25-8418_Bid_Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- NRO Wells 118N and 120N Improvements
- Solicitation number
- 25-8418
- Issued by
- Collier County, Florida
About this file
This is a Bid Schedule document for Collier County's NRO Wells 118N and 120N Improvements project (Bid No. 25-8418). The project encompasses comprehensive water infrastructure improvements to two wells, including installation of pumps, motors, piping, electrical systems, instrumentation and controls, and well conditioning services. The bid schedule is organized into five main categories: General (Mobilization-Demobilization), Well 118N Improvements, Well 120N Improvements, Well Conditioning (consisting of nine detailed tasks including pre-treatment video surveys, step-drawdown tests, chemical treatment with 6,000 gallons of hydrochloric acid, airlift surge development, post-treatment pump development with testing, disinfection, and site restoration), and Well 119N Electrical Improvements (verification of existing wiring, wiring installation totaling 150 linear feet of conduit). A non-mandatory pre-bid meeting is scheduled for September 10, 2025, at 10:00 a.m. at the Collier County Procurement Services Conference Room, with sealed bids due by October 8, 2025, at 3:00 p.m. local time. The project requires substantial completion within 365 calendar days from the Notice to Proceed.
The anticipated project budget is $2,900,000.00, with an additional $200,000 Owner's Allowance allocated for unforeseen conditions or owner-directed work through change order. The bid schedule contains line items with quantities and unit prices to be completed by bidders, with Mobilization-Demobilization capped at 10 percent of the total bid amount. Liquidated damages of $1,201 per calendar day will be assessed for failure to achieve substantial completion within the specified timeframe. Bidders must submit a 5 percent bid bond, proof of $1,000,000 in commercial general liability insurance, performance and payment bonds, and comply with E-Verify program requirements and immigration laws. Prospective bidders must register on Collier County's procurement portal at https://procurement.opengov.com/portal/collier-county-fl to obtain complete project documentation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| 4/8/25 |
| Bid Schedule |
| NRO Wells 118N and 120N Improvements | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Total |
| General | |||||
| 1 | Mobilization-Demobilization (not to exceed 10% of the Total Bid Amount) | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Well 118N Improvements | |||||
| 2 | Misc. Structural | 1 | LS | $ - 0 | |
| 3 | Misc. Electrical | 1 | LS | $ - 0 | |
| 4 | Instrumentation & Controls | 1 | LS | $ - 0 | |
| 5 | Wellhead, Pump and Motor | 1 | LS | $ - 0 | |
| 6 | Misc. Piping, Valves and Fittings | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Well 120N Improvements | |||||
| 7 | Misc. Structural | 1 | LS | $ - 0 | |
| 8 | Misc. Electrical | 1 | LS | $ - 0 | |
| 9 | Instrumentation & Controls | 1 | LS | $ - 0 | |
| 10 | Wellhead, Pump and Motor | 1 | LS | $ - 0 | |
| 11 | Misc. Piping, Valves and Fittings | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Well Conditioning | |||||
| 12 | Well Conditioning (reference WSA, Inc. Specification Section) | ||||
| 12-1 | Perform pre-treatment downhole video survey. | 2 | EA | $ - 0 | |
| 12-2 | Install temporary test pump and perform pre-treatment step-drawdown test. | 2 | EA | $ - 0 | |
| 12-3 | Install required temporary wellhead, isolation packer, and tubing. Treat each well using 6,000 gallons of HCL as specified. | 2 | EA | $ - 0 | |
| 12-4 | Conduct airlift surge development for 16 hours per well. | 32 | Hours | $ - 0 | |
| 12-5 | Install temporary test pump and perform post-treatment high-rate pump development for 16 hours per well. Perform sand content, turbidity and silt density index testing during pump development. | 32 | Hours | $ - 0 | |
| 12-6 | Conduct post-treatment step-drawdown test. | 2 | EA | $ - 0 | |
| 12-7 | Collect water samples and provide analysis results for primary and secondary drinking water standards. | 2 | EA | $ - 0 | |
| 12-8 | Disinfect well as specified. | 2 | EA | $ - 0 | |
| 12-9 | Clean and restore site | 1 | LS | $ - 0 | |
| Subtotal | $ - 0 | ||||
| Well 119N Electrical Improvements | |||||
| 13 | Verification of Existing Wiring | 1 | LS | $ - 0 | |
| 14 | Wiring Installation | 1 | LS | $ - 0 | |
| 15 | Conduit Installation | 150 | LF | $ - 0 | |
| Subtotal | $ - 0 |
| TOTAL BID AMOUNT | $ - 0 |
| * Staff has allocated $200,000 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change. |
NRO Wells 118N and 120N Improvements Engineer's Opinion of Probable Cost April 2025
File details come from the government source that posted it. Updated .