These documents are design and construction plans for a unit ventilator replacement project for Escanaba Area Public Schools located at 1500 Ludington Street in Escanaba, Michigan. The project involves replacing three existing unit ventilators in the Upper Elementary School, with work to include removing existing pneumatic controls, installing new DDC controls, and ensuring compatibility with future building automation systems. The project is designed by Dynamic Design Group, Inc. and is scheduled for construction in June 2025, with the plans dated 06-26-2025 and job number 25-4650.

The project specifications require the contractor to match existing unit capacities as closely as possible, utilize R-454B refrigerant, and provide new standalone programmable DDC controllers. The contractor must confirm power requirements, measure existing locations to ensure new unit fit, and potentially provide sheet metal offsets or extensions to reconnect to existing fresh air intake louvers. The building is a 120,010 square foot educational facility, classified as construction type IIB, fully sprinkled, and adhering to 2021 Michigan Building Codes and related technical standards. The estimated scope involves precise mechanical retrofitting with minimal disruption to the existing school infrastructure.

View the file

Other files for this state and local contract opportunity

Other files attached to Unit Ventilators, newest first.
File Type Posted
25-4650_SPECS_06-26-2025.pdf PDF
25-4650_07-11-2025_DDGi ADDENDUM #1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Z:

\0

0- D

W G

\0 0-

E sc an ab a Ar ea P ub lic

S ch oo ls

\2 5-

T he

U , M ec ha ni ca l U ni ts , E sc an ab a, M I\D

D G i - C

O

VE

R S

H

EE

T x2 2.

dw g

/2 7/

:1

2:

A M

Mdd

Dynamic Design Group, inc.

Engineers Architects Project Managers

Dynamic Design Group, inc.

P.O. Box 1064 900 1st Ave. So., Ste. A Escanaba, MI ph.: 906.786.3300 fax: 906.233.7391 email: gen@ddgi-ddm.com www.ddgi-ddm.com

PROJECT TITLE:

OWNER:

DESIGNER:

G0.1

THE UPPER ELEMENTARY SCHOOL

1500 LUDINGTON STREET, ESCANABA, MICHIGAN

REPLACEMENT OF UNIT VENTILATORS

ESCANABA, MI 49829

1500 LUDINGTON STREET

ESCANABA AREA PUBLIC SCHOOLS

FOR REVIEW/FOR CONSTRUCTION

SET DATE: 06-26-2025

JOB NO.: 25-4650

THREE FULL WORKING DAYS

BEFORE YOU DIG, CALL THE

"MISS DIG" SYSTEM AT

1-(800)-482-7171 OR 811

DELTA COUNTY

PROJECT LOCATION

LOCATION MAPS

SHT. NO. TITLE SHEET SHEET ISSUE DATE

G0.1 TITLE SHEET 06-26-2025

G0.2 NOTES AND ABBREVIATIONS 06-26-2025

A1.0 OVERALL SECOND LEVEL FLOOR PLAN & ENLARGED SECOND LEVEL

FLOOR PLAN 06-26-2025

M1.0 SECOND FLOOR MECHANICAL PLANS AND SCHEDULE 06-26-2025

SHEET INDEX

06-26-2025

BUILDING CODE DATA:

BUILDING AND CODE DATA

PROJECT LOCATION

1500 LUDINGTON ST.

CODES REFERENCED:

· 2021 MICHIGAN BUILDING CODE

· 2021 MICHIGAN MECHANICAL CODE

· 2021 MICHIGAN PLUMBING CODE

· 2023 NATIONAL ELECTRIC CODE (NEC)

· 2017 ICC/ANSI A117.1 - ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES

· 2021 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS

· 2021 MICHIGAN COMMERCIAL ENERGY CODE

BUILDING OCCUPANCY: E

CONSTRUCTION TYPE: IIB

NFPA CONSTRUCTION TYPE: II(000)

BUILDING AREA: 120,010 SF

FIRE SUPPRESSION: FULLY SPRINKLED

ABBREVIATIONS

1. GENERAL

1.1. THE WORD "CONTRACTOR" MEANS, THE PRIME

CONTRACTOR OR THE CONTRACTOR SCHEDULED TO

PERFORM THE WORK.

1.2. CONTRACTOR AND ALL SUBCONTRACTORS SHALL

FAMILIARIZE HIMSELF WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS AND MAKE HIMSELF AWARE

OF OTHER DISCIPLINES WORK THAT MAY AFFECT HIS.

1.3. CONTRACTOR AND ALL SUBCONTRACTORS SHALL VISIT THE

BUILDING SITE AND MAKE HIMSELF AWARE OF CONDITIONS

THAT MAY AFFECT HIS WORK.

1.4. CONTRACTOR IS RESPONSIBLE FOR AND SHALL INCLUDE

PROVISIONS IN HIS BID FOR COORDINATING WORK

BETWEEN OTHER TRADES.

1.5. CONTRACTOR AND ALL SUBCONTRACTORS SHALL

COMPLETELY REVIEW EVERY DRAWING AND SPECIFICATION

TO HAVE A COMPLETE UNDERSTANDING OF THE ENTIRE

PROJECT AND THE WORK THAT MAY BE AFFECTED BY HIS

WORK AND THE WORK OF OTHER DISCIPLINES THAT MAY

AFFECT HIS WORK.

1.6. DO NOT SCALE DRAWINGS. USE DIMENSIONS AND

ELEVATIONS PROVIDED. IF DIMENSIONS AND ELEVATIONS

ARE IN QUESTION, CONTRACTOR SHALL CONTACT THE

OFFICE OF THE ENGINEER BEFORE CONTINUING WITH

WORK.

1.7. EACH CONTRACTOR SHALL VERIFY ALL CONDITIONS AND

DIMENSIONS AND ELEVATIONS AT THE SITE. NEITHER THE

OWNER NOR DYNAMIC DESIGN GROUP, INC. ASSUMES

RESPONSIBILITY FOR CONDITIONS OR DIMENSIONS THAT

ARE EXISTING OR SHOWN AS EXISTING. IF EXISTING ITEMS

ARE DIMENSIONED - DIMENSIONS ARE FOR BIDDING

PURPOSES ONLY AND SHALL BE VERIFIED BY CONTRACTOR.

1.8. ALL HOLES FOR PLUMBING, ELECTRICAL, OR HVAC;

CONDUITS, PIPING, DUCTWORK ARE TO BE REPAIRED BY

THE ASSOCIATED TRADE. ALL TRADES SHALL TAKE CARE

TO MAKE HOLES ONLY AS LARGE AS REQUIRED, ALL HOLES

SHALL BE NEATLY CUT.

1.9. HOLES IN WALLS OR FLOORS SHALL BE PROPERLY SEALED.

1.10. WHEN CONTRADICTIONS OCCUR BETWEEN THE PLANS AND

THE SPECIFICATIONS AND/OR ERRORS ARE FOUND IN

EITHER, THE CONTRACTOR SHALL OBTAIN CLARIFICATION

FROM THE OFFICE OF THE ENGINEER BEFORE CONTINUING

WITH CONSTRUCTION.

1.11. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THESE

PLANS, THE CURRENT MICHIGAN BUILDING CODES, ALL

LOCAL ORDINANCES AND NORMAL INDUSTRY STANDARDS.

1.12. CONTRACTOR IS TO OBTAIN AND PAY FOR PERMITS,

LICENSES, FEES, INSPECTIONS, ETC. AS MAY BE REQUIRED

FOR HIS CONTRACTED WORK, FOR COMPLETION OF HIS

OWN PORTION OF THE PROJECT.

1.13. CONTRACTOR SHALL REMOVE ALL CONSTRUCTION RUBBISH

AND DEMOLISHED MATERIALS GENERATED UNDER HIS

CONTRACTED PORTION OF THE WORK, FROM THE SITE ON

A WEEKLY BASIS AND AT THE END OF THE JOB AND SHALL

DISPOSE OF APPROPRIATELY. THE ENTIRE PROJECT SHALL

BE LEFT BROOM CLEAN.

1.14. CONTRACTOR SHALL FOLLOW "OCCUPATIONAL SAFETY AND

HEALTH ACT" REQUIREMENTS ISSUED BY THE STATE AND

LOCAL LAWS, RULES AND REGULATIONS AS THEY APPLY.

1.15. ALL MATERIALS AND EQUIPMENT INCORPORATED INTO THE

WORK SHALL BE NEW, UNLESS OTHERWISE APPROVED BY

THE OWNER AND ENGINEER.

1.16. CONTRACTOR SHALL BE RESPONSIBLE FOR THE ERECTION

AND MAINTENANCE OF ALL BARRICADES, GUARDRAILS,

LIGHTS AND SIGNS NECESSARY FOR PUBLIC SAFETY.

1.17. CONTRACTOR SHALL PROVIDE PROTECTION AGAINST RAIN,

WIND, STORMS, COLD OR HEAT SO AS TO MAINTAIN ALL

WORK, MATERIALS, APPARATUS, EQUIPMENT AND

FIXTURES UNDER HIS CONTRACT, INCORPORATED IN THE

WORK OR STORED ON SITE FREE FROM INJURY OR

DAMAGE. COVER ALL NEW WORK LIKELY TO BE DAMAGED

ON A DAILY BASIS. ITEMS WHICH REQUIRE DRY STORAGE

SHALL BE STORED IN A DRY BUILDING AND NOT UNDER

TARPS.

1.18. PROVIDE LINTELS/HEADERS AS REQUIRED FOR ALL

MECHANICAL DUCTWORK, LOUVERS, DOORS, OPENINGS,

ETC. WHETHER SPECIFICALLY CALLED OUT ON PLANS OR

NOT.

1.19. CONTRACTOR SHALL PROVIDE AS-BUILTS OF ALL WORK

AND DISCIPLINES AT THE END OF THE PROJECT BEFORE

FINAL PAYMENT IS AUTHORIZED.

1.20. CONTRACTOR SHALL PROVIDE AT LEAST ONE PORTABLE

TOILET TO BE USED/SHARED BY ALL WORKERS ON THE

JOBSITE.

2. ARCHITECTURAL

2.1. CONTRACTOR WILL BE RESPONSIBLE TO PATCH, REPAIR,

PAINT, ETC. ANY EXISTING ITEM DAMAGED THROUGH THE

DURATION OF THE PROJECT.

3. ELECTRICAL

3.1. CONTROL WIRING - IF CONTROL WIRING MUST BE SURFACE

MOUNTED, PROVIDE WIRE MOLD.

NOTES & GENERAL NOTES

# POUND OR NUMBER

& AND

@ AT

% PERCENT

A.B. ANCHOR BOLT

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISHED FLOOR

N.F.A. NET FREE AREA

ALUM. ALUMINUM

APPROX. APPROXIMATE

A/C AIR CONDITIONING

BIT. BITUMINOUS

B.O. BY OWNER - BY OWNER SUPPLIED BY OWNER, INSTALLED BY

CONTRACTOR

BOT. BOTTOM

BSMT. BASEMENT

B/W BETWEEN

CAB. CABINET

CB CATCH BASIN

CJ CONTROL JOINT

CJP COMPLETE JOINT PENETRATION

CL CENTERLINE OR CLOSET

CLG. CEILING

CLR. CLEAR

CMU CONCRETE MASONRY UNIT

COL. COLUMN

CONC. CONCRETE

CONT. CONTINUOUS

CTV CONTRACTOR TO VERIFY

D.A. DOOR ACTUATOR

DBL. DOUBLE

DEMO. DEMOLISH OR DEMOLITION

D.F. DRINKING FOUNTAIN

DIA. DIAMETER

DIM. DIMENSION

DIMS. DIMENSIONS

DN. DOWN

DR. DOOR

D.T. DRAIN TILE

DWG. DRAWING

EA. EACH

EJ EXPANSION JOINT

EL. ELEVATION

ELEC. ELECTRICAL

ELEV. ELEVATOR

EPDM. ETHYLENE PROPYLENE DIENE TERPOLYMER

EQ. EQUAL

EW EACH WAY

EXTG. EXISTING

EXP. EXPANSION

EXT. EXTERIOR

F.B. FACE BRICK

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER & CABINET

FIN. FINISH

FLR. FLOOR

FND. FOUNDATION

FO FACE OF

FTG. FOOTING

GA. GAUGE

GALV. GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN. GENERAL

GND. GROUND

GYPBD. GYPSUM WALL BOARD

HB HOSE BIB

HDR. HEADER

HORIZ. HORIZONTAL

HPDL HIGH PRESSURE DECORATIVE LAMINATE

HM HOLLOW METAL

HR. HOUR

INSUL. INSULATED OR INSULATION

ISO. ISOCYANURATE

INT. INTERIOR

INV. INVERT

JAN. JANITOR

JNT. JOINT

KD KNOCKDOWN

KIP KILOPOUND (1000 POUNDS)

LAV. LAVATORY

LL LIVE LOAD

LOC. LOCATION

LNDG. LANDING

MAX. MAXIMUM

M.E. MATCH EXISTING

MECH. MECHANICAL

MEZZ. MEZZANINE

MFGRS. MANUFACTURER'S

MIN. MINIMUM

MIR. MIRROR

MISC. MISCELLANEOUS

MO MASONRY OPENING

MTD. MOUNTED

MTL. METAL

NFA NET FREE AREA

N.I.C. NOT IN CONTRACT = (SUPPLIED BY OWNER INSTALLED BY OWNER)

NOM. NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OH. OVERHEAD

O.D. OVERHEAD DOOR

PJP PARTIAL JOINT PENETRATION

P.LAM. PLASTIC LAMINATE

PLF POUNDS PER LINEAL FOOT

PLT. PLATE

PLUMB. PLUMBING

PLYWD. PLYWOOD

PR PAIR

PREP. PREPARE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

P.T. PRESSURE TREATED

PVC POLYVINYL CHLORIDE

RAD. RADIUS

RD ROOF DRAIN

REBAR. REINFORCING BAR

REFRIG. REFRIGERATOR

REINF. REINFORCEMENT OR REINFORCE

REQD. REQUIRED

RM. ROOM

ROW RIGHT OF WAY

SAN. SANITARY

SCHED. SCHEDULE

SF SQUARE FOOT

SHTHG. SHEATHING

SHWR. SHOWER

SIM. SIMILAR

SPEC. SPECIFIED OR SPECIFICATION

S.S. STAINLESS STEEL

STD. STANDARD

STL. STEEL

STOR. STORAGE

STRUCT. STRUCTURE OR STRUCTURAL

SUSP. SUSPENDED

T-HOLD THRESHOLD

TD TRENCH DRAIN

T/D TELEPHONE/DATA

T&G TONGUE AND GROOVE

TELE. TELEPHONE

THK. THICK, THICKNESS

THRU THROUGH

TLT. TOILET

T.O. TOP OF

TOC TOP OF CONCRETE

TOS TOP OF STEEL

TP TOILET PAPER DISPENSER

TPO THERMOPLASTIC POLYOLEFIN

TYP. TYPICAL

UNO UNLESS NOTED OTHERWISE

UR. URINAL

VERT. VERTICAL

VEST. VESTIBULE

W/ WITH

W/O WITHOUT

WC. WATERCLOSET

WD. WOOD

WH. WATER HEATER

WPT. WORKING POINT

WT. WEIGHT

WWF WELDED WIRE FABRIC

A1.1

X X

X X

100'-0"

FIN. FLOOR

A

A

REFER TO WINDOW SCHEDULE OR

ENLARGE WINDOW ELEVATION

REFER TO DOOR SCHEDULE

SECTION CALLOUT

INTERIOR ELEVATION

DETAIL BLOWUP

ROOM NAME

ROOM NAME

DETAIL NUMBER

SHEET NUMBER TO REFERENCE

FOR DETAIL BLOWUP

SECTION NUMBER

SHEET NUMBER TO REFERENCE

FOR SECTION

DOOR NUMBER

WINDOW TYPE NUMBER

ELEVATION NUMBER

SHEET NUMBER TO REFERENCE

FOR INTERIOR ELEVATION

A1.1

DETAIL CALLOUT

DETAIL NUMBER

SHEET NUMBER TO REFERENCE

FOR DETAIL

DRAWING SYMBOLS KEY

ROOM TAG/NAME

ROOM NAME

ROOM NUMBER

DOOR TAG

REFER TO ROOM SCHEDULE

WINDOW TAG

COLUMN GRID LINE

ELEVATION TAG

LOCATION REFERENCE

ELEVATION

KEY NOTE TAG

REFERENCE NUMBER

REFER TO KEY NOTE SCHEDULE

G0.2

DSB

DSB

Z:

\0

0- D

W G

\0 0-

E sc an ab a Ar ea P ub lic

S ch oo ls

\2 5-

T he

U , M ec ha ni ca l U ni ts , E sc an ab a, M I\2

5-

_0

1_ G

2_

AB

BR

EV

.d w g

/2 7/

:1

2:

A M

R E

V

IS

IO

N

D A

TE

Date

Drawn By

Checked By

Job No.

P ro je ct

T itl e

Dynamic Design Group, inc.

900 1st Ave. So., Ste. A

Escanaba, MI ph.: 906.786.3300 email: gen@ddgi-ddm.com www.ddgi-ddm.com

M d dD y n a m ic

D e s ig n G ro u p in c

E ng in ee rs

A rc hi te ct s

P ro je ct

M an ag er s

COPYRIGHT 2020 DYNAMIC

DESIGN GROUP, INC., ESCANABA, MI.

This document is not to be used, copied or reproduced without expressed written permission from Dynamic Design Group, inc.

F O

R R

E V

IE

W

/F O

R C

O N

S T

R U

C T

IO

N

ES

C

A N

A B

A , M

IC

H

IG

A

N

ES

C

A N

A B

A A

R

EA

P U

B

LI

C S

C H

O O

LS

Th e U pp er

E le m en ta ry

S ch oo l -

R ep la ce m en t o f U ni t V en til at or s

06-26-2025

25-4650

0- D

W G

\0 0-

E sc an ab a Ar ea P ub lic

S ch oo ls

\2 5-

T he

U , M ec ha ni ca l U ni ts , E sc an ab a, M I\2

5-

_F lo or

P la n.

dw g

/2

7/

:1 2:

A

M

R E

V

IS

IO

N

D A

TE

Date

Drawn By

Checked By

Job No.

P ro je ct

T itl e

Dynamic Design Group, inc.

900 1st Ave. So., Ste. A

Escanaba, MI ph.: 906.786.3300 email: gen@ddgi-ddm.com www.ddgi-ddm.com

M d dD y n a m ic

D e s ig n G ro u p in c

E ng in hi te ct s

P ro je ct

M an ag er s

COPYRIGHT 2020 DYNAMIC

DESIGN GROUP, INC., ESCANABA, MI.

This document is not to be used, copied or reproduced without expressed written permission from Dynamic Design Group, inc.

F O

R R

E V

IE

W

/F O

R C

O N

S T

R U

C T

IO

N

ES

C

A N

A B

A , M

IC

H

IG

A

N

ES

C

A N

A B

A A

R

EA

P U

B

LI

C S

C H

O O

LS

Th e U pp er

E le m en ta ry

S ch oo l -

R ep la ce m en t o f U ni t V en til at or s

06-26-2025

25-4650N.T.S.

OVERALL SECOND LEVEL FLOOR PLAN1

A1.0

N.T.S.

ENLARGED SECOND LEVEL FLOOR PLAN2

EXISTING PLANS SHOWN ARE CLIPS FROM THE 2001

PLANS PREPARED BY WEST-TECH DESIGN, INC AND

DIEKEMA HAMANN ARCHTIECTURE.

THE FULL SET OF 2001 PLANS ARE AVAILABLE TO

CONTRACTORS IN ELECTRONIC FORMAT UPON

REQUEST. CONTACT THE OFFICE OF THE ENGINEER.

UNIT VENTILATORS TO BE REPLACED (3 TOTAL)

A1.0

DSB

0- D

W G

\0 0-

E sc an ab a Ar ea P ub lic

S ch oo ls

\2 5-

T he

U , M ec ha ni ca l U ni ts , E sc an ab a, M I\2

5-

_F lo or

P la n.

dw g

/2

7/

:1 2:

A

M

R E

V

IS

IO

N

D A

TE

Date

Drawn By

Checked By

Job No.

P ro je ct

T itl e

Dynamic Design Group, inc.

900 1st Ave. So., Ste. A

Escanaba, MI ph.: 906.786.3300 email: gen@ddgi-ddm.com www.ddgi-ddm.com

M d dD y n a m ic

D e s ig n G ro u p in c

E ng in hi te ct s

P ro je ct

M an ag er s

COPYRIGHT 2020 DYNAMIC

DESIGN GROUP, INC., ESCANABA, MI.

This document is not to be used, copied or reproduced without expressed written permission from Dynamic Design Group, inc.

F O

R R

E V

IE

W

/F O

R C

O N

S T

R U

C T

IO

N

ES

C

A N

A B

A , M

IC

H

IG

A

N

ES

C

A N

A B

A A

R

EA

P U

B

LI

C S

C H

O O

LS

Th e U pp er

E le m en ta ry

S ch oo l -

R ep la ce m en t o f U ni t V en til at or s

06-26-2025

25-4650N.T.S.

SECOND FLOOR MECHANICAL PLAN1

N.T.S.

SECOND FLOOR PIPING PLAN2

N.T.S.

UNIT VENTILATOR SCHEDULE3

EXISTING PLANS SHOWN ARE CLIPS FROM THE 2001

PLANS PREPARED BY WEST-TECH DESIGN, INC AND

DIEKEMA HAMANN ARCHTIECTURE.

THE FULL SET OF 2001 PLANS ARE AVAILABLE TO

CONTRACTORS IN ELECTRONIC FORMAT UPON

REQUEST. CONTACT THE OFFICE OF THE ENGINEER.

UNIT VENTILATORS TO BE REPLACED

UNIT VENTILATORS TO BE REPLACED

UNIT VENTILATORS TO BE REPLACED

1. MECHANICAL NOTES:

1.1. THE INTENT AND SCOPE OF THIS PROJECT IS TO REPLACE

THE EXISTING PACKAGED HOT WATER AND DX AIRDALE

UNITS WITH NEW BY AIRDALE. CONTRACTOR IS TO REVIEW

EXISTING SITE CONDITIONS AND MEASURE ALL EXISTING

LOCATIONS TO ENSURE THAT NEW UNITS FIT WITHIN

EXISTING LOCATIONS, OR TO PROVIDE ADDITIONAL SHEET

METAL OR PIPING TO ENSURE THAT REPLACED UNITS HAVE

A COMPLETE AND FINISHED LOOK UPON INSTALLATION. THE

EXISTING UNIT CAPACITIES LISTED ON THIS SHEET SHALL

BE MATCHED AS CLOSELY AS POSSIBLE USING NEWLY

PUBLISHED MATERIAL.

1.2. THE NEW UNIT VENTILATORS WILL REQUIRE R-454B

REFRIGERANT, AND THE CONTRACTOR IN CONJUNCTION

WITH THE EQUIPMENT MANUFACTURER SHALL ENSURE

THAT ALL REFRIGERANT MONITOR SYSTEMS ARE INSTALLED

IN UL COMPLIANCE. COORDINATE WITH ELECTRICIAN ANY

DEDICATED CIRCUITS THAT ARE REQUIRED FOR THE NEW

REFRIGERANT MONITOR, OR ANY CHANGES TO THE

ELECTRICAL REQUIREMENTS OF THIS UNIT DUE TO THE

NEW STYLE OF REFRIGERANT REQUIRED TO BE USED.

1.3. REMOVE THE EXISTING PNEUMATIC CONTROLS AND

COMPONENTS, INCLUDING ON THE HOT WATER SYSTEM

AND REPLACE WITH NEW DDC CONTROLS AND WIRING.

1.4. PROVIDE A NEW, STAND-ALONE, PROGRAMMABLE DDC

CONTROLLER FOR THE NEW UNIT VENTILATORS THAT HAS

THE CAPABILITY OF BEING INTERFACED WITH A FUTURE BAS

SYSTEM.

1.5. PROVIDE SHEET METAL OFFSETS AND EXTENSIONS AS

NEEDED TO RECONNECT NEW UNIT VENTILATOR TO THE

EXISTING FRESH AIR INTAKE LOUVER. WHILE THIS

REPLACEMENT IS INTENDED TO BE LIKE-FOR-LIKE, THERE IS

A POSSIBILITY THAT THE OVERALL UNIT DIMENSIONS HAVE

BEEN CHANGED OVER THE YEARS BY THE MFG.

CONTRACTOR IS TO MEASURE AND CONFIRM ALIGNMENT,

BUT TO PROVIDE ADDITIONAL COMPONENTS AS NEEDED TO

MAKE FITMENT WORK.

1.6. DISCONNECT AND DEMO EXISTING HOT WATER PIPING

ONLY AS FAR AS NECESSARY TO REPLACE THE EXISTING

PNEUMATIC CONTROLS COMPONENTS, AND TO ALLOW FOR

RE-INSTALLATION OF NEW EQUIPMENT.

1.7. DISCONNECT AND DEMO EXISTING SUPPLY DUCTWORK

ONLY AS FAR AS NECESSARY TO ALLOW FOR

RE-INSTALLATION OF NEW EQUIPMENT.

1.8. CONTRACTOR IS TO CONFIRM THAT POWER REQUIREMENTS

ARE THE SAME PRIOR TO RECONNECTION. CONSULT WITH

ENGINEER IF THE ELECTRICAL IS FOUND TO BE LARGER

THAN EXISTING.

M1.0

Sheets and Views
G0.1
1 G0.2 GEN NOTES
2 A1.0
3 M1.0

File details come from the government source that posted it. Updated .