25-8418_Bid_Schedule.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
NRO Wells 118N and 120N Improvements
Solicitation number
25-8418
Issued by
Collier County, Florida

About this file

The provided file is a Bid Schedule for Bid No. 25-8418, issued by Collier County, Florida, for the NRO Wells 118N and 120N Improvements project. The solicitation seeks comprehensive water infrastructure upgrades involving two water wells, with work encompassing mobilization, structural improvements, electrical systems, instrumentation and controls, wellhead, pump and motor installations, piping modifications, and extensive well conditioning services. The project includes specific line items for each well (118N and 120N), detailed well conditioning procedures, and electrical improvements for Well 119N. The non-mandatory pre-bid meeting is scheduled for September 10, 2025, at 10:00 a.m., with sealed bids due by October 8, 2025, at 3:00 p.m. local time. The project requires substantial completion within 365 calendar days from the Notice to Proceed, with final completion due 30 calendar days after the Punch List delivery.

The anticipated project budget is $2,900,000.00, with an additional $200,000 Owner's Allowance allocated for unforeseen conditions or owner-directed work. Bidders must register on the county's procurement portal, submit a 5% bid bond, provide proof of insurance, and demonstrate compliance with E-Verify program and immigration laws. The contract includes liquidated damages of $1,201 per calendar day for failure to achieve substantial completion. Contractors must adhere to comprehensive Environmental, Health, and Safety (EHS) requirements and comply with regulations from OSHA, DOT, EPA, and other governmental entities. The project requires $1,000,000 in commercial general liability coverage and involves careful integration with existing well infrastructure, with evaluation criteria focusing on responsiveness, responsibility, and lowest bid.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

4/8/25
Bid Schedule
NRO Wells 118N and 120N Improvements
Item No.DescriptionQuantityUnitUnit PriceTotal
General
1Mobilization-Demobilization (not to exceed 10% of the Total Bid Amount)1LS$ - 0
Subtotal$ - 0
Well 118N Improvements
2Misc. Structural1LS$ - 0
3Misc. Electrical1LS$ - 0
4Instrumentation & Controls1LS$ - 0
5Wellhead, Pump and Motor1LS$ - 0
6Misc. Piping, Valves and Fittings1LS$ - 0
Subtotal$ - 0
Well 120N Improvements
7Misc. Structural1LS$ - 0
8Misc. Electrical1LS$ - 0
9Instrumentation & Controls1LS$ - 0
10Wellhead, Pump and Motor1LS$ - 0
11Misc. Piping, Valves and Fittings1LS$ - 0
Subtotal$ - 0
Well Conditioning
12Well Conditioning (reference WSA, Inc. Specification Section)
12-1Perform pre-treatment downhole video survey.2EA$ - 0
12-2Install temporary test pump and perform pre-treatment step-drawdown test.2EA$ - 0
12-3Install required temporary wellhead, isolation packer, and tubing. Treat each well using 6,000 gallons of HCL as specified.2EA$ - 0
12-4Conduct airlift surge development for 16 hours per well.32Hours$ - 0
12-5Install temporary test pump and perform post-treatment high-rate pump development for 16 hours per well. Perform sand content, turbidity and silt density index testing during pump development.32Hours$ - 0
12-6Conduct post-treatment step-drawdown test.2EA$ - 0
12-7Collect water samples and provide analysis results for primary and secondary drinking water standards.2EA$ - 0
12-8Disinfect well as specified.2EA$ - 0
12-9Clean and restore site1LS$ - 0
Subtotal$ - 0
Well 119N Electrical Improvements
13Verification of Existing Wiring1LS$ - 0
14Wiring Installation1LS$ - 0
15Conduit Installation150LF$ - 0
Subtotal$ - 0
TOTAL BID AMOUNT$ - 0
* Staff has allocated $200,000 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

NRO Wells 118N and 120N Improvements Engineer's Opinion of Probable Cost April 2025

File details come from the government source that posted it. Updated .