25-26MC Electronic Bid Form.xls
XLS spreadsheet 56 KB Posted
- Attached to
- City Hall Restroom Renovations
- Solicitation number
- 25-26MC
- Issued by
- Sarasota County, Florida
About this file
The document is an electronic bid form for ITB #25-26MC, issued by the City of Sarasota for restroom renovation services at City Hall. The project encompasses comprehensive renovation of first and second-floor restrooms, involving complete replacement of mechanical, plumbing, and electrical systems across multiple construction divisions. Key renovation elements include removing and replacing sanitary lines, directionally boring through the lobby to minimize finish damage, installing new wall and floor tiles, replacing ceiling systems, and updating toilet partitions and restroom fixtures.
The bid form provides a detailed divisional breakdown for construction costs, with spaces for vendors to input pricing across 29 potential divisions, ranging from general requirements to electrical and communications systems. The total contract value is currently listed as zero, indicating vendors must complete the pricing information. The City has specified that vendors are responsible for verifying totals and unit prices, and failure to upload the completed bid form will result in being deemed non-responsive. The document emphasizes the vendor's obligation to review and confirm all financial calculations before submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| BID FORM | ||
| COMPANY | ||
| Fill Here | ||
| PROJECT | ||
| ITB #25-26MC CITY OF SARASOTA RESTROOM RENOVATIONS | ||
| DIVISION | DESCRIPTION | Division Total |
| DIVISION 01 | GENERAL REQUIREMENTS | $0.00 |
| DIVISION 02 | EXISTING CONDITIONS | |
| DIVISION 03 | CONCRETE WORK | |
| DIVISION 04 | MASONRY | |
| DIVISION 05 | METALS | |
| DIVISION 06 | WOOD, PLASTICS AND COMPOSITES | |
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | |
| DIVISION 08 | OPENINGS | |
| DIVISION 09 | FINISHES | |
| DIVISION 10 | SPECIALTIES | |
| DIVISION 11 | EQUIPMENT | |
| DIVISION 12 | FURNISHINGS | |
| DIVISION 13 | SPECIAL CONSTRUCTION | |
| DIVISION 14 | CONVEYING EQUIPMENT | |
| DIVISION 15 | RESERVED | |
| DIVISION 16 | RESERVED | |
| DIVISION 20 | RESERVED | |
| DIVISION 21 | FIRE SUPRESSION | |
| DIVISION 22 | PLUMBING | |
| DIVISION 23 | HEATING, VENTILATING AND A/C | |
| DIVISION 24 | RESERVED | |
| DIVISION 25 | RESERVED | |
| DIVISION 26 | ELECTRICAL | |
| DIVISION 27 | COMMUNICATIONS | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | |
| DIVISION 29 | RESERVED | - 0 |
| DIVISION 30 | RESERVED | - 0 |
| DIVISION 31 | EARTHWORK | - 0 |
| DIVISION 32 | EXTERIOR IMPROVEMENTS | |
| DIVISION 49 | RESERVED | - 0 |
| CONTRACT TOTAL | $ - 0 | |
| Vendor is responsible for verifying that totals and unit prices are correct. The City is not responsible for formula errors within this spreadsheet. Should an error be dectected, Vendor shall notify the Purchasing Division for a corrected Bid Form. This Bid Form must be uploaded with bid submittal. Failure to upload Bid Form with bid submittal will result in Vendor being declared non-responsive. |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
File details come from the government source that posted it. Updated .