25-01755 Reqs and Specs Flow cryostats.pdf
PDF 174 KB Posted
- Attached to
- NIST - Custom UHV Flow Cryostats
- Solicitation number
- NB688000-25-01755_Custom_UHV_Flow_Cryostats
About this file
This Requirements/Specifications document details NIST's request for custom ultra-high-vacuum (UHV) flow cryostats for quantum computing, quantum simulation, and optical clock experiments. The Ion Storage Group requires three custom flow cryostats compatible with a ColdEdge Stinger recirculating helium gas closed-cycle cooling system, designed to reduce base temperature and increase radiation shield cooling power for existing experimental apparatus.
Key specifications include full UHV compatibility with all in-vacuum materials meeting UHV service requirements. The solicitation requires turnkey installation with start-up services, software and electronic manuals, and delivery/installation to be completed within 18 weeks after receipt of order. Planned government acceptance testing will take 7 business days, and no specific training or maintenance requirements are outlined. The document indicates standard shipping and no additional warranty beyond the base manufacturer warranty.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-01755 Detailed Specs Flow cryostats.pdf | ||
| Sources Sought Notice Cryostat.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
Requirements / Specifications: Custom UHV flow cryostats 1 Version 1.0 (2019) Double-click on for further assistance.
Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Custom UHV flow cryostats Requesting Lab/Division/Group: PML 688.10
General Statement of Need The Ion Storage Group at NIST performs a variety of quantum computing, quantum simulation, and optical clock experiments using trapped ions. Many of these experiments rely on the use of cryogenically cooled apparatus to achieve NIST’s scientific goals. The base temperature and cooling power of these cryogenic apparatus are key specifications to enable specific classes of experiments. We require custom flow cryostats to reduce the base temperature and increase the radiation shield cooling power of several existing experimental apparatus using a liquid-cryogen-free closed-cycle recirculating helium gas cooling system. The flow cryostats must be fully ultra-high-vacuum (UHV) compatible, with all in-vacuum materials and construction meeting requirements for UHV service.
Items and/or Ancillary Services
Item 1: Custom flow cryostats for use with ColdEdge Stinger recirculating helium gas closed-cycle cryogenic cooling system Quantity: 3 Specifications: See attachment for detailed specifications. All list specifications must be met to satisfy the need.
Separately Priced Options and Services:
Item 2: [List minimum specifications.
Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]
[List any other item(s) or service requirements here using the same format above.]
Service Requirements / Item Specifications
Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]
Shipping & Delivery ☐ N/A
Standard shipping Shipping criteria:
☐ Partial delivery acceptable
Requirements / Specifications: Custom UHV flow cryostats 2
☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:
☒ Delivery of goods, installation, and training shall be completed no later than:
18 weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]
Electronic Media ☐ N/A
[Enter electronic media requirements by item here.] ☒ Software ☒ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]
Installation ☐ N/A
[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☒ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☒ N/A
No utility or facility requirements.
☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]
Requirements / Specifications: Custom UHV flow cryostats 3
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]
Training ☒ N/A
No training requirements ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:
☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.
Inspection and Acceptance ☐ N/A
[Enter inspection requirements per item here] ☒ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]
Maintenance ☒ N/A none Period Length: [Ex. month, 6 month, year etc.] What is included?
☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment ☒ N/A none ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here]
Requirements / Specifications: Custom UHV flow cryostats 4
☐ Other: [Enter other details here] Travel ☒ N/A none ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Provide suggestions to improve this form by clicking here.
https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx
| Use this document to detail specifications/requirements for an item and/or ancillary services. |
| TITLE: Custom UHV flow cryostats |
| Requesting Lab/Division/Group: PML 688.10 |
| General Statement of Need |
| Provide suggestions to improve this form by clicking here. |
File details come from the government source that posted it. Updated .