This document is an Addendum (#1) issued by Dynamic Design Group, Inc. for the Escanaba Area Public Schools' Upper Elementary School Unit Ventilator Replacement project (Job No. 25-4650). The addendum extends the bid due date to Monday, July 21st at 10 am, with a public bid opening at 10:15 pm at the DDGi office. The project involves replacing existing unit ventilators from 2001, with replacement Airedale units being approximately 48" wide compared to the current 36" wide units. Contractors are required to relocate the new units further into the room and modify ductwork to fit the existing alcoves. The school district desires project completion by Tuesday, August 26, 2025 (end of the 2025 School Summer Break), with on-site work potentially beginning as early as Wednesday, July 16, 2025.
The addendum includes an alternate bid option for units that will fit within the existing 42" wide alcoves, with roof condensers for each individual unit and refrigerant lines. Contractors must provide detailed pricing, unit and condenser manufacturer information, and written literature about the proposed installation. The project requires contractors to complete all necessary work, including modifications to ceilings, walls, roofs, and flooring. Two contractors have already scheduled pre-bid meetings: Berger & King and Prime Specialty Contracting. The bid remains open for acceptance for sixty days from the bid closing date, with potential completion during the 2025 Christmas Break if material lead times prevent summer completion.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 25-4650_SPECS_06-26-2025.pdf | ||
| 25-4650_PLANS_06-26-2025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum
Dynamic Design Group, i n c .
Engineers—Architects—Project Managers
Dynamic Design Group, Inc., 900 1st Avenue South, Escanaba, Michigan 49829 Ph. 906.786.3300 email: gen@ddgi-ddm.com www.ddgi-ddm.com
M dd d e s i g n d o c u m ent m a n a g e
Addendum No. 1 Date: July 11, 2025
Job Name: The Upper Elementary School Replacement of Unit Ventilators Escanaba Area Public Schools Escanaba, Michigan
Job No. 25-4650
The following is issued as a supplement or to revise the bid documents. The revision, and/or clarification of the bid documents are described below. Unless specifically changed by Addendum, the remainder of the bid documents shall remain in effect as originally issued. Attach this addendum to your copy of the bid documents and note its receipt on the Bid Form.
Addendum Items:
1 General Bid Date The Bid due date has been extended to Monday, July 21st at 10 am (local time). Public Bid opening will be Monday, July 21st at 10:15 pm (local time) at the office of DDGi. Contractors and subcontractors shall be available to respond to questions about their bids from 11am to 3pm on Monday, July 21.
All bids and bidder information will be presented to the School Board during their meeting on Monday, July 21st at 6pm. If the bids are acceptable to the Board, they will award the bid.
2 General Airedale The Airedale representative is Andy VanPopering of Bolhouse, LLC.; (616)- 209-7543 (office) (616) 890-7426 (cell); andy@bolhousellc.com;
3 General Airedale specifications The original Airedale units are from 2001. The intent is that Airedale will have record of the units from 2001 and will be able to specify the proper replacement. Specifications for these units are not provided with the bid package. Contractors shall acquire the specifications from Airedale.
4 General Airedale Unit Ventilators We have been informed that replacement Airedale Unit Ventilators will be approximately 48” wide. The current units are around 36” wide. The current width of the alcove where the units are located is approximately 42” wide.
The replacement units will need to be located further into the room, with ductwork necked down to fit into the current alcoves. Some rooms include a masonry stem wall that sticks out further into the space. For those rooms, the units will need to set even further into the room, with ductwork necked down to fit into the current alcoves.
5 Drawings Unit Ventilator Detail The Unit Ventilator Detail from the 2001 plans is included.
12-4037
Dynamic Design Group, Inc., 900 1st Avenue South, Escanaba, Michigan 49829 Ph. 906.786.3300 email: gen@ddgi-ddm.com www.ddgi-ddm.com
M dd d e s i g n d o c u m ent m a n a g e
6 General Louver Dimensions The existing louver has the following dimensions:
Exterior – 41” tall x 32” wide.
Interior – 20½” tall x 32” wide – this is all that could be measured from the inside.
Top of louver (from the inside) to finished floor is approximately 47”. Based upon the exterior louver dimensions, the bottom of the louver to finished floor is approximately 6”.
7 General Pre-Bid Meeting Attendance The Contractors that scheduled pre-bid meetings with the School District are:
Berger & King; and Prime Specialty Contracting
8 General Photos An exterior photo of the louvers and an interior photo of a unit are included.
9 General Alternate #1 Due to the encroachment of the replacement Airedale units or other proposed units into the existing classrooms, it is desired to look at an alternate option. Provide an alternate price for units that will fit within the width of the current 42” wide alcoves, with roof condensers for each individual unit and refrigerant lines set between each unit and condenser, sized by the manufacturer. Patch any/all roof/wall penetrations, as required, to be weathertight. Provide composite vibration isolation pads, properly secured to the existing roof structure with weathertight connections. The existing roof structure is a membrane roof, over 3” rigid insulation, over 1½” 22 gauge Type B metal roof deck, over 20K10 steel bars joists @ 4’-8” o.c..
List the unit and condenser manufacturer included in the alternate bid. With the alternate bid submission, provide written manufacturer literature/information about the units and condensers, and all products utilized for this alternate installation.
10 General Affected areas Work associated with the Base Bid or Alternate shall include all work necessary to complete the project, including areas affected by the work.
This shall include ceilings, walls, roofs, flooring, etc.. All affected items shall be modified/repaired/replaced to meet or exceed the existing conditions.
Attachments: Unit Ventilator Detail from 2001; Revised Bid Form; photos;
Note: Contractors shall forward Addenda to their subs and/or verify their subs have all Addenda.
12-4037
Dynamic Design Group, Inc., 900 1st Avenue South, Escanaba, Michigan 49829 Ph. 906.786.3300 email: gen@ddgi-ddm.com www.ddgi-ddm.com
M dd d e s i g n d o c u m ent m a n a g e
25-4650 / The Upper Elementary School - Replacement of Unit Ventilators
00 4100 - 1 REVISED BID FORM -
07-11-2025
SECTION 00 4100
REVISED BID FORM - 07-11-2025
PROJECT
The Upper Elementary School - Replacement of Unit Ventilators Escanaba Area Public Schools Escanaba, MI
SUBMIT BID TO:
Dynamic Design Group, inc.
900 1st Ave. So., Suite A Escanaba, MI 49829
THIS BID IS ADDRESSED TO:
Escanaba Area Public Schools 1500 Ludington St.
Escanaba MI MI
BID CLOSES:
Monday, July 21, 2025 @ 10:00 A.M. (E.S.T.)
OFFER:
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER and agrees to perform and furnish all Work as specified or indicated in the Construction Documents and Bidding Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Bidding documents.
BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to BIDDER’s, including without limitation those dealing with the disposition of Bid security.
BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNERS’s Notice of Intent.
IN SUBMITTING THIS BID, BIDDER REPRESENTS, AS MORE FULLY SET FORTH IN THE
AGREEMENT, THAT:
Construction Documents - BIDDER has obtained and carefully studied (or accepts the consequences for not doing so) the entire set of Contract Documents including drawings, specifications, invitation to bid, supporting documents (if issued) and addenda (if issued).
It is the Engineers intent for all parties involved in the preparation of this bid to have in their possession the entire set of Contract Documents from which to prepare their bids(s). BIDDER acknowledges that at no time, was the drawing set and/or specifications separated and issued in parts to parties associated with the preparation of this bid, whether in hard copy or digital format. BIDDER further acknowledges that all parties involved in the preparation of this bid have obtained and carefully studied the entire set of Contract Documents. It is the responsibility of BIDDER to verify that all parties have reviewed the entire set of Contract Documents.
Addenda – BIDDER has examined and carefully studied any Addenda that has been issued.
Ventilators
00 4100 - 2 REVISED BID FORM -
07-11-2025
Investigations and Examinations - BIDDER - does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
BIDDER has given Engineer and Owner written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Bidding Documents and the written resolution thereof by Engineer and Owner is acceptance to BIDDER.
The Bidding Documents are generally sufficient to indicate and convey understanding of all terms conditions for performing and furnishing the Work for which this Bid is submitted.
Bidders Obligations - BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, drawings, any conflicts identified in the Construction Documents and Bidding Documents and all additional examinations, and data with the Construction Documents and Bidding Documents that will affect his bid.
Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by Dynamic Design Group, inc., of Escanaba for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the Sum of: THE CONTRACTORS TOTAL BID PRICE.
BASE BID
CONTRACTORS TOTAL BID PRICE
Cost to furnish all labor and materials.
___________________________________________________dollars ($____________________)
List the Unit Ventilator Manufacturer/Model # that is included in the Base Bid price
We have included the required bid security deposit as required in Section 00 2113 Instruction to Bidders.
We have included our completed FAMILIAL DISCLOSURE AFFIDAVIT form.
We have included our completed SWORN AND NOTARIZED AFFIDAVIT OF COMPLIANCE IRAN ECONOMIC SANCTIONS ACT form.
We have included the required performance assurance bonds in the Bid Amount as required by the Section 00 2113 Instruction to Bidders.
Ventilators
00 4100 - 3 REVISED BID FORM -
07-11-2025
ALTERNATE BIDS
Bidder shall state the amount for the following alternate and shall include any modifications of work or additional work that the undersigned may be required to perform by reason of acceptance of the alternate. See applicable sections of the specifications and the drawings for detailed information.
Alternate Bid #1 (Alternate units and condensers) State the amount to utilize units that will fit in the existing alcoves, with roof condensers for each unit, and refrigerant line sets between each unit and condenser. This alternate is a firm bid price. It is not to be added/deducted from the Base Bid. It will replace the Base Bid completely.
Cost to furnish all labor and materials.
___________________________________________________dollars ($____________________)
List the Unit and Condenser Manufacturer/Model #'s that are included with the Alternate Bid. Include written manufacturer literature/information about the units and condensers, and all products utilized for this alternate installation, with this Bid Form.
All applicable federal taxes are included and State taxes are included in the Bid Sums.
ACCEPTANCE
This offer shall be open to acceptance and is irrevocable for sixty days from the bid closing date.
If this bid is accepted by Owner within the time period stated above, we will:
Execute the Agreement within seven days of receipt of Notice of Intent.
Commence work within seven days after written agreement is executed. Unless an alternate start date is mutually agreed apon.
If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to Owner by reason of our failure, limited in amount to the lesser of the face value of the security deposit or the difference between this bid and the bid upon which a Contract is signed.
In the event our bid is not accepted within the time stated above, the required security deposit shall be returned to the undersigned, in accordance with the provisions of the Instructions to Bidders; unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time.
CONTRACT TIME
The project has a desired completion date of Tuesday, August 26, 2025 (end of 2025 School Summer Break). On-site work may begin on or after Wednesday, July 16, 2025.
If material/equipment lead times will not allow the work to be completed during the 2025 School Summer Break, the work will need to be completed during the 2025 Christmas Break. On-site work may begin on or after Monday, December 22, 2025. The project desired completion date is Thursday, January 1, 2026.
If this Bid is accepted, and an Owner/Contractor contract/agreement is executed on Tuesday, July 15, 2025 we will:
State the proposed construction start date and construction completion date:
Begin on-site construction on _____________________________ (Bidder to enter day, month, year).
Complete construction on ________________________________(Bidder to enter day, month, year).
Ventilators
00 4100 - 4 REVISED BID FORM -
07-11-2025
CHANGES TO THE WORK
When Engineer establishes that the method of valuation for Changes in the Work will be net cost plus a percentage fee in accordance with General Conditions, our percentage fee will be:
______ percent overhead and profit on the net cost of our own Work;
______ percent on the cost of work done by any Subcontractor.
On work deleted from the Contract, our credit to the Owner shall be Architect approved net cost plus the percentages used above.
ADDENDA
The following Addenda have been received. The modifications noted in the Addendums below have been considered and all costs are included in the Bid Sum.
Addendum #______ Dated _______________.
Addendum #______ Dated _______________.
CONTRACTORS
List your appointed Project Coordinator:
Prime Contractor will be required to designate an on-site Project Coordinator that will represent the Prime Contractor on-site. List the individual:
Project Coordinator:________________________________________________________________
FAMILIAL DISCLOSURE AFFIDAVIT AND IRAN ECONOMIC SANCTIONS
____Yes ____ No - Acknowledge the Familial Disclosure affidavit has been completed and submitted with the Contractor's Bid Form.
____Yes ____ No - Acknowledge the Iran Economic Sanctions compliance affidavit has been completed and submitted with the Contractor's Bid Form.
SUB-CONTRACTORS
Electrical sucontractor:_______________________________________________________________
HVAC subcontractor:________________________________________________________________
BID FORM SIGNATURE(S)
Signature and certification:
I hereby certify that all statements herein are made on behalf of:
Insert Corporation, Partnership or Individual Submitting Bid above.
By presenting this bid and signing below, I acknowledge that at no time, did I separate the Contract Documents and/or issue parts of the Contract Documents to any parties involved in the preparation of this bid, either in hard copy or digital format. I further acknowledge that all parties involved in the preparation of this bid have completely reviewed and studied the entire set of Contract Documents.
Ventilators
00 4100 - 5 REVISED BID FORM -
07-11-2025
I have full authority to make such statement and to submit this proposal.
Signature:_________________________________________________________________________
Printed Name:____________________________________________________________________
Company Name:__________________________________________________________________
Address:__________________________________________________State_______Zip__________
Phone No.:_______________________________________________________________________
Email:____________________________________________________________________________
Witnessed by, Printed Name:_________________________________________________________
Witnessed by, Signature:____________________________________________________________
END OF SECTION