25.09.15 - AWR Market Survey Appendix A.docx

DOCX document 20 KB Posted

Attached to
Aviation Weather Radar (AWR) Request for Information (RFI)
Solicitation number
Not on record
Issued by

About this file

This document is an Appendix A Cost Elements table for an Aviation Weather Radar (AWR) Market Survey, detailing average cost projections across a five-year radar lifecycle. The comprehensive cost breakdown includes granular expense categories spanning radar system hardware, site preparation, installation, training, cybersecurity compliance, maintenance, and support infrastructure. Key cost elements cover radar system components like antenna, transmitter, receiver, pedestal, shelter, signal processor, interface equipment, and non-recurring engineering (NRE), with provisions for tracking expenses across years 1-5. The table provides a structured framework for vendors to estimate and document potential implementation and lifecycle costs associated with developing and deploying aviation weather radar systems, aligning with the Federal Aviation Administration's market research and potential future procurement efforts.

View the file

Other files

File Type Posted
25.09.15 - Draft AWR Requirements Document (1).docx DOCX document
25.09.15 - AWR Market Survey Capabilities Statement.docx DOCX document
25.09.15 - AWR Market Survey Appendix B.docx DOCX document
Business Declaration Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A – Cost Elements Use the below table to provide the average costs (in U.S. dollars) associated with each cost element (as applicable) during the first 5 years of the radar lifecycle.

Cost Element
Average Cost
YR1
YR2
YR3
YR4
YR5

Radar System

· Radar System Hardware (antenna, transmitter, receiver, pedestal, shelter)

· Signal Processor & Interface Equipment

· Non-Recurring Engineering (NRE)

· Shipping & Logistics

Site Preparation

· Site Preparation

· Foundation

· Shelter

· Security (physical and/or system-level)

Installation and Training

· Hardware Installation & Acceptance Testing

· Documentation & Manuals (as-built drawings, Technical Instructions books.

· Training & Technical Support

· Cybersecurity Compliance & Certification (e.g., NIST/FISMA)

· Warranty & Initial Spares

· Software Licensing / Maintenance (if applicable)

· Required Tools and Test Equipment

Maintenance

· Ongoing Maintenance & Facility Support

File details come from the government source that posted it. Updated .