25-8403R_Exhibit_C_-_GENERAL_PUD_PERFORMANCE_STANDARDS.pdf

PDF 111 KB Posted

Attached to
BIOSOLIDS HAULING SERVICES (GRANT FUNDED)
Solicitation number
25-8403R
Issued by
Collier County, Florida

About this file

This file contains General PUD Performance Standards for Collier County, Florida's Public Utilities Department, establishing mandatory reliability engineering criteria for solicitations and contracts related to water plants, wastewater treatment facilities, pump stations, and solid waste operations. The 5N Performance Criteria require zero offsite odors, zero sanitary sewer overflows or spills, zero offsite fugitive dust emissions, and mitigation of noise and light emissions prior to facility fence lines, all maintained 24/7/365. Any deviations from these standards require advance review and recommendation by both Engineering and Operations Division Directors for Department Head approval. These performance standards are directly applicable to RFP 25-8403R for Biosolids Hauling Services, a grant-funded procurement issued by Collier County's Procurement Services Division on behalf of the Public Utilities Department with a May 7, 2026 submission deadline at 3:00 PM EST via the online bidding portal.

The biosolids hauling solicitation encompasses transportation, dewatering where applicable, and disposal services from five county wastewater facilities, with monthly volumes ranging from 1,791 to 2,000 tons for non-dewatering locations and 208,730 to 360,000 gallons for dewatering-required locations. Proposers must select and bid on all line items for either non-dewatering or dewatering-required facility categories, with services scheduled Monday through Saturday, 5:00 AM to 5:00 PM, and normal requests serviced within 48 hours and urgent requests within two hours. The County intends to award multiple contractors with separate awardees designated for each facility category under an initial five-year contract term with three optional five-year renewals, requiring 18 months' notice for non-renewal. Qualified proposers must comply with all federal, state, and local regulatory standards including FDEP, EPA, and OSHA requirements; furnish a Payment and Performance Bond; maintain Workers' Compensation and liability coverage ($1,000,000 Commercial General Liability per occurrence, $1,000,000 Automobile Liability per occurrence); be enrolled in E-Verify; and comply with PUD Performance Standards. Historical annual spending for biosolids hauling has been approximately $3,700,000, though this figure is not guaranteed to represent future purchasing patterns. Evaluation criteria include cost management, schedule adherence, work quality, personnel professionalism, and customer satisfaction as demonstrated through Reference Questionnaires.

View the file

Other files

File Type Posted
OkeechobeeFirstAmendmentFE_.pdf PDF
PB_RenewPrice_Increase_PO_exp._5.30.2027.pdf PDF
25-8403R_Attachment_B_-Cost_of_Services_02-18-26.xlsx XLSX spreadsheet
25-8403R_FPP_FEMA_97.036_12.25.pdf PDF
Form_2_Conflict_of_Interest_Certification.pdf PDF
Form_4_Reference_Questionnaire.pdf PDF
25-8403R_Attachment_A_-_Category_Interest.pdf PDF
25-8403R_Attachment_B_-Cost_of_Services_02-18-26.xlsx XLSX spreadsheet
25-8403R_Insurance_Requirements.pdf PDF
Form_1_Vendor_Declaration_Statement.pdf PDF
Form_2_Conflict_of_Interest_Certification.pdf PDF
Form_4_Reference_Questionnaire.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Request_for_Proposals_Instructions_Version_2.pdf PDF
25-8403R_Insurance_Requirements.pdf PDF
Form_3_Immigration_Certification.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8403R_Insurance_Requirements.pdf PDF
25-8403R_Solicitation_.pdf PDF
Checklist_-Vendor_Checklist.pdf PDF
Form_1_Vendor_Declaration_Statement.pdf PDF
Form_4_Reference_Questionnaire.pdf PDF
Request_for_Proposals_Instructions_Version_2.pdf PDF
25-8403R_Solicitation_.pdf PDF
Checklist_-Vendor_Checklist.pdf PDF
Fixed_Term_Service_Multi-Contractor_Award_Agreement_[2026__ver.1].pdf PDF
25-8403R_Authorization_to_Advertise.pdf PDF
Checklist_-Vendor_Checklist.pdf PDF
Fixed_Term_Service_Multi-Contractor_Award_Agreement_[2026__ver.1].pdf PDF
Checklist_-Vendor_Checklist.pdf PDF
Fixed_Term_Service_Multi-Contractor_Award_Agreement_[2026__ver.1].pdf PDF
25-8403R_Exhibit_C_-_GENERAL_PUD_PERFORMANCE_STANDARDS.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8403R_Attachment_A_-_Category_Interest.pdf PDF
25-8403R_Exhibit_A_-_Plant_Details_Production_Rates.pdf PDF
25-8403R_Exhibit_B-1_-_NCWRF_SCWRF_Analysis.pdf PDF
Form_1_Vendor_Declaration_Statement.pdf PDF
Form_5_Grant_Provisions.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8403R_Exhibit_A_-_Plant_Details_Production_Rates.pdf PDF
25-8403R_Exhibit_C_-_GENERAL_PUD_PERFORMANCE_STANDARDS.pdf PDF
25-8403R_FPP_FEMA_97.036_12.25.pdf PDF
25-8403R_Attachment_A_-_Category_Interest.pdf PDF
25-8403R_Attachment_B_-Cost_of_Services_02-18-26.xlsx XLSX spreadsheet
25-8403R_Authorization_to_Advertise.pdf PDF
25-8403R_Exhibit_A_-_Plant_Details_Production_Rates.pdf PDF
25-8403R_FPP_FEMA_97.036_12.25.pdf PDF
25-8403R_Solicitation_.pdf PDF
Form_1_Vendor_Declaration_Statement.pdf PDF
Form_2_Conflict_of_Interest_Certification.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following 5Ns are the PUD Performance Criteria that needs to be considered and included in

• solicitations,

• agreements,

• contracts, that are specifically related to our Water Plants, Wastewater Plants, Master Pump Stations, Community Pump Stations R&Rs, Solid Waste Sanitary Landfills, Transfer Stations, among others

PUBLIC UTILITIES

5N-RELIABILITY ENGINEERING CRITERIA

No offsite odors | 24/7/365

No SSOs-Spills offsite/onsite | 24/7/365

No offsite fugitive-dust emissions | 24/7/365

No offsite Noise | To be mitigated prior to fence line per Code | 24/7/365

No offsite Light emissions | To be mitigated prior to fence line per Code

Any deviation to above 5N-Reliability Engineering Criteria and guidance has to be reviewed and recommended by both Engineering and Operations Division Directors in advance for approval by the Department Head.

File details come from the government source that posted it. Updated .