This document is a cost proposal bid (25-1001-ITB-KF949) for Roofing Contracted Services issued by Lake County School District in Florida, with a bid opening scheduled for October 20, 2025. The invitation seeks competitive bids from qualified vendors to provide roof repair and replacement services, encompassing comprehensive roofing work that includes labor, materials, tools, equipment, insurance, and supervision. The bid is structured to establish a contract for roofing services on an as-needed basis, with the school board reserving the right to adjust actual purchase quantities.

The cost proposal includes three primary sections detailing labor categories, installation rates, and material costs. Labor categories range from Project Manager to Helper, with specified standard and emergency work hourly rates. Section B covers installation pricing per square for materials like shingles and metal rib panels, while Section C allows for material purchases at contractor's actual cost plus a maximum 15% markup. The bid emphasizes that the estimated quantities are guide figures and do not obligate the school board to specific purchase volumes, providing flexibility in service procurement.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Cost Proposal

Bid : # 25-1001-ITB-KF949
Bid Name: Roofing Contracted Services
Bid Opening: October 20, 2025
Lake County School District
Vendor Name:
Address:
Please complete the blue sections. No hand written responses.
DO NOT SAVE OR UPLOAD THIS DOCUMENT AS A PDF
Section A Labor Category for Roof Repair
Item #Project Estimates*Labor ClassificationsStandard Work Hourly RateTotal PriceEmergency Work Hourly RateTotal Price
125HoursProject Manager$0.00$0.00
230HoursSupervisor$0.00$0.00
375HoursWorking Foreman$0.00$0.00
4120HoursRoofing Mechanic$0.00$0.00
550HoursSheet Metal Mechanic$0.00$0.00
625HoursA/C Mechanic$0.00$0.00
7120HoursHelper$0.00$0.00
85HoursRepairs$0.00$0.00
Section A (Sum of Hourly Rates 1-8)$0.00$0.00
Grand Total Section A$0.00
Section B Installation of MaterialsCOST PER SQUARE (1 SQ - 100 FT)
9Shingles Per Square For Labor Only$0.00
10Metal Rib Panel Per Square For Labor Only$0.00
10.1Aluminum Gutter 040 Per Square Foot For Gutter and Labor$0.00
10.2Stainless Steel Gutter Per Square Foot for Gutter and Labor$0.00
Section B Sum of Installation of Materials (Rows 9- 10.02)$0.00
Grand Total of Section A & B
$0.00
Section C: Roofing Materials
MATERIALS SHALL BE AT CONTRACTOR'S ACTUAL COST PLUS A PERCENTAGE-NOT TO EXCEED 15% (Unless previously negotiated by the School Board)

*Please note that these are estimates only and in no way obligates the SCHOOL BOARD to purchase these amounts. These estimates are intended as a guide in submitting your bid. The actual quantities purchased under this bid may be more or may be less.