25-0077 MARSOC Ceremonial Bell Tower - SUBMITTAL REGISTER.pdf

PDF 62 KB Posted

Attached to
MARSOC Ceremonial Bell Tower
Solicitation number
N40085-25-R-9022
Issued by

About this file

This document is a Submittal Register template for a federal construction contract, detailing various preconstruction, test report, certificate, and closeout submittals that the contractor must provide. The register covers multiple sections including Schedule of Prices, List of Contact Personnel, Construction Schedule, Equipment Delivery Schedule, Accident Prevention Plan (APP), Activity Hazard Analysis (AHA), and various specialized submittals such as Crane Work Plans, Crane Operator Certifications, Environmental Protection Plans, and Quality Control Plans. Key submission categories include Preconstruction Submittals (SD-01), Product Data (SD-03), Test Reports (SD-06), Certificates (SD-07), and Closeout Submittals (SD-11), with specific requirements for items like backflow preventers, storm water discharge permits, traffic control plans, and third-party crane certifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO.

CONTRACTOR

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 20 00

1.3

01 30 00

1.4.1

01 31 50

1.2

01 32 16

1.2

1.3

01 33 00

1.4.1

1.6.1

01 35 29

1.9

1.10

1.9.1

1.9.1

1.7.1.4

1.14

1.14.1

1.14.3

1.14.4

1.14.5

1.11

Regulatory Citations and Violations

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

Crane Critical Lift Plan (If Applicable)

Crane Operators (If Applicable)

Reports

Accident Reports

Monthly Exposure Reports

(Enter Contract No. Here)

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP)

SD-01 PRECONSTRUCTION SUBMITTALS

Equipment Delivery Schedule

SD-01 PRECONSTRUCTION SUBMITTALS

SUBMITTAL REGISTER

P A R A G R A P H

N O

S P E C

S E C T

(d)

Contractor Action

DESCRIPTION

ITEM SUBMITTED

(Enter Contractor Name Here)

Crane Work Plan (If Applicable)

Activity Hazard Analysis (AHA)

SD-06 TEST REPORTS

SD-01 PRECONSTRUCTION SUBMITTALS

Submittal Register

Complete Submittal Package

TITLE AND LOCATION

(Enter Contract Title and Locaiton Here)

Schedule of Prices

List of Contact Personnel

Construction Schedule of Military Real Property (If Applicable)

A C T I V I T Y

N O

T R A N S M I T T A L

N O

Approving AuthorityContractor Schedule Dates

SD-11 CLOSEOUT SUBMITTALS

Interim DD1354, Transfer & Acceptance

SD-11 CLOSEOUT SUBMITTALS

Crane Reports

SD-07 CERTIFICATES

Confined Space Entry Permit

1.14.6

1.14.7

01 45 10

1.6

01 50 00

1.6.2.1

2.1

3.1

1.3

01 57 19

1.6.1

1.6.4

1.7.2

1.7

1.7

PAGE 1 OF _

Submittals 1.

Work schedule Product data

SD-03 PRODUCT DATA

Backflow Preventers (If Applicable)

Backflow Preventers Certificate (If Applicable)

SD-06 TEST REPORTS

SD-07 CERTIFICATES

SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE

MSDS for Class I ODS Waivered Product

SD-01 PRECONSTRUCTION SUBMITTALS

Permit for Storm Water Discharge (If applicab

Environmental Protection Plan

Preconstruction Survey

Notice of Intent (If applicable)

Backflow Tester Certification (If Applicable)

Backflow Preventer Tests (If Applicable)

SD-01 PRECONSTRUCTION SUBMITTALS

Traffic Control Plan (If Applicable)

Qaulity Control Plan (QC Plan)

Certificate of Compliance

Complete Submittal Package

Maufactures Name

Manufactures Warranty

Specifications

SD-11 CLOSEOUT SUBMITTALS

Concrete Ticket

Third Party Certification of Barge-

Mounted Movile Cranes