This document is a Statement of Work (SOW) for the repair of a forklift ramp at Building 1101 located at Camp Lejeune, North Carolina. The project involves demolishing a portion of the existing asphalt and metal gate, and constructing a new concrete forklift ramp approximately 10 feet long. The new concrete shall be a minimum 8-inches deep, 3500-psi fiber-reinforced concrete with specific requirements for installation, including use of fiber reinforcement, expansion joints, and precise finishing techniques.

The project requires detailed submittal of concrete mix composition, batch tickets, and adherence to specific construction standards. Key technical specifications include using 1-1/2 inch compressible expansion joints, mechanically cut relief joints, precise concrete placement and curing procedures, and complete site cleanup. The work is part of a Naval Facilities Engineering Command project limited to pre-approved MACC (Multiple Award Construction Contract) contractors for the Camp Lejeune area of responsibility, with the solicitation number N4008525R9014.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S1144

S1007

S1017

BIRCH ST

ASH ST

GIBB RD

CENTER RD

CAMP LEJEUNE, N.C.

LOCATION MAP DRAWING INDEXAREA MAP

25-0425

REPAIR FORKLIFT RAMP

BLDG 1101LOCATION

MAP

AREA MAP

VICINITY MAP

BLDG

AutoCAD SHX Text %%uJACKSONVILLE

AutoCAD SHX Text

NORTHEAST CREEK

AutoCAD SHX Text A T L A N T I C O C E A N

AutoCAD SHX Text N E W R I V E R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LEJEUNE BLVD

AutoCAD SHX Text

TO WILMINGTON

AutoCAD SHX Text

VERONA LOOP ROAD

AutoCAD SHX Text

PADGETT RD

AutoCAD SHX Text

HAWS RUN RD

AutoCAD SHX Text

DAWSON CABIN RD

AutoCAD SHX Text

HIGH HILL RD

AutoCAD SHX Text

COSTON RD

AutoCAD SHX Text

CHATEAU RD

AutoCAD SHX Text

CC RD

AutoCAD SHX Text

SHEPARD

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW RIVER INLET RD

AutoCAD SHX Text

RANGE RD

AutoCAD SHX Text

DIXON-SNEADS FERRY RD

AutoCAD SHX Text

OCEAN DRIVE

AutoCAD SHX Text

BEACH RD

AutoCAD SHX Text

MARINES RD

AutoCAD SHX Text

LYMAN RD

AutoCAD SHX Text

OLD BEAR CREEK RD

AutoCAD SHX Text

PINEY GREEN RD

AutoCAD SHX Text

HOLCOMB BLVD

AutoCAD SHX Text

BREWSTER BLVD

AutoCAD SHX Text

CURTIS

AutoCAD SHX Text

STONE ST

AutoCAD SHX Text

STONE BAY

AutoCAD SHX Text

FRENCH

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

MAIN SERVICE RD

AutoCAD SHX Text

INTRACOASTAL WATERWAY

AutoCAD SHX Text %%uNEW RIVER INLET

AutoCAD SHX Text

MEANS HIGH WATER +1.50

AutoCAD SHX Text

MEANS SEA LEVEL 0.00

AutoCAD SHX Text

MEANS LOW WATER -1.50

AutoCAD SHX Text %%uSNEADS FERRY

AutoCAD SHX Text

MEANS HIGH WATER +1.10

AutoCAD SHX Text

MEANS SEA LEVEL 0.00

AutoCAD SHX Text

MEANS LOW WATER +0.35

AutoCAD SHX Text

MEANS LOW WATER +0.50

AutoCAD SHX Text

MEANS SEA LEVEL 0.00

AutoCAD SHX Text

MEANS HIGH WATER +1.00

AutoCAD SHX Text %%uTOWN POINT

AutoCAD SHX Text

LEJEUNE RAILROAD

AutoCAD SHX Text

CAMP

AutoCAD SHX Text

SNEADS FERRY RD

AutoCAD SHX Text

SETH

AutoCAD SHX Text

WALLACE

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

SOUTHWEST CREEK

AutoCAD SHX Text

WILSON

AutoCAD SHX Text

BAY

AutoCAD SHX Text

TRAPS

AutoCAD SHX Text

BAY

AutoCAD SHX Text

CHADWICK

AutoCAD SHX Text

BAY

AutoCAD SHX Text

HOWARD BAY

AutoCAD SHX Text

COURTHOUSE

AutoCAD SHX Text

BAY

AutoCAD SHX Text

ELLIS

AutoCAD SHX Text

COVE

AutoCAD SHX Text

TO

AutoCAD SHX Text

MOREHEAD CITY

AutoCAD SHX Text

BEAR

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

BEAR

AutoCAD SHX Text

INLET

AutoCAD SHX Text

STONE

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

MILL

AutoCAD SHX Text

STONE CREEK

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

MUDDY

AutoCAD SHX Text

MILL CREEK

AutoCAD SHX Text

TOWN

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

LEWIS

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

WHITE

AutoCAD SHX Text

HURST

AutoCAD SHX Text

CR.

AutoCAD SHX Text

SNEADS

AutoCAD SHX Text

FERRY

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

TARAWA

AutoCAD SHX Text

TERRACE

AutoCAD SHX Text

KNOX

AutoCAD SHX Text

TR. PARK

AutoCAD SHX Text

MONTFORD

AutoCAD SHX Text

LANDING RD

AutoCAD SHX Text

MIDWAY

AutoCAD SHX Text

PARK

AutoCAD SHX Text

NAVAL

AutoCAD SHX Text

HOSPITAL

AutoCAD SHX Text

FRENCH

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

AREA

AutoCAD SHX Text

MAGAZINE

AutoCAD SHX Text

AREA

AutoCAD SHX Text

HADNOT

AutoCAD SHX Text

POINT

AutoCAD SHX Text

AREA

AutoCAD SHX Text

INDUSTRIAL

AutoCAD SHX Text

AREA

AutoCAD SHX Text

PARADISE

AutoCAD SHX Text

POINT

AutoCAD SHX Text

AREA

AutoCAD SHX Text

RIFLE

AutoCAD SHX Text

RANGE

AutoCAD SHX Text

AMPHIBIAN

AutoCAD SHX Text

BASE

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

AREA

AutoCAD SHX Text

TRIANGLE

AutoCAD SHX Text

OUTPOST

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

AREA

AutoCAD SHX Text

BERKELEY

AutoCAD SHX Text

MANOR

AutoCAD SHX Text

WATKINS

AutoCAD SHX Text

VILLAGE

AutoCAD SHX Text

CAMP

AutoCAD SHX Text

GEIGER

AutoCAD SHX Text

NEW RIVER

AutoCAD SHX Text

AIR STATION

AutoCAD SHX Text

CAMP

AutoCAD SHX Text

GEIGER

AutoCAD SHX Text

BROWNS

AutoCAD SHX Text

INLET

AutoCAD SHX Text

EVERETT CREEK

AutoCAD SHX Text

WILLI

AutoCAD SHX Text

AMS

AutoCAD SHX Text

BLVD

AutoCAD SHX Text

GOLF

AutoCAD SHX Text

COURSE

AutoCAD SHX Text

SWAMP

AutoCAD SHX Text

BELL

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 12000

AutoCAD SHX Text

AutoCAD SHX Text 24000

AutoCAD SHX Text

AutoCAD SHX Text

CREEK

AutoCAD SHX Text

FREEMAN

AutoCAD SHX Text

MILL RUN

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

BRINSON CREEK

AutoCAD SHX Text

HOPE ROAD

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

DUCK CREEK

AutoCAD SHX Text

GREATER SANDY RUN AREA

AutoCAD SHX Text

MAIN

AutoCAD SHX Text

GATE

AutoCAD SHX Text

MONTFORD

AutoCAD SHX Text

POINT

AutoCAD SHX Text

AREA

AutoCAD SHX Text

PAVILION

AutoCAD SHX Text

MARINA

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

PHEONIX

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

FLAMINGO

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

TURKEY

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

OWL

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

LHA

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

ORIOLE

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

SANDPIPER

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

EGRET

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

CANARY

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

DOVE

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

PLOVER

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

HERON

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

HAWK

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

DODO

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

GOOSE

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

FALCON

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

OSPREY

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

QUAIL

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

ALBATROSS

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

BLUEBIRD

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

JAYBIRD

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

CRANE

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

GULL

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

PENGUIN

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

LARK

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

PIGEON

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

TERN

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

COOT

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

SWAN

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

WOODPECKER

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

ROBIN

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

SPARROW

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

MALLARD

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

KIWI

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

EAGLE

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

PARROT

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

CONDOR

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

CARDINAL

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

PARTRIDGE

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text Z

AutoCAD SHX Text

SNIPE

AutoCAD SHX Text

LANDFILL

AutoCAD SHX Text

ROICC OFFICE BLDG 1005

AutoCAD SHX Text

DRMO

AutoCAD SHX Text

FRENCH CREEK BORROW PIT

AutoCAD SHX Text Richlands

AutoCAD SHX Text

US 17

AutoCAD SHX Text Beulaville

AutoCAD SHX Text Burgaw

AutoCAD SHX Text Words Corner

AutoCAD SHX Text Bolton

AutoCAD SHX Text

US 7

AutoCAD SHX Text

AutoCAD SHX Text 4 &

AutoCAD SHX Text Acme

AutoCAD SHX Text Delco

AutoCAD SHX Text Leland

AutoCAD SHX Text Warsaw

AutoCAD SHX Text Magnolia

AutoCAD SHX Text Rosehill

AutoCAD SHX Text

US 117

AutoCAD SHX Text

US 421

AutoCAD SHX Text Wallace

AutoCAD SHX Text %%uCAMP LEJUENE

AutoCAD SHX Text Swansboro

AutoCAD SHX Text Hampstead

AutoCAD SHX Text Wilmington

AutoCAD SHX Text Scott Hill

AutoCAD SHX Text

US 17

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text Holly Ridge

AutoCAD SHX Text

NEW RIVER

AutoCAD SHX Text Folkstone

AutoCAD SHX Text Dixon

AutoCAD SHX Text Jacksonville

AutoCAD SHX Text Verona

AutoCAD SHX Text

AutoCAD SHX Text

GRAPHIC SCALE IN MILES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Morehead City

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text Pink

AutoCAD SHX Text Hill

AutoCAD SHX Text Mt. Olive

AutoCAD SHX Text Seven

AutoCAD SHX Text Springs

AutoCAD SHX Text Goldsboro

AutoCAD SHX Text

US 70

AutoCAD SHX Text New Bern

AutoCAD SHX Text Havelock

AutoCAD SHX Text

NEUSE

AutoCAD SHX Text Tuscarora

AutoCAD SHX Text Trenton

AutoCAD SHX Text Comfort

AutoCAD SHX Text Kinston

AutoCAD SHX Text Dover

AutoCAD SHX Text

%%UOAK GROVE

AutoCAD SHX Text Pollacksville

AutoCAD SHX Text Maysville

AutoCAD SHX Text

%%UCHERRY POINT

AutoCAD SHX Text

US 70

AutoCAD SHX Text

RIVER

AutoCAD SHX Text Otway

AutoCAD SHX Text Beaufort

AutoCAD SHX Text

FORKLIFT RAMP REPAIR BLDG 1101

AutoCAD SHX Text

PROJECT # 25M052CN

AutoCAD SHX Text

CONTRACT # 25-0425

AutoCAD SHX Text

DWG: MARK RAMSDELL

AutoCAD SHX Text

USMC CAMP LEJEUNE

AutoCAD SHX Text

SHEET OF OF OF

AutoCAD SHX Text

BLDG 1101

AutoCAD SHX Text

TITLE PAGE

AutoCAD SHX Text T1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text

SHEET NAME

AutoCAD SHX Text T-1

AutoCAD SHX Text

TITLE SHEET, AREA MAPS

AutoCAD SHX Text A1

AutoCAD SHX Text

NOTES/OVERALL PLAN

AutoCAD SHX Text A2

AutoCAD SHX Text

RAMP PLANS

AutoCAD SHX Text A3

AutoCAD SHX Text

DETAILS; NOTES

AREA OF WORK.

SEE A2

1101 OVERALL PLAN1

NOT TO SCALE

AutoCAD SHX Text

FORKLIFT RAMP REPAIR BLDG 1101

AutoCAD SHX Text

PROJECT # 25M052CN

AutoCAD SHX Text

CONTRACT # 25-0425

AutoCAD SHX Text

DWG: MARK RAMSDELL

AutoCAD SHX Text

USMC CAMP LEJEUNE

AutoCAD SHX Text

SHEET OF OF OF

AutoCAD SHX Text

BLDG 1101

AutoCAD SHX Text

NOTES/OVERALL PLAN

AutoCAD SHX Text A1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1005 OFFICE REPAIRS SCOPE OF WORK: The contractor shall provide all material, labor, equipment and supervision required to accomplish The contractor shall provide all material, labor, equipment and supervision required to accomplish the following. GENERAL DESCRIPTION: This scope of work is to be accomplished at Building 1101 located on Gibb Rd. aboard, Camp This scope of work is to be accomplished at Building 1101 located on Gibb Rd. aboard, Camp Lejeune, North Carolina. The work includes installation of new concrete forklift ramp for the tenants of bldg 1101. DETAILED REQUIREMENTS AND SPECIFICATIONS: The contractor shall take his own field measurements in determining : The contractor shall take his own field measurements in determining required materials and costs for the following. SPECIAL SCHEDULING AND ACCESS: Access and scheduling to the work area shall be arranged through Contracting Access and scheduling to the work area shall be arranged through Contracting Officer"s Representative for the OICC office and the tenant of the building. Point of Contact for access to building is Mark Ramsdell 910-451-0483. NOTES: 1. The measurements and quantities furnished here are for reference only. The contractor is responsible for The measurements and quantities furnished here are for reference only. The contractor is responsible for actual field verification prior to bidding, ordering material and during every step of construction for existing surfaces, dimensions and conditions. 2. Repair, refinish of areas damaged or disturbed by new work to be provided under this contract. Repair, refinish of areas damaged or disturbed by new work to be provided under this contract. 3. Properly remove, haul, and dispose of all debris. The Base Landfill may be utilized. The contractor shall not Properly remove, haul, and dispose of all debris. The Base Landfill may be utilized. The contractor shall not utilize the dumpster provided by Camp Lejeune for the occupants of the buildings. The hours of operations The hours of operations are 0730-1530 Monday- Thursday and 0730-1430 on Friday. delivery of acceptable materials (identified above) shall be by appointment only. Appointment made by phone at 1-910-457-5011 or 1-910-451-2946. 4. The Contracting officer will register the contract via E-mail, with the base landfill. All haul vehicles will The Contracting officer will register the contract via E-mail, with the base landfill. All haul vehicles will maintain a secure vehicle placed as a condition to utilize the scale. E-mail the contractors information to the Landfill Clerk, include the name on the Prime contractor, contract number, job name / description, completion date and whether or not any above material will be delivered to the Landfill. 5. Prior to performing "HOT WORK" (welding, cutting, ect.) or operating other flame -producing spark producing Prior to performing "HOT WORK" (welding, cutting, ect.) or operating other flame -producing spark producing devices, a written permit shall be requested from the Fire Division. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. The contractor will provide at least two (2) twenty (20) pound 4A:20 BC rated extinguishers for normal "HOT WORK". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "HOT WORK" done at this activity. The Fire watch shall be trained in accordance with NFPA 51B and remain on site for a minimum of thirty (30) minutes after work is completed. 6. Contractor is to be aware of all rules, regulation and codes required for successful completion of project.Contractor is to be aware of all rules, regulation and codes required for successful completion of project.

AutoCAD SHX Text SUBMITTALS: 1. AFTER AWARD: The Contractor shall furnish the DSC-EMI, material, specifications for selection and AFTER AWARD: The Contractor shall furnish the DSC-EMI, material, specifications for selection and approval prior to the ordering and installation of said materials. 2. The contractor is required to submit a schedule detailing when they and or any subcontractor will The contractor is required to submit a schedule detailing when they and or any subcontractor will be working. The schedule must be approved by Government before beginning work. 3. The contractor shall submit the manufacture's product specifications, complete with technical The contractor shall submit the manufacture's product specifications, complete with technical products data for all of the material being used in this process. The product specification shall as a minimum, provide the technical details on the following items. 4. Submit: Submit: A. SHOP DRAWINGS. SHOP DRAWINGS. B. INSTALLATION DRAWINGS /shop drawings INSTALLATION DRAWINGS /shop drawings C. PRODUCT DATA PRODUCT DATA C.A. Manufactures technical data Sheet Manufactures technical data Sheet C.B. Material Safety Data Sheets (MADA) Material Safety Data Sheets (MADA) C.C. Maintenance Data Maintenance Data D. WARRANTY ( 10 year Commercial Limited Warranty) WARRANTY ( 10 year Commercial Limited Warranty) 6. Qualifications: Qualifications: 6.1. Fabricator Qualifications: Minimum of three years documented experience in construction similar in Fabricator Qualifications: Minimum of three years documented experience in construction similar in scope and complexity to this Project. Currently certified by the manufacturer as acceptable fabricator. 6.2. Installer Qualification: Minimum of three years documented installation experience for project Installer Qualification: Minimum of three years documented installation experience for project similar in scope and complexity to this project and currently certified by manufacturer as an acceptable installer.

A1

NEW FORKLIFT RAMP RENO PLAN2

DEMOLITION NOTES

NEW FORKLIFT RAMP DEMO PLAN1

A3

A3

AutoCAD SHX Text

FORKLIFT RAMP REPAIR BLDG 1101

AutoCAD SHX Text

PROJECT # 25M052CN

AutoCAD SHX Text

CONTRACT # 25-0425

AutoCAD SHX Text

DWG: MARK RAMSDELL

AutoCAD SHX Text

USMC CAMP LEJEUNE

AutoCAD SHX Text

SHEET OF OF OF

AutoCAD SHX Text

BLDG 1101

AutoCAD SHX Text

RAMP PLANS

AutoCAD SHX Text A2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5'

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text 10'

AutoCAD SHX Text A2

AutoCAD SHX Text

AREA OF EXISTING ASPHALT TO BE REMOVED.

AutoCAD SHX Text

AutoCAD SHX Text PORTION OF EXISTING METAL GRATE TO BE REMOVED FOR INSTALLATION OF NEW FORKLIFT RAMP. APPROX. 10'

AutoCAD SHX Text

RENOVATION NOTES

AutoCAD SHX Text

AutoCAD SHX Text NEW CONCRETE RAMP. SEE DETAILS. REPAIR ANY ASPHALT DAMAGED DURING DEMOLITION/CONSTRUCTION.

AutoCAD SHX Text

AutoCAD SHX Text 5'

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text 10'

AutoCAD SHX Text A2

AutoCAD SHX Text

EXISTING FORKLIFT RAMP TO REMAIN

EXISTING RAMP TO REMAIN

NEW RAMP LONGITUDINAL SECTION1

NEW RAMP TRANSVERSE SECTION2

AutoCAD SHX Text

#6 BARS @ 12"O.C. T&B

AutoCAD SHX Text

#4 BARS @ 12"O.C. T&B

AutoCAD SHX Text

EXISTING ASPHALT. REMOVE ASPHALT AS REQUIRED FOR CONC INSTALLATION

AutoCAD SHX Text

EXISTING CONC. GUTTER

AutoCAD SHX Text

12" EXPANSION JOINT W/ SELF LEVELING COUNPOUND

AutoCAD SHX Text

4" X " DIA. DOWELS. 58" DIA. DOWELS. EMBED 2" INTO EXIST CONC.

AutoCAD SHX Text

EXISTING LOADING DOCK

AutoCAD SHX Text

8" THICK CONCRETE RAMP 3500 PSI CONCRETE AT 28 DAYS

AutoCAD SHX Text 8"

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text

PROVIDE 1" CHAMFER ON OPEN EDGE

AutoCAD SHX Text

#4 BARS @ 12"O.C. T&B

AutoCAD SHX Text

8" THICK CONCRETE RAMP 3500 PSI CONCRETE AT 28 DAYS

AutoCAD SHX Text

#6 BARS @ 12"O.C. T&B

AutoCAD SHX Text

EXISTING RAMP

AutoCAD SHX Text

4" X " DIA. DOWELS. 58" DIA. DOWELS. EMBED 2" INTO EXIST CONC.

AutoCAD SHX Text

12" EXPANSION JOINT W/ SELF LEVELING COUNPOUND

AutoCAD SHX Text

FORKLIFT RAMP REPAIR BLDG 1101

AutoCAD SHX Text

PROJECT # 25M052CN

AutoCAD SHX Text

CONTRACT # 25-0425

AutoCAD SHX Text

DWG: MARK RAMSDELL

AutoCAD SHX Text

USMC CAMP LEJEUNE

AutoCAD SHX Text

SHEET OF OF OF

AutoCAD SHX Text

BLDG 1101

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text A3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1'

AutoCAD SHX Text 2'

AutoCAD SHX Text 3'

AutoCAD SHX Text 3/4" = 1'-0"

AutoCAD SHX Text A3

AutoCAD SHX Text

AutoCAD SHX Text 1'

AutoCAD SHX Text 2'

AutoCAD SHX Text 3'

AutoCAD SHX Text 3/4" = 1'-0"

AutoCAD SHX Text A3

Ramp 1. New concrete shall be a minimum 8-inch deep, New concrete shall be a minimum 8-inch deep, 3500-psi fibrillated fiber reinforced concrete. Height, length and width as shown on plans. 1.1. Fibrillated fiber reinforced concrete shall be a Fibrillated fiber reinforced concrete shall be a minimum of 3500-psi with a maximum 4-inch slump. 1.1.1. The water -cement ratio shall not exceed The water -cement ratio shall not exceed the manufacturer's recommendations. The contractor shall provide a batch ticket to the contracting officer, stating the cement water ratio needed for a 4-inch slump and the amount of water added by the receiver. 1.1.2. Fibrillated fiber reinforcement shall have a Fibrillated fiber reinforcement shall have a minimum ratio of 1-1/2 lbs per yard. 2. Expansion joints consisting of 1/2" compressible Expansion joints consisting of 1/2" compressible material should be placed wherever the new ramp abuts another rigid structure. 3. Surfaces shall have a broom finish. The only means Surfaces shall have a broom finish. The only means a contractor shall add water to the surface of the concrete for finishing is with fog spray or wet burlap. 4. Mechanically cut relief joint no further then 1.5 Mechanically cut relief joint no further then 1.5 times the sidewalk width. 4.1. Relief joints shall be mechanically cut to into Relief joints shall be mechanically cut to into the concrete within 24 hours of the concrete being poured. 4.2. Saw cut relief joints to a minimum depth of Saw cut relief joints to a minimum depth of a ¼- inch for every 1-inch thickness of concrete poured. 5. All debris shall be removed from the work site on All debris shall be removed from the work site on a daily basis. 6. Concrete shall be replaced within 72 hours of Concrete shall be replaced within 72 hours of removal, weather permitting. 7. Forms shall be removed and the ground backfilled, Forms shall be removed and the ground backfilled, with top soil, around sidewalks to prevent tripping hazards. SUBMITTALS: : 1. The contractor shall provide a written report The contractor shall provide a written report detailing the composition of the concrete mix before commencement of work. 2. The contractor shall provide a copy of the batch The contractor shall provide a copy of the batch ticket to the contracting officer upon completion of the pour for verification of the composition of the delivered mix.

Sheets and Views
1101 Warehouse Ramp-Title Page
1101 Warehouse Ramp-A1
1101 Warehouse Ramp-A2
1101 Warehouse Ramp-A3