250128-2203001-Saginaw Correctional Facility - HVAC Renovations - Addendum 1.pdf
PDF 90 KB Posted
- Attached to
- 472/22064. CTS; Saginaw CF - HVAC Renovations
- Solicitation number
- RFQ-171-250000000271-1
- Issued by
- Wayne County, Flint City, Michigan
About this file
This document is a Construction Bid Addendum No. 1 issued by the Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division for the Saginaw Correctional Facility HVAC Renovations project. The addendum, with file number 472/22064.CTS, is distributed to all bidders and primarily clarifies the project advertisement by specifying a mandatory pre-bid meeting scheduled for Friday, January 31, 2025, at 10:00 am. The bid opening date is set for February 12, 2025, with Matrix Consulting Engineers, Inc. serving as the professional consulting firm and Chris Schanbeck as the project director.
The addendum requires bidders to acknowledge receipt of this addendum in the Bid Summary and Bid Form, with a warning that failure to do so may result in bid rejection. The document will become part of the Contract Documents and is being distributed through the www.michigan.gov/SIGMAVSS website. No specific pricing, funding sources, or detailed project scope are provided in this addendum, which appears to be a procedural update primarily focused on clarifying the pre-bid meeting requirement for potential contractors interested in the HVAC renovation project at the Saginaw Correctional Facility.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
1/28/2025
PROJECT NAME
Saginaw Correctional Facility – HVAC Renovations
FILE NUMBER
472/22064.CTS
PROFESSIONAL
Matrix Consulting Engineers, Inc.
PROJECT DIRECTOR
Chris Schanbeck
BID OPENING DATE:
2/12/2025
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Project Advertisement Clarification: Mandatory pre-bid meeting is, Friday, January 31, 2025 at 10:00 am.
ACKNOWLEDGMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Devon Pung, Matrix Consulting Engineers DATE: 1/28/2025
APPROVED BY: Chris Schanbeck PROJECT DIRECTOR: Chris Schanbeck DATE: 1/28/2025 http://www.michigan.gov/SIGMAVSS
File details come from the government source that posted it. Updated .