178, Dated August 10, 2023.
2. Contractor shall verify location of any existing utilities and services and provide protection during construction. Utilities damaged during construction shall be repaired at contractors expense.
3. Contractor shall obtain permits for the work as required and comply with all laws, ordinances, rules and regulations of the local jurisdiction, the state, and all other authorities having jurisdiction.
4. Contractor shall leave site clean and orderly during construction process.
Remove from site all excess materials, soil, debris and equipment. Store materials only in an approved location.
5. All operations will be conducted with the minimum interference to both vehicular and pedestrian traffic.
6. Contractor shall not close or obstruct any public street or sidewalk without permitfrom and notification of the proper authorities.
TIVERTON PUBLIC LIBRARY
LEARNING LANDSCAPE
PHASE 1
34 ROOSEVELT AVENUE
TIVERTON, RI 02878
Sheet Title
Sheet Number
Stamp
0' 32'16'8'
Job No.
Drawn by: Checked by:
Scale Date
Issuance Date Description
2216.02
EP JJ
eponymous practice landscape architecture studio
183 High Street Bristol, RI 02809
T 617-999-9345 www.eponymouspractice.com
06.02.2025 PERMITTING
1/16" = 1'-0" 08.26.2025
2 08.26.2025 ISSUED FOR BID
SITE PLANTING
PLAN
L-300
1/16" = 1'-0" 30 MAY 2025
PLANTING NOTES
1. The Contractor shall supply all plant material in quantities sufficient to complete the planting shown on all drawings.
2. Contractor shall verify all existing conditions in the field. Report any discrepancies to the Landscape Architect for design prior to commencing planting.
3. All plant material shall conform to the guidelines established by “The American Standard for Nursery Stock” published by the American Nursery and Landscape Association, latest edition.
4. All plants shall be balled and burlap unless otherwise noted on the plant list.
5. All plants shall be approved by Landscape Architect prior to their installation at the site.
6. Preliminary layout is required to confirm planting layout and alignment. Contractor shall mark up layout of proposed planting areas using stakes, paint, tape or other temporary measures sufficient for Architect and Owner to review and approve layout and alignment prior to construction.
7. Plants to be transplanted shall be flagged and exact planting locations staked in the field. Layout of transplanted trees shall adhere to requirements described in note #8.
8. Individual trees shall be located in the field as indicated on the Drawings for Architect's and Owner's approval prior to planting. Contractor shall provide one foreman, one loader with operator and two laborers to work with Architect in the field to determine the final location and orientation of each tree prior to planting. It is anticipated that this process may take several days to complete.
Contractor shall plan to have this layout crew available to work with Architect at a slow and deliberate pace in order to achieve the desired results.
9. Individual shrubs, groundcovers, and grasses shall be laid out by the Contractor at the spacing indicated on the drawings for review and approval by the Architect and Owner prior to planting. Plants shall be turned to the desired orientation as directed by the Architect or Owner.
10. Plants shall be installed with the same relationship to finish grade as in the nursery.
11. All areas disturbed by construction activities are to be fine graded and seeded.
242.20
DH PT 140
237.40
ESW
237.47
TC
236.92
BC
238.67
ESW
238.70
TC
238.13
BC
239.64
UP 105
239.91
ESW
240.03
TC
239.50
BC
241.39
BC
241.80
TC
241.80
ESW
244.57
UP 106
244.64
ESW
244.66
TC
244.14
BC
241.32
EP
239.29
EP
237.75
EP
241.99
TC
241.65
BC
241.61
CONC
241.52
TC
241.08
BC
241.79
CONC
241.70
CONC
241.59
CONC50
241.37
CONC
241.38
CONC
241.15
CONC
241.21
CONC
241.07
BOT RAMP
241.11
CONC
240.91
CONC
240.93
CONC
240.88
CONC
240.69
TREE 6" [N]60
241.12
CONC
240.65
BOT STAIR
240.52
BOT STAIR
240.56
CONC
239.87
CONC
239.32
CONC
238.88
CONC
239.40
FSW
240.53
TLP WALL
237.88
CONC
237.41
FSW
240.29
TOP WALL
237.23
FSW
237.24
CONC
236.66
CONC
236.54
CONC
236.05
CONC
235.89
CONC
235.88
CONC
236.00
BIKE
235.90
BIKE
235.84
BIKE
235.86
236.75
FSW
240.27
TOP WALL
235.12
FACE STONE ST
235.57
FACE STONE
235.75
FACE STONE
235.70
FACE STONE
235.54
FACE STONE
236.22
FACE STONE
235.24
FACE STONE END
237.40
FSW 99
240.24
TOP WALL
240.58
TOP WALL
238.14
FSW
237.75
FSW
240.20
TOP WALL
237.83
FSW
240.27
TOP WALL
240.36
WALL
239.92
FSW END
240.45
GS
240.41
GS
241.89
GS
241.66
GS
242.12
GS
242.27
GS
243.81
CO
242.91
SMH
242.87
SMH
243.93
SMH
244.06
SMH
242.87
GS
243.75
GS
243.59
TC
243.42
TC
245.57
GS
245.40
GS
245.88
GS
244.98
GS
245.52
VENT
245.67
GS
245.73
GS
243.12
BC
243.57
TC
243.62
GS
243.34
TC
242.90
BC
242.67
TRASH
242.84
TRASH
242.74
TRASH
242.99
TRASH
244.71
GS
245.25
GS
245.68
GS
245.85
EVEG
246.02
EVEG
245.49
EVEG
244.92
EVEG
243.65
EVEG
243.39
EVEG
242.86
EVEG
242.98
EVEG
242.93
EVEG
244.09
EVEG
243.17
CLSW SCATTERED
240.45
CLSW SCATTERED/CLSW
241.07
EVEG
240.19
EVEG
241.43
EVEG
242.19
EVEG
242.25
GS 159
241.64
GS
239.50
GS161
239.44
EVEG
239.38
EVEG
241.18
EVEG
241.75
EVEG
241.14
EVEG
240.59
EVEG
239.86
EVEG
239.49
EVEG
237.64
EVEG
236.71
EVEG
236.19
EVEG
236.22
EVEG
236.01
EVEG
236.17
EVEG
233.23
BB
235.92
TB
236.37
TB
235.90
TB
233.98
EVEG
233.41
BB
234.44
BB
234.01
BB
232.21
BB
236.21
TB
236.17
TB
234.16
235.84
233.07
BB
232.07
BB
232.20
BB RR
232.10
BB RR
235.60
TB/EVEG
232.43
BB
233.92
TOP RR
232.54
BB
232.76
BB/RR
232.92
BB/RR
232.97
RR
232.66
RR
232.79
RR
234.82
RR
235.16
RR
232.17 226 232.35
INSP PORT
232.49
BB
232.40
BB
232.55
BB
232.31
BB
232.42
BB
232.54
BB
232.11
BOTTOM
232.17
BOTTOM
232.24
BOTTOM
233.98
BB
232.31
BB
236.25
SHRUB DRIP
236.38
SHRUB DRIP
236.43
SHRUB DRIP
236.06
SHRUB DRIP
235.99
SHRUB DRIP
235.80
EVEG
235.42
EVEG
236.28
TC
235.72
BC
236.46
BC
236.89
TC
238.27
TC
237.83
BC
238.47
BC
238.91
TC
239.27
TC
238.74
BC
238.93
BC
239.45
TC
239.47
TC
239.09
BC
239.18
BC
239.42
BC
239.61
BC
240.07
TC
240.25
TC
239.68
BC
239.88
BC
240.40
TC
240.34
TC
240.04
BC
240.26
BC
240.23
BC
240.38
BC
240.88
TC
241.10
TC
240.64
BC
240.67
BC
240.70
BC
240.88
BC
241.40
TC
240.81
WG 297
241.00
WG
241.50
TC
241.09
BC
241.21
BC
241.67
TC
241.22
CB
241.32
BC
241.79
TC
242.11
BOT RAMP
243.53
DOOR
241.59
HYDRANT
241.99
TC
241.68
BC
241.68
BC
241.87
BC
242.14
BC
242.56
TC
242.30
ELEC BOX
242.76
TC
242.32
BC
243.13
TC
242.46
BC
242.65
BC
243.14
BC
242.97
BC
243.76
TC
243.99
TC
243.46
BC
243.16
BC
243.58
TC
243.25
TC
242.86
BC
242.72
BC
242.70
BC
242.66
BC
243.19
TC
243.17
TC
242.62
BC
242.71
BC
243.23
TC
243.10
SHRUB DRIP
243.17
SHRUB DRIP339
243.18
SHRUB DRIP
244.90
TREE 6" [N]
239.08
GS
241.65
TB
242.11
TB
241.05
EVEG
242.08
TB
241.31
TB
240.91
TOP HEADWALL 6"
240.87
TOP HEADWALL 6"
240.46
RR
239.22
RR
239.23
RR
239.41
RR
240.40
RR
241.22
GS355
240.91
GS
240.27
RR
239.96
RR
239.87
RR
240.81
RR
239.64
GS
239.93
EVEG
239.53
TB
238.96
EVEG
238.18
EVEG
238.31
EVEG
238.41
EVEG
238.29
EVEG
237.71
EVEG
237.61
RR
237.92
RR 371
238.51
RR
238.96
TOP HEADWALL 6"
238.88
TOP HEADWALL 6"
236.72
RR
236.38
RR
236.36
BB
236.34
BB
236.59
BB
236.53
BB
236.45
BB
236.45
BB
236.57
BB
236.57
RR
236.90
TOP RR
236.17
RR
236.50
RR
236.77
RR
236.35
BB
236.04
BB
236.39
RR
236.54
BB
239.75
DMH
F-2
E-6
BULGARMARSH ROAD
PLANTER
PLANTER
12" Dia. ADS STORM DRAIN
12" Dia. ADS STORM DRAIN
EXISTING DRAIN MANHOLE
RIM = 234.67
12" ADS INV = 231.94
EXISTING CATCH BASIN
EXISTING 12" DISCHARGE
SMH
SMH
T
EMH
HYD.
6" TREE
6" TREE
EXISTING LIBRARY BUILDING
STAIRCASE
RAMP
RAMP
BUSH
BUSH
INFIL. POND
INFIL. POND
IN
FIL. PO
N D
EXISTING DRAIN MANHOLE
HYD.
CONCRETE SIDEWALK
EXIST.
X-FORMER
CATCH
BASIN
CATCH
BASIN
CATCH
BASIN
CATCH
233234235
239238 24
242240
240 242
24023923
233 235
TRASH REC.243.34
243.34
243.34
243.34
242.27 242.12
241.66
241.89
240.41 24
240.45
240.52
240.65
242.11
241.07
243.53
C.O.
320'±
127'±
0'
4'
VD
VD
VD
VD
VD
VD
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
L.O.W.
L.O.W.
L.O.W.
L.O .W
L.O .W
SEEDED LAWN
SEEDED LAWN 8
L-400
TRANSPLANTED WITCH-HAZEL
ALTERNATE 2: VIBURNUM DENTATUM (6)
ALTERNATE 2: COMPTONIA PEREGRINA (22)
REFER TO PLANTING NOTE 9 FOR LAYOUT
L-400
L-400
L-400
ALTERNATE 1:TRANSPLANTED TREE 6
L-400
L-400
ALTERNATE 2: CONTRACTOR TO PREPARE PLANTING
BED AND ADD MULCH FOR PLANTINGS
PLANTING SCHEDULE COMMON
LATIN NAME NAME QTY SIZE COMMENTS
ALTERNATE 2: SHRUBS
CP Comptonia peregrina Sweetfern 22 4" pot VD Viburnum dentatum 'Chicago Lustre' Arrowwood 6 #5 Container
DESCRIPTIONSYMBOL
LEGEND
LAWN
TRANSPLANTED TREE/SHRUB
L.O.W. LIMIT OF WORK
VD
VD
VD
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP ALTERNATE 2: PROPOSED
SHRUBS
LAWN SEED:
MICROCLOVER BLACK BEAUTY/PLAYERS BEST SEED MIX BY SODCO.
PO BOX 2, 264 EXETER ROAD, SLOCUM, RI 02877
1-800-341-6900
WWW.SODCO.NET
STORYWALK SIGN
Scale: 3/4" = 1'-0"5
GENERAL NOTES
1. Existing conditions and topography data are from a survey prepared by Civil Engineering Concepts, inc. 34A Main Street, Little Compton, RI 02837. Phone:
401-592-0177 Fax: 401-592-0178, Dated August 10, 2023.
2. Contractor shall verify location of any existing utilities and services and provide protection during construction. Utilities damaged during construction shall be repaired at contractors expense.
3. Contractor shall obtain permits for the work as required and comply with all laws, ordinances, rules and regulations of the local jurisdiction, the state, and all other authorities having jurisdiction.
4. Contractor shall leave site clean and orderly during construction process.
Remove from site all excess materials, soil, debris and equipment. Store materials only in an approved location.
5. All operations will be conducted with the minimum interference to both vehicular and pedestrian traffic.
6. Contractor shall not close or obstruct any public street or sidewalk without permitfrom and notification of the proper authorities.
TIVERTON PUBLIC LIBRARY
LEARNING LANDSCAPE
PHASE 1
34 ROOSEVELT AVENUE
TIVERTON, RI 02878
Sheet Title
Sheet Number
Stamp
0' 32'16'8'
Job No.
Drawn by: Checked by:
Scale Date
Issuance Date Description
2216.02
EP JJ
eponymous practice landscape architecture studio
183 High Street Bristol, RI 02809
T 617-999-9345 www.eponymouspractice.com
06.02.2025 PERMITTING
1/16" = 1'-0" 08.26.2025
2 08.26.2025 ISSUED FOR BID
SITE DETAILS
L-400
AS NOTED 30 MAY 2025
CONCRETE SONO-TUBE FOOTING
UNDISTURBED SUBGRADE
TO
F
R O
ST
L
IN
E
SECTION
STORYWALK SIGN POST
BASE PLATE. SECURE POST TO
FOOTING USING MANUFACTURER'S
HARDWARE AND INSTRUCTIONS
STORYWALK PATH
1'-6"
CL
10"
PLAN VIEW
10"
6"
MOUNTING FLANGE
STORYWALK SIGN POST
CONCRETE
SONOTUBE
SIGN PANEL SHALL
FACE STORYWALK
1"
NOTE: STORYWALK SIGNS TO BE
PROVIDED BY OWNER FOR
CONTRACTOR INSTALLATION
ASPHALT PAVING – PEDESTRIAN
2 1/2" BINDER COURSE
COMPACTED AGGREGATE BASE
UNDISTRURBED OR COMPACTED
SUBGRADE
2.
5"
1.
5"
8"
OIL & STONE COURSE
STONE COLOR TO BE BROW/TAN.
CONTRACTOR TO SUBMIT
SAMPLE OF STONE TO LA FOR
REVIEW AND APPROVAL
NOTE: PAVING WORK AND MATERIALS FOR
CONSTRUCTION SHALL CONFORM TO RIDOT
SPECIFICATIONS
10"
EXTEND BASE BEYOND EDGE OF
STORYWALK
REMOVE ALL ROPE, BURLAP, WIRE OR
CONTAINER FROM ROOTBALL; GENTLY
LOOSEN OR SCORE AREAS OF DENSE
ROOT GROWTH.
2" DEPTH PLANTING MULCH: MULCH TO BE
100% FINE SHREDDED, DARK, CEDAR BARK,
FREE FROM ROT, LEAVES, TWIGS, DEBRIS,
OR STONES.
POSITION ROOT CROWN FLUSH OR HIGHER
THAN FINISH GRADE
PLANTING SOIL
SCARIFY SUBGRADE 6" MIN
COMPACTED FILL OR UNDISTURBED
SUBGRADE
" M
IN
CONTRACTOR TO SUBMIT REPRESENTATIVE
PHOTOS OF SHRUBS TO LA FOR REVIEW AND
APPROVAL
COMPACTED OR
UNDISTURBED SUBGRADE
SEEDED MICROCLOVER LAWN:
MICROCLOVER BLACK
BEAUTY/PLAYERS BEST SEED MIX
BY SODCO
EXISTING TOPSOIL, GRADED
TO FINISH GRADE AND RAKED
SMOOTH
SEEDED LAWN
CONTRACTOR TO SUBMIT SAMPLE OF SEED MIX AND
PRODUCT DATA/CERTIFICATE TO LA FOR APPROVAL
6" M
IN
STORYWALK PATH
FIELDSTONE BOULDERS TO RETAIN GRADE
EXISTING CURB AND
PAVEMENT
COMPACTED AGGREGATE
BASE
COMPACTED OR
UNDISTURBED SUBGRADE
VARIES - 18" MIN.
4'-0"
VA
R
IE
S:
2-
BOULDER SIZE VARIES FROM 18-36" to 24-48".
COLOR TO BE BROWN/LIGHT GREY. BOULDERS
TO BE FREE FROM CRACKS, GOUGES,
SCRATCHES, PAINT OR OTHER VISUAL OR
STRUCUTRAL DEFECTS
CONTRACTOR TO SUBMIT PHOTOS OF
REPRESENTATIVE BOULDERS TO LANDSCAPE
ARCHITECT FOR REVIEW AND APPROVAL
STORYWALK PAVING
Scale: 1 1/2" = 1'-0"1
BOULDER RETAINING WALL
Scale: 1" = 1'-0"4
SPLIT RAIL FENCE POST
Scale: 3/4" = 1'-0"2 SPLIT RAIL FENCE PRECEDENT IMAGE
Scale: 1" = 1'-0"3
LAWN PLANTING
Scale: 3/4" = 1'-0"8ALTERNATE 2: SHRUB PLANTING
Scale: 1 1/2" = 1'-0"7
4' -0
3'
-0 " M
IN COMPACTED GRAVEL
SUBGRADE
PRESSURE TREATED SOUTHERN
YELLOW PINE SPLIT RAIL FENCE
POST, 6'-0" ON CENTER
EQ
EQ
16 GAUGE PVC-COATED WELDED
WIRE 2"X3" MESH, ATTACHED TO
RAILS WITH STAINLESS STEEL
FASTENERS
3' -0
CONTRACTOR TO SUBMIT PRODUCT
INFO/DATA FOR POST, RAIL AND MESH TO
LA FOR APPROVAL
EQ
AS NOTED
2" MULCH SAUCER - NOT TOUCHING
TRUNK
PLANTING SOIL MIX
COMPACTED FILL OR UNDISTURBED SUBGRADE
TEST PITS FOR DRAINAGE PRIOR TO
PLANTING. IF DRAINAGE PROBLEMS
EXIST INFORM LANDSCAPE
ARCHITECT.
SET TRUNK FLARE/TOP OF ROOT BALL FLUSH WITH
FINISH GRADE OR SLIGHTLY HIGHER AS DIRECTED BY
LANDSCAPE ARCHITECT. EACH TREE MUST HAVE
TRUNK FLARE VISIBLE AT THE TOP OF THE ROOT BALL.
TREES WHERE TRUNK FLARE IS NOT VISIBLE SHALL BE
REJECTED. DO NOT COVER THE TOP OF THE ROOT
BALL WITH SOIL.
PLACE ROOTBALL ON DRAINAGE
LAYER, TAMP PLANTING SOIL
AROUND BOTTOM EDGE OF
ROOTBALL TO PREVENT SHIFTING
REMOVE ALL ROPE, WIRE OR
BASKET AND BURLAP MATERIAL
FROM TOP AND SIDES OF
ROOTBALL BEFORE BACKFILLING.
SECTION
(2X ROOTBALL DIAMETER MIN)
ALTERNATE 1: TREE PLANTING
Scale: 1 1/2" = 1'-0"6
| COVERSHEET-COVER |
| L-000-SURVEY |
| L-100-SITE DEMO & PREP |
| L-200-SITE LAYOUT, MATERIALS & GRADING |
| L-300-SITE PLANTING |
| L-400-SITE DETAILS |
File details come from the government source that posted it. Updated .