This document is a Statement of Work (SOW) for the repair of a forklift ramp at Building 1101 located at Camp Lejeune, North Carolina. The project involves demolishing a portion of the existing asphalt and metal gate, and constructing a new concrete forklift ramp approximately 10 feet long. The new concrete shall be a minimum 8-inches deep, 3500-psi fiber-reinforced concrete with specific requirements for installation, including use of fiber reinforcement, expansion joints, and precise finishing techniques.
The project requires detailed submittal of concrete mix composition, batch tickets, and adherence to specific construction standards. Key technical specifications include using 1-1/2 inch compressible expansion joints, mechanically cut relief joints, precise concrete placement and curing procedures, and complete site cleanup. The work is part of a Naval Facilities Engineering Command project limited to pre-approved MACC (Multiple Award Construction Contract) contractors for the Camp Lejeune area of responsibility, with the solicitation number N4008525R9014.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S1144
S1007
S1017
BIRCH ST
ASH ST
GIBB RD
CENTER RD
CAMP LEJEUNE, N.C.
LOCATION MAP DRAWING INDEXAREA MAP
25-0425
REPAIR FORKLIFT RAMP
BLDG 1101LOCATION
MAP
AREA MAP
VICINITY MAP
BLDG
AutoCAD SHX Text %%uJACKSONVILLE
AutoCAD SHX Text
NORTHEAST CREEK
AutoCAD SHX Text A T L A N T I C O C E A N
AutoCAD SHX Text N E W R I V E R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LEJEUNE BLVD
AutoCAD SHX Text
TO WILMINGTON
AutoCAD SHX Text
VERONA LOOP ROAD
AutoCAD SHX Text
PADGETT RD
AutoCAD SHX Text
HAWS RUN RD
AutoCAD SHX Text
DAWSON CABIN RD
AutoCAD SHX Text
HIGH HILL RD
AutoCAD SHX Text
COSTON RD
AutoCAD SHX Text
CHATEAU RD
AutoCAD SHX Text
CC RD
AutoCAD SHX Text
SHEPARD
AutoCAD SHX Text
RD
AutoCAD SHX Text
NEW RIVER INLET RD
AutoCAD SHX Text
RANGE RD
AutoCAD SHX Text
DIXON-SNEADS FERRY RD
AutoCAD SHX Text
OCEAN DRIVE
AutoCAD SHX Text
BEACH RD
AutoCAD SHX Text
MARINES RD
AutoCAD SHX Text
LYMAN RD
AutoCAD SHX Text
OLD BEAR CREEK RD
AutoCAD SHX Text
PINEY GREEN RD
AutoCAD SHX Text
HOLCOMB BLVD
AutoCAD SHX Text
BREWSTER BLVD
AutoCAD SHX Text
CURTIS
AutoCAD SHX Text
STONE ST
AutoCAD SHX Text
STONE BAY
AutoCAD SHX Text
FRENCH
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
MAIN SERVICE RD
AutoCAD SHX Text
INTRACOASTAL WATERWAY
AutoCAD SHX Text %%uNEW RIVER INLET
AutoCAD SHX Text
MEANS HIGH WATER +1.50
AutoCAD SHX Text
MEANS SEA LEVEL 0.00
AutoCAD SHX Text
MEANS LOW WATER -1.50
AutoCAD SHX Text %%uSNEADS FERRY
AutoCAD SHX Text
MEANS HIGH WATER +1.10
AutoCAD SHX Text
MEANS SEA LEVEL 0.00
AutoCAD SHX Text
MEANS LOW WATER +0.35
AutoCAD SHX Text
MEANS LOW WATER +0.50
AutoCAD SHX Text
MEANS SEA LEVEL 0.00
AutoCAD SHX Text
MEANS HIGH WATER +1.00
AutoCAD SHX Text %%uTOWN POINT
AutoCAD SHX Text
LEJEUNE RAILROAD
AutoCAD SHX Text
CAMP
AutoCAD SHX Text
SNEADS FERRY RD
AutoCAD SHX Text
SETH
AutoCAD SHX Text
WALLACE
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
SOUTHWEST CREEK
AutoCAD SHX Text
WILSON
AutoCAD SHX Text
BAY
AutoCAD SHX Text
TRAPS
AutoCAD SHX Text
BAY
AutoCAD SHX Text
CHADWICK
AutoCAD SHX Text
BAY
AutoCAD SHX Text
HOWARD BAY
AutoCAD SHX Text
COURTHOUSE
AutoCAD SHX Text
BAY
AutoCAD SHX Text
ELLIS
AutoCAD SHX Text
COVE
AutoCAD SHX Text
TO
AutoCAD SHX Text
MOREHEAD CITY
AutoCAD SHX Text
BEAR
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
BEAR
AutoCAD SHX Text
INLET
AutoCAD SHX Text
STONE
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
MILL
AutoCAD SHX Text
STONE CREEK
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
MUDDY
AutoCAD SHX Text
MILL CREEK
AutoCAD SHX Text
TOWN
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
LEWIS
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
WHITE
AutoCAD SHX Text
HURST
AutoCAD SHX Text
CR.
AutoCAD SHX Text
SNEADS
AutoCAD SHX Text
FERRY
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
TARAWA
AutoCAD SHX Text
TERRACE
AutoCAD SHX Text
KNOX
AutoCAD SHX Text
TR. PARK
AutoCAD SHX Text
MONTFORD
AutoCAD SHX Text
LANDING RD
AutoCAD SHX Text
MIDWAY
AutoCAD SHX Text
PARK
AutoCAD SHX Text
NAVAL
AutoCAD SHX Text
HOSPITAL
AutoCAD SHX Text
FRENCH
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
AREA
AutoCAD SHX Text
MAGAZINE
AutoCAD SHX Text
AREA
AutoCAD SHX Text
HADNOT
AutoCAD SHX Text
POINT
AutoCAD SHX Text
AREA
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
PARADISE
AutoCAD SHX Text
POINT
AutoCAD SHX Text
AREA
AutoCAD SHX Text
RIFLE
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
AMPHIBIAN
AutoCAD SHX Text
BASE
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
AREA
AutoCAD SHX Text
TRIANGLE
AutoCAD SHX Text
OUTPOST
AutoCAD SHX Text
BEACH
AutoCAD SHX Text
AREA
AutoCAD SHX Text
BERKELEY
AutoCAD SHX Text
MANOR
AutoCAD SHX Text
WATKINS
AutoCAD SHX Text
VILLAGE
AutoCAD SHX Text
CAMP
AutoCAD SHX Text
GEIGER
AutoCAD SHX Text
NEW RIVER
AutoCAD SHX Text
AIR STATION
AutoCAD SHX Text
CAMP
AutoCAD SHX Text
GEIGER
AutoCAD SHX Text
BROWNS
AutoCAD SHX Text
INLET
AutoCAD SHX Text
EVERETT CREEK
AutoCAD SHX Text
WILLI
AutoCAD SHX Text
AMS
AutoCAD SHX Text
BLVD
AutoCAD SHX Text
GOLF
AutoCAD SHX Text
COURSE
AutoCAD SHX Text
SWAMP
AutoCAD SHX Text
BELL
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 12000
AutoCAD SHX Text
AutoCAD SHX Text 24000
AutoCAD SHX Text
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
FREEMAN
AutoCAD SHX Text
MILL RUN
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
BRINSON CREEK
AutoCAD SHX Text
HOPE ROAD
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
DUCK CREEK
AutoCAD SHX Text
GREATER SANDY RUN AREA
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
GATE
AutoCAD SHX Text
MONTFORD
AutoCAD SHX Text
POINT
AutoCAD SHX Text
AREA
AutoCAD SHX Text
PAVILION
AutoCAD SHX Text
MARINA
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
PHEONIX
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
FLAMINGO
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
TURKEY
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
OWL
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
LHA
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
ORIOLE
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
SANDPIPER
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
EGRET
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
CANARY
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
DOVE
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
PLOVER
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
HERON
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
HAWK
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
DODO
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
GOOSE
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
FALCON
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
OSPREY
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
QUAIL
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
ALBATROSS
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
BLUEBIRD
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
JAYBIRD
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
CRANE
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
GULL
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
PENGUIN
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
LARK
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
PIGEON
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
TERN
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
COOT
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
SWAN
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
WOODPECKER
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
ROBIN
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
SPARROW
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
MALLARD
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
KIWI
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
EAGLE
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
PARROT
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
CONDOR
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
CARDINAL
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
PARTRIDGE
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text Z
AutoCAD SHX Text
SNIPE
AutoCAD SHX Text
LANDFILL
AutoCAD SHX Text
ROICC OFFICE BLDG 1005
AutoCAD SHX Text
DRMO
AutoCAD SHX Text
FRENCH CREEK BORROW PIT
AutoCAD SHX Text Richlands
AutoCAD SHX Text
US 17
AutoCAD SHX Text Beulaville
AutoCAD SHX Text Burgaw
AutoCAD SHX Text Words Corner
AutoCAD SHX Text Bolton
AutoCAD SHX Text
US 7
AutoCAD SHX Text
AutoCAD SHX Text 4 &
AutoCAD SHX Text Acme
AutoCAD SHX Text Delco
AutoCAD SHX Text Leland
AutoCAD SHX Text Warsaw
AutoCAD SHX Text Magnolia
AutoCAD SHX Text Rosehill
AutoCAD SHX Text
US 117
AutoCAD SHX Text
US 421
AutoCAD SHX Text Wallace
AutoCAD SHX Text %%uCAMP LEJUENE
AutoCAD SHX Text Swansboro
AutoCAD SHX Text Hampstead
AutoCAD SHX Text Wilmington
AutoCAD SHX Text Scott Hill
AutoCAD SHX Text
US 17
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text Holly Ridge
AutoCAD SHX Text
NEW RIVER
AutoCAD SHX Text Folkstone
AutoCAD SHX Text Dixon
AutoCAD SHX Text Jacksonville
AutoCAD SHX Text Verona
AutoCAD SHX Text
AutoCAD SHX Text
GRAPHIC SCALE IN MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Morehead City
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text Pink
AutoCAD SHX Text Hill
AutoCAD SHX Text Mt. Olive
AutoCAD SHX Text Seven
AutoCAD SHX Text Springs
AutoCAD SHX Text Goldsboro
AutoCAD SHX Text
US 70
AutoCAD SHX Text New Bern
AutoCAD SHX Text Havelock
AutoCAD SHX Text
NEUSE
AutoCAD SHX Text Tuscarora
AutoCAD SHX Text Trenton
AutoCAD SHX Text Comfort
AutoCAD SHX Text Kinston
AutoCAD SHX Text Dover
AutoCAD SHX Text
%%UOAK GROVE
AutoCAD SHX Text Pollacksville
AutoCAD SHX Text Maysville
AutoCAD SHX Text
%%UCHERRY POINT
AutoCAD SHX Text
US 70
AutoCAD SHX Text
RIVER
AutoCAD SHX Text Otway
AutoCAD SHX Text Beaufort
AutoCAD SHX Text
FORKLIFT RAMP REPAIR BLDG 1101
AutoCAD SHX Text
PROJECT # 25M052CN
AutoCAD SHX Text
CONTRACT # 25-0425
AutoCAD SHX Text
DWG: MARK RAMSDELL
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG 1101
AutoCAD SHX Text
TITLE PAGE
AutoCAD SHX Text T1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text
SHEET NAME
AutoCAD SHX Text T-1
AutoCAD SHX Text
TITLE SHEET, AREA MAPS
AutoCAD SHX Text A1
AutoCAD SHX Text
NOTES/OVERALL PLAN
AutoCAD SHX Text A2
AutoCAD SHX Text
RAMP PLANS
AutoCAD SHX Text A3
AutoCAD SHX Text
DETAILS; NOTES
AREA OF WORK.
SEE A2
1101 OVERALL PLAN1
NOT TO SCALE
AutoCAD SHX Text
FORKLIFT RAMP REPAIR BLDG 1101
AutoCAD SHX Text
PROJECT # 25M052CN
AutoCAD SHX Text
CONTRACT # 25-0425
AutoCAD SHX Text
DWG: MARK RAMSDELL
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG 1101
AutoCAD SHX Text
NOTES/OVERALL PLAN
AutoCAD SHX Text A1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1005 OFFICE REPAIRS SCOPE OF WORK: The contractor shall provide all material, labor, equipment and supervision required to accomplish The contractor shall provide all material, labor, equipment and supervision required to accomplish the following. GENERAL DESCRIPTION: This scope of work is to be accomplished at Building 1101 located on Gibb Rd. aboard, Camp This scope of work is to be accomplished at Building 1101 located on Gibb Rd. aboard, Camp Lejeune, North Carolina. The work includes installation of new concrete forklift ramp for the tenants of bldg 1101. DETAILED REQUIREMENTS AND SPECIFICATIONS: The contractor shall take his own field measurements in determining : The contractor shall take his own field measurements in determining required materials and costs for the following. SPECIAL SCHEDULING AND ACCESS: Access and scheduling to the work area shall be arranged through Contracting Access and scheduling to the work area shall be arranged through Contracting Officer"s Representative for the OICC office and the tenant of the building. Point of Contact for access to building is Mark Ramsdell 910-451-0483. NOTES: 1. The measurements and quantities furnished here are for reference only. The contractor is responsible for The measurements and quantities furnished here are for reference only. The contractor is responsible for actual field verification prior to bidding, ordering material and during every step of construction for existing surfaces, dimensions and conditions. 2. Repair, refinish of areas damaged or disturbed by new work to be provided under this contract. Repair, refinish of areas damaged or disturbed by new work to be provided under this contract. 3. Properly remove, haul, and dispose of all debris. The Base Landfill may be utilized. The contractor shall not Properly remove, haul, and dispose of all debris. The Base Landfill may be utilized. The contractor shall not utilize the dumpster provided by Camp Lejeune for the occupants of the buildings. The hours of operations The hours of operations are 0730-1530 Monday- Thursday and 0730-1430 on Friday. delivery of acceptable materials (identified above) shall be by appointment only. Appointment made by phone at 1-910-457-5011 or 1-910-451-2946. 4. The Contracting officer will register the contract via E-mail, with the base landfill. All haul vehicles will The Contracting officer will register the contract via E-mail, with the base landfill. All haul vehicles will maintain a secure vehicle placed as a condition to utilize the scale. E-mail the contractors information to the Landfill Clerk, include the name on the Prime contractor, contract number, job name / description, completion date and whether or not any above material will be delivered to the Landfill. 5. Prior to performing "HOT WORK" (welding, cutting, ect.) or operating other flame -producing spark producing Prior to performing "HOT WORK" (welding, cutting, ect.) or operating other flame -producing spark producing devices, a written permit shall be requested from the Fire Division. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. The contractor will provide at least two (2) twenty (20) pound 4A:20 BC rated extinguishers for normal "HOT WORK". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "HOT WORK" done at this activity. The Fire watch shall be trained in accordance with NFPA 51B and remain on site for a minimum of thirty (30) minutes after work is completed. 6. Contractor is to be aware of all rules, regulation and codes required for successful completion of project.Contractor is to be aware of all rules, regulation and codes required for successful completion of project.
AutoCAD SHX Text SUBMITTALS: 1. AFTER AWARD: The Contractor shall furnish the DSC-EMI, material, specifications for selection and AFTER AWARD: The Contractor shall furnish the DSC-EMI, material, specifications for selection and approval prior to the ordering and installation of said materials. 2. The contractor is required to submit a schedule detailing when they and or any subcontractor will The contractor is required to submit a schedule detailing when they and or any subcontractor will be working. The schedule must be approved by Government before beginning work. 3. The contractor shall submit the manufacture's product specifications, complete with technical The contractor shall submit the manufacture's product specifications, complete with technical products data for all of the material being used in this process. The product specification shall as a minimum, provide the technical details on the following items. 4. Submit: Submit: A. SHOP DRAWINGS. SHOP DRAWINGS. B. INSTALLATION DRAWINGS /shop drawings INSTALLATION DRAWINGS /shop drawings C. PRODUCT DATA PRODUCT DATA C.A. Manufactures technical data Sheet Manufactures technical data Sheet C.B. Material Safety Data Sheets (MADA) Material Safety Data Sheets (MADA) C.C. Maintenance Data Maintenance Data D. WARRANTY ( 10 year Commercial Limited Warranty) WARRANTY ( 10 year Commercial Limited Warranty) 6. Qualifications: Qualifications: 6.1. Fabricator Qualifications: Minimum of three years documented experience in construction similar in Fabricator Qualifications: Minimum of three years documented experience in construction similar in scope and complexity to this Project. Currently certified by the manufacturer as acceptable fabricator. 6.2. Installer Qualification: Minimum of three years documented installation experience for project Installer Qualification: Minimum of three years documented installation experience for project similar in scope and complexity to this project and currently certified by manufacturer as an acceptable installer.
A1
NEW FORKLIFT RAMP RENO PLAN2
DEMOLITION NOTES
NEW FORKLIFT RAMP DEMO PLAN1
A3
A3
AutoCAD SHX Text
FORKLIFT RAMP REPAIR BLDG 1101
AutoCAD SHX Text
PROJECT # 25M052CN
AutoCAD SHX Text
CONTRACT # 25-0425
AutoCAD SHX Text
DWG: MARK RAMSDELL
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG 1101
AutoCAD SHX Text
RAMP PLANS
AutoCAD SHX Text A2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5'
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 10'
AutoCAD SHX Text A2
AutoCAD SHX Text
AREA OF EXISTING ASPHALT TO BE REMOVED.
AutoCAD SHX Text
AutoCAD SHX Text PORTION OF EXISTING METAL GRATE TO BE REMOVED FOR INSTALLATION OF NEW FORKLIFT RAMP. APPROX. 10'
AutoCAD SHX Text
RENOVATION NOTES
AutoCAD SHX Text
AutoCAD SHX Text NEW CONCRETE RAMP. SEE DETAILS. REPAIR ANY ASPHALT DAMAGED DURING DEMOLITION/CONSTRUCTION.
AutoCAD SHX Text
AutoCAD SHX Text 5'
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 10'
AutoCAD SHX Text A2
AutoCAD SHX Text
EXISTING FORKLIFT RAMP TO REMAIN
EXISTING RAMP TO REMAIN
NEW RAMP LONGITUDINAL SECTION1
NEW RAMP TRANSVERSE SECTION2
AutoCAD SHX Text
#6 BARS @ 12"O.C. T&B
AutoCAD SHX Text
#4 BARS @ 12"O.C. T&B
AutoCAD SHX Text
EXISTING ASPHALT. REMOVE ASPHALT AS REQUIRED FOR CONC INSTALLATION
AutoCAD SHX Text
EXISTING CONC. GUTTER
AutoCAD SHX Text
12" EXPANSION JOINT W/ SELF LEVELING COUNPOUND
AutoCAD SHX Text
4" X " DIA. DOWELS. 58" DIA. DOWELS. EMBED 2" INTO EXIST CONC.
AutoCAD SHX Text
EXISTING LOADING DOCK
AutoCAD SHX Text
8" THICK CONCRETE RAMP 3500 PSI CONCRETE AT 28 DAYS
AutoCAD SHX Text 8"
AutoCAD SHX Text 10'-0"
AutoCAD SHX Text
PROVIDE 1" CHAMFER ON OPEN EDGE
AutoCAD SHX Text
#4 BARS @ 12"O.C. T&B
AutoCAD SHX Text
8" THICK CONCRETE RAMP 3500 PSI CONCRETE AT 28 DAYS
AutoCAD SHX Text
#6 BARS @ 12"O.C. T&B
AutoCAD SHX Text
EXISTING RAMP
AutoCAD SHX Text
4" X " DIA. DOWELS. 58" DIA. DOWELS. EMBED 2" INTO EXIST CONC.
AutoCAD SHX Text
12" EXPANSION JOINT W/ SELF LEVELING COUNPOUND
AutoCAD SHX Text
FORKLIFT RAMP REPAIR BLDG 1101
AutoCAD SHX Text
PROJECT # 25M052CN
AutoCAD SHX Text
CONTRACT # 25-0425
AutoCAD SHX Text
DWG: MARK RAMSDELL
AutoCAD SHX Text
USMC CAMP LEJEUNE
AutoCAD SHX Text
SHEET OF OF OF
AutoCAD SHX Text
BLDG 1101
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text A3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3/4" = 1'-0"
AutoCAD SHX Text A3
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3/4" = 1'-0"
AutoCAD SHX Text A3
Ramp 1. New concrete shall be a minimum 8-inch deep, New concrete shall be a minimum 8-inch deep, 3500-psi fibrillated fiber reinforced concrete. Height, length and width as shown on plans. 1.1. Fibrillated fiber reinforced concrete shall be a Fibrillated fiber reinforced concrete shall be a minimum of 3500-psi with a maximum 4-inch slump. 1.1.1. The water -cement ratio shall not exceed The water -cement ratio shall not exceed the manufacturer's recommendations. The contractor shall provide a batch ticket to the contracting officer, stating the cement water ratio needed for a 4-inch slump and the amount of water added by the receiver. 1.1.2. Fibrillated fiber reinforcement shall have a Fibrillated fiber reinforcement shall have a minimum ratio of 1-1/2 lbs per yard. 2. Expansion joints consisting of 1/2" compressible Expansion joints consisting of 1/2" compressible material should be placed wherever the new ramp abuts another rigid structure. 3. Surfaces shall have a broom finish. The only means Surfaces shall have a broom finish. The only means a contractor shall add water to the surface of the concrete for finishing is with fog spray or wet burlap. 4. Mechanically cut relief joint no further then 1.5 Mechanically cut relief joint no further then 1.5 times the sidewalk width. 4.1. Relief joints shall be mechanically cut to into Relief joints shall be mechanically cut to into the concrete within 24 hours of the concrete being poured. 4.2. Saw cut relief joints to a minimum depth of Saw cut relief joints to a minimum depth of a ¼- inch for every 1-inch thickness of concrete poured. 5. All debris shall be removed from the work site on All debris shall be removed from the work site on a daily basis. 6. Concrete shall be replaced within 72 hours of Concrete shall be replaced within 72 hours of removal, weather permitting. 7. Forms shall be removed and the ground backfilled, Forms shall be removed and the ground backfilled, with top soil, around sidewalks to prevent tripping hazards. SUBMITTALS: : 1. The contractor shall provide a written report The contractor shall provide a written report detailing the composition of the concrete mix before commencement of work. 2. The contractor shall provide a copy of the batch The contractor shall provide a copy of the batch ticket to the contracting officer upon completion of the pour for verification of the composition of the delivered mix.
| Sheets and Views |
| 1101 Warehouse Ramp-Title Page |
| 1101 Warehouse Ramp-A1 |
| 1101 Warehouse Ramp-A2 |
| 1101 Warehouse Ramp-A3 |
File details come from the government source that posted it. Updated .