25-015 Pellston Public Schools Roof Plan Sealed 250409.pdf

PDF 2 MB Posted

Attached to
2025 PELLSTON PUBLIC SCHOOLS ROOF REPLACEMENT PROJECTS
Solicitation number
RFP-PELL-250000002090-2
Issued by
Emmet County, Michigan

About this file

This document is a roof renovation project plan for Pellston Public Schools located at 172 Park St, Pellston, MI 49769, prepared by Sedgewick Architects. The plan details roof replacement work for multiple school buildings, specifically an Elementary School and a Middle/High School, with approximately 56,815 total square feet of roofing areas. The project involves installing new PVC and shingle roof systems across five distinct areas, with varying roof slopes (3/12 and 4/12), and includes additional improvements such as ice and water membrane installation at eaves, valleys, and rake edges. The roof plan also specifies new siding installation, with approximately 65,550 total square feet of work, including 1,400 square feet of pre-finished 24 GA metal siding on one wall.

The project includes technical specifications for roofing materials and accessories, such as custom corner trims, sill finishing, and J-panel installations. The architectural drawing (Sheet A2.3) is dated 04/01/2025, with the most recent revision on 4/9/2025, suggesting an imminent construction timeline. While specific pricing and bidding details are not explicitly shown in this drawing, the comprehensive roof plan indicates a substantial renovation project for the school district, likely funded through local educational infrastructure budgets or potential state/federal educational facility improvement grants.

View the file

Other files

File Type Posted
2025 Roof RFP 4.9.25 (3).pdf PDF
2025 Roof RFP 4.9.25 (2).pdf PDF
2025 Roof Bid Ad Document (1).pdf PDF
2025 Roof Bid Ad Document.pdf PDF
2025 Roof RFP 4.9.25 (1).pdf PDF
2025 Roof RFP 4.9.25.pdf PDF
2025 Roof Bid Ad Document (2).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROX. 56,815 TOTAL SF * ALL DIMENSIONS, SQUARE FOOTAGES, AND

ROOF SLOPES APPROXIMATE; VERIFY IN FIELD

NEW PVC ROOF SYSTEM

'-7

'-3

99'-2"

101'-3"

10560 SF

3/12

4165 SF

4/12

24370 SF

4/12

17720 SF

4/12

NEW SHINGLE ROOF SYSTEM

NEW SHINGLE ROOF SYSTEM

NEW SHINGLE

ROOF SYSTEM

GENERAL NOTES FOR ELEMENTARY

9' ROW OF ICE AND WATER

MEMBRANE AT ALL EAVES

9' ROW OF ICE AND WATER

MEMBRANE AT ALL VALLEYS

3' ROW OF ICE AND WATER

MEMBRANE AT ALL RAKE EDGES

84'-2"

547'-6"

173'-8" 126'-2"

'-4

'-4

NIC

AREA 1

9555 SF

AREA 2

16350 SF

AREA 3

14885 SF

AREA 4

6270 SF

AREA 5

16020 SF

2090 SF 250 SF

130 SF

N E

W S

ID

IN

G

APPROX. 65,550 TOTAL SF * ALL DIMENSIONS AND SQUARE

FOOTAGES APPROXIMATE; VERIFY

IN FIELD

ADD METAL CORNER TRIM OVER BRICK - SEE DETAIL

NEW PRE FINISHED 24 GA METAL SIDING 1,400 SQ FT ONE

WALL AT 116' X 12' ON METAL FURRING FLASH TO ROOF OVER

BRICK STANDARD COLOR TO BE PICKED BY OWNER

SCALE

DATE

PROJECT NUMBER

S E

D G

E W

IC

K

A

R C

H

IT

E C

T S

SHEET NUMBER

A R

C H

IT

E

C T

SEAL OF ARCHITECT

E a s t C o u rt

S tr e e t F lin t, M I

-2

-9 w w w

.s fa rc h .u s

G o o d c lie n ts

G re a t a rc h it e c tu re

R E V I S I O N S

DRAWN BY:

CHECKED BY:

G o o d d e s ig n

F

E R

W E

D A

P ro je c t

D ra w in g

1/32" = 1'-0"

/9

/2

:4 :5

A

M

A2.3

04/01/2025

25-015

TAG

JSF

R o o f

P la n

P el ls to n S ch o o ls

R o o f

R en o va ti o n s

P ar k S t, P el ls to n

, M I 4

Date Description

1/32" = 1'-0"A2.3

Elementary School Roof Plan1

1/32" = 1'-0"A2.3

Middle/High School Roof Plan21 1/2"

3"

130 LN FT

SILL FINISHING CORNER TRIM

12"

12"

100 LN FT

CUSTOM J PANEL

6"

2'

3"

100 LN FT

SIG 200 FINISH

4/9/2025

Sheets
A2.3 - Roof Plan

File details come from the government source that posted it. Updated .