25-8402_Solicitation.pdf
PDF 176 KB Posted
- Solicitation number
- 25-8402
- Issued by
- Collier County, Florida
About this file
This is a Request for Professional Services (RPS) issued by the Collier County Board of County Commissioners' Procurement Services Division on behalf of the Collier County Metropolitan Planning Organization (MPO) for general planning services. The solicitation seeks multiple qualified firms to provide as-needed metropolitan planning organization services including safety and security planning, policy planning, systems planning, transportation statistics, transit planning, long-range planning, traffic modeling, environmental analysis, public participation assistance, freight planning, bicycle/pedestrian facilities planning, and services related to automated vehicles and climate resilience. Proposals are due September 10, 2025 at 3:00 PM EST and must be submitted online through Collier County's procurement portal. The contract term is intended to be five years with a single one-year renewal option at the County's discretion, with an additional potential 180-day extension available.
Work will be distributed through a professional services library rotation system where firms are ranked based on their proposal scores and assignments are awarded rotationally, with provisions for direct selection when unique experience is required. The MPO has historically spent approximately $934,404 over the previous five-year period, though this may not indicate future spending patterns. All work must comply with Florida Statute §287.055 Consultants' Competitive Negotiation Act, with individual projects not exceeding $7.5 million in estimated construction costs and professional services not exceeding $500,000 per project. Proposals will be evaluated on four criteria worth 25 points each: ability of professional personnel, past performance, project approach and willingness to meet time and budget requirements, and recent/current/projected workloads.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement Services Division
COLLIER COUNTY
BOARD OF COUNTY COMMISSIONERS
GRANT FUNDED REQUEST FOR PROFESSIONAL SERVICES (RPS)
In accordance with Florida Statute §287.055 Consultants’ Competitive Negotiation Act
FOR
METROPOLITAN PLANNING ORGANIZATION
GENERAL PLANNING SERVICES
RPS NO.: 25-8402
OLIVIA PUGA, PROCUREMENT STRATEGIST
PROCUREMENT SERVICES DIVISION
3295 TAMIAMI TRAIL EAST, BLDG C-2
NAPLES, FLORIDA 34112
TELEPHONE: (239) 252-4286
Olivia.Puga@colliercountyfl.gov (Email)
Any alterations to this document made by the Consultant may be grounds for the rejection of proposal, cancellation of any subsequent award, or any other legal remedies available to the Collier County Government.
SOLICITATION PUBLIC NOTICE
REQUEST FOR PROFESSIONAL
SERVICES (RPS) NUMBER:
25-8402
PROJECT TITLE: METROPOLITAN PLANNING SERVICES
RPS OPENING DAY/DATE/TIME: SEPTEMBER 10, 2025 AT 3:00PM (EST)
PLACE OF RPS OPENING: Procurement Services Division 3295 Tamiami Trail East, Bldg. C-2 Naples, FL 34112
All proposals shall be submitted online via the Collier County Procurement Services Division Online Bidding System:
https://procurement.opengov.com/portal/collier-county-fl.
INTRODUCTION
As requested by the Collier County Metropolitan Organization (hereinafter, the “MPO”), the Collier County Board of County Commissioners Procurement Services Division (hereinafter, “County”) has issued this Request for Professional Services (hereinafter, “RPS”) with the intent of obtaining proposals from interested and qualified Consultants in accordance with the terms, conditions and specifications stated or attached. The Consultants, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated.
The purpose of this solicitation is to acquire multiple-qualified firms to provide as-needed Metropolitan Planning Organization General Planning Services. Historically, the MPO has spent approximately $934,404 over the previous 5-year period; however, this may not be indicative of future buying patterns.
BACKGROUND
The Collier County Board of County Commissioners, in compliance with Florida Statute §287.055, Consultants’ Competitive Negotiation Act, is seeking proposals from qualified and experienced engineering firms to perform continuing professional services, for Metropolitan Planning Organization General Planning Services.
All work awarded under the resultant contract will be for projects, within the thresholds allowable in Florida Statute §287.055, Consultants’ Competitive Negotiation Act, in which the estimated construction cost of each individual project does not exceed $7.5 million, and professional services for each individual project do not exceed $500,000. All work will be performed in accordance with industry standards and will comply with applicable laws and regulations.
TERM OF CONTRACT
The contract term, if awards are made, is intended to be for a one (1) five (5) year term with a single one (1) year renewal option, at the sole discretion of the County.
The County reserves the right to modify this scope during negotiations for budgetary reasons. Surcharges will not be accepted in conjunction with this contract, and such charges should be incorporated into the pricing structure.
The County Manager, or designee, may, at his discretion, extend the Agreement under all of the terms and conditions contained in this Agreement for up to one hundred eighty (180) days. The County Manager, or designee, shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect.
https://procurement.opengov.com/portal/collier-county-fl https://procurement.opengov.com/portal/collier-county-fl
DETAILED SCOPE OF WORK
Firms shall be required to work in close cooperation/coordination with Collier County staff. Work orders will be assigned on an as-needed basis and may include, but not be limited to, the following types of professional services in the Metropolitan Planning Organization services field:
• Safety and Security Planning
• Policy Planning
• Systems Planning
• Sub-Area / Corridor Planning
• Transportation Statistics, including traffic statistics and traffic data collection
• Transit Planning
• Transportation Disadvantaged Planning
• Short and Long Range Planning
• Assistance with various surface transportation plans and programs, including highway, transit, transportation disadvantaged, congestion management, pedestrian, and bicycle facilities.
Specific work tasks or scopes of work may be issued for:
• Community Impact Assessment
• Safety And Security Planning
• Preparation of Corridor Studies
• Traffic Modeling
• Traffic Data Collection Services
• Access Management Studies
• Environmental Data Collection and Analysis
• Data Collection and Analysis
• Traffic Operations Analysis Studies
• Preparation of Long-Range Transportation Plan
• Preparation of Public Participation Plan Updates
• Freight Planning
• Regional Planning, including hosting regional summits
• Preparation of Annual Report
• Level of Service Analysis and Mapping
• Long Range Transportation Planning to include modeling assistance
• Mapping and Graphics Production
• Preparation of PowerPoint and Video Presentations
• Transit Planning
• Bicycle / Pedestrian Facilities Planning and Design, including preparation of updates to the Bicycle and
Pedestrian Master Plan
• Congestion Management Analysis, including Project Identification, Monitoring and Evaluation, Preparation of
Congestion Management Process Updates
• Transportation Safety Planning, Data Gathering, and Analysis
• Support Staff at Public Meetings and prepare meeting minutes
• Public involvement assistance including website development, preparation of hard copy and electronic newsletters, online surveys, interactive maps, informational videos, Public Service Announcements, and other educational and informational materials, as necessary
• Develop project information, including community impacts and input into the Efficient Transportation Decision Making (ETDM) process
• Evaluate potential Transportation Regional Incentive Program (TRIP) applications
• Review of Project Development & Environment studies
• Developing Project Cost Estimates
• Provide administrative support to the MPO
• Transportation Disadvantaged Planning
• Project Management Oversight
• GIS services
• Reporting, analysis, and planning related to Automated, Connected, Autonomous Vehicles and Ride-Hailing
Services
• Reporting, analysis, mapping, and planning related to climate change, sea level rise, coastal resiliency, extreme weather phenomena and transportation infrastructure resiliency
• Analysis and reporting on socio-economic data and trends, and travel behavior
• Origin/Destination studies
• Reporting and compliance with Federal Performance measures, including project review, analysis, and monitoring
DISTRIBUTION OF WORK
Professional Services Library Rotation
1. Work assignments within each service category are awarded on a rotational basis by County’s Administrative Agent within the MPO.
2. The MPO will place qualifying firms Professional Services in the order they are ranked, with the highest scoring firm placed in the first position in the rotation.
3. As each work assignment is identified, the next firm in the rotation will be offered the opportunity to negotiate that work assignment with the County’s Administrative Agent.
4. Should a firm decline a work assignment or be unable to reach a satisfactory fee negotiation with the County within a reasonable time frame, the County will contact the next firm on the list until the work assignment is successfully negotiated.
5. Firms will have the option of rejecting one work assignment within each service category within a twelve (12) month period without penalty. A second work assignment rejection within any twelve (12) month period will cause the firm to be skipped in the rotation. A firm that rejects three (3) work assignments (or is unable to satisfactorily negotiate 3 work assignments) in any twelve (12) month period may be removed at the direction of the MPO Director or designee.
6. Firms wishing to reject a work assignment for any reason must complete a Work Assignment Rejection Notification Form.
A copy of this completed form must be provided to the County’s Administrative Agent.
7. Once a full rotation through all firms in a service category is complete, a method that attempts to impart an equitable distribution of work among selected firms will be based on prior dollars awarded, with the firm having received the least amount of dollars being considered for the next work assignment.
Professional Services Library - Direct Selection
For work assignments requiring unique experience or knowledge, including past experience on another phase of the project, the County project manager may formally request permission to forego the rotation and select a specific firm. This request will require the completion of a Work Assignment Direct Select Form, which requires the approval by the County’s Administrative Agent and MPO Director. Firms that are directly selected for a work assignment as a result of this process shall be passed on to their next scheduled turn in the rotation.
RESPONSE FORMAT AND SCORING CRITERIA FOR DEVELOPMENT OF SHORTLIST:
Proposals must be assembled, at minimum, in the order of the Evaluation Criteria listed or your proposal may be deemed non-responsive
Evaluation Criteria
Maximum Points
1. Ability of Professional Personnel 25 Points
2. Past Performance 25 Points
3. Project Approach, Willingness to Meet Time and Budget Requirements 25 Points
4. Recent, Current, and Projected Workloads of the Firm 25 Points
TOTAL POSSIBLE POINTS 100 Points
For complete explanation of each evaluation criteria, please see the file titled “RPS Instructions” included with this advertisement. Note any references in the instructions to Board of County Commissioners shall mean Board of Collier
Metropolitan Planning Organization.
VENDOR CHECKLIST
***Vendor should check off each of the following items as the necessary action is completed (please see, Vendor Check List)***
| INTRODUCTION |
| BACKGROUND |
| TERM OF CONTRACT |
| DETAILED SCOPE OF WORK |
| DISTRIBUTION OF WORK |
| Proposals must be assembled, at minimum, in the order of the Evaluation Criteria listed or your proposal may be deemed non-responsive |
| VENDOR CHECKLIST |
File details come from the government source that posted it. Updated .